2013 Environmental Objectives & Targets

Objective Target
Energy
Reduce energy/electrical consumption via heating, air conditioning,
ventilation, and lighting operational adjustments, retrofits, and
technology upgrades. Recent accomplishments include building control Ongoing; Facilities and IT Goals and Objectives, reduce
system upgrade, variable frequency drives, chiller economizer, demand energy/electrical consumption by 3% from previous year.
control ventilation, North & South Tower T-8 lamp and electronic lighting
ballast retrofit.

Water conservation See 2013 Sustainability Goals


Recycling
Reduce solid waste disposal into landfill via recycling, reuse, and
less paper generation. Recycling programs includes single sort
paper/metal/plastic, cardboard, batteries, copier toners, printer ink Per Facilities and Operations Goals and Objectives, increase
cartridges, computer hardware, and production scrap. Non-recycled solid waste landfill diversion rate of 100%.
trash is reused via local steam plant incineration and power generation
to Redstone Arsenal.

Recycle all field returned product and IT scrap equipment 100% Ongoing
Awareness Communications/Integration/Training
Awareness Training: Increase employee awareness of EMS Program
and enhancements at the following locations:
Headquarters and satellite locations 100% new hire. Ongoing
ADTRAN-Bluesocket
ADTRAN-VBA
EMS Policy Training: Review revised policy 100% new hire. Ongoing
Global Site and Manufacturing Audits:
Q4 2013
Conduct 8 or more assessments
BBA Integration: 100% integration Q2 2013
Full Integration of ISO 14001 Team and Green Team Q3 2013
Meeting to discuss integration with Green Team and EMS
leaders [Q1 2013]
Review ISO 14001 documentation to integrate Green Team
[Ongoing]
Assign ISO 14001/Green Team Coordinator [Q2 2013]
Product Based EMS
Determine requirements for initiating a product based EMS Establish global ISO 14001 team to identify requirements for
obtaining a certified ISO 14001 product based EMS by 2014.

Form GEN43.3-3, Rev G. ADTRAN Environmental Objective Review, Huntsville, AL 07/05/13 Page 1 of 2
(Printout is not a controlled copy)
2013 Environmental Objectives & Targets

REVISION DATE AUTHOR CHANGE DESCRIPTION

A 05/28/10 G. Giles New


B 08/12/11 G. Giles Updated to reflect 2011 objectives, updated Awareness Training and EMS Policy Training.
C 09/26/11 G. Giles Correct Header: was showing as 2010 and should have been changed to 2011.
D 02/28/12 P. Jackson Updated to reflect 2013 objectives.
E 03/29/12 P. Jackson Included reference to Sustainability Goals, and added new hire training requirements.
F 04/26/12 P. Jackson Updated the water conservation objective to match with Sustainabilitys Goals.
G 06/08/12 P. Jackson Merged recycling goal for IT scrap and field returned product scrap. Included an objective for
BBA integration.
H 05/28/13 P. Jackson/G. Giles/L. Review of 2013 Objectives and Targets. Review was delayed due to business needs and
Gilbreath waiting on input from the Green Team. 2013 Objectives include increased site assessments.
I 7/1/13 P. Jackson/G. Giles/L. Update 2013 Objectives and Targets to reflect Green Team 2013 goals.
Gilbreath

Form GEN43.3-3, Rev G. ADTRAN Environmental Objective Review, Huntsville, AL 07/05/13 Page 2 of 2
(Printout is not a controlled copy)