1.0 Purpose
The purpose of this procedure is to ensure that the production activities are planned
and manufactured to meet the customer requirements under controlled conditions.
2.0 Scope
This procedure covers the fabrication activities such as planning, material selection,
galvanizing, testing and delivery.
It is the responsibility of Production Controller to ensure that all activities are carried
out in compliance with this procedure. This procedure is authorized by the General
Manager and any changes thereof can be made with his approval only.
4.0 Reference
5.0 Definitions/Abbreviations
Page 2 of 4
On receipt of work order, Production Controller identifies the priority based on the
commitment of sales department for delivery and details are provided to Production
Coordinator.
Production Controller makes regular visit to galvanizing companies and carry out
checks as per the requirements and details are recorded in the Sub-contractor
Monitoring Report. During Galvanizing, In-process inspection and testing are
carried out as per specification by the Galvanizing companies.
Production Controller ensures galvanized de-burs are removed and checked before
delivery. Production Coordinator prepares delivery note as per the customer
order/work order and arranges for delivery.
Production controller obtains details from the system about pending order details
and follow up with the status based on production and galvanizing. Daily status is
monitored and updated.