DATOS METEREOLOGICOS

Cuadro N 03.- ESTACION MALLARES


Latitud Sur: 0451'53'' S
Longitud Oeste 8043'53'' W
Altitud 45

Variable Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.

Temperatura Media
26.153916 27.32099 27.41461 28.202025 23.4927 21.5353 21.23002 20.90466 13.53963 20.89057 21.90499 23.4692
(C)

Temperatura
26.425165 27.59802 27.71244 28.582157 23.77568 21.8032 21.48887 21.16929 13.72626 21.17119 22.19427 23.7688
Maxima (C)

Temperatura Minima
25.882666 27.04395 27.11677 27.821893 23.20972 21.2674 20.97118 20.64004 13.353 20.60995 21.61572 23.1696
(C)

Humedad Relativa
62.929684 62.87017 62.6617 57.588941 67.3895 70.0452 68.93377 69.21018 46.4559 69.90078 69.13798 66.0107
(%)

Velocidad Media
1.0609045 1.02617 1.012977 0.8935022 0.570289 0.8746 1.237097 1.328498 0.768958 0.90377 0.822501 0.9328
(Km/dia)

Velocidad Media
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.01 0.01 0.01 0.01
(m/seg)

Horas Sol Media


8.2999496 10.02746 11.54651 11.55 9.431625 7.65028 7.719529 8.06174 6.214247 8.787505 9.093714 8.66965
(Horas)

Precipitacin prom.
0.05 0.140089 0.01 0.00 0.00 0.00 0.00 0.0 0.00 0.00 0.000407 0.0005
(mm)
Fuente: Estacin Metereologica:Mallares

ESTACION: MALLARES-SULLANA
Cuadro N 09.- Evapotranspiracin potencial de los cultivos (Eto)
Latitud: 0451'53'' S Longitud: 8043'53''W Altitud : 45 m.s.n.m.
Eto Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.
mm/da 4.11 4.75 5.13 4.76 3.54 2.89 2.93 3.28 2.52 3.86 3.97 3.94
mm/mes 127.41 133 159.03 142.8 109.74 86.7 90.83 101.68 75.6 119.66 119.1 122.14
m3/mes/ha 1274 1330 1590 1428 1097 867 908 1017 756 1197 1191 1221
Fuente: Estacin Metereologica:Mallares/cropwat
CUADRO N 07.- COEFICIENTE DE RIEGO o Kc DE LOS CULTIVOS SIN PROYECTO

CULTIVO Area
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
(Has)

Banano Orgnico Principal 30.1 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70
Banano
comvencional
Principal 20.0 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70
Area cultivada
50.1
Kc. Ponderado 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

Fuente. FAO

CUADRO N 8.- COEFICIENTE DE RIEGO o Kc DE LOS CULTIVOS CON PROYECTO

CULTIVO Area
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
(Has)
Banano Orgnico Principal 51.00 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70
Area cultivada
51.00
Kc. Ponderado 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

Fuente. FAO
CUADRO N 13.- PRECIPITACION EFECTIVA (mm)

ESTACION: MALLARES
Latitud: 0451'53'' S Longitud:8043'53''W Altitud : 45 m.s.n.m.
Prec. efec. Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.
mm 0.03 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
das 31 28 31 30 31 30 31 31 30 31 30 31
mm/da 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PRECIPITACION MENSUAL : (mm)

Pe % 75
ao/mes Enero Feb. Marzo Abril Mayo Junio Julio Agost. Set. Oct. Nov. Dic.
2005 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2006 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2007 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2008 0.14 0.42 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Prom. 0.04 0.084 0.006 0.00 0.00 0 0.00 0.0 0 0 0 0
Max. 0.14 0.42 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Min. 0.00 22.20 1.60 4.50 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.30
Pe 0.03 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pe: factor de precipitacin efectiva 70%.
Fuente: Estacin Metereologica:Mallares
MUNICIPALIDAD PROVINCIAL DE SULLANA
Asociacin de microproductores de banano organico - margen izquierda del rio chira

CUADRO N 08.-CULTIVOS - CRONOGRAMA MENSUALCON PROYECTO

AREAS (Has)
CULTIVO DE Total
REFERENCIA CAMPAA
Area ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
(Has)

Banano Orgnico Principal 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11
Area cultivada
50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11

Fuente. Comisn de Regantes Poechos Pelados - AMPBAO

CUADRO N 07.-CULTIVOS - CRONOGRAMA MENSUAL SIN PROYECTO

AREAS (Has)
CULTIVO DE Total
CAMPAA
REFERENCIA Area ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
(Has)
Banano Orgnico Principal 30.11 30.1 30.1 30.1 30.1 30.1 30.1 30.1 30.1 30.1 30.1 30.1 30.1
Banano
Principal 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0
convencional 20.00
Arroz Rotacin 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Area Total (ha) 50.11 50.1 50.1 50.1 50.1 50.1 50.1 50.1 50.1 50.1 50.1 50.1 50.1

Fuente. Comisn de Regantes Poechos Pelados - AMPBAO


CUADRO N14. DEMANDA DE AGUA SIN PROYECTO

PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1. Evotransp. Potencial (mm/dia) 4.11 4.75 5.13 4.76 3.54 2.89 2.93 3.28 2.52 3.86 3.97 3.94
2. Kc ponderado 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70
3. Evotranp. Real o Uso consuntivo (mm/dia) 2.06 3.33 4.10 4.76 3.89 3.18 2.93 3.28 2.14 3.28 3.18 2.76
4. Precip. Efect. (mm/dia) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5. Dficit de Humedad (3-4) (mm/dia) 2.05 3.32 4.10 4.76 3.89 3.18 2.93 3.28 2.14 3.28 3.18 2.76
6. Eficiencia de riego (%) 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
7. N dias del mes (dias) 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00 365.00
8. Requerimiento de agua (5/6) (mm/dia) 5.87 9.49 11.73 13.60 11.13 9.08 8.37 9.37 6.12 9.37 9.07 7.88
(m3/ha/dia) 58.69 94.94 117.25 136.00 111.26 90.83 83.71 93.71 61.20 93.74 90.74 78.80
(m3/ha/mes) 1,819.39 2,658.20 3,634.84 4,080.00 3,448.97 2,724.86 2,595.14 2,905.14 1,836.00 2,906.03 2,722.29 2,442.80 33,773.66
9.-Area total has 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11
10. Volumen demandado m3/mes 91,169.78 133,202.40 182,141.98 204,448.80 172,827.96 136,542.59 130,042.61 145,576.71 92,001.96 145,621.09 136,413.74 122,408.71 1,692,398.32
La mayor demanda sin proyecto se observa en el mes de abril
CUADRO N15. DEMANDA DE AGUA CON PROYECTO

PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1. Evotransp. Potencial (mm/dia) 4.11 4.75 5.13 4.76 3.54 2.89 2.93 3.28 2.52 3.86 3.97 3.94
2. Kc ponderado 0.50 0.70 0.80 1.00 1.10 1.10 1.00 1.00 0.85 0.85 0.80 0.70

3. Evotranp. Real o Uso


consuntivo (1*2) (mm/dia) 2.06 3.33 4.10 4.76 3.89 3.18 2.93 3.28 2.14 3.28 3.18 2.76
4. Precip. Efect. (mm/dia) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5. Dficit de Humedad (3-4) (mm/dia) 2.05 3.32 4.10 4.76 3.89 3.18 2.93 3.28 2.14 3.28 3.18 2.76
6. Eficiencia de riego (%) 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
7. N dias del mes (dias) 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00 365.00
8. Requerimiento de agua (5/6) (mm/dia) 2.74 4.43 5.47 6.35 5.19 4.24 3.91 4.37 2.86 4.37 4.23 3.68
(m3/ha/dia) 27.39 44.30 54.72 63.47 51.92 42.39 39.07 43.73 28.56 43.75 42.35 36.77
(m3/ha/mes) 849.05 1,240.49 1,696.26 1,904.00 1,609.52 1,271.60 1,211.07 1,355.73 856.80 1,356.15 1,270.40 1,139.97 15,761.04
9.-Area total has 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11
10. Volumen demandado m3/mes 42,545.90 62,161.12 84,999.59 95,409.44 80,653.05 63,719.88 60,686.55 67,935.80 42,934.25 67,956.51 63,659.74 57,124.06 789,785.88

Fuente. Elaboracin propia Demanda maxima 63.47 m3/ha/dia


Demanda minima 27.39 m3/ha/dia
La mayor demanda con proyecto se observa en el mes de abril Demanda promedio 43.20 m3/ha/dia
CUADRO N 16: OFERTA DE AGUA DE GRAVEDAD CON Y SIN PROYECTO

AGUA DE GRAVEDAD/C.D Daniel Escobar/L1 Toma 29+080


UNID ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
Caudal lts/seg 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0
Nmero de riego por mes N 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Tiempo o duracin por riego. horas/ha 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Volumen promedio (m3/ha/mes) 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0 2,160.0
Nmero de das del mes, das 31.0 28.0 31.0 30.0 31.0 30.0 31.0 30.0 31.0 30.0 31.0 30.00
Volumen promedio (m3/ha/da) 69.7 77.1 69.7 72.0 69.7 72.0 69.7 72.0 69.7 72.0 69.7 72.0
Area proyecto Has 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11
Volumen Ofertado m3/mes 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6

Volumen Total Ofertado


Gravedad Con y Sin proyecto m3/mes 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6 108,237.6
Fuente. Comisn de Regantes Poechos Pelados - ATDRCH
CUADRO N 17- BALANCE DE AGUA - SIN PROYECTO

PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Demanda (m3/mes) 91,169.78 133,202.40 182,141.98 204,448.80 172,827.96 136,542.59 130,042.61 145,576.71 92,001.96 145,621.09 136,413.74 122,408.71
OFERTA (m3/mes) 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60

Balance (m3/dia) 17,067.82 -24,964.80 -73,904.38 -96,211.20 -64,590.36 -28,304.99 -21,805.01 -37,339.11 16,235.64 -37,383.49 -28,176.14 -14,171.11
La oferta de agua solo es de gravedad.
Fuente. ATDR Chira. Elaboracin propia.
Figuras N 06

250,000.00

200,000.00

Volumen de agua (m3/mes)


150,000.00

100,000.00

50,000.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Oferta Demanda

eEn el mes de marzo y abril se tiene un deficit de agua


CUADRO N18 BALANCE DE AGUA - CON PROYECTO

PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Demanda (m3/mes) 42,545.90 62,161.12 84,999.59 95,409.44 80,653.05 63,719.88 60,686.55 67,935.80 42,934.25 67,956.51 63,659.74 57,124.06
Oferta (m3/mes) 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60 108,237.60

Balance (m3/mes) 65,691.70 46,076.48 23,238.01 12,828.16 27,584.55 44,517.72 47,551.05 40,301.80 65,303.35 40,281.09 44,577.86 51,113.54
La oferta de agua solo es de gravedad. Debido al ahorro de agua se tiene un superavir
Fuente. ATDR Chira. Elaboracin propia.
Figuras N 07

120,000.00

100,000.00
Volumen de agua (m3/mes)

80,000.00

60,000.00

40,000.00

20,000.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Oferta Demanda

CON PROYECTO, HEMOS INCREMENTADO LA EFICIENCIA DE APLICACIN, SOBRA AGUA TODO EL AO, PARA EFECTOS DE COMPARACION.
POR OTRO LADO, SE APRECIA QUE LA LLUVIA CUBRE COMPLETAMENTE LA DEMANDA EN LOS MESES DE ENERO A MARZO...LO CUAL SE CONFIRMA EN LA REALIDAD. OSEA, ESTAMOS BIEN.
DISEO DEL RESERVORIO REVESTIDO CON GEOMEMBRANA

PROYECTO : CONSTRUCCION RESERVORIO AMPBAO - MONTENEGRO

1.- DATOS: RESERVORIO-PLANTA


Talud (Z) 1 0.5 Ingreso 0.5
Altura mayor del agua( h ) 2.00 m 0.5 404.60 m h=0.00
Borde Libre (bl) 0.30 m 404.00 m
Caudal de entrada (Qe) 250 l/s

ZONA DE ANCLAJE

ESPEJO DE AGUA
tubera de descarga 12 Pulg 400.00 m

BORDE LIBRE

204.60 m
204.00 m

204.00 m
200.00 m
Pendiente transversal a L del fondo 1%
FONDO

1%
Ancho del borde de anclaje 0.50 m 200.00
Longitud del Anclaje Subterraneo 0.50 m
Tiempo de embalse 24.00 h
2.- DIMENSIONAMIENTO Y CAL. HIDRAULICOS
Volumen neto de diseo 21600 m3
Largo del Fondo (L) 400.00 m 0.5 2.00 m
Ancho del Fondo (A) 200.00 m Salida .
Area del Fondo ( b ) 80000.00 m2 ###
Area del Espejo de agua ( B ) 82416.00 m2
Altura menor del agua ( h' ) 0.00 m (a reservorio lleno, debido al pendiente) Agua
Reduc.Volumen x pendiente (Vp) 82037.60 m3 = Vol. Tronco de pirmide / 2
Volumen Neto calculado 80372.41 m3 = h * ( B + b + B*b ) / 3 - Vp Fondo ###
Volumen Total (con borde libre) 105151.62 m3 = (Tronco de pirmide) - Vp
Tiempo de embalse (en h y min) 9 h 0min
Tiempo mnimo de descarga 7 h 22min
Caudal mximo de descarga 297.09 l/s
3.- AREA DE GEOMEMBRANA
Longitud de Talud 3.25 m
Area de Taludes 3933.15 m2
Area de Anclajes 1221.40 m2
Area neta geomembrana 85154.55 m2
Autor: W. Rios E.
CALCULO DEL VOLUMEN REQUERIDO PARA ATENDER LA DEMANDA DE AGUA DEL PROYECTO

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Tiempo de riego/dia (hrs) 24 24 24 24 24 24 24 24 24 24 24 24
N dias / mes 31 28 30 31 30 31 30 31 30 31 30 31
Tiempo de riego/mes (hrs) 744 672 720 744 720 744 720 744 720 744 720 744
Volumen demandado para el proyecto/mes (m3) 42,545.90 62,161.12 84,999.59 95,409.44 80,653.05 63,719.88 60,686.55 67,935.80 42,934.25 67,956.51 63,659.74 57,124.06
Caudal de descarga mensual con RTG (l/s) 15.88 25.69 32.79 35.62 31.12 23.79 23.41 25.36 16.56 25.37 24.56 21.33

Volumen demandado llenado en 3 momentos (m3) 14,181.97 20,720.37 28,333.20 31,803.15 26,884.35 21,239.96 20,228.85 22,645.27 14,311.42 22,652.17 21,219.91 19,041.35
Caudal de descarga mensual con RTG (l/s)

Tiempo de riego/dia (hrs) 24 24 24 24 24 24 24 24 24 24 24 24


Volumen demandado ha/dia (m3) 27.39 44.30 54.72 63.47 51.92 42.39 39.07 43.73 28.56 43.75 42.35 36.77
rea del proyecto (has) 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11 50.11
Volumen demandado para el proyecto/dia (m3) 1,372.45 2,220.04 2,741.92 3,180.31 2,601.71 2,124.00 1,957.63 2,191.48 1,431.14 2,192.15 2,121.99 1,842.71
Caudal de descarga diario con RTG (l/s) 15.88 25.69 31.74 36.81 30.11 24.58 22.66 25.36 16.56 25.37 24.56 21.33

Fuente. Elaboracin propia

Volumen mximo llenado en un solo


momento
Demanda maxima 95,409.44
V=Q*T*3.6 Demanda minima 42,545.90
T=V/Q*3.6 Demanda promedio 65,815.49
Q=V/T*3.6
Volumen mximo llenado en 03
momentos
Demanda maxima 31,803.15
Demanda minima 14,181.97
Demanda promedio 21,938.50