You are on page 1of 88

N68E-21-N Cabinet Installation Guide

Issue 01
Date 2013-01-30

HUAWEI TECHNOLOGIES CO., LTD.


Copyright Huawei Technologies Co., Ltd. 2013. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: http://www.huawei.com
Email: support@huawei.com

Issue 01 (2013-01-30) Huawei Proprietary and Confidential i


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide About This Document

About This Document

Overview
This document describes how to install an N68E-21-N cabinet. When installing the N68E-21-
N cabinet, the installation personnel need to install the cabinet, cabinet fittings, external power
cables, and PGND cables. The installation personnel also need to attach engineering labels to
power cables and PGND cables.

Product Version
This document applies to all the versions of the following products: eCoordinator, BSC6910,
and BSC6900.

Intended Audience
This document is intended for the installation personnel.

Organization
1 Changes in the N68E-21-N Cabinet Installation Guide
This section describes the changes in the N68E-21-N Cabinet Installation Guide.
2 Overview of N68E-21-N Cabinets
N68E-21-N cabinets have a modular design. N68E-21-N cabinets provide sufficient space for
devices, such as subracks, to facilitate capacity expansion and maintenance.
3 Preparing for the N68E-21-N Cabinet Installation
Before installing the N68E-21-N cabinet, you need to unpack the cases and check the items in
the cases. Ensure that all the tools required for the installation are available.
4 Installing N68E-21-N Cabinets
When installing N68E-21-N cabinets, the installation personnel need to install the external power
cables, PGND cables, cabinet, and cabinet fittings. The installation personnel also need to check

Issue 01 (2013-01-30) Huawei Proprietary and Confidential ii


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide About This Document

the power-on status of the cabinet, and attach engineering labels to the cabinet, external power
cables, and PGND cables.
5 Installing the N68E-21-N Cabinet on a Concrete Floor
This chapter describes how to install the N68E-21-N cabinet on a concrete floor.
6 Installing the N68E-21-N Cabinet on an ESD Floor
This chapter describes how to install the N68E-21-N cabinet on an ESD floor.
7 Installing the Accessories for the N68E-21-N Cabinet
This chapter describes how to install the front and back doors as well as side panels for the
N68E-21-N cabinet and how to install the PGND cables for the doors and side panels.
8 Attaching the Engineering Labels to the Cabinets
This chapter describes how to attach the engineering labels, including row and column labels,
to the cabinets.
9 Hardware Installation Record
The hardware installation record is used to record the hardware installation information.
10 Checklist for the Cabinet Installation
This chapter describes the items and specifications for checking the cabinet installation.
11 Exploded View of the N68E-21-N Cabinet
This section describes the components of the N68E-21-N cabinet and the cabinet details, which
are indicated in the exploded view.

Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates a hazard with a high level or medium level of risk


which, if not avoided, could result in death or serious injury.

Indicates a hazard with a low level of risk which, if not


avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation that, if not


avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.

Indicates a tip that may help you solve a problem or save


time.

Provides additional information to emphasize or supplement


important points of the main text.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential iii


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide About This Document

General Conventions

The general conventions that may be found in this document are defined as follows.

Convention Description

Times New Roman Normal paragraphs are in Times New Roman.

Boldface Names of files, directories, folders, and users are in


boldface. For example, log in as user root.

Italic Book titles are in italics.


Courier New Examples of information displayed on the screen are in
Courier New.

Command Conventions

The command conventions that may be found in this document are defined as follows.

Convention Description

Boldface The keywords of a command line are in boldface.

Italic Command arguments are in italics.

[] Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... } Optional items are grouped in braces and separated by


vertical bars. One item is selected.

[ x | y | ... ] Optional items are grouped in brackets and separated by


vertical bars. One item is selected or no item is selected.

{ x | y | ... }* Optional items are grouped in braces and separated by


vertical bars. A minimum of one item or a maximum of all
items can be selected.

[ x | y | ... ]* Optional items are grouped in brackets and separated by


vertical bars. Several items or no item can be selected.

GUI Conventions

The GUI conventions that may be found in this document are defined as follows.

Convention Description

Boldface Buttons, menus, parameters, tabs, window, and dialog titles


are in boldface. For example, click OK.

> Multi-level menus are in boldface and separated by the ">"


signs. For example, choose File > Create > Folder.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential iv


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide About This Document

Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.

Format Description

Key Press the key. For example, press Enter and press Tab.

Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently.

Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means
the two keys should be pressed in turn.

Mouse Operations
The mouse operations that may be found in this document are defined as follows.

Action Description

Click Select and release the primary mouse button without moving
the pointer.

Double-click Press the primary mouse button twice continuously and


quickly without moving the pointer.

Drag Press and hold the primary mouse button and move the
pointer to a certain position.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential v


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide Contents

Contents

About This Document.....................................................................................................................ii


1 Changes in the N68E-21-N Cabinet Installation Guide.........................................................1
2 Overview of N68E-21-N Cabinets..............................................................................................2
3 Preparing for the N68E-21-N Cabinet Installation..................................................................4
3.1 Unpacking the Cases and Checking the Items....................................................................................................5
3.2 Tools Required for Installing the N68E-21-N Cabinet....................................................................................10

4 Installing N68E-21-N Cabinets.................................................................................................12


5 Installing the N68E-21-N Cabinet on a Concrete Floor........................................................13
5.1 Materials Required for Installing the N68E-21-N Cabinet on a Concrete Floor..............................................14
5.2 Template Files for N68E-21-N Cabinet Installation........................................................................................14
5.3 Positioning N68E-21-N Cabinets on a Concrete Floor....................................................................................17
5.4 Securing an N68E-21-N Cabinet to a Concrete Floor......................................................................................22
5.5 Combining the N68E-21-N Cabinets...............................................................................................................30

6 Installing the N68E-21-N Cabinet on an ESD Floor.............................................................33


6.1 Materials Required for Installing the N68E-21-N Cabinet on the ESD Floor.................................................34
6.2 Introduction to the Shockproof Support...........................................................................................................34
6.2.1 Shockproof Support Assembly................................................................................................................34
6.2.2 Fastening the Lock Catches on the Shockproof Support Assembly........................................................36
6.2.3 Cutting Guide Rails for the Shockproof Support....................................................................................37
6.3 Positioning N68E-21-N Cabinets on an ESD Floor.........................................................................................40
6.4 Assembling the Shockproof Support................................................................................................................44
6.5 Installing Floating Nuts on the Shockproof Support........................................................................................50
6.6 Securing a Shockproof Support to a Concrete Floor........................................................................................51
6.7 Securing an N68E-21-N Cabinet to an ESD Floor...........................................................................................55

7 Installing the Accessories for the N68E-21-N Cabinet.........................................................64


7.1 Accessories to Be Installed for the N68E-21-N Cabinet..................................................................................65
7.2 Installing the Side Panels for the N68E-21-N Cabinet.....................................................................................65
7.3 Installing the Front and Back Doors for the N68E-21-N Cabinet....................................................................67
7.4 Installing the PGND Cables for the Doors and Side Panels of the N68E-21-N Cabinet.................................69

8 Attaching the Engineering Labels to the Cabinets...............................................................71

Issue 01 (2013-01-30) Huawei Proprietary and Confidential vi


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide Contents

9 Hardware Installation Record...................................................................................................73


10 Checklist for the Cabinet Installation...................................................................................75
11 Exploded View of the N68E-21-N Cabinet...........................................................................77

Issue 01 (2013-01-30) Huawei Proprietary and Confidential vii


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 1 Changes in the N68E-21-N Cabinet Installation Guide

1 Changes in the N68E-21-N Cabinet


Installation Guide

This section describes the changes in the N68E-21-N Cabinet Installation Guide.

01 (2013-01-30)
Compared with Draft A (2012-07-23), this issue includes the new topic:
9 Hardware Installation Record
11 Exploded View of the N68E-21-N Cabinet
Compared with Draft A (2012-07-23), this issue does not incorporate any changes.
Compared with Draft A (2012-07-23), this issue does not exclude any topics.
Since N68E-21-N cabinets remain the same despite different versions and modes, the names of
different versions and modes are changed into N68E-21-N Cabinet Installation Guide, and the
documentation version is upgraded to 01. This document applies to all the versions of the
following products: eCoordinator, BSC6910, and BSC6900 .

Draft A (2012-07-23)
This is the Draft A release of V100R014C00.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 1


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 2 Overview of N68E-21-N Cabinets

2 Overview of N68E-21-N Cabinets

N68E-21-N cabinets have a modular design. N68E-21-N cabinets provide sufficient space for
devices, such as subracks, to facilitate capacity expansion and maintenance.

Exterior of an N68E-21-N Cabinet


Among the main parts of a cabinet, load-bearing parts include middle columns, and door frames.
See Exploded View of the N68E-21-N Cabinet. Other parts cannot bear load, including mounting
bars, front and rear doors, wooden plates on both sides of the cabinet, front and rear wire
bushings, and guide rails.
Figure 2-1 shows an N68E-21-N cabinet.

Figure 2-1 Exterior of an N68E-21-N cabinet

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 2


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 2 Overview of N68E-21-N Cabinets

Engineering Specifications of the N68E-21-N Cabinet


Table 2-1 provides the engineering specifications of the N68E-21-N cabinet.

Table 2-1 Engineering specifications of the N68E-21-N cabinet


Item Specification

Dimensions 2130 mm (height) x 600 mm (width) x 800 mm


(depth)

Height of the available space 44 U

Cabinet weight Rack: 105 kg; empty cabinet: 155 kg;


cabinet in full configuration: 430 kg

Power supply Four routes of -48 V DC power supply for each


subrack

Electromagnetic compatibility (EMC) l Meets the requirements in GR 1089


l Meets the requirements in ETSI EN300 386
l Meets the requirements in Council directive
89/336/EEC

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 3


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

3 Preparing for the N68E-21-N Cabinet


Installation

About This Chapter

Before installing the N68E-21-N cabinet, you need to unpack the cases and check the items in
the cases. Ensure that all the tools required for the installation are available.

3.1 Unpacking the Cases and Checking the Items


This section describes how to unpack the cases and check the items in the cases to facilitate
subsequent cabinet installation.
3.2 Tools Required for Installing the N68E-21-N Cabinet
The tools required for installing the N68E-21-N cabinet are tools for measuring, marking,
drilling, and fastening, small tools, auxiliary tools, meters, and some special tools.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 4


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

3.1 Unpacking the Cases and Checking the Items


This section describes how to unpack the cases and check the items in the cases to facilitate
subsequent cabinet installation.

Prerequisites
l Site preparation for the installation is complete.
l The cases that contain the cabinets and components are delivered to the site.

Context
l When carrying or placing the equipment, you should ensure that it does not collide with
doors, walls, shelves, or other objects.
l When transporting or installing the equipment, components, or parts, you should avoid
touching their uncoated metal surfaces with sweaty or dirty gloves.

Procedure
Step 1 Unload the cases.

CAUTION
When unloading the cases, you should place the cases in sequence. Ensure that the labels on the
cases face the same direction.

Step 2 Check whether the number of cases on site matches the Packing List and whether the place of
delivery is the same as the actual installation place.

If... Then...

The number of cases on site matches that in the Packing List Go to Step 4.

The number of cases on site does not match that in the Packing List Go to Step 3.

Step 3 Stop unpacking the cases. Ask the project supervisor to send the Cargo Problems Report that is
signed by the customer to the local Huawei office within three days.

Step 4 Check whether the cases are intact.

If... Then...

Any case is seriously damaged or soaked Go to Step 5.

The cases are intact Go to Step 6.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 5


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

Step 5 Stop unpacking the cases, find out the causes, and contact the local Huawei office to further
handle the problem.

CAUTION
To protect the equipment and find out the causes, perform the following actions: Move the
unpacked equipment indoors for proper storage, take photos of the storage environment, the
rusted or corroded equipment, packing cases, and packing materials. Keep these photos for future
verification. Store the packing cases and materials properly.

Step 6 Unpack the wooden cases.

CAUTION
l Before unpacking, move the wooden cases into or close to the equipment room if enough
space is available. This prevents damage to the cabinets during the transportation.
l When you unpack the wooden cases, unpack the one containing the packing list first. Then,
you can find items rapidly according to the names, codes, positions, and quantities in the
Packing List.
l The following description takes the wooden case that contains the cabinet as an example.
The methods of unpacking other types of wooden cases are similar.

1. Place the wooden case on the ground. Ensure that the side with the wooden frame faces the
bottom.
2. Use a wrench, a flat-head screwdriver, or a claw hammer to straighten the tongues on the
four sides of the cover, as shown in Figure 3-1.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 6


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

Figure 3-1 Straightening the tongue

3. Remove the cover. If the wooden case contains a carton, take out the carton and then open
it according to Step 7. If the wooden case contains a cabinet, go to the next step. See Figure
3-2.

Figure 3-2 Removing the cover

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 7


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

4. Use the same method to remove the side boards from the wooden case, as shown in Figure
3-3.

Figure 3-3 Removing side boards

5. Erect the cabinet with the BOTTOM side down.

CAUTION
This operation needs three to five installers. Prevent the cabinet from falling during the
erection to avoid personnel injury.

6. Remove the bottom of the case, that is, the side with the wooden frame.
7. Remove the packing foam from the corners and edges of the cabinet.
8. Remove the vacuum plastic bag.
Step 7 Unpack the carton, as shown in Figure 3-4.

Figure 3-4 Unpacking a carton

1 Carton label 2 Strap 3 Pressure-sensitive tape

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 8


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

4 Foam plate 5 Board label 6 Board

1. Check the types and quantities of the items in the carton according to the carton label.
2. Use diagonal pliers to cut the straps.
3. Rip the tape along the joint seams by using the paper knife. Do not insert the knife too deep,
or else the items may be damaged.
4. Unpack the carton and take out the items.

Step 8 Unpack boards.

CAUTION
l Electronic components are extremely sensitive to static electricity. When unpacking the
boards, wear an ESD wrist strap or a pair of ESD gloves properly.
l The ESD bag contains desiccant to keep the bag dry. When taking the board from a cold dry
place to a hot damp place, wait at least 30 minutes before unpacking. Otherwise, moisture
condensed on the board surface may damage the board.

1. Check that no evident damage is on the board packages.


2. Open the packages and ensure that the boards are in good condition. For any board problem,
contact the order management engineer at the local Huawei office.

Step 9 Check whether the unpacked boards need to be installed immediately, and then proceed
accordingly.

If... Then...

The unpacked boards need to be installed Place the boards on an ESD surface and
immediately discharge the static electricity.

The unpacked boards need not be installed Pack the boards with the original materials and
immediately place them in a cool dry place away from direct
sunlight or strong electromagnetic radiation.

Step 10 Check the items. Check the items one by one according to the names, types, and quantities
described in the Packing List.
The acceptance of items covers the following aspects:
l Appearance: Check whether there is any visible defect, looseness, distortion, or damage;
check whether the labels are legible and whether the nameplates and decorating plates are
available and meet the requirements.
l Integrity: Ensure that all the parts and accessories required for the installation of cabinets are
available.
l Computer: Check whether the monitor, keyboard, and mouse are intact and in good condition.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 9


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

l Board: Ensure that the type and quantity of the boards are consistent with those in the Packing
List. Ensure that no printed circuit board is broken and no component is detached from the
board.
NOTE

The project supervisor should take the major role in the inspection of equipment and components whose
electric characteristics are likely to have been affected.

If... Then...

The packing list indicates "shortage of Inform the order management engineer at the
articles" local office. Then, sign the Packing List together
with the customer.

There are any short, wrong, extra, or Representatives of Huawei and the customer
damaged items must sign the Unpacking Inspection Memo and
Packing List. The installation supervisor must fill
in the Cargo Problems Report and inform the
order management engineer at the local office in
three days. The installation supervisor must keep
the problematic items intact and the inner and
outer packing intact for future investigation and
verification.

The shipment is intact Place the inspected items by type. Then,


representatives of Huawei and the customer sign
the Packing List.

----End

3.2 Tools Required for Installing the N68E-21-N Cabinet


The tools required for installing the N68E-21-N cabinet are tools for measuring, marking,
drilling, and fastening, small tools, auxiliary tools, meters, and some special tools.

Common Tools
Table 3-1 lists the common tools required for installing the N68E-21-N cabinet.

Table 3-1 Common tools required for installing the N68E-21-N cabinet

Type Tool

Measuring tools Long tape, 50 m ribbon tape, 5 m tape measure, 400 mm level bar, and
level instrument

Marking tools Marking pen, pencil

Drilling tools Percussion drill with matching bits of 6, 8, 10, 12, 14, and 16,
and vacuum cleaner

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 10


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 3 Preparing for the N68E-21-N Cabinet Installation

Type Tool

Fastening tools Flat-head screwdrivers (M3 to M6)


Phillips screwdrivers (M3 to M6)
Adjustable wrench
Socket wrenches (M6, M8, M10, M12, M14, M17, M19)
Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19)
Combination wrenches (M17 and M19)
Long-arm wrench

Small tools Sharp-nose pliers, diagonal pliers, pliers, hand-held electric drill, file,
handsaw, crowbar, rubber hammer, and claw hammer

Auxiliary tools Paper knife, bellows, plumb, fork, ladder, heat gun, and PVC insulation
tape

Special Tools
The special tools required for installing the N68E-21-N cabinet are the earth resistance meter,
ESD wrist strap, ESD gloves, cable peeler, safety knife, and multi-purpose crimping pliers.

Meters
The meters required for installing the N68E-21-N cabinet are the multimeter and 500 V
megohmmeter (for testing insulation resistance).

NOTE

The meters must be checked and certified.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 11


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 4 Installing N68E-21-N Cabinets

4 Installing N68E-21-N Cabinets

When installing N68E-21-N cabinets, the installation personnel need to install the external power
cables, PGND cables, cabinet, and cabinet fittings. The installation personnel also need to check
the power-on status of the cabinet, and attach engineering labels to the cabinet, external power
cables, and PGND cables.

Prerequisites
l The equipment is unpacked and accepted.
l The tools required for the installation are available.

Procedure
Step 1 Install N68E-21-N cabinets.

If... Then...

N68E-21-N cabinets need to be installed on See 6 Installing the N68E-21-N Cabinet on


an ESD floor an ESD Floor.

N68E-21-N cabinets need to be installed on See 5 Installing the N68E-21-N Cabinet on


a concrete floor a Concrete Floor.

N68E-21-N cabinets need to be installed on Contact Huawei for technical support.


other types of floor

Step 2 Install cabinet fittings by referring to 7 Installing the Accessories for the N68E-21-N
Cabinet.
Step 3 Attach engineering labels to cabinets by referring to 8 Attaching the Engineering Labels to
the Cabinets.

----End

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 12


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

5 Installing the N68E-21-N Cabinet on a


Concrete Floor

About This Chapter

This chapter describes how to install the N68E-21-N cabinet on a concrete floor.

5.1 Materials Required for Installing the N68E-21-N Cabinet on a Concrete Floor
The N68E-21-N cabinet can be directly installed on a concrete floor, so other types of materials
are not required. The number of N68E-21-N cabinets to be installed depends on the actual
requirements.
5.2 Template Files for N68E-21-N Cabinet Installation
The template files for installing N68E-21-N cabinets consist of the equipment room floor plan
and marking-off template. The equipment room floor plan is used to determine the installation
positions of N68E-21-N cabinets. The marking-off template is used to determine the drilling
positions. Installing N68E-21-N cabinets on a concrete floor or on an ESD floor requires the
same template files. When installing multiple N68E-21-N cabinets, install them side by side to
ensure that the length of the SFP+ high-speed cable is sufficient.
5.3 Positioning N68E-21-N Cabinets on a Concrete Floor
Positioning N68E-21-N cabinets on a concrete floor requires the following steps: determining
the installation position, marking off the installation position, drilling holes, and installing
expansion bolt assemblies. Install N68E-21-N cabinets side by side to ensure that the length of
the SFP+ high-speed cable is sufficient.
5.4 Securing an N68E-21-N Cabinet to a Concrete Floor
This section describes how to secure an N68E-21-N cabinet to a concrete floor.
5.5 Combining the N68E-21-N Cabinets
This section describes how to combine multiple N68E-21-N cabinets.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 13


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

5.1 Materials Required for Installing the N68E-21-N Cabinet


on a Concrete Floor
The N68E-21-N cabinet can be directly installed on a concrete floor, so other types of materials
are not required. The number of N68E-21-N cabinets to be installed depends on the actual
requirements.

5.2 Template Files for N68E-21-N Cabinet Installation


The template files for installing N68E-21-N cabinets consist of the equipment room floor plan
and marking-off template. The equipment room floor plan is used to determine the installation
positions of N68E-21-N cabinets. The marking-off template is used to determine the drilling
positions. Installing N68E-21-N cabinets on a concrete floor or on an ESD floor requires the
same template files. When installing multiple N68E-21-N cabinets, install them side by side to
ensure that the length of the SFP+ high-speed cable is sufficient.

Equipment Room Floor Plan


The equipment room floor plan is provided by the customer or engineering survey personnel.
Figure 5-1 shows an example of the equipment room floor plan.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 14


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-1 An example of the equipment room floor plan (unit: mm)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 15


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

NOTE

As shown in Figure 5-1, the installation positions of N68E-21-N cabinets meet the following requirements:
l The clearance between two rows of cabinets is at least 1000 mm.
l The clearance between a wall and the side panel that is the closest to the wall i at least 800 mm.
l The clearance between a wall and the cabinet front or rear that is the closest to the wall is at least 800
mm.
l The width of aisles in the equipment room is at least 1000 mm.

Marking-off Template
The marking-off template is delivered with N68E-21-N cabinets. Figure 5-2 shows an example
of the marking-off template.

Figure 5-2 An example of the marking-off template (unit: mm)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 16


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

5.3 Positioning N68E-21-N Cabinets on a Concrete Floor


Positioning N68E-21-N cabinets on a concrete floor requires the following steps: determining
the installation position, marking off the installation position, drilling holes, and installing
expansion bolt assemblies. Install N68E-21-N cabinets side by side to ensure that the length of
the SFP+ high-speed cable is sufficient.

Prerequisites
l The M12x102 expansion bolt assemblies are available.
l The equipment room floor plan and marking-off template are available.
l The following tools are available: a measuring tape, marker, hammer drill with 16 and
18 bits, vacuum cleaner, dustproof cover for electronic equipment, socket wrench, a
rubber mallet, and safety goggles.

Procedure
Step 1 Ensure that the equipment room floor plan meets the requirements for installing N68E-21-N
cabinets by referring to 5.2 Template Files for N68E-21-N Cabinet Installation.

Step 2 Use a measuring tape to determine the cabinet positions based on the dimensions specified in
the equipment room floor plan.

Step 3 Determine the positions of the the holes for installing the expansion bolt assemblies.
Use either a marking-off template or a measuring tape to determine the positions of holes for
installing the expansion bolt assemblies. The marking-off template is made of paper and is prone
to deformation. Before using the marking-off template, check whether it is deformed based on
the dimensions of the marking-off template specified in 5.2 Template Files for N68E-21-N
Cabinet Installation.

If... Then...

A marking-off template is delivered onsite Use the marking-off template to determine


and is not deformed the positions of the holes for installing the
expansion bolt assemblies. For detailed
operations, see Step 4.

Under other circumstances Use a measuring tape to determine the


positions of the holes for installing the
expansion bolt assemblies. For detailed
operations, see Step 5.

Step 4 Use the marking-off template to determine the positions of the holes for installing the expansion
bolt assemblies.
1. As shown in Figure 5-3 or Figure 5-4, use the measuring tape and marker to measure and
mark the start point for the front of each row of cabinets. From each start point, draw a
benchmark line in the direction that cabinets are to be arranged.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 17


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

2. Place the marking-off template on the floor. Ensure that the semicircle notch of the marking-
off template indicates the front of the cabinet and one edge of the marking-off template
aligns with the benchmark line.
3. Mark the positions of holes for installing expansion bolt assemblies. Each cabinet requires
four expansion bolt assemblies.
4. After marking the holes, measure the positions again to ensure correctness.
5. Go to Step 6.
Step 5 Use the measuring tape to determine the positions of the holes for installing the expansion bolt
assemblies.
1. As shown in Figure 5-3 or Figure 5-4, use the measuring tape and marker to measure and
draw two straight lines parallel to the front of the cabinet. The spacing between the two
straight lines is 408 mm.

Figure 5-3 Holes for installing one cabinet (unit: mm)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 18


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-4 Holes for installing a row of cabinets (unit: mm)

CAUTION
Ensure that each line is accurately drawn, because imprecise line may hamper the
installation.

2. As shown in Figure 5-3 or Figure 5-4, determine the position of the hole for installing the
first expansion bolt assembly on each straight line. Using this position as a reference, mark
the holes for installing the other expansion bolt assemblies.
3. After marking the holes, measure the positions again to ensure correctness.
Step 6 Drill the holes.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 19


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

NOTE

Ensure that all the holes are drilled at their correct positions, because imprecise hole drilling may hamper
the installation.
l Before drilling the holes, ensure that the positions of the holes are correct based on Figure 5-4 or
Figure 5-5.
l Ask architectural engineers whether drilling into the concrete floor is permissible before drilling holes.
l The concrete floor should not be fully penetrated. Therefore, you should confirm the thickness of the
concrete floor before drilling any holes. If the concrete floor is not thick enough to hold the selected
expansion bolt assemblies, replace them.
l Protect the electronic equipment from dust before drilling the holes. For example, cover the electronic
equipment.
l Use a vacuum cleaner to remove the dust when drilling the holes. Before removing the dustproof cover
from the electronic equipment, remove particles and other waste that have accumulated when drilling
the holes.
l Wear safety goggles when drilling the holes.
1. Use a chisel to dig a pit to help hold the drill bit to the floor, as shown in Figure 5-5.

Figure 5-5 Using a chisel to dig a pit

NOTE
If the ground is too hard or slippery to position the drill bit stably, use a chisel to dig a pit before
drilling the holes. If a reinforcing steel bar is found where the hole is being drilled, stop drilling the
hole and drill another one a little inward along the diagonal.
2. Use the 16 bit and the scaleplate on the hammer drill to ensure that the drilling depth
ranges from 85 mm to 90 mm, as shown in Figure 5-6.

Figure 5-6 Drilling holes

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 20


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

NOTE

The drilling depth must not be less than 85 mm or more than 90 mm. Otherwise, the expansion bolt
assemblies cannot be installed and fastened.
3. Align the drill bit upright to the drilling position. Use both hands to hold the drill firmly,
and drill a hole. Use a vacuum cleaner to remove the dust when drilling the holes.
NOTE

If the ground is too hard or slippery to position the drill bit stably, use a chisel to dig a pit before
drilling the holes. If a reinforcing steel bar is found where the hole is drilled, stop drilling and drill
another one a little inward along the diagonal.
4. Remove the dust in the hole, measure its depth, and check whether the hole is slanted. If
the depth is insufficient or the hole is slanted, continue drilling. If the hole cannot be
corrected, stop drilling the hole.
5. Replace the 16 bit with the 18 bit, and then drill the hole until its diameter meets the
requirement.
NOTE

If the hole cannot be corrected, stop drilling and drill another one.

Step 7 Install expansion bolt assemblies. Figure 5-7 shows an expansion bolt assembly.

Figure 5-7 An expansion bolt assembly

(1) Bolt (2) Flat washer (3) Steel tube

4. Plastic tube (5) Expansion tube (6) Conical nut

1. Use the vacuum cleaner to remove the dust inside and outside the holes.
2. Measure the distance between holes. If the difference between the actual distance and the
required distance is larger than 2 mm, position and drill new holes.
3. Insert the guiding rib on the nut into the guide trough on the expansion tube, and tighten
the bolt slightly to ensure that the guiding rib does not move out from the guide trough, as
shown by 1 in Figure 5-8.
4. Insert the expansion bolt assembly into the hole, and hit the expansion bolt with a rubber
mallet until the entire expansion tube fills the hole, as shown by 2 in Figure 5-8.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 21


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-8 Installing an expansion bolt assembly (1)

5. Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not come
loose easily, as shown by 1 in Figure 5-9.
6. Unscrew the expansion bolt counterclockwise and remove the spring washer and flat
washer, as shown by 2 in Figure 5-9. Keep them for future use.

Figure 5-9 Installing an expansion bolt assembly (2)

----End

Follow-up Procedure
Record the positioning result in the corresponding table provided in Hardware Installation
Record.

5.4 Securing an N68E-21-N Cabinet to a Concrete Floor


This section describes how to secure an N68E-21-N cabinet to a concrete floor.

Prerequisites
l The N68E-21-N cabinet is available.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 22


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

l The following materials are available: insulation plates, flat washers 12, spring washers 12,
pads (optional), and expansion bolt assemblies.
l The following tools are available: a multimeter, level, and torque wrench.

Context

CAUTION
The cabinet has a high center of gravity. Therefore, do not lift or push the cabinet alone. Moving
a cabinet requires at least two people and a pallet truck to ensure personnel safety and prevent
equipment damage.

Procedure
Step 1 Remove the protection covers from the front and rear of the cabinet.

Step 2 Remove the metal packing accessories from the cabinet columns, as shown in Figure 5-10.

Figure 5-10 Removing the metal packing accessories

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 23


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Step 3 Optional: (When BSC6900 series controllers are used) Remove the subrack at the bottom of
the cabinet and keep for subsequent installation.
NOTE
The components installed in the bottom 5 U (1 U = 44.45 mm) space of the cabinet hampers the cabinet
installation. Therefore, remove them before installing the cabinet and reinstall them after the cabinet has
been installed.
1. At the rear of the subrack, remove the M3 screw on the right side of the plastic cover of
the power cable terminal, and loosen the M3 screw on the left side. Do not remove the M3
screw on the left side. Figure 5-11 shows the rear view of a subrack.

Figure 5-11 Rear view of a subrack

(1) PDB monitoring cable (2) Power cables (3) PGND cables

(4) Plastic cover (5) M3 screw (6) subrack

2. Remove the power cables from the rear of the subrack. Figure 5-11 shows the positions of
the power cables.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 24


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

CAUTION
When removing cables from the rear of the subrack, record the cable connections for future
reinstallations.

3. Remove the PGND cables and PDB monitoring cable from the rear of the subrack. Figure
5-11 shows the positions of the cables.
4. Use the cable ties to bind these cables to the mounting bars, and properly store the screws
and nuts for future use.
5. Use the Phillips screwdriver to remove all eight M6x12 screws that attach the subrack to
the front of the cabinet, and keep them for future use.

CAUTION
Five people are required to remove the subrack. Ensure personnel safety.

6. One people pushes the subrack out along the guide rail from the rear of the cabinet. The
other four people hold the mounting ears and the bottom of the subrack to pull the subrack
out of the cabinet from the front.
7. Keep the subrack for future use.
Step 4 Optional: (When BSC6910 series controllers are used) Remove the air defence subrack and the
subrack at the bottom of the cabinet and keep for subsequent installation.
NOTE
The components installed in the bottom 5 U (1 U = 44.45 mm) space of the cabinet hampers the cabinet
installation. Therefore, remove them before installing the cabinet and reinstall them after the cabinet has
been installed.
1. Remove the clock cables, SFP+ high-speed cables, and Ethernet cables from the boards in
the subrack.

CAUTION
When removing cables from the rear of the subrack, record the cable connections for future
reinstallations.

2. Remove the PGND cables from the rear of the subrack. Figure 5-12 shows the positions
of the cables.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 25


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-12 PGND cables at the rear of the subrack

3. Use the cable ties to bind these cables to the mounting bars, and properly store the screws
and nuts for future use.
4. Use the Phillips screwdriver to remove all eight M6x12 screws that attach the subrack to
the front of the cabinet, and keep them for future use.

CAUTION
Five people are required to remove the subrack. Ensure personnel safety.

5. One people pushes the subrack out along the guide rail from the rear of the cabinet. The
other four people hold the mounting ears and the bottom of the subrack to pull the subrack
out of the cabinet from the front.
6. Remove the air defence subrack under the subrack.
7. Keep the subrack and air defence subrack for future use.
Step 5 Lay two insulation plates for each cabinet on the floor, as shown in Figure 5-13.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 26


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-13 Installing the N68E-21-N cabinet on the concrete floor

(1) Bolt (2) Spring washer 12 (3) Flat washer

(4) Plain washer (5) Insulation tube (6) Steel tube

(7) Installation hole for the cabinet (8) Insulation plate (9) Pad (optional)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 27


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Step 6 Place the cabinet in the planned position. Align the installation holes at the bottom of the cabinet
with the holes for installing the expansion bolt assemblies.
Step 7 Use the level to check the cabinet. If the cabinet is not level, adjust it by inserting pads between
the insulation plate and the floor, as shown in Figure 5-13.

CAUTION
The pads must be inserted between the insulation plate and the floor. If they are inserted between
the insulation plate and the cabinet, the cabinet cannot be insulated.

Step 8 As shown in Figure 5-13, place the steel tube, insulation tube, and plain washer over the
installation hole. Ensure that the convex surface of the insulation tube faces downwards.
Step 9 Place the bold through the spring washer 12 and flat washer, and insert the bolt into the steel
tube, as shown in Figure 5-13.
Step 10 Tighten the four expansion bolt assemblies in a diagonal sequence to 80 Nm (708.06 lbf.in.).
Step 11 Level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level,
use a M12 socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet
and ensure that the cabinet is level.
Step 12 Measure the resistance between the fixing bolt of the cabinet and the ground bolt at the bottom
of the cabinet.
1. Set the multimeter to the megohm scale.
2. Measure the resistance between the fixing bolt of the rack and the ground bolt at the bottom
of the rack, as shown in Figure 5-14.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 28


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-14 Measuring the resistance

(1) Resistance tester (2) Fixing bolt (3) Ground bolt at the bottom of the rack

If... Then...

The resistance is greater than or equal to (When BSC6900 series controllers are used)
five megohms The cabinet is insulated from the ground. Go
to Step 17.
(When BSC6910 series controllers are used)
The cabinet is insulated from the ground. Go
to Step 18.

The resistance is less than five megohms The cabinet is not insulated from the ground.
Go to Step 13.

Step 13 Remove the cabinet.

Step 14 Check whether the improper insulation of the cabinet is caused by missing or damaged insulation
parts.
The insulation parts of the cabinet are the insulation plates and insulation tubes.

Step 15 Secure the cabinet again.

Step 16 Repeat the insulation test by following the instructions in Step 12 until the resistance is greater
than or equal to five megohms.

Step 17 Optional: (When BSC6900 series controllers are used) Reinstall the removed and subrack in
the cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 29


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

1. Two people hold the mounting ears of the subrack and the bottom of the subrack, and slide
the subrack into the cabinet along the guide rail. Use the eight M6x12 screws to attach the
subrack to the cabinet.
2. At the rear of the cabinet, connect the PGND cables, power cables, and PDB monitoring
cable and then reinstall the two plastic covers, as shown in Figure 5-11.
Step 18 Optional: (When BSC6910 series controllers are used) Reinstall the removed air defence
subrack and subrack in the cabinet.
1. Two people hold the mounting ears of the subrack and the bottom of the subrack, and slide
the subrack into the cabinet along the guide rail. Use the eight M6x12 screws to attach the
subrack to the cabinet.
2. At the rear of the cabinet, connect the PGND cables.

----End

Follow-up Procedure
Record the installation result in the corresponding table provided in Hardware Installation
Record.

5.5 Combining the N68E-21-N Cabinets


This section describes how to combine multiple N68E-21-N cabinets.

Prerequisites
For the installation, wrench and climbing ladder tools are available.

Context
Combining the cabinets is accomplished using connecting plates that connect the adjacent
cabinets after the cabinet installation. The connecting plates, which ensure that the cabinets are
upright, are already installed on the top of the cabinets at delivery.
NOTE

The cabinets cannot be installed back to back. When multiple cabinets are combined, they should be
installed side by side.

Figure 5-15 and Figure 5-16 show how to fix the connecting plates to combine cabinets.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 30


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-15 Installing connecting plates on the top of two adjacent cabinets

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 31


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 5 Installing the N68E-21-N Cabinet on a Concrete Floor

Figure 5-16 Installing connecting plates on the door heads of two adjacent cabinets

Procedure
Step 1 Reach the top of the cabinet using a climbing ladder.
Step 2 Install the connecting plates on the top of two adjacent cabinets, as shown in Figure 5-15.
Step 3 Install the connecting plates on the door heads of two adjacent cabinets, as shown in Figure
5-16.
Step 4 Ensure that the horizontal and vertical deviation of the cabinets is within specifications.
Step 5 Ensure that all of the cabinets are at the same level and stand side by side closely.

----End

Follow-up Procedure
Record the operation result in the corresponding table provided in Hardware Installation Record.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 32


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

6 Installing the N68E-21-N Cabinet on an ESD


Floor

About This Chapter

This chapter describes how to install the N68E-21-N cabinet on an ESD floor.
6.1 Materials Required for Installing the N68E-21-N Cabinet on the ESD Floor
This section describes the materials required for installing the N68E-21-N cabinet on the ESD
floor. The required materials are the N68E-21-N cabinet and shockproof support assembly.
6.2 Introduction to the Shockproof Support
This section describes the shockproof support, which is made of several components and needs
to be assembled on site.
6.3 Positioning N68E-21-N Cabinets on an ESD Floor
Positioning N68E-21-N cabinets on an ESD floor requires the following steps: determining
installation positions, marking off installation positions, and drilling holes. Install N68E-21-N
cabinets side by side to ensure that the length of the SFP+ high-speed cable is sufficient.
6.4 Assembling the Shockproof Support
This section describes how to assemble the shockproof support. The methods of assembling the
shockproof support are similar in the scenarios of combining an even number of cabinets in a
row, combining an odd number of cabinets in a row, and installing a single cabinet. The following
takes a single cabinet as an example to describe how to assemble the shockproof support.
6.5 Installing Floating Nuts on the Shockproof Support
After the shockproof support is assembled, the floating nuts must be installed to fix the N68E-21-
N cabinet on the shockproof support.
6.6 Securing a Shockproof Support to a Concrete Floor
This section describes how to drill holes, install expansion bolt assemblies, and secure a
shockproof support to a concrete floor.
6.7 Securing an N68E-21-N Cabinet to an ESD Floor
This section describes how to secure an N68E-21-N cabinet to an ESD floor.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 33


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

6.1 Materials Required for Installing the N68E-21-N Cabinet


on the ESD Floor
This section describes the materials required for installing the N68E-21-N cabinet on the ESD
floor. The required materials are the N68E-21-N cabinet and shockproof support assembly.
Table 6-1 lists the materials required for installing the N68E-21-N cabinet on the ESD floor.

Table 6-1 Materials

Name Sub- Quantity Remarks


Item

Shockproof Support N+1, for N The support needs to be assembled on site.


support cabinets For the ESD floors of different heights (H),
assembly the installation of the supports is of the
following types:
l For H 325 mm, no special processing
is required. This height is presented as an
example in this section.
l For 205 mm H < 325 mm, the
installation method is the same as that
used when H 325 mm but the support
needs to be customized.
l For H < 205 mm, the installation method
is different from that used in the previous
two scenarios and the support needs to be
customized.

Guide rail N, for N Each guide rail is 1,200 mm long. It needs


cabinets to be cut as required.

N68E-21-N - Depends on -
cabinet the site
requirements

6.2 Introduction to the Shockproof Support


This section describes the shockproof support, which is made of several components and needs
to be assembled on site.

6.2.1 Shockproof Support Assembly


This section describes the components of the shockproof support assembly. The components are
the horizontal beam/guide rail, lock catch, column connector, floating nut, column, base, angle
bracket, and expansion bolt.
Table 6-2 illustrates the components of the shockproof support assembly.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 34


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Table 6-2 Components of the shockproof support assembly

Horizontal beam/guide rail Column

Base

Lock catch

Angle bracket

Column connector

Floating nut

Expansion bolt

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 35


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

NOTE

l The horizontal beam/guide rail, column, base, column connector, and angle bracket are the main
components of the shockproof support assembly.
l The lock catch is used to secure the components.
l The floating nut is used to secure the cabinet on the guide rail. There are teeth on the floating nut.
Pre-tightening is implemented through the meshing of the teeth on the floating nut and the teeth on
the guide rail, and with the aid of the spring of the plastic pad on the floating nut.
l The expansion bolt is used to fix the support on the concrete floor.

6.2.2 Fastening the Lock Catches on the Shockproof Support


Assembly
This section describes how to fasten the lock catches on the shockproof support assembly.

Context
Lock catches are used to connect all the components of the shockproof support assembly. Both
the lock catch and the U-steel (horizontal beam/guide rail/column) have teeth. When the
components are assembled, mesh the teeth of the lock catch and the components to pre-tighten
them, as shown in Figure 6-1. The tightened support is shockproof.

Figure 6-1 Teeth of the U-steel and lock catch

Procedure
Step 1 Pre-tighten the lock catch. Press the bolt of the lock catch while turning the bolt to 90 degrees
clockwise. With the rotation of the bolt, the nut also rotates 90 degrees. Then, the two pieces are
pre-tightened, as shown in Figure 6-2.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 36


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-2 Tightening the lock catch

1 M10 bolt 2 Washer 3 Nut

Step 2 Tighten the lock catch. Use a socket wrench to tighten the bolt to 40 Nm clockwise.

----End

6.2.3 Cutting Guide Rails for the Shockproof Support


Before assembling the shockproof support, you should cut the guide rails according to the type
of the combined cabinets. According to the number of combined cabinets, there are three types:
an even number of cabinets combined in a row, an odd number of cabinets combined in a row,
and a single cabinet installed. If the guide rails on site are already cut, skip this procedure.

Prerequisites
l The materials required for the cutting are available. The required materials are the guide
rails.
l The tools required for the cutting are available. The required tools are the tape measure,
file, sandpaper, and metal cutter.

Context
The guide rail is 1,200 mm long and the cabinet is 600 mm wide. Therefore,
l For combining an even number of cabinets in a row, it is not necessary to cut the guide rail.
Figure 6-3 shows the guide rails for combining an even number of cabinets in a row.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 37


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-3 Guide rails for combining an even number of cabinets in a row

l To combine an odd number of cabinets in a row, cut a 1,200 mm long guide rail into two
600 mm long guide rails. Figure 6-4 shows the guide rails for combining an odd number
of cabinets in a row.

Figure 6-4 Guide rails for combining an odd number of cabinets in a row

l To install a single cabinet, cut a 1,200 mm long guide rail into two 600 mm long guide
rails. Figure 6-5 shows the guide rails for installing a single cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 38


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-5 Guide rails for installing a single cabinet

CAUTION
In underfloor cabling mode, the guide rail may block part of the cabling space. Therefore, for
installations using underfloor cabling with a large number of cables, ensure beforehand that the
guide rails will not affect the cabling.

Procedure
Step 1 Choose a scheme of cutting the guide rails according to the type of the combined cabinets.

If... Then...

An odd number of cabinets are combined in a row or Go to Step 2.


a single cabinet is installed,

An even number of cabinets are combined in a row, Cutting guide rails is unnecessary.

Step 2 Use the metal cutter to cut a 1,200 mm long guide rail into two 600 mm long guide rails.

Step 3 Use the file or sandpaper to smooth the cut surfaces of the guide rails.

Step 4 Apply antirust paint on the cut surfaces.

----End

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 39


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

6.3 Positioning N68E-21-N Cabinets on an ESD Floor


Positioning N68E-21-N cabinets on an ESD floor requires the following steps: determining
installation positions, marking off installation positions, and drilling holes. Install N68E-21-N
cabinets side by side to ensure that the length of the SFP+ high-speed cable is sufficient.

Prerequisites
l The equipment room floor plan is available.
l The following tools are available: a measuring tape, panel lifter, electrical saw, marker,
hammer drill with a 14 bit, vacuum cleaner, dustproof cover for electronic equipment,
rubber mallet, and safety goggles.

Procedure
Step 1 Ensure that the equipment room floor plan meets the requirements for installing N68E-21-N
cabinets by referring to 5.2 Template Files for N68E-21-N Cabinet Installation.

Step 2 Use a measuring tape to determine the cabinet positions based on the dimensions specified in
the equipment room floor plan.

Step 3 Determine the positions of holes for installing bolts on the ESD floor based on the cabinet
positions.
Use either a marking-off template or a measuring tape to determine the positions of the holes
for installing the bolts. The marking-off template is made of paper and is prone to deformation.
Before using the marking-off template, check whether it is deformed based on the dimensions
of the marking-off template specified in 5.2 Template Files for N68E-21-N Cabinet
Installation.

If... Then...

A marking-off template is delivered onsite Use the marking-off template to determine


and is not deformed the positions of the holes for installing the
bolts. For detailed operations, see Step 4.

Under other circumstances Use a measuring tape to determine the


positions of the holes for installing the bolts.
For detailed operations, see Step 5.

Step 4 Use the marking-off template to determine the positions of the holes for installing the bolts.
1. As shown in Figure 6-6 or Figure 6-7, use the measuring tape and marker to measure and
mark the start point for the front of each row of cabinets. From each start point, draw a
benchmark line in the direction that cabinets are to be arranged.
2. Place the marking-off template on the floor. Ensure that the semicircle notch of the marking-
off template indicates the front of the cabinet and one edge of the marking-off template
aligns with the benchmark line.
3. Mark the positions of the holes for installing the bolts. Each cabinet requires four bolts.
4. After marking the holes, measure the positions again to ensure correctness.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 40


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

5. Go to Step 6.
Step 5 Use the measuring tape to determine the positions of the holes for installing the bolts.
1. As shown in Figure 6-6 or Figure 6-7, use the measuring tape and marker to measure and
draw two straight lines parallel to the front of the cabinet. The spacing between the two
straight lines is 408 mm.

Figure 6-6 Holes for installing one cabinet (unit: mm)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 41


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-7 Holes for installing a row of cabinets (unit: mm)

CAUTION
Ensure that each line is accurately drawn, because imprecise line may hamper the
installation.

2. As shown in Figure 6-6 or Figure 6-7, determine the position of the hole for installing the
first bolt on each straight line. Using this position as a reference, mark the holes for installing
the other bolts.
3. After marking the holes, measure the positions again to ensure correctness.
Step 6 Drill the holes.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 42


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

NOTE

Ensure that all the holes are drilled at their correct positions, because imprecise hole drilling may hamper
the installation.
l Before drilling the holes, ensure that the positions of the holes are correct according to Figure 6-6 or
Figure 6-7.
l Protect the electronic equipment in the equipment room from dust before drilling the holes. For
example, cover the electronic equipment.
l Use a vacuum cleaner to clean up the dust when drilling the holes. Before uncovering the electronic
equipment, remove particles and other waste that that have accumulated when drilling the holes.
l Wear safety goggles when drilling the holes.
1. Use the 14 bit and the scaleplate on the hammer drill to ensure that the drilling depth is
slightly larger than the thickness of the ESD floor, as shown in Figure 6-8.

Figure 6-8 Drilling holes

2. Align the drill bit upright to the drilling position. Use both hands to hold the drill firmly,
and drill a hole. Use a vacuum cleaner to remove the dust when drilling the holes.
3. Remove the dust in the hole, measure its depth, and check whether the hole is slanted. If
the depth of the hole is insufficient or the hole is slanted, continue drilling. If the hole cannot
be corrected, stop drilling and drill another one.
Step 7 Cut the ESD floor. Use a panel lifter to move the ESD floor to be cut and cut a part off the ESD
floor to facilitate cabling. Figure 6-9 shows the positions for cutting the ESD floor.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 43


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-9 Positions for cutting the ESD floor (unit: mm)

CAUTION
When doing the cutting, wear a pair of gloves to prevent injury.

Step 8 Remove the ESD floor supports from the area where cabinets are to be installed.

----End

Follow-up Procedure
Clean up the installation area for future installations.

6.4 Assembling the Shockproof Support


This section describes how to assemble the shockproof support. The methods of assembling the
shockproof support are similar in the scenarios of combining an even number of cabinets in a
row, combining an odd number of cabinets in a row, and installing a single cabinet. The following
takes a single cabinet as an example to describe how to assemble the shockproof support.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 44


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Prerequisites
l For the assembling, the following components are available - the horizontal beam/guide
rail, lock catch, column connector, floating nut, column, base, angle bracket, and expansion
bolt.
l The following tools are available - the level bar, torque wrench, and metal cutter.
l For combining an odd number of cabinets in a row or for installing a single cabinet, cutting
a guide rail is complete. For combining an even number of cabinets in a row, guide rails
need not be cut beforehand.

Procedure
Step 1 Place the bases on the concrete floor.
Step 2 Insert the columns until they reach the bottom of the bases, and pre-tighten the columns and the
bases by using the lock catches, as shown in Figure 6-10.

Figure 6-10 Installing the columns

Step 3 Pre-tighten the column connectors onto the top of the columns by using the lock catches. Ensure
that the top surface of each support plate soldered to the column connectors and the top surface
of each column are at the same level, as shown in Figure 6-11.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 45


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-11 Installing the column connectors

Step 4 Place the two guide rails onto the column connectors. Pre-tighten the guide rails to the column
connectors by using the lock catches. Adjust the positions of the bases and ensure that each guide
rail projects 10-15 mm beyond both sides of the column. See Figure 6-12.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 46


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-12 Installing the guide rails

Step 5 Pre-tighten each angle bracket to the corresponding column by using two lock catches. Ensure
that the top surface of the angle brackets and the top surface of the columns are at the same level.
Four angle brackets need to be pre-tightened, as shown in Figure 6-13.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 47


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-13 Installing the angle brackets

Step 6 Place two horizontal beams onto the columns. Ensure that the beams are in close contact with
the corresponding angle brackets. Adjust the positions of the columns. Ensure that the distance
between the two guide rails is 457.5 mm. Pre-tighten the horizontal beam and the corresponding
angle bracket by using two lock catches.
Step 7 Adjust the height of the columns. Ensure that the height of the support is 3-5 mm greater than
the distance between the concrete floor and the lower surface of the ESD floor.
Step 8 Adjust the positions of the horizontal beams and guide rails. Ensure that they are at the same
level. The distance between the two guide rails should be 457.50.5 mm.
Step 9 Tighten all the lock catches to 40 Nm.
Step 10 Check whether the column connectors need to be cut.

If... Then...

The column connectors are already cut to The assembling of the shockproof support is
the proper length, complete.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 48


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

If... Then...

The column connectors are not cut and the 1. Loosen some of the lock catches.
cutting tool is unavailable on site, 2. Move the columns inward along the guide
rails until the columns are aligned with the
ends of the guide rails.
3. Tighten all the lock catches.
The assembling of the shockproof support is
complete.

There is another situation, Go to Step 11.

CAUTION
When doing the cutting, wear a pair of gloves to prevent injury.

Step 11 Use the metal cutter to cut the column connectors that project beyond the guide rails. Figure
6-14 shows the assembled support.

Figure 6-14 Assembled support (unit: mm)

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 49


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

CAUTION
After cutting the column connectors, smooth the cut surfaces and brush antirust paint on the
cross section.

----End

6.5 Installing Floating Nuts on the Shockproof Support


After the shockproof support is assembled, the floating nuts must be installed to fix the N68E-21-
N cabinet on the shockproof support.

Prerequisites
l The shockproof support is assembled.
l For the installation, the torque wrench and rubber hammer are available.

Procedure
Step 1 Place the assembled support under the ESD floor and loosen the lock catches that connect the
bases and the columns.
Step 2 Put the ESD floor back to the original position on the floor framework and use a rubber hammer
to hammer the ESD floor. Ensure that the top surface of the support clings to the ESD floor.
Step 3 Tighten the lock catches that connect the bases and the columns to 40 Nm.
Step 4 Remove the ESD floor.
Step 5 Install four floating nuts at both ends of the two guide rails. Ensure that the floating nuts are
symmetrical around the center of the support. The positions of the floating nuts are shown in
Figure 6-15.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 50


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-15 Installing floating nuts (unit: mm)

NOTE

l There are teeth on the floating nut. Pre-tightening is implemented through the meshing of the teeth on
the floating nut and the teeth on the guide rail, and with the aid of the spring of the plastic pad on the
floating nut.
l If you want to move a floating nut, press the plastic pad and meanwhile move the floating nut along
the guide rail.

----End

6.6 Securing a Shockproof Support to a Concrete Floor


This section describes how to drill holes, install expansion bolt assemblies, and secure a
shockproof support to a concrete floor.

Prerequisites
l The shockproof support to be installed is available.
l The M875 expansion bolt assemblies are available.
l The equipment room floor plan is available.
l The following tools are available: a socket wrench, measuring tape, panel lifter, marker,
hammer drill with a 12 bit, vacuum cleaner, dustproof cover for electronic equipment,
rubber mallet, and safety goggles.

Procedure
Step 1 Place the removed ESD floor on the assembled shockproof support. Align the installation holes
on the ESD floor with the floating nuts.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 51


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Step 2 Use a marker to mark the holes for installing the base, as shown in Figure 6-16.

Figure 6-16 Holes installing for the base

(1) ESD floor (2) Installation hole aligned with the floating nut (3) Hole for installing the base

Step 3 Remove the ESD floor and the shockproof support and mark the holes for drilling on the concrete
floor.
NOTE

Ensure that all the holes are drilled at their correct positions, because imprecise hole drilling may hamper
the installation.
l Ask architectural engineers whether drilling into the concrete floor is permissible before drilling holes.
l The concrete floor should not be fully penetrated. Therefore, you should confirm the thickness of the
concrete floor before drilling any holes. If the concrete floor is not thick enough to hold the selected
expansion bolt assemblies, replace them.
l Protect the electronic equipment from dust before drilling the holes. For example, cover the electronic
equipment with dustproof cover.
l Use a vacuum cleaner to remove the dust when drilling the holes.
l Before removing the dustproof cover from the electronic equipment, remove particles and other waste
that have accumulated when drilling the holes.
l Wear safety goggles when drilling the holes.
1. Use a chisel to dig a pit to help hold the drill bit to the floor, as shown in Figure 6-17.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 52


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-17 Using a chisel to dig a pit

NOTE
If the ground is too hard or slippery to position the drill bit stably, use a chisel to dig a pit before
drilling the holes. If a reinforcing steel bar is found where the hole is being drilled, stop drilling the
hole and drill another one a little inward along the diagonal.
2. Fasten the 12 bit onto the hammer drill.
3. Use the scaleplate on the hammer drill to ensure that the drilling depth ranges from 70 mm
to 75 mm, as shown in Figure 6-18.

Figure 6-18 Drilling holes

NOTE

The drilling depth must not be less than 70 mm or more than 75 mm. Otherwise, the expansion bolt
assemblies cannot be installed and fastened.
4. Align the drill bit upright to the marked holes to install the support. Use both hands to hold
the drill firmly, and drill a hole. Use a vacuum cleaner to remove the dust when drilling the
holes.
5. Measure the depth of a hole. If the depth is insufficient, continue to drill the hole.
6. Check whether the hole is slanted. If it is, drill the hole again.

Step 4 Install the expansion bolt assemblies. Figure 6-19 shows an expansion bolt assembly.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 53


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-19 An expansion bolt assembly

(1) M875 bolt (2) Large flat washer (3) Steel tube

(4) Plastic tube (5) Expansion tube (6) Nut

1. Insert an expansion bolt assembly vertically into the hole to install the support.
2. Use the rubber mallet to hammer the expansion bolt assembly until the steel tube is 3 mm
to 5 mm above the ground.
3. Use the torque wrench to remove the bolt, and then remove the flat washer and steel tube.
Keep them for future use.
Step 5 Fix the support, as shown in Figure 6-20.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 54


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-20 Fixing the support

(1) M875 bolt (2) Large flat washer (3) Steel tube

(4) Plastic tube (5) Expansion tube (6) Nut

CAUTION
When fixing the support, use the large flat washer instead of the flat washer provided with the
expansion bolt assembly.

1. Place the support in the installation position and ensure that the hole for installing the base
aligns with the hole for installing the expansion bolt assembly.
2. Insert the steel tube into the hole for the expansion bolt assembly through the hole for
installing the base.
3. Place the large flat washer on the bolt, insert the bolt into the steel tube, and tighten the bolt
to 25 Nm (221.26875 lbf.in.).
4. Repeat Step 5.2 and Step 5.3 to tighten the remaining bolts to 25 Nm (221.26875 lbf.in.)
diagonally.

----End

6.7 Securing an N68E-21-N Cabinet to an ESD Floor


This section describes how to secure an N68E-21-N cabinet to an ESD floor.

Prerequisites
l The N68E-21-N cabinet is available.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 55


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

l The following materials are available: knitting bags or other protective materials, insulation
plates, spring washers 12, plain washers, insulation tubes, expansion bolt assemblies (bolts,
steel tubes, and large flat washers), and cable ties.
l The following tools are available: a Phillips screwdriver, level, torque wrench, socket
wrench, multimeter, and diagonal pliers.

Procedure
Step 1 Remove the protection covers from the front and rear of the cabinet.

Step 2 Remove the metal packing accessories from the cabinet columns, as shown in Figure 6-21.

Figure 6-21 Removing the metal packing accessories

Step 3 Optional: (When BSC6900 series controllers are used) Remove the subrack at the bottom of
the cabinet and keep for subsequent installation.
NOTE
The components installed in the bottom 5 U (1 U = 44.45 mm) space of the cabinet hampers the cabinet
installation. Therefore, remove them before installing the cabinet and reinstall them after the cabinet has
been installed.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 56


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

1. At the rear of the subrack, remove the M3 screw on the right side of the plastic cover of
the power cable terminal, and loosen the M3 screw on the left side. Do not remove the M3
screw on the left side. Figure 6-22 shows the rear view of a subrack.

Figure 6-22 Rear view of a subrack

(1) PDB monitoring cable (2) Power cables (3) PGND cables

(4) Plastic cover (5) M3 screw (6) subrack

2. Remove the power cables from the rear of the subrack. Figure 6-22 shows the positions of
the power cables.

CAUTION
When removing cables from the rear of the subrack, record the cable connections for future
reinstallations.

3. Remove the PGND cables and PDB monitoring cable from the rear of the subrack. Figure
6-22 shows the positions of the cables.
4. Use the cable ties to bind these cables to the mounting bars, and properly store the screws
and nuts for future use.
5. Use the Phillips screwdriver to remove all eight M6x12 screws that attach the subrack to
the front of the cabinet, and keep them for future use.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 57


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

CAUTION
Five people are required to remove the subrack. Ensure personnel safety.

6. One people pushes the subrack out along the guide rail from the rear of the cabinet. The
other four people hold the mounting ears and the bottom of the subrack to pull the subrack
out of the cabinet from the front.
7. Keep the subrack for future use.

Step 4 Optional: (When BSC6910 series controllers are used) Remove the air defence subrack and the
subrack at the bottom of the cabinet and keep for subsequent installation.
NOTE
The components installed in the bottom 5 U (1 U = 44.45 mm) space of the cabinet hampers the cabinet
installation. Therefore, remove them before installing the cabinet and reinstall them after the cabinet has
been installed.
1. Remove the clock cables, SFP+ high-speed cables, and Ethernet cables from the boards in
the subrack.

CAUTION
When removing cables from the rear of the subrack, record the cable connections for future
reinstallations.

2. Remove the PGND cables from the rear of the subrack. Figure 6-23 shows the positions
of the cables.

Figure 6-23 PGND cables at the rear of the subrack

3. Use the cable ties to bind these cables to the mounting bars, and properly store the screws
and nuts for future use.
4. Use the Phillips screwdriver to remove all eight M6x12 screws that attach the subrack to
the front of the cabinet, and keep them for future use.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 58


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

CAUTION
Five people are required to remove the subrack. Ensure personnel safety.

5. One people pushes the subrack out along the guide rail from the rear of the cabinet. The
other four people hold the mounting ears and the bottom of the subrack to pull the subrack
out of the cabinet from the front.
6. Remove the air defence subrack under the subrack.
7. Keep the subrack and air defence subrack for future use.

Step 5 Before securing the cabinet, reposition the ESD floor under the cabinet and align the installation
holes on the ESD floor with the floating nuts.

Step 6 Lay two insulation plates for each cabinet on the floor. Then, align the installation holes of the
insulation plates with those of the cabinet, as shown in Figure 6-24.

Figure 6-24 Fixing the cabinet to the support

(1) M1280 bolt (2) Spring washer 12 (3) Large flat washer

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 59


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

(4) Plain washer (5) Insulation tube (6) Steel tube

(7) Cabinet (8) Insulation plate (9) ESD floor

(10) Support

Step 7 Place the cabinet in the planned position. Align the installation holes at the bottom of the cabinet
with the holes for the insulation plates.
Step 8 Place an insulation tube, plain washer, and steel tube on each installation hole. Ensure that the
convex surface of the insulation tube faces downwards.
Step 9 Place a bolt through the spring washer 12 and large flat washer. Insert the bolt through the cabinet
installation hole into the floating nut in the beam on the support. Use the torque wrench to keep
the bolt in place.
Step 10 Repeat Step 8 and Step 9 to install the remaining bolts. Tighten the four bolts to 40 Nm (354.03
lbf.in.) in a diagonal sequence. Figure 6-25 shows the cabinet fixed to the support.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 60


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

Figure 6-25 N68E-21-N cabinet fixed to the support

Step 11 Level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level,
use a M12 socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet
and ensure that the cabinet is level.

Step 12 Measure the resistance between the fixing bolt of the cabinet and the ground bolt at the bottom
of the cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 61


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

1. Set the multimeter to the megohm scale.


2. Measure the resistance between the fixing bolt of the rack and the ground bolt at the bottom
of the rack, as shown in Figure 6-26.

Figure 6-26 Measuring the resistance

(1) Resistance tester (2) Fixing bolt (3) Ground bolt at the bottom of the cabinet

If... Then...

The resistance is greater than or equal to The cabinet is insulated from the ground. The
five megohms insulation test is complete.

The resistance is smaller than five megohms The cabinet is not insulated from the ground.
Go to Step 13.

Step 13 Uninstall the cabinet.

Step 14 Check whether the improper insulation of the cabinet is caused by missing or damaged insulation
parts.
The insulation parts are the insulation plates and insulation tubes.

Step 15 Secure the cabinet again.

Step 16 Repeat the insulation test by following the instructions in Step 12 until the resistance is greater
than or equal to five megohms.

Step 17 Optional: (When BSC6900 series controllers are used) Reinstall the removed and subrack in
the cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 62


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 6 Installing the N68E-21-N Cabinet on an ESD Floor

1. Two people hold the mounting ears of the subrack and the bottom of the subrack, and slide
the subrack into the cabinet along the guide rail. Use the eight M6x12 screws to attach the
subrack to the cabinet.
2. At the rear of the cabinet, connect the PGND cables, power cables, and PDB monitoring
cable and then reinstall the two plastic covers, as shown in Figure 6-22.
Step 18 Optional: (When BSC6910 series controllers are used) Reinstall the removed air defence
subrack and subrack in the cabinet.
1. Two people hold the mounting ears of the subrack and the bottom of the subrack, and slide
the subrack into the cabinet along the guide rail. Use the eight M6x12 screws to attach the
subrack to the cabinet.
2. At the rear of the cabinet, connect the PGND cables.

----End

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 63


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

7 Installing the Accessories for the N68E-21-N


Cabinet

About This Chapter

This chapter describes how to install the front and back doors as well as side panels for the
N68E-21-N cabinet and how to install the PGND cables for the doors and side panels.
7.1 Accessories to Be Installed for the N68E-21-N Cabinet
The accessories to be installed for the N68E-21-N cabinet are front and back doors, side panels,
and the corresponding PGND cables.
7.2 Installing the Side Panels for the N68E-21-N Cabinet
A single N68E-21-N cabinet has four side panels, with two side panels on both the left and right
sides. When multiple N68E-21-N cabinets are combined in a row, a total of four side panels
need to be installed at the two ends of the cabinet row. When the N68E-21-N cabinet is combined
with other types of cabinets, you need to install the side panels where the cabinets are combined.
7.3 Installing the Front and Back Doors for the N68E-21-N Cabinet
This section describes how to install the front and back doors (four in total) for the N68E-21-N
cabinet.
7.4 Installing the PGND Cables for the Doors and Side Panels of the N68E-21-N Cabinet
Each door and each side panel of the cabinet need to be installed with a PGND cable.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 64


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

7.1 Accessories to Be Installed for the N68E-21-N Cabinet


The accessories to be installed for the N68E-21-N cabinet are front and back doors, side panels,
and the corresponding PGND cables.
Table 7-1 lists the accessories to be installed for the N68E-21-N cabinet.

Table 7-1 Accessories to be installed for the N68E-21-N cabinet


Accesso Installation Position Remarks
ry

Side See Exploded View of the N68E-21-N Side panels need to be installed at
panel Cabinet. both ends of a row of combined
cabinets. The side panels are
classified into left panels and right
panels.

Front and Both the front and back doors have


back a double-door structure: one left
doors door and one right door. The
methods of installing the front and
back doors are the same.

PGND The PGND cables connect the


cables for front and back doors as well as side
the doors panels to the base of the cabinet.
and side
panels

7.2 Installing the Side Panels for the N68E-21-N Cabinet


A single N68E-21-N cabinet has four side panels, with two side panels on both the left and right
sides. When multiple N68E-21-N cabinets are combined in a row, a total of four side panels
need to be installed at the two ends of the cabinet row. When the N68E-21-N cabinet is combined
with other types of cabinets, you need to install the side panels where the cabinets are combined.

Prerequisites
l For the installation, the side panels and M6x12 countersunk screws are available.
l A Phillips screwdriver with a long handle is available.

Context
Figure 7-1 shows how to install the side panels for the N68E-21-N cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 65


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

Figure 7-1 Installing the side panels for the N68E-21-N cabinet

1 M6x12 countersunk screw 2 Installation hole for the countersunk screw 3 Floating nut
4 Notch on the side panel 5 M6x16 screw assembly

Procedure
Step 1 Loosen the M6x16 screw assembly on the cabinet.
Step 2 Fit the three installation notches on the side panel downwards to the M6x16 screw assembly.

CAUTION
Figure 7-1 shows the direction of the installation notch.

Step 3 Fix the side panel into the open slot on the door head.
Step 4 Tighten the two M6x12 countersunk screws and the three M6x16 screw assemblies.

----End

Follow-up Procedure
Record the installation result in the corresponding table provided in Hardware Installation
Record.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 66


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

7.3 Installing the Front and Back Doors for the N68E-21-N
Cabinet
This section describes how to install the front and back doors (four in total) for the N68E-21-N
cabinet.

Prerequisites
l To facilitate the operation, the front and back doors should be installed after the installation
of other hardware is complete.
l For the installation, the front and back doors of the cabinet are available.

Context
Figure 7-2 shows how to install the front and back doors for the N68E-21-N cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 67


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

Figure 7-2 Installing the front and back doors for the N68E-21-N cabinet

1 Movable pivot 2 Lower pivot 3 Pivot hole

Procedure
Step 1 Insert the lower pivot of the door into the pivot hole on the lower enclosure of the cabinet. Then,
install the lower edge of the door.
Step 2 Pull down the movable pivot, align the hole of the movable pivot with the pivot hole on the
upper enclosure of the cabinet, and then release the movable pivot to fix the door onto the cabinet.

----End

Follow-up Procedure
Record the installation result in the corresponding table provided in Hardware Installation
Record.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 68


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

7.4 Installing the PGND Cables for the Doors and Side
Panels of the N68E-21-N Cabinet
Each door and each side panel of the cabinet need to be installed with a PGND cable.

Prerequisites
l For the installation, the PGND cables for the doors and side panels are available.
l The following tools are available - the Phillips screwdriver and wrench.

Context
Figure 7-3 shows how to install the PGND cables for the doors and side panels of the N68E-21-
N cabinet.

Figure 7-3 Installing the PGND cables for the doors and side panels of the N68E-21-N cabinet

1 Front/rear door 2 Side panel 3 Ground screw on the 4 PGND cable for the
front/rear door front/rear door

5 Ground screw on the side 6 PGND cable for the side 7 Ground screws on the 8 Base
panel panel base

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 69


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 7 Installing the Accessories for the N68E-21-N Cabinet

Procedure
Step 1 Connect the PGND cables for the side panels. In a row of cabinets, connect the ground screw
on each of the left panels of the left-most cabinet to that at the bottom of the left-most cabinet
by using the PGND cable; connect the ground screw on each of the right panels of the right-
most cabinet to that at the bottom of the right-most cabinet by using the PGND cable, as shown
in Figure 7-3.
Step 2 Connect the PGND cables for the front and rear doors of each cabinet, as shown in Figure
7-3.

----End

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 70


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 8 Attaching the Engineering Labels to the Cabinets

8 Attaching the Engineering Labels to the


Cabinets

This chapter describes how to attach the engineering labels, including row and column labels,
to the cabinets.

Context
Figure 8-1 shows the row label.

Figure 8-1 Row label

Figure 8-2 shows the column label.

Figure 8-2 Column label

Procedure
Step 1 Attach the row labels to the cabinets.

Attach the row labels to the side panels of the cabinets that stand near the aisle at the two ends
of each cabinet row.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 71


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 8 Attaching the Engineering Labels to the Cabinets

If there is more than one row of cabinets, attach label A to the side panels at the two ends of the
first cabinet row that is the closest to the door of the equipment room, label B to the second row,
label C to the third row, and so on.
Step 2 Attach the column labels to the cabinets.
Attach the column labels to the door head of the cabinet front, with label 00 to the first cabinet
near the main aisle, 01 to the second one, 02 to the third one, and so on.

----End

Follow-up Procedure
Record the operation result in the corresponding table provided in Hardware Installation
Record9 Hardware Installation Record.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 72


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 9 Hardware Installation Record

9 Hardware Installation Record

The hardware installation record is used to record the hardware installation information.

Table 9-1 Checklist for the installation of cable tray


Item Yes or No Record/Remarks

The bolts for all the


cable ladders are
installed.

The cable troughs


and all their bolts
are installed.

All the accessories


for the cable tray
are installed.

Table 9-2 Checklist for the cabinet installation


Item Yes or No Record/Remarks

The installation
positions of the
cabinets are
determined.

The positions of all the


cabinets are marked.

The installation holes


for all the expansion
bolt assemblies are
drilled.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 73


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 9 Hardware Installation Record

Item Yes or No Record/Remarks

All the expansion bolt


assemblies are
installed.

All the supports are


installed if the ESD
floor is used.

All the cabinets are


installed and secured.

All the cabinets are


insulated.

All the cabinets are


combined.

The ESD floor is


placed in the original
position if the ESD
floor is used.

Table 9-3 Checklist for the installation of other accessories


Item Yes or Record/Remarks
No

The side panels of all the


cabinets are installed.

The front and back doors


of all the cabinets are
installed.

All the PGND cables for


the doors are installed.

All the engineering labels


are attached to the cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 74


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 10 Checklist for the Cabinet Installation

10 Checklist for the Cabinet Installation

This chapter describes the items and specifications for checking the cabinet installation.
Table 10-1 lists the items and specifications for checking the cabinet installation.

Table 10-1 Checklist for the cabinet installation


SN Item

1 The cabinet layout complies with the engineering design.

2 The supports are positioned and spaced according to the schematic drawing of
installation holes if the equipment room has an ESD floor.

3 All supports are properly fixed to the floor if the equipment room has an ESD floor.

4 The support assembly is properly installed if the equipment room has an ESD floor.

5 All the front pallets for the ESD floor are installed at the same height if the equipment
room has an ESD floor that needs to be supported by front pallets.

6 The cabinet is well insulated from the support or ground.

7 The cover plates are properly installed at the top and bottom of the cabinet.

8 The accessories such as the side panel, front door, and rear door are properly
installed.

9 The row labels, column labels, and product labels are properly attached.

10 The ESD wrist strap is inserted into the ESD installation hole of the cabinet.

11 The connecting plates of the combined cabinets are properly installed.

12 The shockproof parts between multiple rows of cabinets are insulated.

13 All the screws are fastened. The flat washers and spring washers are mounted. The
spring washers are placed between the flat washers and the screws.

14 The cabinets are stable and orderly placed.

15 The adjacent cabinets are close to each other and are in alignment.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 75


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 10 Checklist for the Cabinet Installation

SN Item

16 The vertical deviation of the cabinet is less than 3 mm.

17 All the cabinet side panels facing the aisle are properly aligned, with the maximum
deviation of 5 mm.

18 The surfaces of the cabinets are clean without any fingerprint or smudge. The paint
on the surfaces of the cabinets is intact. There is no dust, excessive cable tie ends,
or other sundries in the cabinets (even at dead corners).

19 All the labels, tags, and nameplates are complete, legible, and correct.

20 The front and rear doors of the cabinet open and close easily.

21 The modules in one cabinet are aligned from the top down.

22 All the filler panels are installed.

23 All the boards are installed in proper positions, and the DIP switches of the boards
are properly set.

24 The components and the connecting wires or cables of the cabinets are not detached
or damaged.

25 The paint on the components of the cabinets is in overall good condition.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 76


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 11 Exploded View of the N68E-21-N Cabinet

11 Exploded View of the N68E-21-N Cabinet

This section describes the components of the N68E-21-N cabinet and the cabinet details, which
are indicated in the exploded view.
Figure 11-1 shows the structure of the N68E-21-N cabinet.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 77


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 11 Exploded View of the N68E-21-N Cabinet

Figure 11-1 Structure of the N68E-21-N cabinet

1 Door frames 2 Side panels 3 Rack

4 Front and rear doors 5 Middle columns

Table 11-1 describes the parts marked with letters in Figure 11-1.

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 78


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 11 Exploded View of the N68E-21-N Cabinet

Table 11-1 Parts of the N68E-21-N cabinet


No. Description No. Description

a b

(1) Installation hole for the sunk (1) Installation notch on the side
screw on the side panel panel

c d

(1) Combination screw M6 x 12 (1) Installation hole for the over-


(2) Connecting plate for combining cabinet support
RNC cabinets

e f

(1) Installation bolt for PGND cable


of RNC cabinet (1) Power cable hole

g h

(1) Plastic rodent-proof cover plate (1) Position for product label

i j

(1) Latch on the front door (1) Combination screw M6 x 16

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 79


Copyright Huawei Technologies Co., Ltd.
N68E-21-N Cabinet Installation Guide 11 Exploded View of the N68E-21-N Cabinet

No. Description No. Description

k l

(1) Pivot pin on the front door (1) Grounding bolt on the front/rear
door
(2) Floating nut for the side panel
(3) Pin hole for the front door

Issue 01 (2013-01-30) Huawei Proprietary and Confidential 80


Copyright Huawei Technologies Co., Ltd.

You might also like