CLAUSE NO.

TECHNICAL REQUIREMENTS

This building shall be prefabricated steel framed structure with brick wall up to window sill
height & prefabricated insulated double skin metal sheeting cladding above it. Roof of the
building shall be prefabricated insulated double skin metal sheeting on steel roof truss.The
building shall provide for Dozer shed space, Workshop space, Office Rooms, Stores, Toilet &
Pantry as per functional requirement. Minimum size of the dozer shed shall be 500 Sq.m.

Metal side cladding shall be composed of different colour shades to match with the other
buildings. External finish for brick walls shall be of Premium Acrylic Smooth Paint with
Silicone additives.

5.26.00 Area Paving in Main Plant Block

RCC paving of minimum 150 mm thick with M25 grade concrete, over an underbed as
specified herein shall be provided for areas mentioned below. RCC paving shall be
designed as rigid reinforced concrete pavement for the crane/ vehicular/ equipment
movement loads which the paving has to bear. The underbed for paving shall consist of
preparation and consolidation of sub-grade to the required level, laying of stone soling of
200mm compacted thick for normal duty paving and 400mm compacted thick for heavy duty
paving with 63 mm and down aggregate with interstices filled with selected moorum followed
by 75 mm thick 1:4:8 PCC (1 part cement, 4 parts sand and 8 parts stone aggregate) with 40
mm nominal size aggregate. Paving areas shall be provided with the metallic hardener floor
finish as specified elsewhere in the specification.

Entire main plant area from chimney to transformer yard as enclosed within the peripheral
roads of the main plant area shall be provided with paving (on chimney side, paving shall be
upto the edge of the storm water drain by Bidder.

Passages shall be provided inside the main plant block connecting to the outer periphery
road to have access to the various facilities/buildings. The passage areas shall be provided
with heavy duty paving for movement of heavy vehicles. The top surface of the passages
shall be finished with 50 mm thick metallic hardener topping.

Heavy duty paving shall be provided for the areas in the Mill bunker building, equipment lay
down area in the TG hall and handling areas for PA/FD fans with 50 mm thick metallic
hardener topping.

The ground floor area in the boiler shall also be provided with normal duty paving and shall
be finished with 50 mm thick metallic hardener topping.

Lightly loaded areas such as corridors below trestle and other areas in the main plant block
where no heavy traffic movement is envisaged shall be provided with interlocking concrete
block paving with RCC concrete blocks of minimum M 35 grade and minimum 80 mm
thickness underlain by 200mm thick with 63 mm and down aggregate with interstices filled
with selected moorum.

All other area inside the main plant block shall be provided with normal duty paving. 2.5 m
wide paving around periphery of all sumps and underground tanks without metallic hardner.

Suitable drains shall be provided to dispose off storm water as well as floor wash of the main
plant block. The paving shall be provided with slope of 1:500 to dispose the surface
water/wash water to the nearest drain. Drains shall be provided to dispose the floor wash
water of ESP to a sump of suitable size. Further, the overflow from the sump to be drained to
the nearest storm water drain.

KHARGONE STPP TECHNICAL SPECIFICATION SUB-SECTION- PAGE


(2X660MW) BID DOC NO. CS-9578-001(R1)-2 CIVIL WORKS 140 OF 461
EPC PACKAGE