You are on page 1of 19

1

BIT SINDRI

PRACTICAL TRAINING REPORT


SUDAMDIH INCLINE COLLIERY (B.C.C.L.)
DURATION OF TRAINING (03/06/2011-30/06/2011)

PREPARED BY

NAME: GULAM MOINUDDIN

ROLL NO.- 0908014

BRANCH: MINING ENGINEERING


2

I am greatly indebted to Dr. U. K. Dey (H. O. D. Mining Engg.)


who encouraged me to take practical training at Incline Mine ,Sudamdih
(BCCL) in SUDAMDIH. He give me precise knowledge about Mining
methods which I found very useful in my training period in Coal Mines.

I am also very grateful to Mr. B. Mahto (Colliery Manager),


Mr. P.N. Tiwary (Project officer), Mr. J.S.Jaiswal (Safety Officer ) &
Mr .D.K. Sinha(A.C.M) for their co-operation and suggestion during
training period.

Lastly I acknowledge my indebtedness to


all colliery employees to whom & was in touch during the training
period.
3

CONTENTS

TOPIC PAGE NO
(i) ACCESSIBILITY 4
(ii) MANAGEMENT 4
(iii) BOUNDARY 5
(iv) SURFACE FEATURE 5
(v) DRILLING AND BLASTING 6
(vi) HAULAGE DETAILS 7
(vii) TIME STUDY 8
(viii) LAMP HOUSE DETAILS 9
(ix) DETAILS OF UNUSED SEAM 10
(x) DETAILS OF SEAM UNDER WORKING 12
(xi) FIRE POSITION 12
(xii) INNUNDATION 12
(xiii) ROOF MANAGEMENT 13
(xiv) VENTILATION 14
(xv) PRODUCTION 15
(xvi) MAN POWER 16
(xvii) ACCIDENTS 16
(xviii) LIST OF SAFETY EQUIPMENTS 17
(xix) CONCLUSION 18
4

ACCESSIBILITY:
It is accessible by road as Dhanbad Sindri Road passes through
very near to the office. It is also accessible by Railway through
Patherdih bazaar railway station.

MANGEMENT:

The Management of this colliery is very promising and efficient .


They take good care of workers and other employees. Moreover
there is good relationship between them.

The management runs as follows:-

Owner : B.C.C.L.

Head office: Koyla Nagar (Dhanbad)

Personal Department

Mining Department

Supervisory Department

LOCATION OF INCLINE MINE, SUDAMDIH

The Incline Mine, Sudamdih is situated at the distance of about 22


km. from Dhanbad Railway Station on Dhanbad-Sindri Road, Near
Bhowra Railway Station.
5

THE BOUNDARY OF THE MINE IS AS FOLLOWS:-

EAST : PATHERDIH COLLIERY

WEST : BHOWRA (SOUTH) COLLIERY

NORTH : PATHERDIH / EAST BHOWRA

SOUTH : SITANALLAH / GOURIGRAM.

SURFACE FEATURE :-

Damodar River flows on the southern side of the Mine, Adra-Gomoh


Railway line, Dhanbad-Chandankiyari Road, JSEB HT Line and seasonal
Nallahs exist over the mine area.
6

DRILLING AND BLASTING:


Drilling :- The system of breaking coal is solid blasting .

The holes are drilled with the help of drill machine.

Type - Huwood

Maker Huwood and Co.

Volts -125 V

H.P. 1.5

R.P.M. of Motor- 2800

R.P.M. of rod - 728

The drill rods are made of mild steel . This type of drill bit for coal is
eccentric drill bits are tungsten carbide tipped.The bits are detachable.

Length of drill cable = 300 ft.

About 15 to 18 holes are drilled in the specific duration .The pattern of hole
is wedge cut.

BLASTING:
Explosive used:-

(i) Powergel (P5),32 mm dia.200 gm , M/s IEL limited Gomia ,maximum


1000 gm.

Production per shift = 40 tonnes.

STEMMING MATERIAL
The stemming material used is the mixture of sand and clay in the ratio 3:1.
7

EXPLODERS
Type : Multi shot exploder.

Capacity: maximum 25

Battery: P-276 everyday batteries

Firing current: 1.5 Amp.

Limiting resistance:8

Discharging current duration: 3.4 milli second

TYPE OF SHOT FIRING CABLE:


It is two cores PVC cable each core contains a conductor of fine wires of
0.002 dia.

Length of cable = 30 m.

HAULAGE DETAILS:
For main haulage:-

(i) Squirrel cage motor of 100 HP and voltage of 550V.

Three gears are used for operation and it is liquid controlled.

Rope dia = 22mm

Time taken from tugger haulage to surface = 5 minute


8

TUGGER HAULAGE DETAILS:


It is direct rope haulage having following specifications:-

Motor power -40 H.P.(induction motor flame proof)

Current - 52 amp.

RPM -1480

Type -BF

KW/HP - 37/50

Rope - single stranded

Type -617 FMC

Size -19 mm.

Maximum no. of tubs to be attached =5 (when loaded)

=5(when unloaded)

TIME STUDY:
Time taken in drilling one hole of 1.5 m =60 sec.

Time taken on priming one cartridge =5 sec.

Time taken in charging hole =15 sec.

Time taken in stemming the hole =1 min.

Time taken in operating the exploder=1 min.

Time taken in disconnecting the cable= 6sec.

Time taken in loading one tub of coal =5 min.

Capacity of tub =1.2 tonne

20-30 baskets are needed to load a tub having capacity of one ton.
9

MAGAZINE:
No. of detonators =10000 (license and capcity)

Explosive used =99 kg.

Lifted explosive =6 months from the date of manufacture.

Daily consumption = 150 kg.

SAFETY PRECAUTION:
(i) Torch cap lamp electricity can not reach inside the house.
(ii) Use of generators in the magazine.

LAMP HOUSE DETAILS:


Lamp capacity : 600

Safety lamp : 10

Charge capacity:8

No. of self rescue : 300

Charging voltage required : 4.8 V

Life of cap lamp : 18 months

Check time internal of self rescue : 3 months

Input voltage of the charger : 440 V

Output voltage : 4.8V D.C.

Time taken to full charging : 10 hrs.

Discharging time : 8 hrs.


10

DETAILS OF UNUSED SEAMS :-

XVIII SEAM : Abandoned

XVII SEAM : Abandoned

XVI SEAM : Abandoned

XV SEAM : Abandoned

XIV A & XIV SEAM : Abandoned

XIII SEAM : Not worked, as it is only 0.8m. thick.

XI / XII SEAM : Extracted & stowed with sand.

IX & X SEAM : Parts of Old workings are standing on


pillars
11

and water logged and isolated due to fire.

VIII SEAM : Eastern side property of Reverse Incline


has

been extracted and stowed below


5thlevel.

Above 5th level is standing on the pillars.


A

patch of western side of Reverse Incline


is to

be depillared with sand stowing, for which

preparation is going on.

VII SEAM : Eastern side property from Reverse


Incline

below 5th level extracted and stowed.


Above

5th level is standing on pillars. A patch in


the

western side of Reverse Incline is to be

depillared with sand stowing after


completion

the depillaring work in VIIIth seam is over


in
12

the western side.

FIRE :-

There had been fire in old working of IX / X Seam and the same has been sealed off.

INUNDATION

The mine is situated near the River Damodar. The H.F.L of the river
is 136.20 M. The R.L. of Incline Mine is 140.00 M adequate precaution are
taken during monsoon.

DETAILS OF SEAMS UNDER WORKING :-

Seam Gassiness District Thickness Gradient Method of


of Seam of Seam
of Seam working

VI II D5 Panel 3.0 M. 1 IN 1.8 Depillaring


with sand
stowing
(Manual)
IV Top II Development 3.0 M 1 IN 1.8 Development
Section (Manual)

IV II Development 3.0 M 1 IN 1.8 Development


Bottom (Manual)
Section
13

ROOF MANAGEMENT:-

1. In depillaring district - Conventional support


of VI Seam.

2. In Development district - Roof bolting with Resin


Capsules and
Conventional support.

ROCK MASS RATIO :-

Seam R.M.R. Roof classification

IV Top 38.8 Poor

VI 48.8 Fair
14

VENTILATION :-

A. Main Mechanical Ventilator:-

Type Capacity W.G Location District Seam


(m3/min.) (mm.)

P.V.-200 5000 80 New Incline Surface D5 Panel VI

P.V.- 90 2000 50 Surface Development IV

B. QUANTITY OF AIR :-

Type Of Fan Total Intake Total Return W.G Dist. District Details
(m3/min.) (m3/min.) (mm) Intake Return Face Temp.

P.V.-200 2975 3062 33 D5 1425 1678 300 22.0oC

P.V-90 1353 1452 10 Dev. 1288 1337 281 22.5oC


15

PRODUCTION:-

Year Target (Te.) Achievement (Te)

2004-05 1,17,000 1,08,000

2005-06 1,22,220 84,818

2006-07 1,82,000 56,942

2007-08 1,10,000 51,724

2008-09 90,000 64,328

2009-10 46,830 46,243

( upto 08.01.2010 )

MANPOWER DETAILS :-
DESIGNATION MANPOWER
Manager 01

Safety Officer 01

Ventilation Officer 01

A.C.M 02
16

Engineer 01

Survey Officer 01

Surveyor 02

Overman 16

Forman 06

Mining Sirdar 23

Other Monthly Rated 52

Time Rated Worker 411

P.R.W 419

P.R.T 61

Female Worker 23

Total 1018

ACCIDENT:-STATICS:-

YEAR FATAL SERIOUS REPORTABLE TOTAL

2001 - 01 28 29

2002 - 01 13 14

2003 - -- 27 27

2004 - -- 33 33

2005 - -- 11 11

2006 - -- 09 09

2007 - 01 03 04

2008 - -- 03 03

2009 - 02 01 03
17

LIST OF SAFETY EQUIPMENT :-

Equipment Required Available

Methanometer 10 09

Anemometer 02 02

Miniwarn 01 01

Pac III 01 01

Hygrometer 02 02

Flame Safety Lamp 16 16

Toximeter 01 01

Fire Extinguisher 15 15

Exploder 06 06

Anchorage Testing Machine 02 02

Cap Lamp 900 900

Self Rescuer 400 375

Raksha Kavach 450 130

Teledyne 03 03

Gas Man 01 01.


18

I gathered lots of information regarding underground mines (both

development & depillaring) under the guidance of the mining officials

of the Incline Mine Sudamdih.

At last it could be concluded that mines of Sudamdih comprise Total


Manpower of 1018 including officials with a monthly production of 3730 tons
in 2010-11.

It was one of the best time of my life that I spent during my vocational training