ECIL WELCOMES

(NRB TEAM )
For Presentation on
EC SCADA
ECSCADA

ECILs indigenous ECSCADA is available on


following platforms:

 Open VMS
 UNIX: Tru 64, HP-UX
 WINDOWS:
Windows 2000,2003, 2008 ,2012 Server
Widows 7, Windows 8.1
 LINUX: RHEL
SHAR
MBPL
ISPRL
UCSPL
KDKRPL
Sanganer
MBPL
MDPL Windows Linux
TPPL
KVSSPL MS 200
CTMPL 2003/
MMPL HP-UX 2008/ 2015
OIL India 2012
SMPL
integrity
True64 2011-2012
HBPL Unix
Open 2006
VMS
PDP
11
2004
system
1995
1985
SCADA SERVERS

ECSCADA Servers
ECSCADA Features
 Powerful Data acquisition and control facility through user friendly GUI.
 Support for scanning and control of PLCs, RTUs, IEDs and various data
acquisition devices.
 Support for MODBUS (Serial/TCPIP), FERRANTI, DNP3.0(
Serial/TCPIP) , IEC 870-5-101/104,SRTP protocols, ICCP, OPC DA,
OPC UA
 Built around client-server architecture
 Supports Dual redundant server configuration
 Server supporting various hardware platforms and Operating systems
(Unix, Windows, Open VMS, Linux)
 Clients built around windows based work stations making use of power of
Windows GUI

ELECTRONICS CORPORATION OF INDIA LIMITED


CnI DIVISION
ECSCADA server soft ware
The ECSCADA server provides facilities such as
Data Acquisition and control
Data process management
Alarm and event management
Real time and In built historian with an optional de-linking facility
Network management system for providing system diagnostic
support
Interface to ECSCADA Web Server for providing web enabling
facility to SCADA database
Time synchronization across the nodes

ELECTRONICS CORPORATION OF INDIA LIMITED


CnI DIVISION
ECSCADA Man Machine Interface

Graphics generation and presentation with various static and dynamic


symbol objects, navigation schemes, pop ups and visual effects
Supervisory monitoring and control capability with easy to use menu
operations.
different security levels viz., Operator / Engineer / Manager Etc
Multi windowed environment/Multiple monitor support
Powerful alarm and event presentation with various filtering schemes
Configurable current and historical trends with online groups (Assign
trend) or archived groups.

ELECTRONICS CORPORATION OF INDIA LIMITED


CnI DIVISION
ECSCADA Man Machine Interface
System status displays depicting the online status of various nodes in
the system, up to module level in the RTU/PLCs
Database editor that supports tag data base creation/ updation and
deletion
Picture editor that supports Static, dynamic and action objects building
Reports through Microsoft Excel/notepad

ELECTRONICS CORPORATION OF INDIA LIMITED


CnI DIVISION
SCADA Software Architecture

SCADA Client
Graphics
Editor HMI Trending
Alarm
Display

Library
SCADA SERVER

RT & Event Manager

SCADA
Develop Report
Environme Alarm Trend Log
generator
nt

DATA
Processing
Export / Import

RT DB
Ref DB

DB Editor

Data
R/W

Driver

IED PLC
OPC
ECSCADA applications

ECSCADA finds applications in small to very large industrial


applications. They include
Pipelines for Oil, Gas, Water etc.
Off shore and on shore Oil drilling and production facilities
Cement, Steel, Fertilizer and other process plants
Power plants and electrical sub stations
Electrical traction
Power transmission and distribution
Nuclear applications

ELECTRONICS CORPORATION OF INDIA LIMITED


CnI DIVISION
ECSCADA on Linux
ECSCADA Server was developed on Linux and
supplied to SHAR/ISRO

OS:RHEL
Database: Mysql
Historian: Sqlite
Protocol : Modbus TCP
MMI/Client: on windows ECSCADA MMI
Dual LAN at Supervisory and Control LAN
ECSCADA
COMPARISION OF SERVER CHANGEOVER TIMINGS FOR ECSCADA(Linux
server& Windows MMI), APROL (B&R) AND ViJeo Citect
ECSCADA: APROL(B&R): Vijeo Citect:
Server changeover takes Server changeover takes 10- Server changeover takes
8-12 Sec 15 Sec 5-10 Sec
SCADA LAN switch over SCADA LAN switch over SCADA LAN switch over
(Supervisory level) (Supervisory level) (Supervisory level)
Takes 2-4 sec Takes 2-4 sec Takes 2-3 sec
SCADA LAN switch over SCADA LAN switch over SCADA LAN switch over
(Control level) (Control level) (Control level)
Takes 0-2 sec Takes 0-2 sec Takes 0-2 sec
Teaming configured for Teaming configured for No teaming
Control LAN level Supervisory LAN
Servers in Active /stand Servers in Active /stand by servers configured in
by mode mode Distributed Architecture
if Control LANS ( both) Changeover of servers is Server changeover takes
removed of active server not taking place and 5-10 Sec
standby server take over communication with PLC is
master role with in 10 completely lost. Manual
seconds. intervention required.
ECSCADA (S1) ECSCADA (S2) ECSCADA (S3)
SERVER CUM CLIENT SERVER CUM CLIENT SERVER CUM CLIENT
IP-172.16.0.1 & 2 S1L1 S1L2 IP-172.16.1.1 & 2 S2L1 S2L2 IP-172.16.2.1 & 2 S3L1 S3L2
SM-255.255.224.0 SM-255.255.224.0 SM-255.255.224.0

SW-1A-CL SW-2A-CL SW-3A-CL

ECPLC-ECSCADA C DAC TEST SETUP ARCHITECTURE USING LAYER -2


SW-1B-CL SW-2B-CL SW-3B-CL

INDUSTRIAL GRADE SWITCHES IN DUAL RING TOPOLOGY


IP-172.16.0.1 05 IP-172.16.0.1 06
SM-255.255.224.0 SM-255.255.224.0
DUAL RING CONTROL LAN WITH RING COUPLING
RIO-M

RIO-M
CPU

CPU

IP-192.168.10.1 PLC-PRIM PLC-STBY


SM-255.255.255.0 IP-192.168.10.2
SM-255.255.255.0
DUAL RING RIO LAN WITH RING COUPLING

SW-1A SW-2A SW-3A

SW-1B SW-2B SW-3B

RIOS-1 RIOS-3 RIOS-5


IP-192.168.10.11 IP-192.168.10.13 IP-192.168.10.15
SM-255.255.255.0 SM-255.255.255.0 SM-255.255.255.0

RIOS-2 RIOS-4 RIOS-6


IP-192.168.10.12 IP-192.168.10.14 IP-192.168.10.16
SM-255.255.255.0 SM-255.255.255.0 SM-255.255.255.0
ECSCADA Work ECSCADA Work
Station1 Station2

SCADA LAN
Ethernet SW5 Ethernet SW6
System Configuration
ECSCADA ECSCADA
PLC Programming Station Server1 Server2

Control LAN
Ethernet SW2
Ethernet SW1

P C C P P C C P P C I I P P C I I P
S P O S S P O S S P / / S S P / / S
U M U M U F F U F F
M M

Primary PLC1 Secondary PLC1 Primary PLC2 Secondary PLC2

Ethernet SW3 Ethernet SW4

Serial Data Input


IO LAN
P C D D D D D D D D A A A A P P P C D D D D D D D D A A A A P P P C D D D D D D D D A A A A P P
S O I I I I I I O O I I I O I S S O I I I I I I O O I I I O I S S O I I I I I I O O I I I O I S
M M M
M M M

RIO-M RIO-R RIO-T


ECSCADA
ECSCADA Integration:

Some of the PLC/RTUs integrated with ECSCADA


using different industry standard protocols:

ECIL-MPROGICON Series PLC


GEIP-90-30/90-70/Rx3i/PAC8000
Allen Bradley- PLC5/Contol logix/Compact logix
(Rockwell Automation)
SIEMENS-S7-400, S7-300
Schneider-Quantum, Premium & M340
ABB-RTU
Bristol Babcock-Control wave micro (Emerson
RTU)
Technical skills of CnID
Continuous updates on state-of-the-art technologies.
Continuous R&D in SCADA and associated applications.
System engineering skills in integrating different SCADA systems,
PLCs, RTUs and Application software.
To integrate PLCs of different makes
Interface flow computers/PIDs
Interface tank gauging system
Interface serial line devices
Team of 30 engineers possessing above skills