You are on page 1of 7

PRASAR BHARATI

OFFICE OF THE DEPUTY DIRECTOR GENERAL (E)


HIGH POWER TRANSMITTER; ALL INDIA RADIO
KINGSWAY: MALL ROAD, DELHI-09.
(Phone/FAX-01123818416)

No. HPTK-11(06)(02)/2013-14/
To
The Additional Director General(E)(NZ), Dated :-04-08-2013
Kind Attn: Deputy Director General(AVM),
All India Radio & Doordarshan,
Jamnagar House,Shahjahan Road,
New Delhi-110011.

Sub: Monthly report on the working of FM Transmitters at TV tower


Pitampura, Delhi for the month of July 2013 .

Sir,

Find enclosed herewith the above cited subject report for your kind
perusal and further action please.

Enclosures: As above- 6 pages.

Yours faithfully

(Bal krishna)
Assistant Director (Engg.)
For Deputy Director General (Engg.)

1
STATISTICAL DATA (F.M. TRANSMITTERS)
FOR THE MONTH OF JULY 2013

F.M. I F.M. II
BREAKDOWNS + SHUTDOWNS
( Rainbow) (Gold)
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
GEAR Numbers 00 00
Minor
Duration 00:00 00:00
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
POWER SUPPLY Numbers 0 4
Minor
Duration 00:02 00:06
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
O/C Numbers 01 0
Minor
Duration 00:02 00:00
Numbers 0 0
Major
RF Shutdown Duration 00:00 0:00
(SD) Numbers 00 00
Minor
Duration 00:00 00:00
Numbers 0 0
Total BD + SD Major
Duration 00:29 0:00
Numbers 2 4
Minor Duration 00:04 00:06

RF Shutdown = SD

2
STATISTICAL DATA
FOR THE MONTH OF JULY 2013

FM I FM II
MONTHLY FIGURES (10KW) (R&S) (20 KW) (Nautel)
Hours of Testing 00:00 00:00
WORKING OF
Hours of Programme 744:00 744:00
TRANSMITTER
Total Working Hours 744:00 744:00
B/D due to Gear 00:00 00:00
Percentage 0.00% 0.00%
B/D due to P/S 00:02 00:06
Percentage 0.00448% 0.01344%
BREAK DOWNS/ B/D due to O/C 00:02 00:00
INTERRUPTIONS
Percentage 0.00448% 0.0%
/SHUTDOWNS
SD 0:00 00:00
Percentage 0.0% 0.0%
Total (BD+SD) 0:04 0:06
Percentage 0.00896% 0.01344%

FM I FM II
PROGRESSIVE TOTAL (10KW) (R&S) (20 KW) (Nautel)
Hours of Testing 00:00 00:00
WORKING OF
Hours of Programme 2928:00 2928:00
TRANSMITTER
Total Working Hours 2928:00 2928:00
B/D due to Gear 00:00
00:00
Percentage 0.00% 0.00%
B/D due to P/S 00:03 00:26
BREAK DOWNS/ Percentage 0.00171% 0.0148%
INTERRUPTIONS\ B/D due to O/C 00:39 00:38
SHUTDOWN Percentage 0.0222% 0.02163%
SD 00:00 00:00
Percentage 00:00% 0.00%
Total(BD+SD) 00:42 00:58
Percentage 0.02391% 0:03301%
3
BREAKDOWN IN RESPECT OF FM TRANSMITTER
FOR THE MONTH OF JULY 2013

FM I TRANSMITTER (102.6 MHz) (RAINBOW)


B/D due to GEAR
B/D Timing Duration
Date Cause
From To Hours Minutes

Total 0 0

B/D due to POWER SUPPLY FAILURE


B/D Timing Duration
Date Cause
From To Hours Minutes
17/07/2013 1235 1238 - 3 UPS fault
Total 0 1

B/D due to OTHER CAUSES


B/D Timing Duration
Date Cause
From To Hours Minutes
21/07/2013 1310 1312 0 2 STL failure, E-1 failure
Total 0 2

Momentary Interruptions
Date MI Timing Cause

RF Shut down
B/D Timing Duration
Date Cause
From To Hours Minutes

Total 0 0

4
FM II TRANSMITTER (106.4 MHz) (GOLD)
B/D due to GEAR
B/D Timing Duration
Date Cause
From To Hours Minutes
-

Total -

B/D due to POWER SUPPLY FAILURE


B/D Timing Duration
Date Cause
From To Hours Minutes
11/07/13 1342 1343 00 1 PSF
11/07/13 1419 1420 00 1 PSF
16/07/13 2140 2141 00 1 PSF
17/07/13 1235 1238 00 3 UPS fault
Total 00 6

B/D due to OTHER CAUSES


B/D Timing Duration
Date Cause
From To Hours Minutes

Total

Momentary Interruptions
Date MI Timing Cause
02/07/13 1054,1056,1420 PSF
11/07/13 1042,1102,1105,1431,1440 PSF
15/07/13 1020,1030 PSF
21/07/13 1309 STL failure

RF Shut down
B/D Timing Duration
Date Cause
From To Hours Minutes
0 0

Total 0 0

5
STATUS OF DG I(For FM RAINBOW)
FOR THE MONTH OF JULY 2013

HMR OF D.G. Set as on 31/07/13 347


HMR OF D.G. Set as on 30/06/13 346
For Testing 2Hrs 41mins
D.G. Set running
during the month of For Transmission 0Hrs 56mins
JULY 2013 Total Running 3Hrs 37mins
Balance in tank as on 1/07/13 13Litres
Added in tank during JULY 190
DIESEL Balance in tank as on 31/07/13 170Litres
POSITION
Consumed during JULY 33Litres
Average Consumption 9.12Litres/Hour
*Was taken from IGNOU kept as spare.
STATUS OF DG II (For FM GOLD)
FOR THE MONTH OF JULY 2013

HMR OF D.G. Set as on 31/07/13 395


HMR OF D.G. Set as on 30/06/13 393
For Testing 2Hrs 38mins
D.G. Set running
during the month of For Transmission 0Hrs 56mins
JULY 2013 Total Running 3Hrs 34mins
Balance in tank as on 1/07/13 70Litres
Added in tank during JULY 190
DIESEL Balance in tank as on 31/07/13 226Litres
POSITION
Consumed during JULY 34Litres
Average Consumption 9.5 Litres/Hour

6
Important Work Done During The Month

Sr.No Date Work Done


1.
2
3.

You might also like