You are on page 1of 31

NORTHCENTER

TOWN SQUARE
FINAL CONCEPT DESIGN
June 14, 2017Community Meeting #3
3/29 COMMUNITY MEETING #1
ANALYSIS, APPROACH,
PRECEDENTS + FEEDBACK
(+ONLINE SURVEY)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 5
EXISTING PLAZA AND BELLE PLAINE AVE
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 4
CONCEPT DESIGN SCOPE
40 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 2
SITE AREA
25 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 3
ENHANCE THE SITE TO SUPPORT PLAY
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 9
ENHANCE THE SITE FOR PERFORMANCES
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 10
MAINTAIN CAPACITY/FLEXIBILITY FOR MARKETS/POP-UP RETAIL
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 11
MAINTAIN CAPACITY/FLEXIBILITY FOR LARGE EVENTS
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 12
SEASONAL USES
University Circle Ice Skating Rink, Cleveland State Street Rose Kennedy Greenway Rings Fountain, Boston
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 13
5/9 COMMUNITY MEETING #2
3 DESIGN OPTIONS
+ FEEDBACK
(+ONLINE SURVEY)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 14
EXISTING SITE PLAN
Alley N Damen Ave
C4 Counseling Center Existing Tree Plaza
N Lincoln Ave
Existing W Belle Plaine Ave Cul-de-Sac
Flagpole
CVS Parking Lot
25 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 33
OPTION 1: THE LINEAR PLAZA
Thickened Art Installation Screen
Rubber Play Mounds
New Tree Planters Act as Bollards Flexible Space for Vendors Low Stage Platform
Long Planter
Water Misting Feature Moveable Chairs
Boombox Kiosk
Flagpole
New Tree Planters
New Divvy Location Moveable Planters with Seating Edges
Sign Art Dividing Screen Visible from both Directions
25 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 34
OPTION 2: THE ROUND LAWN
Thickened Art Installation Screen
Rubber Play Mounds Round Seating Benches
Flexible Space for Vendors
New Tree Planters Act as Bollards
Painted Floor Pattern on Existing Cul-de-Sac Raised Round Lawn
Boombox Kiosk
Flagpole
New Tree Planters
New Divvy Location
Sign Art Dividing Screen Visible from both Directions
25 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 35
OPTION 3: THE LINEAR LAWN
Thickened Art Installation Screen
Rubber Play Mounds
Linear Benches with Under-Lighting
Flexible Space for Vendors
New Tree Planters Act as Bollards Raised Linear Lawn Low Stage Platform
Water Misting Feature Moveable Seating
Boombox Kiosk
Flagpole
New Tree Planters
New Divvy Location
Sign Art Dividing Screen Visible from both Directions
25 ft
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 36
FINAL CONCEPT DESIGN
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 42
FINAL CONCEPT DESIGN OVERVIEW
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 43
FINAL CONCEPT DESIGN PLAN
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 44
FINAL CONCEPT DESIGN PLAN (EXISTING HEALTHY TREES)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 45
FINAL CONCEPT DESIGN PLAN (NEAR TERM, NEW TREES REPLACING UNHEALTHY TREES)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 46
FINAL CONCEPT DESIGN PLAN (LONG TERM)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 47
FINAL CONCEPT DESIGN PLAN (TREES CANOPIES HIDDEN)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 48
FINAL CONCEPT DESIGN PLAN (LONG TERM)
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 49
TREE PLAZA IN FALL
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 51
RAISED ARTIFICIAL TURF LAWN + STAGE SHADE CANOPY BEYOND
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 54
STAGE, FABRIC SHADE CANOPY AND RAISED ARTIFICIAL TURF LAWN
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 56
RAISED ARTIFICIAL TURF LAWN AND EVENING CONCERT PERFORMANCE
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 58
RUBBER PLAY MOUNDS, VINE FENCE AND SHADE PLAZA BEYOND
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 59
LINCOLN AVE. ARRIVAL, BOOM-BOX MICRO-RETAIL + RELOCATED DIVVY STATION
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 62
BELLE PLAINE ARRIVAL FACING WEST
Northcenter Town Square | Final Concept Design | 06 / 14 / 2017 | Community Meeting #3 | PORT 63
THANK YOU!
FINAL CONCEPT DESIGN
June 14, 2017Community Meeting #3

You might also like