Earthwork in backfilling in 15 cm layer
including water sprinkle and mechanical
Cuft 31,460.63
compaction as per drawing specification
and instruction all complete
2,097.38 15.00
3 Earthwork in filling Cuft 2,404.04 15.00 36,060.63
B. BRICK MASONRY
1
Flat brick soling work as per specifocation
Sqft 28,856.94
and instruction all complete
1,442.85 20.00
2 Supplying and laying of first class
chimney made brick work and erection
brick masonry wall in cement sand mortar
Sqft
(1:6) including in true line and level and
curing etc as per specification and
instruction all complete.
For Substructure Sqft 1,161.67 35.00 40,658.33
For Superstructure Sqft 7,948.13 30.00 238,443.75
C. PCC WORK
1 pcc Sqft 1,442.85 15.00 21,642.71
2 rcc foundation Cuft 872.00 90.00 78,480.00
BEAM Cuft 3,791.12 80.00 303,289.29
SLAB TOP Cuft 48.67 80.00 3,893.33
3 SLAB Cuft 1,132.72 80.00 90,617.91
4 column Cuft 510.00 80.00 40,800.00
5 TILE Sqft 570.07 35.00 59,857.35
D. FLOORING WORKS
1 Providing and laying of glazed and non
glazed (non skiding) porcelian clay tiles in
floor and walls of approved colour and
size on kitchen,toilet and bathroom in 1:4 Sqft 175.31 0.00
cement sand mortar in true line and level
as per drawing, specification all
instruction all complete
2 screeding Sqft 3,205.39 20.00 64,107.78
E. FINISHING WORK
Page 1
Item No Description of Item Unit Quantity Rate Amount(Rs) Remarks
1
Supplying and applying of 12.5mm thick
1:6 cement sand plaster on true line and
Sqft 0.00
level including curing as per specification
and instruction all complete
4
Supplying, fixing and erection of 38 mm
thick sal wood door shutter fixed on 4mm
thick glass shutter with hinges, tower
Sqft 0.00
bolts, door stoper hooks and handles of
approved quality and and colour as per
specification and instruction all complete
Page 2
Item No Description of Item Unit Quantity Rate Amount(Rs) Remarks
5
Supplying, fixing and erection of 25 mm
thick local soft wood celing mounted on
60*90 cm size wooden frame at suitable Sqft 0.00
position including fixing nailing as per
specification and instruction all complete
6
Supplying, fixing and erection of 6 mm
water proof plywood flush door fixing with
hinges,and handles of approved quality Sqft 0.00
and and colour as per specification and
instruction all complete
G. METAL WORKS
7 Stainless steel railing works Rft 0.00 1,450.00 0.00
H. COLOURING AND PAINTING
1 Supplying and applying of 2 coats of
water proof cement paint of approved
Sqft 0.00
color as per drawing, specification and
instruction all complete
Inner 0.00 6.96 0.00
Outer 0.00 7.30 0.00
Ceiling 0.00 7.30 0.00
2 Supplying and laying of two coats of
enamel paint with one coat primer as per
Sqft 0.00
drawing, specification and instruction all
complete
3 Supplying and laying of two coats of
enamel paint with out primer as per
Sqft 0.00
drawing, specification and instruction all
complete
4 Supplying and applying of three coats of
chapra polish as per specification and Sqft 0.00
instruction all complete
J. MISCELLANEOUS WORK
Total of Civil Works: 1,415,912.38
Page 3
Bishun Rate
9
109,468.75 10
28,856.94 40
240
279,102.08 250
21,642.71 210
240
94,511.25 300
115000 3023.593 3174.773
85
9.416667
150
64,107.78 48
Page 4
Bishun Rate
19
20
25
275,115.40
15
4500
800
Page 5
Bishun Rate
Page 6
MEASUREMENT SHEET
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
Sub Structure Works
1 Earthwork:
1.1 Earthwork in excavation
Footing F1 4 5 5 5.00 500 cft
F3 1 12 8 5.00 480 cft
Footing F2 4 12 5 5.00 1200 cft
1.2 Trench for Wall Footings:
Along Grid A ( 1-3) 1 12.083333 2 3.00 72.5 cft
Along Grid B (2-4) 1 0 0 0.00 0 cft
Along Grid C, D (1-2), (2-3) 2 11 2 3.00 132 cft
Along Grid E (2-3) 1 6.5 2 3.00 39 cft
Along Grid 1 ( A-C), (C-D) 2 17.25 2 3.00 207 cft
Along Grid 2 ( A-C), (C-D), (D-E) 1 13.833333 2 3.00 83 cft
Along Grid 3 (B-C), (C-D), (D-E) 1 13.833333 2 3.00 83 cft
2796.50
Earthwork in backfilling 1 75% of total Earthwork approx deducting water tank 2097.38 cft
1.3 Earthfilling 1
Room ( staircase ) 1 21 10 3.00 630 cft
Living Room 1 10.5 14 3.00 441 cft
1 13.833333 10 3.00 415
1 13.833333 10.416667 3.00 432.29167
Kitchen 1 13.75 7.25 3.00 299.0625 cft
Room1 (Bedroom+Toilet) 1 8.5833333 7.25 3.00 186.6875 cft
2404.04
872.00
4.2 Foundation Tie-Beam cft
Along Grid A ( 1-2) 1 22.25 1 1.17 74.166667 cft
Along Grid B (2-3) 1 9.25 1 1.17 30.833333 cft
Along Grid C, D (1-2), (2-3) 2 30.5 1 1.17 203.33333 cft
Along Grid E (2-3) 1 11.5 1 1.17 38.333333 cft
Along Grid 1 ( A-C), (C-D) 2 36.75 1 1.17 245 cft
Along Grid 2 ( A-C), (C-D), (D-E) 1 29.5 1 1.17 98.333333 cft
Along Grid 3 (B-C), (C-D), (D-E) 1 25.333333 1 1.17 84.444444 cft
cft
4.3 Plinth Tie-Beam cft
Along Grid A ( 1-2) 1 22.25 0.75 1.00 61.1875 cft
Along Grid B (2-3) 1 9.25 0.75 1.00 25.4375 cft
Along Grid C, D (1-2), (2-3) 2 30.5 0.75 1.00 167.75 cft
Along Grid E (2-3) 1 11.5 0.75 1.00 31.625 cft
Along Grid 1 ( A-C), (C-D) 2 36.75 0.75 1.00 202.125 cft
Along Grid 2 ( A-C), (C-D), (D-E) 1 29.5 0.75 1.00 81.125 cft
Along Grid 3 (B-C), (C-D), (D-E) 1 25.333333 0.75 1.00 69.666667 cft
4.7 Staircase
Waist Slab 1 2 6 3.5 0.58 24.36 cft
Waist Slab 2 1 6 3.79 0.58 13.1892 cft
Landing 1 1 3.5 3.535 0.41 5.072725 cft
Landing 2 2 3.5 4.035 0.41 11.58045 cft
1132.72
5 Flooring
Ground Floor
5.1 Screeding
1 21 10 210 sft
Living Room 1 10.5 14 147 sft
1 13.833333 10 138.33333 sft
1 13.833333 10.416667 144.09722 sft
Kitchen 1 13.75 7.25 99.6875 sft
Bedroom 1 8.5833333 7.25 62.229167 sft
3205.39
5.2 Punning
Living Room 1 10.83 8.4 90.972 sft
Kitchen 1 10.16 9.8 99.568 sft
Bedroom 1 10.08 11.83 119.2464 sft
toilet 1 7 4 28
3205.39
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
6 Formworks
6.1 Upto Ground Floor
Combined footing CF1 along grid A 10.29 1.50 0 Sft
Combined footing CF2 along Grid B 9.75 1.50 0 Sft
Combined footing CF3 along Grid C 11.5 1.50 0 Sft
Combined footing CF4 along Grid B 6 1.50 0 Sft
6.5 Columns
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
Columns in Ground floor
12" x 9" columns 44 1 13.49 593.56 Sft
Column in First Floor
12" x 9" columns 16 1 9.00 144 Sft
6.6 Slab
Living Room 1 10.83 8.4 90.972 sft
Kitchen 1 10.16 9.8 99.568 sft
Bedroom 1 10.08 11.83 119.2464 sft
toilet 1 7 4 28
6.8 Staircase
Waist Slab 2 6 3.5 42 Sft
Waist Slab 2 1 6 3.79 22.74 Sft
landing 1 1 3.5 3.535 12.3725 Sft
landing 2 1 3.5 4.035 14.1225 Sft
Riser 15 3.5 7.40 388.5 Sft
0.00
7 Brickwork
7.1 Brickwork In sub-Structure Works in Cm (1:6)
Dwarf wall 9"
Along Grid A ( 1-2) 1 22.25 1 5.00 111.25 cft
Along Grid B (2-3) 1 9.25 1 5.00 46.25 cft
Along Grid C, D (1-2), (2-3) 2 30.5 1 5.00 305 cft
Along Grid E (2-3) 1 11.5 1 5.00 57.5 cft
Along Grid 1 ( A-C), (C-D) 2 36.75 1 5.00 367.5 cft
Along Grid 2 ( A-C), (C-D), (D-E) 1 29.5 1 5.00 147.5 cft
Along Grid 3 (B-C), (C-D), (D-E) 1 25.333333 1 5.00 126.66667 cft
1161.67
7.2 Brickworks in super structure
Along Grid A ( 1-2) 1 22.25 3 8.25 550.6875 cft
Along Grid B (2-3) 1 9.25 3 8.25 228.9375 cft
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
Along Grid C, D (1-2), (2-3) 2 30.5 3 8.25 1509.75 cft
Along Grid E (2-3) 1 11.5 3 8.25 284.625 cft
Along Grid 1 ( A-C), (C-D) 2 36.75 3 8.25 1819.125 cft
Along Grid 2 ( A-C), (C-D), (D-E) 1 29.5 3 8.25 730.125 cft
Along Grid 3 (B-C), (C-D), (D-E) 1 25.333333 3 8.25 627 cft
8 Plasterworks
Ground Floor
8.1 Outer walls
Along North wall 1.5 134.5 9.33 1882.3275 sft
sft
5646.98
8.2 Inner Walls
Staircase area 2 106 9.00 1908
sft
5724.00
8.3 Ceilings
Living Room 1 10.83 8.4 90.972 sft
Kitchen 1 10.16 9.8 99.568 sft
Bedroom 1 10.08 11.83 119.2464 sft
toilet 1 7 4 28
2404.04
9 Paintwork
Ground Floor
9.1 Outer walls
Along North wall 0 22.66 9.33 0 sft
Along east Wall 0 31.75 9.33 0 sft
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
Along South Wall 0 22.75 9.00 0 sft
Along West Wall 0 31 9.00 0 sft
0 sft
Deduction for Doors and Windows 0 sft
Opening (main entry) 0 3.5 7.00 0 sft
Door 1 0 2.5 7.00 0 sft
0 0 sft
Window (w) 0 2.75 4.00 0 sft
window 1 (W1) 0 5 5.00 0 sft
Window 2 (W2) 0 6 5.00 0 sft
window 3 (W3) 0 8.25 6.00 0 sft
0 0.00
9.2 Inner Walls 0
Staircase area 0 42.23 9.00 0
Living Room 0 38.46 9.00 0 sft
Kitchen 0 39.92 9.00 0 sft
Bedroom 0 44.32 9.00 0 sft
toilet 0 22 9.00 0 sft
Toilet Void 0 13.5 9.00 0 sft
0 sft
Deductions 0 sft
Opening (main entry) 0 3.5 7.00 0 sft
Main Door 0 3.5 7.00 0 sft
Door 1 0 3 7.00 0 sft
Door 2 0 2.5 7.00 0 sft
0 sft
Window (w) 0 2.75 4.00 0 sft
window 1 (W1) 0 5 5.00 0 sft
Window 2 (W2) 0 6 5.00 0 sft
window 3 (W3) 0 8.25 6.00 0 sft
Ventilation (V) 0 3 2.50 0
0 0.00
0
9.3 Ceilings 0
Living Room 0 10.83 8.4 0 sft
Kitchen 0 10.16 9.8 0 sft
S.N. Description of work No. Area Length Breadth Height Quantity Total Unit
Bedroom 0 10.08 11.83 0 sft
toilet 0 7 4 0 sft
0.00
10 Woodwork
10.1 Framework
Main Door 0 10.5 0.25 0.33 0 cft
Door 1 0 17 0.25 0.33 0 cft
Door 1 0 16.5 0.25 0.33 0 cft
Window (w) 0 14.5 0.25 0.33 0 cft
window 1 (W1) 0 20 0.25 0.33 0 cft
Window 2 (W2) 0 22 0.25 0.33 0 cft
window 3 (W3) 0 40.5 0.25 0.33 0 cft
0 0.00
0
10.2 Shutter work 0
Main Door 0 3.5 7.00 0 sft
Door 1 0 3 7.00 0 sft
Door 1 0 2.5 7.00 0 sft
0 sft
Window (w) 0 2.75 4.00 0 sft
window 1 (W1) 0 5 5.00 0 sft
Window 2 (W2) 0 6 5.00 0 sft
window 3 (W3) 0 8.25 6.00 0 sft
0 0.00
0
0
11 Rebar as per bar sechudle 0 0.00 kg
12 Steel railing for staircase 0 18 0 0.00 rft
Remark
1 2 3 4
X 36.75 36.75 29.5 25.33333
Y
A 22.25
B 9.25
C 30.5 106
D 30.5
E 11.5
21
Remark
Remark
Remark
Area
Area
average ht (10"+5")/2
average ht (10"+5")/2
area
area
area
area
area
area
area
area
area
area
Remark
Remark
Remark
area
area
area
area
Remark
Column plaster
area
area
Remark
area
area
Sn Summary
Earthwork in excavation Err:509
Earthwork in filling
Flat Brick Soling Err:509
PCC Err:509
RCC concreting Err:509
Brickwork
substructure Err:509
superstructure Err:509
Plaster
inner Err:509
outer Err:509
ceiling Err:509
Painting
inner Err:509
outer Err:509
ceiling Err:509
Formwork Err:509
Brick cladding Err:509
Cornice Err:509
Flooring
Screeding Err:509
Punning Err:509
Tile works
Floor Err:509
Wall Err:509
Telia tile Err:509
Wood work
Frame Err:509
Shutter Err:509
Ironwork
Shutter Err:509
CG Err:509
GF
Footing Err:509 Err:509
Beam 423.7 942.4894
Column 285 950.9422
Slab Err:509 Err:509
Err:509
Abstract of Estimated Quantity
Site : Residential Building
Location :
2
Earthwork in backfilling in 15 cm layer
including water sprinkle and mechanical
Cuft 35,455.09
compaction as per drawing specification
and instruction all complete
2,097.38 16.90
3 Earthwork in filling Cuft 2,404.04 16.90 40,628.30
B. BRICK MASONRY
1
Flat brick soling work as per specifocation
Sqft 74,948.94
and instruction all complete
1,442.85 51.95
2 Supplying and laying of first class
chimney made brick work and erection
brick masonry wall in cement sand mortar
Cuft
(1:6) including in true line and level and
curing etc as per specification and
instruction all complete.
For Substructure Cuft 1,161.67 250.45 290,938.74
For Superstructure Cuft 7,948.13 257.59 2,047,379.79
C. PCC WORK
1
Providing, mixing and laying PCC 1:3:6
(lean concrete) works in foundation with
proper compaction by needle vibrator and
Cuft 357,812.21
completion to perfect line, level and
finishing including curing as per drawing,
specification and instruction all complete.
1,442.85 247.99
2
Providing, mixing and laying PCC 1:2:4
works in floor with proper compaction by
needle vibrator and completion to perfect
Cuft 0.00
line, level and finishing including curing
as per drawing, specification and
instruction all complete
250.19
Page 26
Item No Description of Item Unit Quantity Rate Amount(Rs) Remarks
3
Providing, mixing and laying PCC 1:1.5:3
(M20) for RCC works in column, slab,
beam etc. with proper compaction by
needle vibrator and completion to perfect Cuft 408,264.00
line, level and finishing including curing
as per drawing, specificationa and
instruction all complete.
1,132.72 360.43
4 Providing high strength defoRfted bars
(HYSD) of grade Fe 415 or approved
TMT reinforcement bars including
straightening, cutting, bending, placing in mt 0.00
position and binding by annealed wire as
per drawing, specification, and instruction
all complete. 0.00 111,065.39
5
Providing, fiting and fixing standard
formwork of good wooden planks/steel
plates including all necessary
steel/wooden props, bracing, wedges and Sqft 0.00
careful removable of foRftworks at
approved time as per drawing,
specification, and instruction all complete.
0.00 92.97
D. FLOORING WORKS
1 Providing and laying of glazed and non
glazed (non skiding) porcelian clay tiles in
floor and walls of approved colour and
size on kitchen,toilet and bathroom in 1:4 Sqft 175.31 0.00
cement sand mortar in true line and level
as per drawing, specification all
instruction all complete
2 50 mm Screeding works in floors in 1:2:4
cement sand mortar in true line and level
Sqft 181,613.88
as per drawing, specification all
instruction all complete 3,205.39 56.66
E. FINISHING WORK
1
Supplying and applying of 12.5mm thick
1:6 cement sand plaster on true line and
Sqft 0.00
level including curing as per specification
and instruction all complete
Page 27
Item No Description of Item Unit Quantity Rate Amount(Rs) Remarks
4
Supplying, fixing and erection of 38 mm
thick sal wood door shutter fixed on 4mm
thick glass shutter with hinges, tower
Sqft 0.00
bolts, door stoper hooks and handles of
approved quality and and colour as per
specification and instruction all complete
5
Supplying, fixing and erection of 25 mm
thick local soft wood celing mounted on
60*90 cm size wooden frame at suitable Sqft 0.00
position including fixing nailing as per
specification and instruction all complete
6
Supplying, fixing and erection of 6 mm
water proof plywood flush door fixing with
hinges,and handles of approved quality Sqft 0.00
and and colour as per specification and
instruction all complete
G. METAL WORKS
7 Stainless steel railing works Rft 1,450.00 0.00
H. COLOURING AND PAINTING
Page 28
Item No Description of Item Unit Quantity Rate Amount(Rs) Remarks
Page 29
Bishun Rate
9
10
40
240
250
210
240
Page 30
Bishun Rate
300
85
150
48
19
20
25
Page 31
Bishun Rate
15
4500
800
Page 32
Bishun Rate
Page 33