Professional Documents
Culture Documents
It is the policy of the Company to improve products whenever it is possible and practical to do so. The
Company reserves the right to make changes or add improvements at any time without incurring any
obligation to install such changes on products sold previously.
Because of continuous research and development, periodic revisions may be made to this publication.
Customers should contact their local distributor for information on the latest revision.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-1
PAYLOAD METER II
ON BOARD WEIGHING SYSTEM (OBWS)
INDEX
GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-3
LIGHTS, SWITCHES, and COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-4
TIPS FOR OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-5
EXTERNAL DISPLAY LIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-5
THEORY OF OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-6
Basic Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-6
Linkage Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-6
Brake Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-7
Sources of Error . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-7
Typical Data From Service Check Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-7
Example Calculation of Payload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-8
Calculation of the Calibration Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-8
TYPES OF DATA STORED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-9
Cycle data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-9
Engine ON/OFF Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-10
Fault Codes and Warning Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-10
Engine Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-11
Total Payload and Total Number of Cycles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-11
Other Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-11
OPERATOR FUNCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
Using the Operator Load Counter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
Viewing the Operator Load Counter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
Clearing the Operator Load Counter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
Dimming the Lights on the Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-12
INITIAL SETUP OF PAYLOAD METER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-13
Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-13
Checking the Operator Check Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-13
Checking the Service Check Mode. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-14
Setting "UP:00". . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-14
Setting "PL:00" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-14
Checking the Gt Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-14
Checking the Inclinometer Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-15
Calibrating a Truck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-15
DISPLAYS AT START-UP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-16
SETUP AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-17
Setting the Speed Limit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-17
Setting the Option Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-17
Setting The Machine I.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-17
Setting The Operator I.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-18
Setting The Time and Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M20-18
Optional Equipment - Section 6 OM6006 10/00
Page 6-2 Payload Meter II
PAYLOAD METER II
ON BOARD WEIGHING SYSTEM (OBWS)
GENERAL INFORMATION The payload meter stores in memory various operating
data. This data includes:
The Payload Meter II On Board Weighing System
displays and records the payload weight along with 1) The payload, time, distance, and travel speed for
other operating information. The system consists of a each cycle.
payload meter, pressure sensors, deck mounted lights 2) The date and time that the engine was started and
and an inclinometer. stopped.
The payload meter (Figure 20-1) uses the four suspen- 3) The date and time of each fault that occurred or
sion pressures and an inclinometer to determine the was canceled.
load in the truck. The payload weight can be displayed
in short tons or metric tons. 4) The total payload and the overall number of cycles
for a specific time period.
There are three external deck-mounted lights on each
side of the truck. The lights indicate payload weight This data is retained even when the power is switched
divided into three separate stages. A forecast feature off. The stored data is backed up by an internal battery.
will flash a deck mounted light predicting the payload The data can be down loaded from the payload meter
weight if the next bucket of material is dropped into the to a personal computer when a communication cable
body. is connected to the port inside the cab.
Figure 20-3.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-7
Figure 20-5.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-9
Cycle Data
One cycle is considered to be from the point where a load is dumped to the point where the next load is dumped.
Data between these two points is recorded in memory. Examples of the data are shown below. The maximum
number of cycles that can be stored in memory is 2900 cycles.
Engine Operation
Other Data
CONTENT ITEM UNIT RANGE REMARKS
Set Up Data That The Speed Limit Km/MPH 0 - 99
Operator Can Check Option Code Digital Number 0 - 13 Communication Mode
Year Year 0 - 99
Month Month 1 - 12
Calibration Data Day Day 1 - 31 Date and time when calibrated.
Hour Hour 24 Hour Clock
Minute Minute 0 - 59
Optional Equipment - Section 6 OM6006 10/00
Page 6-12 Payload Meter II
Viewing the Operator Load Counter Dimming the Lights on the Display
1. Press the TOTAL/SFT switch once. There are a total of 10 brightness levels on the PLM
If there is a fault code present at this time: display.
2. The error code for that problem will be displayed.
This will be a flashing display. From the normal operation display:
3. Press the TOTAL/SFT switch again. If additional 1. Press the LIGHT/INC switch. The lighting will
faults or warnings exist, that fault code will be become one level dimmer. This will continue until
displayed as a flashing code. the lighting has reached its lowest level.
4. Repeat step #3 until no fault codes are displayed. 2. After reaching the lowest level, the display will
":" will show when no additional faults exist. The return to the brightest setting.
display will then show total tons hauled since the
last time the counter was cleared. The total is If the switch is held in the depressed position, the
displayed in hundreds of tons. brightness will change continuously.
5. Press the TOTAL/SFT switch again. The number
displayed is the number of haul cycles since the
last time the cycle counter was cleared.
6. Press the TOTAL/SFT switch again. ":" is dis-
played for 2 seconds before the display returns to
normal operations.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-13
INITIAL SETUP OF PAYLOAD METER There are nine switches located behind the panel on
the left side of the payload meter. Figure 20-8 shows
There are several things that must be checked and the switch numbers. The following switch positions
programmed when a Payload Meter is first installed. should be confirmed before the meter is installed.
1. Check the Switch Settings on the side of the
Switch Position
meter.
1 Gt Gain - Do Not Adjust
2. Check the Operator Check Mode settings
B Buzzer Volume - Do not Adjust
3. Check the Service Check Mode settings 2 7
4. Calibrate the clean truck. 3 7
The next few pages show the steps required to perform 4* 4 - 685E
these checks. Only after all of these steps have been 5 - 630E
performed can the payload meter be released for B - 730E
service.
C - 930E
D - 530M
E - 330M
Switch Settings
F - 830E
5 DOWN
6 DOWN
7 DOWN - SHORT TONS
UP - METRIC TONS
8 UP
Calibrating a Truck
The payload meter should be calibrated whenever one
of the following occurs:
1. When a new payload meter is installed.
2. When a suspension sensor has been changed.
3. Whenever the suspensions have been serviced
or the Nitrogen levels have changed.
4. Once a month thereafter.
To calibrate the payload meter:
1. With the engine running and the truck stopped,
press and hold the CAL/CLR switch until "CAL" is
flashing on the display.
2. Drive the truck until the speed is approximately
6-10 MPH (10-15 Km/H)
3. Press the CAL/CLR switch once.
4. Drive until the display switches back to the time
of day. This will take up to 30 seconds.
5. The payload meter is now calibrated and ready
for normal operation.
Reception Pilot Lamp (2, Figure 20-1) 10. The display will show:
Transmission Pilot Lamp (3, Figure 20-1)
This display indicates the Option code setting.
Memory Card Pilot Lamp (4, Figure 20-1)
Refer to Operator Check Mode, Setting the Op-
2. The display will show: tion Code and to Method of Operation for more
information on this function.
The xx indicates the Truck Model. Refer to
"Initial Setup of Payload Meter" for code defini-
tions.
SETUP AND MAINTENANCE 7. Press the LIGHT/INC switch to change the tens
digit to the desired number.
8.Press the MODE switch to return to normal opera-
Speed Limit tion.
A warning can be displayed if the machine exceeds a 9. The Option Code selects the PLM communication
preset speed. mode as follows:
The available range is: 10 - 99 km/h (6 - 62 mph). It is
recommended to set the speed limit to 99 km/h (62 Option
mph). COMMUNICATION MODE
Code
9. Press the LIGHT/INC switch to change the first 7. Press the LIGHT/INC switch to change the hours.
digit to the desired number. The clock is a 24 hour clock.
10. Press the MODE switch to return to normal op- 8. Press the TOTAL/SFT switch and
eration. the display will then indicate:
Setting The Operator I.D. Code 9. Press the LIGHT/INC switch to change the day.
1. Press and hold the MODE switch 10. Press the TOTAL/SFT switch and
until "Cd:dP" is displayed. the display will then indicate:
2. Press the MODE switch once. The 11. Press the LIGHT/INC switch to change the month.
display will show:
12. Press the TOTAL/SFT switch and
the display will then indicate:
3. Press the MODE switch once. The
display will show:
13. Press the LIGHT/INC switch to change the year.
4. Press the MODE switch repeatedly 14.Press the MODE switch to return to normal opera-
until "o.XXX" is displayed. tion.
Setting The Time and Date To begin, the shift lever should be in the N
position, the brake lock set, the hoist control lever
1. Press and hold the MODE switch should be in the FLOAT position and the body in
until "Cd:dP" is displayed. the down position.
2. Press the MODE switch once. The 1. Press and hold the MODE switch
display will show: until "Cd:dP" is displayed.
3. Press the MODE switch once. The 2. Press the MODE switch once. The
display will show: display will show:
4. Press the MODE switch repeatedly 3. Press and hold the CAL/CLR
until "XX:XX" is displayed. switch until "A.CLE" is flashing.
5. Press the LIGHT/INC switch to change the min- 4. Press the CAL/CLR switch again and the memory
utes. will be cleared. The meter will then return to
normal operation.
6. Press the TOTAL/SFT switch and
the display will then indicate: This does not clear the Operator Load Counter.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-19
C1:oo Shift selector is in "N". 4. Press the TOTAL/SFT switch to view faults again
or press the MODE switch to return to normal
C1: Shift selector is not in "N. operation.
Electric trucks
C1:oo Brake lock is on.
C1: Brake lock is off.
Condition of the Body Up Switch signal.
The panel will display: C2:XX for 3 seconds,
then indicate:
C2:oo Body up switch is in up position.
C2: Body up switch is in down position.
Optional Equipment - Section 6 OM6006 10/00
Page 6-20 Payload Meter II
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-21
Optional Equipment - Section 6 OM6006 10/00
Page 6-22 Payload Meter II
UP Factor - Payload Calculation Gain Careful consideration must be given to the use of
PL:01 and PL:10. These modes divide the data trans-
Description of UP Factor mitted by Modular Mining and the data stored in the
payload meters memory. Additionally, each mode
The payload calculation gain, or UP factor is multiplied handles the UP factor differently and can calculate
to the actual calculated load. From the example shown different loads for the same haul cycle. For these
in Figure XX, the calculated load is 143.8 tons. If the reasons it is recommended that the payload meter
UP factor is set to +5% the displayed load will be 143.8 be set to use PL:00 in all cases.
x 1.05 = 151 tons. This factor can be used to minimize
the effects of systematic error for a particular truck. The PL:00
UP factor is not applied uniformly to all load calcula-
tions. There are three operating modes for the payload Modular Mining Transmission - The data is captured
meter and the UP factor is applied differently to each at the last transition from 0 to 1 MPH prior to traveling
mode. Therefore, it is recommended that this percent- 160 meters from the shovel. The captured data is
age be set to 0. There are significant differences in final transmitted when the truck travels 160m from the
calculated load that can be introduced by adjusting this shovel. This load calculation will use the UP factor
gain. percentage.
Payload meters sent from the factory are typically set Memory Storage - Same as above, the data is cap-
to "UP: 5" indicating a +5% gain in final load. tured at the last transition from 0 to 1 MPH prior to
traveling 160 meters from the shovel. The captured
This should be checked on all new meters and data is stored into memory when the body rises at the
changed to "UP: 0". dump. This load calculation will use the UP factor
percentage.
PL Mode - Load Calculation Timing
PL:01
Load Calculation Timing
Modular Mining Transmission - The data is captured
The PL mode controls when the payload meter takes at the last transition from 0 to 1 MPH prior to traveling
a sample of the data and calculates the load. There 160 meters from the shovel. The captured data is
are three modes available. There are two sets of data transmitted when the truck travels 160m from the
that are affected by the PL mode setting. shovel. This load calculation will use the UP factor
percentage.
Modular Mining Transmission
Memory Storage - The data is captured and stored
Memory Storage when the body rises from the frame. This calculation
will not use the UP factor percentage.
PL:10
The PL mode setting can have a significant impact on Modular Mining Transmission - The data is captured
the perceived accuracy of the payload meter. and transmitted when the truck travels 160 meters
from the shovel. This calculation will not use the UP
PL:00 is the only recommended setting. factor percentage.
Use of settings other than PL:00 Memory Storage - The data is captured and stored
is NOT recommended. when the body rises from the frame. This calculation
will not use the UP factor percentage.
Optional Equipment - Section 6 OM6006 10/00
Page 6-24 Payload Meter II
Installation Installation
1. Install new O-ring on sensor (4, Figure 20-11) and 1. Install inclinometer (3, Figure 20-13) with cap-
install sensor into adapter (3). Tighten sensor to screws, nuts and lockwashers (4).
2229 ft.lbs. (3039 N.m) torque.
2. Install new O-ring on adapter (3) and install com-
plete adapter/sensor assembly into valve (2).
Hold valve body and tighten adapter/sensor as-
sembly to 103 ft.lbs. (176 N.m) torque.
3. Connect sensor wiring to truck wiring harness.
The sensors have three wires. Be sure that wires
are connected correctly. (Figure 20-12)
INCLINOMETER
As the truck is tilted fore or aft, the weight distribution
between the front and rear axles changes. To compen- FIGURE 20-14. INCLINOMETER SIDE
sate for this, the inclinometer measures the ground CONNECTOR VIEW
angle at which the truck rests. This data is then sent
to the payload meter so it can calculate the correct Pin Number Wire Color Wire Function
payload weight. The inclinometer is located below the
operators center console (passenger seat structure). 1 Black Ground (GND)
2 White Signal
Removal 3 Red + Power
1. Disconnect inclinometer wire lead from harness.
Adjustment
2. Remove the three capscrews, nuts and lockwash-
ers (4, Figure 20-13) and inclinometer (3). 1. Park the truck on a 0% grade.
2. Loosen the three Inclinometer mounting cap-
screws (4, Figure 20-13) and rotate the Incli-
nometer until a voltage range of 2.6 0.1 Volts
can be measured (using aVolt/Ohm Meter) at pins
1 and 2 of the inclinometer electrical harness
connector.
3. Tighten all capscrews (4, Figure 20-13) to stand-
ard torque, after adjustment.
Optional Equipment - Section 6 OM6006 10/00
Page 6-28 Payload Meter II
SCOREBOARD
Description
The Scoreboard from Komatsu Mining Systems uses
information from the Payload Meter to display the
current load. It uses ultra-high-brightness LED tech-
nology to form 3 digits. The sign is fully sunlight read-
able and housed in a rugged steel enclosure.
The Scoreboard displays each swing pass as the truck
is being loaded. As the truck drives away, the sign will
display the last swing pass until the final load calcula-
tion is made. It will then switch to display the final load
calculation and hold it until the truck dumps. The sign
will then clear for the empty ride back to the shovel.
Making Connections
The Scoreboard connects to the RS232 port on the
Payload Meter. It must share this connection with other
dispatch systems like Modular Mining as well as the
PC download connection. This sharing of the single
port creates special circumstances when using a Per- Figure 20-15. Scoreboard
sonal Computer or dispatch system.
The Scoreboard is in constant communications with
The harness for the Scoreboard supplies two extra
the Payload Meter and must acknowledge every mes-
connections in the overhead compartment of the cab.
sage from the meter. In addition, the Scoreboard must
One is for the existing PC port and the other is for
also signal the Payload Meter that it is ready to receive
Modular Mining.
messages by supplying a 5vdc signal over the CTS
line. Installations that include Modular Mining or other When two Scoreboards are installed, the first sign
dispatch systems must take over the responsibility for transmits load information and power to the second
acknowledging messages from the Payload Meter. To sign. Note that the communications wire from the first
do this, the return communications line and the CTS sign connects to terminal 35L7. This is the retransmit
line from the Scoreboard must be cut and taped back. terminal. This wire then connects to the 35L4 terminal
When this is done, the Scoreboard simply monitors in the second sign. This is the receive terminal of the
communications between the Payload Meter and second sign.
Modular Mining. The Modular Mining system acknow-
The Payload Meter must be set to use OP12. Refer
ledges each message from the meter.
to "Setting the Option Code" for instructions.
Sharing this RS232 port with the Personal Computer
Once in this mode, the Payload Meter will look for the
for downloading can also create problems with com-
Scoreboard and attempt to communicate with it. If
munications. The Payload Meter can confuse mes-
there are communications problems the Payload Me-
sages from the PersonalComputer and Scoreboard.
ter may indicate a communications port error. Refer to
To eliminate this problem, the Scoreboard must be
"Fault Codes" for additional information.
turned off during downloading of the Payload Me-
ter. Using the circuit breaker to turn off the main power
to the Scoreboard is the best way to accomplish this.
The power to the Scoreboard must be turned off before
communications between a Personal Computer and
the Payload Meter can start. Once the download proc-
ess is finished, the power needs to be restored to the
Scoreboard to keep from receiving F99 or F93 error
codes.
OM6006 10/00 Optional Equipment - Section 6
Payload Meter II Page 6-29
Optional Equipment - Section 6 OM6006 10/00
Page 6-30 Payload Meter II
CONNECTIONS
CN1 - AMP MIC-MKII 13 Pins White Connector CN3 - AMP MIC-MKII 9 Pins
No. Description Comments White (RS-232C Port)
CN2 - AMP 040 12 Pins Black Connector CN4 - AMP 040 8 Pins Black
(Optional Input, Reserved)
No. Description Comments
Running Open No. Description
1 Engine Oil Pressure Switch
Off - Closed 1 Optional Input GND
2 Sensor Power Out +18V 2 Analog Input 1
3 Sensor GND 3 Analog Input 2
4 Left FrontSuspension Pressure Sensor 1-5VDC Normal 4 Digital Input 1
Right Front Suspension PressureSensor 5 Digital Input 2
5 1-5VDC Normal
6
6 Left Rear Suspension Pressure Sensor 1-5VDC Normal 7
7 Right Rear Suspension Pressure Sensor 1-5VDC Normal
8 Inclinometer
Body Down - Open
9 Body Rise Signal
Body Up - Gnd
Lock Off - Open
10 Break Lock Signal/Neutral Signal
Lock On - Gnd
11
12
Optional Equipment - Section 6 OM6006 10/00
Page 6-32 Payload Meter II
This procedure is necessary to fix a rare condition in 7. Set the time, date, OP, PL, and UP settings. All
the operation of the meter. Indication for this procedure other user settings should updated at this time.
is a repeated display of F.CAL on the meter despite
8. Calibrate the Payload Meter by holding the CAL
repeated calibration. If possible, download the Pay-
button until CAL flashes.
load Meter before performing this procedure. This
procedure will erase all memory and user settings. 9. Release the Brake Lock (Park Brake for 330M)
and begin driving 5-8 MPH on level ground and
NOTE:
press CAL.
This procedure should be performed before any
CAL should display until the meter finishes its
Payload Meter is returned for warranty or repair.
calibration.
10. Load the truck to rated load and drive through one
Before performing this procedure, be sure that the
haul cycle.
engine inputs into the payload meter can be manipu-
lated to indicate engine running and engine stopped. 11. After dumping the load, wait at least 15 seconds
Some payload meter installations have hard-wired and drive the truck to a safe location.
these inputs. These inputs must be accessible and
12. Stop the truck and shut down the engine.
able to produce the following input conditions:
13. Turn on the Payload Meter but leave the engine
off.
21C 21D
14. Hold MODE and LIGHT until CHEC flashes.
Condition Engine Oil Alternator "R"
Pressure Terminal 15. Hold LIGHT and CAL until A:CLE flashes.
Engine Running Open 24VDC 16. Press CAL to clear the service memory.
Engine Stopped Ground Open
17. When CHEC is displayed, press MODE to return
to normal operation.
1. Turn off all systems. 18. Clear the Haul Cycle Memory by holding MODE
until Cd:dP is displayed.
2. Turn on the Payload Meter but leave the engine
off. 19. Press MODE and A.CLE will be displayed.
3. Hold MODE and LIGHT until CHEC flashes. 20. Hold CAL until A.CLE flashed.
4. Hold the CAL, TOTAL and LIGHT buttons until 21. Press CAL once more to clear the haul cycle
00:00 is displayed. memory.
5. Press CAL for 2 seconds. 00 00 will flash and the 22. Clear the operator load counter by pressing the
meter will erase its memory and reset to its factory TOTAL button until ":" is displayed.
settings. This includes and OP, UP, PL, P.SEL,
23. Hold the CAL button until the display flashes.
and E.SEL settings.
The meter will restart and display F.CAL. 24. Hold the CAL button until 0000 is displayed to
clear the memory.
6. Start the engine.
25. The payload meter should now function normally.
Optional Equipment - Section 6 OM6006 10/00
Page 6-34 Payload Meter II
NOTES
L. G. HAGENBUCH holder of
U.S. Patent Numbers 4,831,539 and 4,839,835
DataKom Publishing Corporation
2300 N. E. Adams Street
Peoria, IL 61639
Printed in U.S.A. 10/00