A Trunkline is a non-electric initiation system which
is designed for use in underground and surface mines. The unit consists of an out-hole detonator.
Technical Specifications Mining Method
Appearance Underground A length of green shock tubing, which includes a short period Narrow Reef; Massive delay detonator and a rubber sleeve that has been crimped on Surface one end. The free end of the shock tube is sealed and Opencast; Open Pit; Quarrying; Construction incorporates a colour-coded connector clip which indicates the Application delay period. The out-hole detonator is located in a plastic six Tunnelling; Stoping; Massive (uphole); Ring Blasting; Trenching; tube connector block, which is colour-coded according to the Open Pit; Quarrying; Civils delay of the detonator. Product Range Benefits & Features Nominal delay (ms) 0 17 25 33 42 75 100 Colour code Turquiose Blue Orange Dark Green Yellow Red Brown Benefits Nominal delay (ms) 125 150 175 200 225 250 Combined trunkline and delay Colour code Light Light Beige Clear Grey Dark Pink Rugged, abrasion-resistant tubing Green Blue Easy connection Packaging Immune to hazards of radio frequency radiation, stray currents Description Case and electro-static discharge Dimensions (LxBxH) 565x295x270mm Can be used in underground or surface applications Gross weight 22kg Features Thirteen different short period delays Units per case/bag Length (m) Units per NEQ (kg) Length (m) Units per NEQ (kg) Colour coded connector block indicates delay time case case Connector block has a six tube capacity 2 250 0.2 9 140 0.1 Green coloured shock tubing 3-5 200 0.2 10 120 0.1 18kg minimum break load on shock tube 6 175 0.1 12 100 0.1 7-8 150 0.1 15 75 0.1 30 50 0.1
Transport (UN Classification)
Class 1.1B UN No 0360, DETONATOR ASSEMBLIES, NON-ELECTRIC