You are on page 1of 4

POWER SOLUTION INDUSTRIES

PSI-BP-05
Quality Management System Procedure Doc. #

Production Coordination, Galvanizing and Page 1 of 4


Page #
Delivery

REVISION HISTORY

Approval Details Prepared by Approved by Issued by

Date Issue No.


Production Controller General Manager MR QMS
30.07.2014 00

Issue Date Revision Description

00 30.07.2014 First Issue

Page 1 of 4

PDF Created with deskPDF PDF Creator X - Trial :: http://www.docudesk.com


POWER SOLUTION INDUSTRIES
PSI-BP-05
Quality Management System Procedure Doc. #

Production Coordination, Galvanizing and Page 2 of 4


Page #
Delivery

TABLE OF CONTENTS

1.0 Purpose ...................................................................................... 2

1.0 Purpose

The purpose of this procedure is to ensure that the production activities are planned
and manufactured to meet the customer requirements under controlled conditions.

2.0 Scope

This procedure covers the fabrication activities such as planning, material selection,
galvanizing, testing and delivery.

3.0 Responsibility & Authority

It is the responsibility of Production Controller to ensure that all activities are carried
out in compliance with this procedure. This procedure is authorized by the General
Manager and any changes thereof can be made with his approval only.

4.0 Reference

1. ISO 9001:2008 - 7.5.1 Production and Service Provision


2. Procedure for Production Control (PSI-BP-06)

5.0 Definitions/Abbreviations

QMS: Quality Management System


MR: Management Representative
PSI: Power Solution Industries

6.0 Procedural Steps

Page 2 of 4

PDF Created with deskPDF PDF Creator X - Trial :: http://www.docudesk.com


POWER SOLUTION INDUSTRIES
PSI-BP-05
Quality Management System Procedure Doc. #

Production Coordination, Galvanizing and Page 3 of 4


Page #
Delivery

6.1 Delivery Coordination

On receipt of work order, Production Controller identifies the priority based on the
commitment of sales department for delivery and details are provided to Production
Coordinator.

6.2 Galvanizing Control

Production Controller provides delivery schedule to the Galvanizing sub-contractors


where materials are sent for galvanizing. Materials are sent along with Sub-
contractor Transfer Note which is prepared as per the work order.

Production Controller makes regular visit to galvanizing companies and carry out
checks as per the requirements and details are recorded in the Sub-contractor
Monitoring Report. During Galvanizing, In-process inspection and testing are
carried out as per specification by the Galvanizing companies.

If any abnormal non-conformity is noticed, it should bring to the knowledge of


Galvanizing Company, and necessary corrective action to be carried out
immediately. Test report is obtained randomly from the Galvanizing companies.

6.3 Cleaning and Delivery

Production Controller ensures galvanized de-burs are removed and checked before
delivery. Production Coordinator prepares delivery note as per the customer
order/work order and arranges for delivery.

6.4 Pending Sales Order

Production controller obtains details from the system about pending order details
and follow up with the status based on production and galvanizing. Daily status is
monitored and updated.

7.0 Process Monitoring Method

Page 3 of 4

PDF Created with deskPDF PDF Creator X - Trial :: http://www.docudesk.com


POWER SOLUTION INDUSTRIES
PSI-BP-05
Quality Management System Procedure Doc. #

Production Coordination, Galvanizing and Page 4 of 4


Page #
Delivery

1. Delivery as per Plan

8.0 Process Measures

1. 90% Achievement as per Galvanizing plan

9.0 Document/Records Management

Sl Retention
Record Name Form No. Record Location
No period

Sub-contractor Monitoring Production


01 PSI-BP-05-F1 2 years
Report Controller

Sub-contractor Material Production


02 PSI-BP-09-F5 2 years
Transfer Note Controller

Galvanizing Test report Production


03 - 2 years
(Sub Contractor) Controller

Production
04 Delivery Note PSI-BP-09-F4 2 years
Controller

Pending Sales Order Production


05 PSI-BP-05-F2 2 years
Report Controller

Page 4 of 4