S.NO. Date DESCRIPTION LEAKS
[ joints ]

HOPPER S- PANEL top panel


1 18-09-2014 to panel joint 1
HOPPER S- PANEL Bottom
2 18-09-2014 Loose tube joint 1
Furnace Right side water
3 5/10/2014 wall tube joint 44 meter 1
HOPPER S- PANEL Bottom
4 24-10-2014 Loose tube joint 1
SH platen Inlet coil to Hdr
5 9/11/2014 Joint 1
furnace left side water wall
6 26-12-2014 tube joint 44 meter 3
HOPPER S- PANEL top panel
7 20-02-2015 to panel joint 1
HOPPER S- PANEL top panel
8 3/4/2015 to panel joint 1
HOPPER S- PANEL Bottom
Loose tube TO top pannel
9 19-04-2015 joint 1
Side passage water wall
Bottom Joint in Rear Arch
10 19-04-2015 Area 1
11 10/6/2015 Furnace Rear Water Wall 2
12 10/6/2015 Bottom of S Panel 6
13 11/2/2015 Bottom of S Panel 1
Back pass Water Wall Rear
14 11/12/2015 Side 1

15 21/11/2015 Bottom of S Panel 1


16 30/11/2015 Boiler Front Side 1
17 17/2/2016 LHS water wall 1
Bottom S pannel Front water
18 17/2/2016 wall 1
Bottom S pannel Rear water
19 30/6/2016 wall 1
Back pass Water Wall Rear
20 7/5/2016 Side 1
Furnace Roof outlet Header
21 9/2/2016 Stub joint 1
Bottom S pannel Front water
22 27/11/2016 wall 1

Ms vent pipe P91 joint


23 30/12/2016 leackage identified 1

s pannel front TUBE JOINT


24 30/12/2016 WELD LEACKAGE 1
25 31/12/2016 LHS water wall 1
s pannel LHS TUBE JOINT
26 13/1/2017 WELD LEACKAGE 1

27 19/1/2017 Roof tube weld joint leackage 1

LTSH Vertical coil tube


28 25/1/2017 damaged 6

Drum RHS Pr transmiter pipe


line 1

BCWPUMP chemical cleaning 1


29 19/4/2017 LHS water wall 1
30 24/5/2017 Drum sampling joint 2
Total 46

1 3/1/2016 Eco inlet Hdr to Coil joint 1


Furnace rear water wall S
2 7/1/2016 pannel 1
3 6/2/2016 RearArch water wall 1
Furnace front water wall S
4 3/3/2016 pannel [8 meter] 1
Furnace front water wall [13
5 18/4/2016 meter] 1
Furnace rear water wall [13
6 14/5/2016 meter] 1
Furnace RHS water wall [42
7 23/8/2016 meter] 2
Furnace front water wall [14
8 24/9/2016 meter] 1
Total 9
DETAILS UNIT TRIP UNIT SYNCHRONISED Outage Hours

REMARKS DATE TIME DATE TIME HOURS

Full cut & welding Not in trip Detail As per Operation record

Full cut & welding Not in trip Detail As per Operation record
Full cut & welding
Not in trip Detail As per Operation record
Full cut & welding
Not in trip Detail As per Operation record
Full cut & welding
Not in trip Detail As per Operation record
25-Dec-14 04:51 28-Dec-14 09:50
Full cut & welding 76
19-Feb-15 16:37 21-Feb-15 18:21
Full cut & welding 49

Full cut & welding Unit Running

Full cut & welding


18-Apr-15 02:29 20-Apr-15 22:01 67

Full cut & welding


Grind and Reweld Unit Running
Grind and Reweld Unit Running
Grind and Reweld Unit Running

Grind and Reweld Unit Running

Grind and Reweld 21-Nov-15 1:16 4-Dec-15 20:57 331


Grind and Reweld
Grind and Reweld
15-Feb-16 22:47 1-Mar-16 21:44 358
Grind and Reweld
30-Jun-16 13:41 6-Jul-16 7:50 138
Grind and Reweld
6-May-16 13:14 8-May-16 23:19 58
Grind and Reweld
Grind and Reweld Unit Running
26-Nov-16 12:13 28-Nov-16 2:49 38
Grind and Reweld

Full cut & welding


29-Dec-16 17:14 1-Jan-17 6:20 61

Full cut & welding


Grind and Reweld

Grind and Reweld

Grind and Reweld

Tube Replacement 11-Jan-17 17:52 8-Feb-17 6:23 660

pipe joint fulcut and weld

pipe replaced
Grind and Reweld
Full cut & welding

UNIT #2 BOILER PR.PARTS REPAIR JOINT DETAILS


3-Jan-16 0:11 3-Jan-16 13:50
pinhole[welded joint] 13
5-Jan-16 2:39 8-Jan-16 2:50
pinhole[welded joint] 72
pinhole[welded joint] 1-Feb-16 22:39 15-Feb-16 18:36 63
1-Mar-16 23:03 23-Mar-16 19:17
pinhole[welded joint] 63
17-Apr-16 1:10 19-Apr-16 18:43
pinhole[welded joint] 65
12-May-16 20:24 24-May-16 17:28
pinhole[welded joint] 63
22-Aug-16 1:30 24-Aug-16 6:16
pinhole[welded joint] 52
23-Sep-16 0:05 3-Oct-16 3:40
pinhole[welded joint] 63
Outage Hours
Loss in
MINUTES Generation Revenu Loss in Coal Consumption
@558MW/hr Generation INR @ in MT (SCC of Cost of Coal
(MU) Rs.4.91/kwhr 0.62kg/Kwhr) Consumption

59 42.9567 210,917,397.00 28637.8

44 27.7512 136,258,392.00 18500.7999999581

32 37.6836 185,026,476.00 25122.3999999755

41 185.0793 908,739,363.00 123386.200000027

57 200.2941 983,444,031.00 133529.399999961

9 77.0877 378,500,607.00 51391.799999987

5 32.4105 159,135,555.00 21607.0000000144


36 21.5388 105,755,508.00 14359.1999999697

6 34.0938 167,400,558.00 22729.2000000346

31 368.5683 1,809,670,353.00 245712.200000042

TAILS

39 7.6167 37,397,997.00 5077.799999987

11 40.2783 197,766,453.00 26852.1999999625


57 35.6841 175,208,931.00 23789.400000026

14 35.2842 173,245,422.00 23522.7999999798

33 36.5769 179,592,579.00 24384.600000039

4 35.1912 172,788,792.00 23460.8000000159

46 29.4438 144,569,058.00 19629.1999999986


35 35.4795 174,204,345.00 23653.0000000577
Loss of Profit (Rs.)
(Revenu Loss - Coal
Cost)

210,917,397.00

136,258,392.00

185,026,476.00

908,739,363.00

983,444,031.00

378,500,607.00

159,135,555.00
105,755,508.00

167,400,558.00

1,809,670,353.00

37,397,997.00

197,766,453.00
175,208,931.00

173,245,422.00

179,592,579.00

172,788,792.00

144,569,058.00
174,204,345.00
SYNC DETAILS (UNIT-1)

UNIT SYNCHRONISED UNIT TRIP UNIT RUNNING HOURS Outage Hours


TOTAL EXPORTED
S.NO GENERATION in
DATE TIME DATE TIME HOURS MINUTES HOURS MINUTES POWER
MU

1 9/7/2014 17:23 9/7/2014 17:55 0 32 28 58 0.00 0

2 9/8/2014 22:53 9/8/2014 22:53 0 0 30 10 0.00 0

3 9/10/2014 05:03 9/10/2014 08:32 3 29 334 12 0.17 0.06

4 9/24/2014 06:44 9/24/2014 11:43 4 59 11 21 0.27 0.16

5 9/24/2014 23:04 9/25/2014 04:22 5 18 149 18 0.35 0.2

6 10/1/2014 09:40 10/1/2014 22:10 12 30 9 31 0.96 0.67

7 10/2/2014 07:41 10/4/2014 11:18 51 37 80 58 7.95 6.68

8 10/7/2014 20:16 10/8/2014 01:38 5 22 118 45 0.45 0.32

9 10/13/2014 00:23 10/14/2014 02:30 26 7 118 54 4.16 3.51

10 10/19/2014 01:24 10/19/2014 01:38 0 14 30 37 0.01 0

11 10/20/2014 08:15 10/22/2014 06:42 46 27 744 40 9.66 8.39

12 11/22/2014 07:22 11/22/2014 10:32 3 10 3 5 0.31 0.24

13 11/22/2014 13:37 11/23/2014 16:44 27 7 4 15 5.33 4.64

14 11/23/2014 20:59 11/24/2014 03:44 6 45 39 38 1.11 0.94

15 11/25/2014 19:22 11/29/2014 00:00 76 38 50 2 22.22 19.89


16 12/1/2014 02:02 12/2/2014 13:09 35 7 1 5 11.81 10.56

17 12/2/2014 14:14 12/7/2014 11:38 117 24 249 6 47.10 42.53

18 12/17/2014 20:44 12/22/2014 17:58 117 14 38 59 62.83 57.74


19 12/24/2014 08:57 12/25/2014 04:51 19 54 76 59 7.62 6.97
20 12/28/2014 09:50 12/28/2014 12:06 2 16 5 19 0.25 0.19
21 12/28/2014 17:25 1/3/2015 14:24 140 59 80 50 48.34 44.01
22 1/6/2015 23:14 1/15/2015 15:21 208 7 62 9 97.42 90.14

23 1/18/2015 05:30 1/24/2015 12:59 151 29 3 10 74.74 69.18

24 1/24/2015 16:09 1/30/2015 12:59 140 50 3 16 69.57 64.34

25 1/30/2015 16:15 2/2/2015 17:15 72 60 66 55 30.17 27.6

26 2/5/2015 12:10 2/7/2015 01:07 36 57 15 58 16.43 15.07

27 2/7/2015 17:05 2/7/2015 17:45 0 40 0 23 Only home load

28 2/7/2015 18:08 2/8/2015 00:09 6 1 16 20 1.77 1.55

29 2/8/2015 16:29 2/19/2015 16:37 264 8 49 44 128.78 119.21

30 2/21/2015 18:21 2/25/2015 14:10 91 49 12 50 43.20 39.84

31 2/26/2015 03:00 2/26/2015 14:16 11 16 2 35 3.15 2.81


32 2/26/2015 16:51 4/18/2015 02:29 1209 38 67 32 573.71 529.54
33 4/20/2015 22:01 5/8/2015 19:17 429 16 69 5 189.65 176.86
34 5/11/2015 16:22 5/11/2015 16:42 0 20 3 15 0.01
35 5/11/2015 19:57 5/16/2015 01:53 101 56 104 26 32.87 29.38
36 5/20/2015 10:19 5/30/2015 13:40 243 21 38 20 81.23 73.8
37 6/1/2015 04:00 6/19/2015 02:59 430 59 88 3 225.53 208.9
38 6/22/2015 19:02 7/24/2015 21:15 770 13 2 9 344.14 317.15
39 7/24/2015 23:24 7/25/2015 16:00 16 36 9 17 5.05 4.52
40 7/26/2015 01:17 8/9/2015 04:28 339 11 976 56 149.08 137.45
41 9/18/2015 21:24 10/5/2015 03:52 390 28 78 35 196.82 182.72

42 10/8/2015 10:27 10/11/2015 02:29 64 2 27 48 20.44 18.64

43 10/12/2015 06:17 10/12/2015 11:05 4 48 1 29 1.06 0.94


44 10/12/2015 12:34 10/18/2015 01:32 132 58 17 12 58.78 54.34
45 10/18/2015 18:44 10/25/2015 03:35 152 51 39 43 72.69 67.19
46 10/26/2015 19:18 11/1/2015 11:54 136 36 40 19 67.36 62.50

47 11/3/2015 04:13 11/8/2015 00:00 115 47 89 5 57.16 52.92

48 11/11/2015 17:05 11/13/2015 13:24 44 19 98 3 16.60 14.82

49 11/17/2015 15:27 11/21/2015 1:16 81 49 331 41 37.19 33.62

50 12/4/2015 20:57 12/6/2015 22:10 49 13 198 7 15.68 14.06

51 12/15/2015 4:17 12/19/2015 23:45 115 28 61 42 40.78 36.97


52 12/22/2015 13:27 12/26/2015 20:30 103 3 79 59 39.48 35.347

53 12/30/2015 4:29 12/31/2015 21:08 40 39 109 37 8.19 7.614

54 1/5/2016 10:45 1/5/2016 17:12 6 27 611 34 2.41 2.2

55 1/31/2016 4:46 2/15/2016 22:47 378 1 358 57 139.43 129.05

56 3/1/2016 21:44 3/10/2016 23:32 217 48 15 41 96.93 90.34

57 3/11/2016 15:13 3/14/2016 1:36 58 23 8 27 36.84 34.4

58 3/14/2016 10:03 3/20/2016 9:45 143 42 3 8 90.58 85.01


59 3/20/2016 12:53 3/21/2016 8:50 19 57 5 44 694.00 57

60 3/21/2016 14:34 4/11/2016 7:04 496 30 4 22 271.21 253.83

61 4/11/2016 11:26 4/17/2016 1:09 133 43 4 48 89.02 83.3


62 4/17/2016 5:57 4/17/2016 8:44 2 47 2 18 7.04 6.5
63 4/17/2016 11:02 4/23/2016 23:45 156 43 47 9 79.59 73.86
64 4/25/2016 22:54 5/6/2016 13:14 254 20 58 5 120.78 112.21

65 5/8/2016 23:19 5/9/2016 15:34 16 15 4 34 6.64 6.08

66 5/9/2016 20:08 5/20/2016 16:07 259 59 180 4 108.68 100.67

67 5/28/2016 4:11 6/3/2016 11:45 151 34 2 8 71.79 66.77

68 6/3/2016 13:53 6/23/2016 22:11 488 18 55 46 193.58 179.29

69 6/26/2016 5:57 6/30/2016 13:41 103 44 138 9 36.30 33.6

70 7/6/2016 7:50 7/9/2016 22:21 86 31 40 4 30.47 28.15

71 7/11/2016 14:25 7/17/2016 10:13 139 48 17 2 57.05 52.75

72 7/18/2016 3:15 7/22/2016 23:39 116 24 76 30 50.35 46.96

73 7/26/2016 4:09 7/30/2016 22:01 113 52 903 20 45.56 42.45

74 9/6/2016 13:21 9/16/2016 11:19 237 58 4 56 5.90 5.39

75 9/16/2016 16:15 10/19/2016 20:02 795 47 86 31 305.94 234.41


76 10/23/2016 10:33 10/25/2016 20:43 58 10 1 33 21.75 16.76

77 10/25/2016 22:16 11/26/2016 12:13 757 57 38 36 21.19 19.84

78 11/28/2016 2:49 11/30/2016 10:01 55 12 4 15 33.76 31.7

79 11/30/2016 14:16 12/5/2016 23:50 129 34 80 1 50.13 44.88


80 12/9/2016 7:51 12/29/2016 17:14 489 23 61 6 181.27 168.31

80 1/1/2017 6:20 1/11/2017 17:52 251 32 660 31 102.59 95.58

81 2/8/2017 6:23 2/10/2017 2:11 43 48 2 27 20.23 18.69

82 2/10/2017 4:38 2/15/2017 22:59 138 21 100 14 32.57 29.85

83 2/20/2017 3:13 2/27/2017 12:05 176 52 3 42 5.85 5.38

84 2/27/2017 15:47 3/2/2017 11:59 68 12 17 52

85 3/3/2017 5:51 3/5/2017 14:42 56 51 112 15

86 3/10/2017 6:57 4/14/2017 6:28 839 31 1697 32

6/24/2017 0:00

Total 12782 2584 7751 2173 5939.06 4851.93


SYNC DETAILS (UNIT-1)

REMARKS

The unit synchronized with 4 LDO guns. The HFO could not be taken into service due to
insufficient atomising steam to PRDS actuator/ valve problem. Mill 1A was tried to take into
service. As the primary air temperature and flow could not be sustained, the mill could not
be taken into service. As the MS Pressure was low the unit was stopped.

On synchronisation, the GT Tripped on earth fault protection.

Unit stopped due to shortage of HSD.

Due to chokage of coal feeder #1 (stone), Coal Mill #1 tripped on no coal flow. Due to delay
in clearing the chokage, unit was stopped.

Unit stopped due to shortage of HSD.

Unit stopped by opening the GCB for conducting the following tests on
Turbine:

a. G.V. Seal Test,


b. T.V. Seal Test
c. Overspeed Protection control test at 3090rpm (103%) d.
Overspeed Protection trip - Mechanical at 3212
rpm
e. Digital Electroc Hydraulic Governing System Protection Trip (DEH OST) at 110%
(3300rpm)
f.TSI (Turbine Supervisory Instruments) overspeed Protection trip at 110 % (3300
rpm)
g. Oil ignition test at 3000 rpm,
h. TDBFP - B mechanical overspeed protection at 5214 rpm and oil injection test at 4800
rpm
i. HPCV - Seal test at 4800 rpm
j.LPCV - Seal test at 4800 rpm.

APH A Motor tripped on over current protection. Hence MFT initiated to stop the unit.

APH A Motor tripped on over current Protection. The associated ID (B) & FD (B) tripped.
With one ID (A) & FD (A) and one APH, the furnace pressure couldnot be maintained. As
the furnace pressure was positive, MFT initiated and unit stopped.

Attempt was made to put drum level controler in Auto mode. In the process, MDBFP tripped
on flow low protection. Hence MFT initiated to stop the unit.

GT Tripped on surge protection. 86 protection Relay operated.

MILL 1 C tripped. After about 15minutes a loud explosion occurred from boiler to Mill 1 C
causing damages to the system. Hence MFT initated to stop the unit.
Unit tripped on exciter high winding temperature. While switching on the circuit the unit
tripped due to shorting of cable.
Unit tripped on MFT on high drum level protection.

Unit tripped on stataor water flow low protection.

While taking MDBFP in service GT tripped on high current. Unit triped on loss of power.
boiler tripped on drum level low low protection.

full load achieved on 02.12.14 at 1943 hrs. Unit stopped to attend to boiler tube leakage

unit stopped to attend to APH expansion bellow leakage.


unit stopped due to boiler tube leakage and APH bellow leak.
MFT initiated due to tripping of MDBFP on high vibration
unit stopped to attend to APH-A expansion bellow leakage.
unit stopped as per the rquest of TANGEDCO, due to no load demand.
unit tripped on MFT on loss of all fuel protection trip. Due to logic mistake (all mill/
feeders on MFT trip activated)the unit tripped. Same corrected in the logic.
UAT -1B breaker tripped on earth fault. Consequently Mill C, D & F tripped. Mill B feeder
tripeed and hence Mill B tripped. Only Mill E & G was in service and MFT acted resulting in
unit tripping.
unit stopped to attend to boiler tube leakage.
Unit tripped on MFT due to logic mistake. All feeders/ Mills "ON" the protection is for all
feeder/mill trip. All feeders are tripped on MFT. Logic corrected
GCB opened.

NTPL-Energen line tripped resulting in dip in voltage causing undervoltage trip to all
feeders. Unit tripped on MFT. On investigation observed that the trip was due to dip in
vlotage to feeder microprocceser. UPS supply established to feeder microprocesser.

Pooling station to NTPL line under W/P. Direct trip command given from pooling station to
Coastal line 1 to trip. Due to line tripping unit triped.
one CW pump tripped at 0245 hrs. ID fan A tripped at 14:10 hrs subsequently unit tripped
on opening of GCB.
Unit tripped on ID fan motor bearing vibration high protection trip. (Spurious triping)
Unit stopped as per the request of TANGEDCO due to no load from the grid.
GT Tripped on earth fault protection due disturbance in the 400 Kv line.
Unit stopped due to non availabilty of coal mills.
Unit stopped as per grid requirement
Unit stoped due to heavy leakage in the CRH drain to condenser pipeline
Unit taken out as per TANGEDCO request. (to attend to mill A & B prob)
Due to tripping of ID B fan unit tripped on MFT. ID Fan A under W/P
Due to tripping of ID B fan unit tripped on MFT. ID Fan A under W/P
Unit stopped for annual mintenance
unit stopped due to boiler tube leakage.
Unit taken out as per TANGEDCO request and to attend boiler tube leakage @ 7m near seal
trough
Unit tripped on excitation winding high temperature protection. (False Signal)
Unit stopped as per the request of TANGEDCO due to no load from the grid.
Unit tripped on Generator earth fault protection
Boiler tube leakage at boiler rear side 8M elevation above seal trough observed
Unit stopped as per the request of TANGEDCO due to no load from the grid And to attend
boiler tube leakage @ 7m elev.

GT #1 B phase PRV acted and tripped.

Unit stopped as per the request of TANGEDCO due to no load from the grid and to attend
Leakage In seal trough @ 3m & GRP line in CT #1 leakage. Flood in TN.

Unit stopped as per the request of TANGEDCO due to no load from the grid.

Unit stopped as per the request of TANGEDCO due to no load from the grid.
Unit stopped as per the request of TANGEDCO due to no load from the grid. H2 leakage was
heavy

Stopped to synchronise UNIT #2 as the line limit was given to be 1350MW for NTPL +
Coastal together.
Manual MFT due to GSC vent line leakage.

Turbine trip following manual MFT(Boiler leakage at bottom ring header front side.(8M)

Unit tripped @ 23.32 hrs due to Generator stator earth fault. (R-phase VT1 failure)
Unit Black Out @ 01:36 hrs due to Coastal to Pooling station line tripped.(NTPL line tripped
first then coastal line)
Unit tripped @ 09:45 hrs in MFT both IDF triped (UAT 1A trip ,bushing got burst)
. Unit tripped @ 08:50 hrs due to UT-1A PRV acted.
Line-2 got tripped due to over current in B-phase (30KA & 24KV),Unit tripped @ 07:04 hrs
due to SPS (Line 2 disturbance).
Line-2 Fault,Due to tripping of 400 KV line, unit tripped
Line-1 Over Current in Y Phase (On SPS protection Unit tripped)
Transmission line constraints (To attend Line Work)
Due to heavy leak in CEP Discharge to Deaerator line shut down was planned

15:34 Hrs- Unit-1 tripped on Generator Stator Earth fault.Generator B Phase VT2 replaced

Boiler MFT @ 16:07Hrs , No demand from TANGENDCO (Unavailability of Coal)


Unit tripped @ 11:45 Hrs due to Generator Stator Earth Fault Protection acted.R-phase VT-2
Primary Core Shorted with earth.B-Phase VT-1 also newly replaced.

Turbine Manually tripped and Manual MFT done at 22.11 hrs (Mill-1B, Mill-1A, HFO oil
guns stopped) (No load demand from tangedco)
Unit stopped @13:42 Hrs as per the request of TANGEDCO due to no load from the grid..
(Morning ID FAN Tripped on VFD ,not the reason for unit stoppage )

Unit stopped @22:21 Hrs as per the request of TANGEDCO due to no load from the grid.

Found problem in unit-1 GT R phase breaker abnormal sound and frequent operation of
hydraulic pump. So we forced to shut down the unit on emergency basis @10:14am

Unit stopped @23:39Hrs as per the request of TANGEDCO due to no load from the grid.

Unit stopped @22:01Hrs as per the request of TANGEDCO due to no load from the grid.

U#1 is planned for shutdown to attend the GT B Phase bushing temperature high issue,
stopped the unit @11:19
Unit-1 was tripped on emergency due to Boiler Tube Leakage on 20:02hrs of 19.10.16.
Unit-1 was tripped on SPS protection acted @ 20:43.
Unit was stopped on emergency to attend boiler tube leakage (S bend near seal trough ) &
ID Fan-1B 4 cracks observed

Unit #1 of Coastal Energen is tripped at 10.01 hrs on 30-11-2016 due to Generator class-D
protection operated. (Stator water System problem (Generator cooling system issue))

Unit-1 was stopped due to coal Shortage @ 23:50 hrs on 5-12-2016.


Unit-1 was stopped at 17:14 hrs on 29/12/2016 due to low load schedule. (Boiler Tube
leakage @ 8Mt & 20 Mt)

Unit tripped at 17.52 Hrs due to Boiler tube leakage(BTL). (coal Shortage)

We have tripped the unit-1 on emergency basis at 02:11hrs of 10.02.17 due to circulating
water pump tripped. (CWP Cooling water pump tripped ,on logic CWP tripped (3CWP Pump
tripped due to wrong phase connection))

Unit-1 was stopped due to coal Shortage @ 22:59 hrs on 15-02-2017.

Unit got tripped at 12:05hrs of 27.02.17 due to turbine 8th bearing temperature was found
high(Instrumentation error)

Unit was Stopped on 02.03.2017 at 11:59 hrs due to Coal Shortage

Unit was stopped on 05.03.2017 at 14:42 hrs due to Coal Shortage

Unit was stopped on 14.04.2017 at 6:28 hrs due to Coal Shortage


7/6/2016 to 17/6/2016 Annual maintenance declared

UNIT SYNCHRONISED UNIT TRIP UNIT RUNNING HOURS Outage Hours


TOTAL
S. No. GENERATION in MU
DATE TIME DATE TIME HOURS MINUTES HOURS MINUTES

1 12/26/2015 17:27 12/27/2015 2:00 8 33 47 7 0.950

2 12/29/2015 1:07 12/29/2015 15:11 14 4 53 17 2.331

3 12/31/2015 20:28 1/3/2016 0:11 51 43 13 39 15.104

4 1/3/2016 13:50 1/5/2016 2:39 36 49 72 11 17.045

5 1/8/2016 2:50 1/9/2016 15:25 36 35 6 24 18.851

6 1/9/2016 21:49 1/15/2016 0:00 122 11 76 3 65.237

7 1/18/2016 4:03 2/1/2016 22:39 354 36 331 57 137.14

8 2/15/2016 18:36 3/1/2016 23:03 364 27 524 14 144.91

9 3/23/2016 19:17 4/17/2016 1:10 581 53 65 33 236.36

10 4/19/2016 18:43 4/24/2016 19:03 120 20 16 41 50.06

11 4/25/2016 11:44 5/12/2016 20:24 416 40 285 4 209.75

12 5/24/2016 17:28 5/29/2016 0:10 102 42 1386 52 47.39

13 7/25/2016 19:02 7/25/2016 22:25 3 23.0000000016 194 4 0.65

14 8/3/2016 0:29 8/12/2016 0:49 216 20 5 3 63.1

15 8/12/2016 5:52 8/12/2016 7:21 1 29 95 23 0.5


16 8/16/2016 6:44 8/22/2016 1:30 138 46 52 46 58.2

17 8/24/2016 6:16 9/10/2016 1:23 403 7 2 31 127.93

18 9/10/2016 3:54 9/23/2016 0:05 308 10.9999999974 243 35 110.51

19 10/3/2016 3:40 10/3/2016 4:23 0 43 0 46 6.99

20 10/3/2016 5:09 10/6/2016 23:59 90 50 165 4 29.86

21 10/13/2016 21:03 10/14/2016 23:31 26 28.0000000005 392 37 7.95

22 10/31/2016 8:08 11/12/2016 17:51 297 43 1080 20 112.88

23 12/27/2016 18:11 12/28/2016 4:22 10 11 27 52 2.26

24 12/29/2016 8:14 1/1/2017 8:46 72 32 438 24 14.05

24 1/19/2017 15:10 2/6/2017 7:07 423 57 1243 6

25 3/30/2017 2:13 4/20/2017 13:59 515 46 138 43

26 4/26/2017 8:42 6/11/2017 5:20 1100 38 42 51

27 6/13/2017 0:11 6/22/2017 20:43 236 32 91 23

28 6/26/2017 16:06
Total 6042 909 7081 750 1480
2016 Annual maintenance declared

EXPORTED REMARKS
POWER

0.733 OPC test partially complete. Unit stopped due to shortage of HSD.

1.883 MFT as All ID fan stopped. ID fan B tripped and the cause found to be
LPB.
TDBFP A rolling , electrical overspeed testing was done. Reached full
13.477 load on 2nd Jan 2016 @ 22:58hrs. Max=609.75MW.
TDBFP B overspeed test done. COD trial. But failed due to boiler tube
15.359 leakage and APH overcurrent trip.

17.551 Black out (GT problem)

60.917 load rejection test performed @310MW

Turbine Manual tripped and MFT pressed @ 22:39HRS(ID Fan 2A


126.67 started at 19:20 hrs. Since its IGV not operating above 40%, ID Fan 2A
stopped at 19:46 hrs)
Turbine Tripped manually @ Unit Load: 77 MW.due to ID -Fan 2A
134.28 problem got tripped due to high vibration (12.72mm/sec)

219.48 Line#2 Fault ,Due to tripping of 400 KV line, unit tripped

MSV and RSV Closed, GCB opened due to Reserve power relay
46.28 operated.( Main reason is insufficient EH oil pressure)
Condensate line leakage (COAL WAS ALSO NOT SUFFICIENT TO
187.73 RUN THE UNIT) Planned
APH-A , Support bearing cage ring which holds the spherical roller in
44.29 position has broken in to pieces.
Due to leakage in main turbine lube oil, unit #2 of Coastal Energen is
0.29 tripped at 22:25 hrs. Unit is available from 27.08.2016

51.95
Coastal Energen unit #2 stopped at 00:49Hrs on 12-08-2016 due to
no schedule.

0.42 Unit got tripped due to problem in AVR System(Excitation)


53.83 Unit Stopped due to Boiler tube leakage @1:30 Hrs.

118.14
Coastal Energen unit #2 is stopped at 01:23 Hrs on 10-09-2016 due
to excitation panel fault alarm

103.15
Coastal Energen unit #2 stopped at 0:05Hrs on 23-09-2016 due to
no schedule.

6.4
Unit tripped due Turbine bearing no.2 metal temperature bad &
fluctuating@ 4:43 Hrs

27.4
Coastal Energen unit #2 stopped at 23:59Hrs on 6-10-2016 due to
no schedule.

7.23
Coastal Energen unit #2 stopped at 23:31Hrs on 14-10-2016 due
APH -2A Choke suspected

109.63
Coastal Energen unit #2 stopped at 17:51Hrs on 12-11-2016 due Air
preheater Choke suspected

2.05
Due to Reheater spray valve problem we tripped the unit-2 on
emergency basis at 4.22 hrs 28.12.16

13.07
Boiler Tube leakage @ 69.5 Mt Left side Reheater finishing Coil, unit
was stopped on emergency @ 8:46 hrs on 1.1.2017.
Unit was Stopped due to APH Chokage problem @ 7:07 hrs on
6.02.2017 (Coal Shortage problem)
Unit-2 was stopped due to Coal Shortage @ 13:59 hrs on 20-04-
2017. (CW Line Leakage )
Unit#2 tripped on emergency at 5:20 Hrs due to Heavy Vibration in
ID fans (Actual Reason was Coal Shortage , ID Fan vibartion was
done to fluctuate manually)
1362