Professional Documents
Culture Documents
R-10(A)
NORTHWOOD RD
R-1ac(A)
DEL NORTE LN
PRESTON RD
MF-1(A)
TOWN HOUSE ROW
PRESTON RD
BANDERA AVE
PICKWICK LN
AV
E RIL
US
LW
AY Printed: 4/28/2017
Legend
s
Dry Overlay
This data is to be used for graphical
!!
!!!
F F
k School
Certified Parcels
D
PD Subdistricts
taken/used as data produced by a Registered
Floodplain Base Zoning DF F
D
D-1
PDS Subdistricts Professional Land Surveyor (RPLS) for the State
CP of Texas. 'This product is for informational
Deed Restrictions
# # Parking Management Overlay
D
1:2,400
" " Height Map Overlay
K K # #
Erik Williams
" "
38'
The project consists of A-03-1 Realistic Overweiw Plan FRONT YARD
a. 1600sf. GLA. addition to the Southern end of the A-03-2 Addition Arangements
existing 2500sf. house including 2 bedrooms with PROJECT ADDRESS: 6004 Northwood Rd
WIC., 2 bathrooms, an office, a hallway. Total GLA Dallas, TX 75225 A-03-3 Ceiling -Roof -Framing
4100sf. A-03-4 Foundation/Floor /Exterior light Framing 8'-1"
The common wall between the two parts to be ASSESSOR'S PARCEL #: A-03-5 Elevations
changed from exterior to interior structure. 00000406513000000 A-03-6 Sections
LOCATION:
b. some minor changes in the existing part including A-03-7 Details
PROJECT:
demolishing one LB. and one none LB wall. A-03-8 Storm/Rain Drainage
---------------------------------------------------------- LEGAL DESCRIPTION: Lot 1, Block B/5467, 7'-4"
176'-6"
4,861.65 sq ft
2.Flooring on strip foundation and pile&pier SITE AREA: 14.122 sf. >10.000ft. Total Floor area
Existing+Addition SIGNITURE:
footings on the similar elevation. ADDITIONAL AREA: 1770 sf.
3.Removing the shared exterior wall TOTAL COVERAGE: 4060 sf. REVISIONS:
between the exist. and add. part, also removing the
Roof and the framing at the Hip of the addition side
LOT COVERAGE RATIO: %35 <%45 CODE COMPLIANCE
of the existing roof. -Dallas Administrative Procedures for the
BUILDING HEIGHT: 20ft. <30ft.
4.Installation of walls exactly similar to the Addition
existing structure.
Construction Codes-BI_Chapter 52
5.Ceiling and Roof framing plus Skylight, SETBACKS: SIDE YARD: min.7'4" >6' _Amendments_03-01-2017
1,771.43 sq ft
flush with existing roof. FRONT YARD: min.38' >30' -Dallas Building Code-BI_2015 BOUNDARY LINE Addition area
6.Fenestration. REAR YARD: min.27' >6' _IBC_Amendments_01-25-2017 SHEET TITLE:
7.Additional MEP & Drainage. CONSTRUCTION TYPE: Found.strip -Dallas One-and Two-Family Dwelling Code-
8.Other (Exterior light framing and decking,
foundation+pile&piers BI_2015_IRC_Amendments_01-25-2017 COVER
Additional Fire protection facilities, trimmings etc.)
Ext.walls 2x6stud+veneer -Dallas Electrical Code-BI_Chapter 56
-Stages of the changes on the existing part: stonework Ordinance 29633-March 13 2015 Overall Lot area
1.Demolishing the none LB. wall Int.walls 2x4stud -Dallas Energy Conservation Code-BI_2015 14,109.03 sq ft
26'-8"
2.Demolishing the LB. wall, installing *All trees remain as they are (as illustrated on _IECC_Amendments_01-25-2017
supporting studs, support beam below the ceiling the Distribution Map) -Dallas Fire Code-BI_Ord30135_IFC2015 BACK YARD
joists, installing additional joists on floor framing. -Dallas Mechanical Code-BI_2015 80' SCALES AS NOTED:
A-03-0
_IMC_Amendments_01-25-2017
-Dallas Plumbing Code-BI_2015
GSPublisherVersion 0.3.100.100
_IPC_Amendments_01-25-2017 DISTRIBUTION 1/32" = 1'-0"
GENERAL SHEET NOTES:
S3DA-DESIGN
A
4196 Adams Ave. San Diego CA 92116
+1 619 6757274
Flat 4 Walfield House 1502 High Road
London N20 9QA
64'-65/8" +44 203 0956 409
B
21'-21/2" 7'-3/16" 20'-89/16" 12'-73/8" 2'-1115/16" hello@s3da-design.com
SHEET KEYNOTES:
VIEW 01
19'-13/16"
4'-913/16"
4'-65/16"
US
53'-15/16"
14'-13/8"
EXISTING
Erik Williams
56'-19/16"
VIEW 02
24'-115/16"
04
EW
VI
VI
EW
01
8'-41/8"
1'-61/16" 6'-101/16"
4'-31/4" 3'-3/8"
LOCATION:
7'-83/4"
7'-311/16"
PROJECT:
22'-7"
Exterior 2x6 Wall
changed to Interior 2x4
DATE:
HALLWAY
10'-4"
5.23.17
94 sq.ft.
14'-31/2"
OFFICE
200 sq.ft.
DRAWN BY:
PROPOSED
BEDROOM 02
C 180 sq.ft.
C S3DA
63/4"
JOB #:
Arc.17.045
9'-613/16"
SIGNITURE:
4'-29/16"
CLOSET 02
Extended Decking 43 sq.ft.
BATHROOM 02
& Garden 207 sq.ft.
9'-51/16"
REVISIONS:
42'-45/16"
4'-213/16" 3'-29/16" 4'-213/16"
VIEW 03
31'-61/4"
29'-39/16"
13'-515/16"
BEDROOM 01 CLOSET 01
570 sq.ft. 138 sq.ft.
BATHROOM
15'-35/8"
207 sq.ft.
7'-27/8"
6'-515/16"
SHEET TITLE:
3'-3/8"
PROPOSED
3"
1'-61/16"
6'-103/4"
10'-3" 63/4" 8'-115/16" REALISTIC
02
VIE
Shower Drainage
41'-101/4"
OVERVIEW
B
Looped Pipes
W0 -3" under grade
A
3
VIE
to the pond
South Elevation
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
GROUND FLOOR 1/16" = 1'-0"
VIEW 04
A-03-1
GENERAL SHEET NOTES:
S3DA-DESIGN
4196 Adams Ave. San Diego CA 92116
22'-7" +1 619 6757274
Flat 4 Walfield House 1502 High Road
Exterior 2x6 Wall London N20 9QA
changed to Interior 2x4 +44 203 0956 409
hello@s3da-design.com
SHEET KEYNOTES:
HALLWAY
94 sq.ft.
OFFICE
200 sq.ft.
BEDROOM 02
180 sq.ft.
CLOSET 02
43 sq.ft.
BATHROOM 02
US
207 sq.ft.
BATHROOM
207 sq.ft.
LOCATION:
PROJECT:
Arrangement 1/8" = 1'-0" DATE:
5.23.17
DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
REVISIONS:
SHEET TITLE:
ADDITION
ARRANGEMENTS
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
A-03-2
GENERAL SHEET NOTES ON THE ADDITION:
S3DA-DESIGN
4196 Adams Ave. San Diego CA 92116
Ceiling: +1 619 6757274
Ceiling joists: 2x8 - 16"OC with 2x6 bridging Flat 4 Walfield House 1502 High Road
40'-109/16"
over the L.Bearing walls between joist London N20 9QA
Left & Right Joists
Connection Line connections. +44 203 0956 409
on the LB. Wall head to head, no
overlap. Ceilining sheeting: 1/2" Dry wall hello@s3da-design.com
2x6" Top Plate Using 8" width metal Sole Plate
over the Wall Structure Anchor "SPA" connection or similar.
Roof:
Roof hangout: 4'4" all the way around the
1'-1" addition.
4'-9"
Roof pitch:%20 (1'Run-4 3/8" Rise)
2'-115/8" All Rafters, 2x8" @16"OC
75/16" Hip & Valley Rafters 2x8"
Hip Rafters to be dropped to match Rafters
top with Rectangular end cut.
2x6" Bridging @~10' OC.
41'-51/16"
Eave angle Rectangular end cut, no suffits
All tie beams 2x6"
All Purlins 2x8"
Insulation: typical 8" Cavity Insulation
between the Roof Common Rafters, with
closed-cell foam insulation sealing the
underside of the roof sheathing to ettic floor
sheathing, and to inside face of the inside
US
1'-4" face of the wall sheathing.
1'-4" Roof
1'-4"
1'-4"
9"
1-There are two options to flush the
Erik Williams
to whether:
Ceiling Framing 1/16" = 1'-0" a.Remove all Hip part of the southern end of
the existing roof avoiding unnecessary
separations, and do the framing shown in the
references. or
b.Use the existing southern Hip part of the
roof framing and sheeting Removing only the
shingle tiles) in order to mount the new roof
on it, all the new framing in this case will be
the same as illustrated but the two additional
hip rafters at the very northern side of the
addition, referring to the crossection that will
be installed horizontally instead of vertically.
LOCATION:
4'-4"
Existing & Additional Roof Connection Line
PROJECT:
1'-4"
1'-4"
1'-4"
1'-4"
DATE:
1'-4"
1'-4"
5.23.17
1'-4"
DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
REVISIONS:
Single side Tie Beams
SHEET TITLE:
PROPOSED
CEILING
Roof Framing 1/16" = 1'-0" ROOF
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
A-03-3
GENERAL SHEET NOTES:
2'-81/16" Additional part
S3DA-DESIGN
2'-8" 2'-6" 4196 Adams Ave. San Diego CA 92116
Foundation: +1 619 6757274
Typical concrete strip foundation for the exterior walls with 4" PVC solid
4'-85/8"
Floor Framing all 2x12" joists @16" OC spacing, on 2x12" Doubled Girders @
7'-413/16"
Crawl space opening in the Hall, with access hatch hinged framing as shown, all
1x5" planks, with additional similar 1" flooring, sitting on 1" opening internal
103/4"
ledge at the lower half of the floor framing. (referring to the details sheet)
Openning
103/4"
3'-8"
103/4"
8'-31/8"
103/4"
Exterior deck framing for the additional part as illustrated with simple 4x6" or
4x8" timber piles at the indicated points buried in the ground (depth to be defined
9'-613/16"
3'-113/16"
by the builder referring to the soil situation)
3'-13/16" Deck final planks all similar to the existing.
3'-21/4" 17'-413/16"
3'-43/4"
4'-213/16"
2'-25/8"
2'-29/16"
3'-29/16"
US
4'-213/16"
1'-4"
1'-4" 1'-4" 1'-4"
Erik Williams
4'-213/16" 6'-103/4"
1/8" 1/8" 1/8" 1/8"
5'-93/4" 10'-1 10'-1 10'-1 10'-1
LOCATION:
PROJECT:
DATE:
5.23.17
Starting reference point for
foundation indicating that DRAWN BY:
the top of the foundation
wall should stand flush with
S3DA
the previous foundation
JOB #:
despite the reversed base in
the addition. Arc.17.045
SIGNITURE:
REVISIONS:
8'-23/16"
40'-111/16"
8'-23/16"
OC
SHEET TITLE:
FOUNDATION
8'-23/16"
FLOOR
EXT.LIGHT
1'-8"
FRAMING
1'-8"
10'-11/8" 10'-11/8"
SCALES AS NOTED:
A-03-4
40'-45/8"
OC
SHEET KEYNOTES:
8'-2 3/16" 8'-2 3/16" 8'-2 3/16" 8'-2 3/16" 8'-2 3/16"
6 5 4 3 2 1
US
6004 NORTHWOOD RD DALLAS, TEXAS
NEW Residential Extension for:
Erik Williams
1 2 3 4 5 6
LOCATION:
1 2 3 4 5 6
PROJECT:
West Elevation (1) 1/16" = 1'-0"
DATE:
5.23.17
DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
A B C D E E D C B A
REVISIONS:
19'-77/16"
SHEET TITLE:
ELEVATIONS
10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8"
A B C D E E D C B A
South Elevation (1) 1/16" = 1'-0" North Elevation (1) 1/16" = 1'-0"
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
A-03-5
GENERAL SHEET NOTES:
S3DA-DESIGN
4196 Adams Ave. San Diego CA 92116
+1 619 6757274
Flat 4 Walfield House 1502 High Road
London N20 9QA
+44 203 0956 409
hello@s3da-design.com
A B C D E SHEET KEYNOTES:
US
6004 NORTHWOOD RD DALLAS, TEXAS
10'-11/8" 10'-11/8" 10'-11/8" 10'-11/8"
LOCATION:
PROJECT:
1 2 3 4 5 6
D-03
DATE:
Roof Pitch:%20 5.23.17
1' Run
4 3/8"Rise DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
D-01
8'-10"
REVISIONS:
1'
1'-2"
4'-10"
1'-6"
6" 1'
8'-23/16" 8'-23/16" 8'-23/16" 8'-23/16" 8'-23/16" 4"
D-02 SHEET TITLE:
1 2 3 4 5 6
SECTIONS
A Section AA 3/32" = 1'-0"
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
A-03-6
Typical
Stone Veneer
Type S Mortar Sitting Bed
Type S Mortar Scratch Coat
Gypsum Wall+Finish Metal Lath Fastened Thru Ins. Into Framing
Plywood 2 Layer WaterResistant Barriers
2x6" Wall System-Cavity Insulator OSB Sheathing
Detail # 01
US
1/2" Flooring
1/2" SubFloor
5/8"
Crawl Space Vent
DownSpout Typical
Protective Sheild
-2'-4"
2"
Min.4" UnderGrade
1'-8"
1'-6"
Erik Williams
Stone/Gravel cover
9"
to be extended min.
6" 8" 6" 6" 8" 6" 6" over pipe
1'
1'
1'-8"
Detail # 02
Foundation, Floor Framing
& Found. Drainage
LOCATION:
Plywood
PROJECT:
Stone Wool Insulation
OSB sheathing
Cavity Insulation
Rafter
DATE:
5.23.17
Detail # 03 DRAWN BY:
Skylight S3DA
JOB #:
Arc.17.045
SIGNITURE:
SHEET TITLE:
1'
DETAILS
1'-8"
A-03-7
Detail # 04
Crawl Space Access
GSPublisherVersion 0.3.100.100
GENERAL SHEET NOTES:
S3DA-DESIGN
Rain/Stormwater Drainage: 4196 Adams Ave. San Diego CA 92116
DownPipes on the Additional part exactly as the existing +1 619 6757274
at the indicated locations. Flat 4 Walfield House 1502 High Road
Drainage: 6" Dia. sealed PVC pipe 4" undergrade buried London N20 9QA
(or as the grade slope allows) all around the foundation. +44 203 0956 409
Protected by at least 2" sand and 5" width/2" depth hello@s3da-design.com
buried protective shield over the pipe avoiding likely
future carving damages.
US
6004 NORTHWOOD RD DALLAS, TEXAS
NEW Residential Extension for:
Erik Williams
DownPipes to the Drain Pipe
LOCATION:
PROJECT:
DATE:
5.23.17
DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
REVISIONS:
SHEET TITLE:
STORM/RAIN
To the
existing
DRAINAGE
Pond
GSPublisherVersion 0.3.100.100
A-03-8
GENERAL SHEET NOTES:
S3DA-DESIGN
...................... 4196 Adams Ave. San Diego CA 92116
+1 619 6757274
Flat 4 Walfield House 1502 High Road
London N20 9QA
+44 203 0956 409
hello@s3da-design.com
US
6004 NORTHWOOD RD DALLAS, TEXAS
NEW Residential Extension for:
Erik Williams
LOCATION:
PROJECT:
DATE:
5.23.17
DRAWN BY:
S3DA
JOB #:
Arc.17.045
SIGNITURE:
REVISIONS:
SHEET TITLE:
FENESTRATION
SCALES AS NOTED:
GSPublisherVersion 0.3.100.100
A-03-9