You are on page 1of 8

Bill of materials

PROJECT : _________________________________

Adress : _________________________________

_________________________________

_________________________________

_________________________________

_________________________________

_________________________________

Table of contents will be inserted here on update.

Autodesk 16/06/2017 - 1/8


Bill of materials

Notations

Elemento Etiqueta Significado de la etiqueta

Piso e Thickness

Si Superficie con abertura

Se Superficie sin abertura

Viga L Distancia entre axisas

S Seccion

H&l Alto y ancho

Columna H Altura

l&L Ancho y longitud

Diametro

S Seccion

P Perimetro

Pared H Altura

L Longitud entre axisas

l Grosor

Si Superficie con abertura

Zapata aislada l&L Dimensiones

H Altura

Zapata continua L Longitud entre axisas

l Ancho

H Altura

Autodesk 16/06/2017 - 2/8


Bill of materials

Calculation conventions

Element Material(m3) Formwork(m2)

Slab e * (Se-Si) Se-Si

Beam S*L L * (h+h+b)

Column S*h P*h

Wall (l * L * h)-(Si*l) 2*(L*h)-Si

Isolated footing L*l*h 2 * (L + l) * h

Continuous footing L*l*h L * h*2

Autodesk 16/06/2017 - 3/8


Bill of materials

Details of elements

Slab Beam Wall Continuous footing Total by


model

Basement 0 0 0 4 4
(+0.00m)

Level 1 (+3.00m) 2 4 2 0 8

Total 2 4 2 4 12
This table contains the details of selected structural elements. The selection is partial.

Autodesk 16/06/2017 - 4/8


Bill of materials

CONCRETE

Detailed list

Basement (+0.00m)

Element Number Dimensions CONCRETE Formwor


k
(m3)
(H) or (e) (l) (L) (m2)

Continuous CF 2 6.18 0.7 0.25 0.96 3.09


footing
CF 3 2.7 0.7 0.25 0.35 1.35

CF 4 2.7 0.7 0.25 0.35 1.35

/ 6.18 0.7 0.25 0.96 3.09

Level 1 (+3.00m)

Element Number Dimensions CONCRETE Formwor


k
(m3)
(H) or (e) (l) (L) (m2)

Slab S1 0.1 - - 1.08 10.79

S2 0.15 - - 2.22 14.83

Beam B1 0.8 0.2 1.8 0.29 3.24

B2 0.46 0.2 1.8 0.17 2.02

B3 0.46 0.2 1.8 0.17 2.02

Autodesk 16/06/2017 - 5/8


Bill of materials

B4 1.1 0.2 1.8 0.4 4.32

Wall W1 3.78 0.2 5.98 4.52 45.21

W2 3.78 0.2 5.98 4.52 45.21

Sums and ratios

Sums

Element CONCRETE Formwork

(m3) (m2)

Slab 3.3 25.62

Beam 1.02 11.59

Wall 9.04 90.41

Continuous footing 2.62 8.88

Total 15.98 136.5

Ratios

Element Formwork/CONCRETE

(m2/m3)

Slab 7.76

Beam 11.42

Autodesk 16/06/2017 - 6/8


Bill of materials

Wall 10

Continuous footing 3.39

Total 8.54

Price

CONCRETE

Elemento Cantidad Precio Unitario Precio

(m3) (Dollars/m3) (Dollars)

Piso de Rampa 1.50 100.62 150.00

Losa de techo 1.80 100.62 182.05

Vigas 1.02 102.14 104.18

Pared 9.04 97.57 882.03

Fundacion 2.62 99.09 259.62


Continua

Total 15.98 1,577.88

Formwork

Element Quantity Unit price Price

(m2) (Dollars/m2) (Dollars)

Slab 25.62 19.82 507.79


Autodesk 16/06/2017 - 7/8
Bill of materials

Beam 11.59 41.16 477.04

Wall 90.41 15.24 1377.85

Continuous footing 8.88 38.11 338.42

Total 136.5 2701.10