Professional Documents
Culture Documents
(NRB TEAM )
For Presentation on
EC SCADA
ECSCADA
Open VMS
UNIX: Tru 64, HP-UX
WINDOWS:
Windows 2000,2003, 2008 ,2012 Server
Widows 7, Windows 8.1
LINUX: RHEL
SHAR
MBPL
ISPRL
UCSPL
KDKRPL
Sanganer
MBPL
MDPL Windows Linux
TPPL
KVSSPL MS 200
CTMPL 2003/
MMPL HP-UX 2008/ 2015
OIL India 2012
SMPL
integrity
True64 2011-2012
HBPL Unix
Open 2006
VMS
PDP
11
2004
system
1995
1985
SCADA SERVERS
ECSCADA Servers
ECSCADA Features
Powerful Data acquisition and control facility through user friendly GUI.
Support for scanning and control of PLCs, RTUs, IEDs and various data
acquisition devices.
Support for MODBUS (Serial/TCPIP), FERRANTI, DNP3.0(
Serial/TCPIP) , IEC 870-5-101/104,SRTP protocols, ICCP, OPC DA,
OPC UA
Built around client-server architecture
Supports Dual redundant server configuration
Server supporting various hardware platforms and Operating systems
(Unix, Windows, Open VMS, Linux)
Clients built around windows based work stations making use of power of
Windows GUI
SCADA Client
Graphics
Editor HMI Trending
Alarm
Display
Library
SCADA SERVER
SCADA
Develop Report
Environme Alarm Trend Log
generator
nt
DATA
Processing
Export / Import
RT DB
Ref DB
DB Editor
Data
R/W
Driver
IED PLC
OPC
ECSCADA applications
OS:RHEL
Database: Mysql
Historian: Sqlite
Protocol : Modbus TCP
MMI/Client: on windows ECSCADA MMI
Dual LAN at Supervisory and Control LAN
ECSCADA
COMPARISION OF SERVER CHANGEOVER TIMINGS FOR ECSCADA(Linux
server& Windows MMI), APROL (B&R) AND ViJeo Citect
ECSCADA: APROL(B&R): Vijeo Citect:
Server changeover takes Server changeover takes 10- Server changeover takes
8-12 Sec 15 Sec 5-10 Sec
SCADA LAN switch over SCADA LAN switch over SCADA LAN switch over
(Supervisory level) (Supervisory level) (Supervisory level)
Takes 2-4 sec Takes 2-4 sec Takes 2-3 sec
SCADA LAN switch over SCADA LAN switch over SCADA LAN switch over
(Control level) (Control level) (Control level)
Takes 0-2 sec Takes 0-2 sec Takes 0-2 sec
Teaming configured for Teaming configured for No teaming
Control LAN level Supervisory LAN
Servers in Active /stand Servers in Active /stand by servers configured in
by mode mode Distributed Architecture
if Control LANS ( both) Changeover of servers is Server changeover takes
removed of active server not taking place and 5-10 Sec
standby server take over communication with PLC is
master role with in 10 completely lost. Manual
seconds. intervention required.
ECSCADA (S1) ECSCADA (S2) ECSCADA (S3)
SERVER CUM CLIENT SERVER CUM CLIENT SERVER CUM CLIENT
IP-172.16.0.1 & 2 S1L1 S1L2 IP-172.16.1.1 & 2 S2L1 S2L2 IP-172.16.2.1 & 2 S3L1 S3L2
SM-255.255.224.0 SM-255.255.224.0 SM-255.255.224.0
RIO-M
CPU
CPU
SCADA LAN
Ethernet SW5 Ethernet SW6
System Configuration
ECSCADA ECSCADA
PLC Programming Station Server1 Server2
Control LAN
Ethernet SW2
Ethernet SW1
P C C P P C C P P C I I P P C I I P
S P O S S P O S S P / / S S P / / S
U M U M U F F U F F
M M