This drawing is the copyright and property of AKS


Architects and Engineers Ltd. It must not be copied or
published without written consent.

Do not scale from this drawing.

All dimensions to be checked on site.


General
1. Do not scale from the drawings, if in doubt ask.
2. All drawing to be read in conjunction with relevant Architect's, Engineer's and
subcontractor's drawings and Specifications.
3. Contractor to check all dimensions on site prior to commencing works.
4. All temporary support work to be the responsibility of the Contractor.
5. All dimensions are in millimeters.
6. Details and positions of slab openings as M+E engineers builders work drawings.
7. Where service penetrations are to be cast into slabs, use not greater than 150 void.
Always check positions and sizes with structural engineer.
8. It is the Builder's responsibility to ensure all Government Approvals are in place prior to
commencement of works.
9. Waterproofing, sealing and tanking are to the Architect's details. If unclear refer to the
Architect for advice. Compressible joints will generally need to be sealed - seek advice
from the Architect.
10. Contractor must allow for local traffic weight restrictions and seek approval for deliveries
from the Highways Department.
11. There is no Party Wall act in Gibraltar. It is therefore the Client and Project Manager's
responsibility to ensure that all works at or adjacent boundaries have been agreed
between Parties.
12. All loads quoted on drawings are unfactored. Statutory load factors must be applied to

LEVEL 4
these loads.

Masonry
1. New infill masonry and fixings to Architects details. Details omitted from structural
arrangements for clarity. All masonry items to BS5628.
2. Movement joints will be required in masonry walls. Confirm placings and spacings from
the Architect and Engineer where not shown.
3. At wall corners, walls should be constructed in fully bonded masonry. Refer to engineer
for details of jointing.
4. External wall panels will typically require windposts. Contractor to allow for stainless
steel windposts and fixings to specialist fabricator details. In absence of drawn positions
allow posts at 4m centres.
5. Wall tie spacings and form to be in strict accordance with the Building Regulations and
BS requirements.
6. All mortar to be MD(III).
7. All blockwork to be 20N/mm2.
8. Allow for stainless steel head restraints at 600c/c to blockwork walls.
9. Provide bed joint reinforcement to masonry walls throughout in each course. Refer to
engineer for form and type.

Concrete

1. Cement to be CEM III B + SR


2. All structural concrete in foundation caps, beams and concrete topping to be in
accordance with BS8110 and to be 40N/mm2 cube strength grade C32/40 or RC40
designated mix to BS8500. Sulphate resisting cement to be used in foundations.
Cement type to be ordinary portland.
3. Curing times and procedures to be in strict accordance with the specification.
4. All concrete surfaces to be free from voids, honey-combing and other blemishes.
5. Concrete to be vibrated by mechanical means.
6. Minimum of six concrete cube samples to be taken for testing per pour, testing should
be carried out by an approved consultant. Testing recommended at 7,14 and 28 days.
7. Concrete cover to reinforcement to be, unless otherwise noted:

TOP BOTTOM SIDES


Deck XX XX XX
Slab XX XX XX
Foundations 40 40 40
Columns XX XX XX
Walls XX XX XX
Beam 25 25 40

8. Proprietary movement joints to be installed in strict accordance with manufacturers


details.
9. Water bars are required in construction joints for pools, retaining walls and liquid
retaining structures in this project. Submit product for Approval.
10. All concrete works to be in strict accordance with the NSCS National Structural Concrete
Specification, including tolerances. Where clarification on tolerances is required seek
confirmation from the Architect.
11. Fire protection to all structure is to be provided to suit Architects requirements for fire
rating.

Reinforcement
1. Reinforcement to be cut and bent to BS8666 (2005). All rod reinforcement to be high
yield deformed type 2 to BS4499.
COLUMN SCHEDULE 2. The characteristic strength of reinforcement to be 500N/mm2 Grade B500B.

Steelwork
1. All materials and workmanship to comply with BS 5950.
C1 - 2 NO. 200x200x6.3 SHS 2. Welds to be continuous 6mm FPFW U.N.O.
C2 - HEB 360 3. Allow for steel element splices to aid delivery and installation.
4. All columns to be continuous from ground to roof or spliced to be continuous.
C3 - 80x80x5 SHS 5. Unless noted otherwise all new steelwork to be grade S275 JO to BS EN 10025.
6. Bolts to be grade 8.8 equivalent and hot-dip galvanised unless noted otherwise. All
C4 - 120x120x10 SHS - height has to be confirmed bolts must have washers.
C5 - IPN 380 7. All internal hidden steelwork (C2 Risk Category) to be thoroughly cleaned by grit blasting
to grade Sa2.5 and primed with zinc phosphate primer to 80um. Fire protected to meet
C6 - HEB 240 Architects requirements. Visible steelwork then finished to Architects requirements.
8. All non-internal, partly internal embedded or external steelwork (C3 Risk Category) to be
galvanised to be marine grade and guaranteed to required lifetime specified by Client.
BEAM SCHEDULE Fire protected to meet Architects requirements. Finished to Architects requirements.
9. Steelwork fire protection to Architect's specification - intumescent coated, compatible
with primer / coating. X hour protection provided as per Architects requirements.
SUBMIT FOR APPROVAL.
B1 - HE360B 10. The Contractor must allow for tolerance in fabrication and provide all shimming and
B2 - 2NO HEB 240 packing necessary to obtain the correct levels shown on the drawings.
11. All dimensions based on provided site survey and Architects drawings. Contractor &
B3 - 2NO 350x250x12.5 EURO RHS fabricators to carry out their own surveys.
12. All steel works are to be in strict accordance with the NSSS National Structural
B4 - HEB 280 Steelwork Specification, including tolerances.
B5 - HEB 240 13. Resin anchor bolts to be installed in strict accordance with the manufacturers
recommendations.
B6 - IPN 380
B7 - HEB 280
B8 - HEB 200
B9 - IPN 180
B10 -HEB 180 P4 20.01.17 DIMENSION ADDED PK
B11 - HEB 200 P3 07.02.16 GENERAL UPDATE PK
B12 - IPN 220 P2 02.10.15 ISSUE FOR COMMENTS PK
B13 - IPN 260 P1 23.09.15 PRELIMINARY ISSUE PK
B14 - HE200M T1 17.07.15 ISSUE FOR TENDER PK
B15- HE180M rev. date description drawn
B16 - HE160M

JOIST SCHEDULE
P . O. Bo x 8 5 5 G i br al t ar
J1 - REMOVE EXISTING FLOOR AND REPLACE WITH
Tel (+350) 20073260 Fax(+350) 20074739 Email mail@aks.gi
AYRSHIRE CW24020 300clc WITH 18mm PLY DECK
SCREWED THROUGHOUT @ 300clc.
J2 - REMOVE EXISTING FLOOR AND REPLACE WITH
AYRSHIRE CW20018 WITH 18mm PLY DECK
SCREWED THROUGHOUT @ 400clc.
J3 - REMOVE EXISTING FLOOR AND REPLACE WITH client
SWE 6623 Property Holdings Limited
AYRSHIRE CW12715 WITH 18mm PLY DECK
PO Box 19
SCREWED THROUGHOUT @ 400clc.
St Peter Port Guernsey GY1 3AJ
project
T1 - BACK TO BACK J1 - SCREWED TOGETHER TO
FORM TRIMMER 5 - 13 Flat Bastion Road
T2 - BACK TO BACK J2 - SCREWED TOGETHER TO
FORM TRIMMER
title
T3 - BACK TO BACK J3 - SCREWED TOGETHER TO
FORM TRIMMER LEVEL 4 - STRUCTURAL ARRANGEMENT
scale
Where walls retained allow for opening inspection and replacement of lintel ROOF STEEL WORK
Presence of underground water tank on the site is likely allow for 1:100_1:10@A1 1:200_1:20@A3
investigation to asceratain location and new spanning rc floor over. R1 - 120x120x 8 SHS
drawn checked
Allow for pre repairing and strengthening existing walling to full thickness R2 - 2NO. 120x120x10 SHS - SIDE BY SIDE WELDED
with engineering brick,mortar and ties where walls are in poor condition or BOX PK IR
voids exist. C4 -120x120x10 SHS
drawing no. rev. date
R3 - 2NO. 160x160x12 SHS SIDE BY SIDE WELDED
BOX 213062.403 P4 17.07.15