VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL

May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
01 ESTRUCTURAS 276,241.61 133,448.24 48.31%
01.01 TRABAJOS PRELIMINARES 4,626.16 1,876.59 40.56%

01.01.01 DESMONTAJE DE CERCO PERIMETRICO DE PUAS EXISTENTE m 206.32 4.32 891.30 206.32 891.30 100.00% 0.00
01.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1,277.21 0.24 306.53 551.31 132.31 43.16% 71.50
01.01.03 TRAZO Y REPLANTEO PRELIMINAR m2 993.72 3.45 3,428.33 247.24 852.98 24.88% 70.50
01.02 MOVIMIENTO DE TIERRAS 31,503.55 13,571.16 43.08%
01.02.01 CORTE SUPERFICIAL MANUAL,E=0.20 m2 16.74 35.12 587.91 2.64 92.72 15.77% 14.10
01.02.02 CORTE MASIVO DE TERRENO A MAQUINA m2 65.44 18.09 1,183.81 0.00 - 0.00% 0.00
01.02.03 NIVELACION Y APISONADO MANUAL m2 142.49 2.61 371.90 97.34 254.06 68.31% 45.15
01.02.04 EXCAVACION PARA CIMIENTOS - ZAPATASEN TERRENO NORMAL m3 118.30 6.39 755.94 94.56 604.24 79.93% 23.74
01.02.05 EXCAVACION MANUAL EN ZAPATAS m3 5.76 70.25 404.64 5.76 404.64 100.00% 0.00
01.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO O DE PRESTAMO m3 30.76 83.71 2,574.92 30.76 2,574.92 100.00% 0.00
01.02.07 RELLENO CON MATERIAL DE PRESTAMO MANUAL EN VEREDAS m3 9.15 138.68 1,268.92 9.15 1,268.92 100.00% 0.00
01.02.08 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 7.02 71.29 500.46 3.79 270.19 53.99% 3.23
01.02.09 RELLENO COMPACTADO CON MATERIAL GRANULAR m3 70.50 130.82 9,222.81 61.55 8,051.97 87.30% 8.95
01.02.10 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 267.06 18.29 4,884.53 0.00 - 0.00% 136.23

01.02.11 AFIRMADO DE E=4" PARA PISOS INTERIORES Y EXTERIORES CON COMPACTACION m2 657.74 14.82 9,747.71 3.34 49.50 0.51% 0.00

01.03 CONCRETO SIMPLE 91,235.37 39,326.50 43.10%


VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
01.03.01 CIMIENTO CORRIDO C:H= 1:10 + 30% P.G. m3 74.07 275.06 20,373.69 62.06 17,070.22 83.79% 12.01
01.03.02 SOLADO PARA ZAPATAS e=4" C:H, 1:12 m2 51.73 34.03 1,760.37 51.73 1,760.37 100.00% 0.00
01.03.03 CONCRETO DE SOBRECIMIENTO C:H=1:8 + 25% P.M. m3 13.30 414.14 5,508.06 11.24 4,654.93 84.51% 2.06
01.03.04 CONCRETO F'C=140 KG/CM2 EN LOSA DEPORTIVA m3 64.88 346.32 22,469.24 0.00 - 0.00% 0.00
01.03.05 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA m2 50.80 67.77 3,442.72 0.00 - 0.00% 0.00
01.03.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS m2 192.68 48.60 9,364.25 165.40 8,038.44 85.84% 27.28
01.03.07 FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON) m2 192.43 100.95 19,425.81 72.00 7,268.40 37.42% 68.23
01.03.08 ENCOFRADO Y DESENCOFRADO PARA EL PISO m2 169.58 50.35 8,538.35 3.60 181.26 2.12% 112.58
01.03.09 DADO DE CONCRETO f'c=210 kg/cm2 m3 0.24 590.33 141.68 0.24 141.68 100.00% 0.00
01.03.10 ENCOFRADO Y DESENCOFRADO NORMAL EN DADOS DE CONCRETO m2 3.84 55.00 211.20 3.84 211.20 100.00% 0.00
01.04 CONCRETO ARMADO 145,253.04 77,045.40 53.04%
01.04.01 ZAPATAS 13,430.30 13,430.30 100.00%
01.04.01.01 CONCRETO FC' = 210 KG/CM2 PARA ZAPATAS m3 21.88 526.30 11,515.44 21.88 11,515.44 100.00% 0.00
01.04.01.02 ACERO FY= 4200 kg/cm2 GRADO 60 kg 245.18 7.81 1,914.86 245.18 1,914.86 100.00% 0.00
01.04.02 VIGAS DE CIMENTACION 10,317.69 6,173.86 59.84%
01.04.02.01 CONCRETO FC' = 210 KG/CM2 PARA VIGA DE CIMENTACION m3 8.92 534.20 4,765.06 5.88 3,141.10 65.92% 3.04
01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGA DE CIMENTACION m2 69.56 35.80 2,490.25 39.20 1,403.36 56.35% 30.36
01.04.02.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 392.11 7.81 3,062.38 208.63 1,629.40 53.21% 183.48
01.04.03 COLUMNAS 48,196.27 31,794.35 65.97%
01.04.03.01 CONCRETO f'c=210 kg/cm2 DE COLUMNAS m3 13.85 566.14 7,841.04 4.82 2,728.79 34.80% 7.77
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 388.06 55.30 21,459.72 213.64 11,814.29 55.05% 159.84
01.04.03.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 2,419.40 7.81 18,895.51 2,208.87 17,251.27 91.30% 210.53
01.04.04 VIGAS 57,982.28 16,604.01 28.64%
01.04.04.01 CONCRETO f'c=210 kg/cm2 DE VIGAS m3 26.61 593.15 15,783.72 8.54 5,065.50 32.09% 14.99
01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 223.42 113.68 25,398.39 66.64 7,575.64 29.83% 101.25
01.04.04.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 2,151.11 7.81 16,800.17 507.41 3,962.87 23.59% 1,196.93
01.04.05 MUROS REFORZADOS 901.91 - 0.00%
01.04.05.01 CONCRETO EN MUROS REFORZADOS FC' = 175 KG/CM2 m3 0.38 449.38 170.76 0.00 - 0.00% 0.38
01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL MUROS REFORZADOS m2 5.40 101.64 548.86 0.00 - 0.00% 5.40
01.04.05.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 23.34 7.81 182.29 0.00 - 0.00% 23.34
01.04.06 VIGUETA EN BORDE DE (0.10x0.15) 237.90 - 0.00%
01.04.06.01 CONCRETO FC' = 175 KG/CM2 DE VIGUETAS m3 0.35 462.98 162.04 0.00 - 0.00% 0.00
01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGUETAS m2 0.23 101.64 23.38 0.00 - 0.00% 0.00
01.04.06.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 6.72 7.81 52.48 0.00 - 0.00% 0.00
01.04.07 LOSA ARMADA 6,330.54 1,186.73 18.75%

01.04.07.01 CONCRETO F'C = 175 KG/CM2 PARA LOSA ARMADA MESA DE TRABAJO DE COCINA m3 0.74 385.53 285.29 0.00 - 0.00% 0.00

ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ARMADA MESA DE TRABAJO DE


01.04.07.02
COCINA
m2 35.50 101.64 3,608.22 0.00 - 0.00% 0.00

01.04.07.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 160.09 7.81 1,250.30 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
01.04.07.04 CONCRETO FC' = 175 KG/CM2 PARA LOSA ARMADA PARA EL ATRIO PRINCIPAL m3 1.35 370.10 499.64 1.35 499.64 100.00% 0.00

ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ARMADA PARA EL ATRIO


01.04.07.05
PRINCIPAL
m2 6.76 101.64 687.09 6.76 687.09 100.00% 0.00

01.04.08 TANQUE ELEVADO 7,856.15 7,856.15 100.00%


01.04.08.01 CONCRETO FC' = 210 KG/CM2 PARA EL TANQUE ELEVADO m3 2.78 510.67 1,419.66 2.78 1,419.66 100.00% 0.00
01.04.08.02 ENCOFRADO Y DESENCOFRADO DE TANQUE ELEVADO m2 25.26 113.03 2,855.14 25.26 2,855.14 100.00% 0.00
01.04.08.03 ACERO FY= 4200 kg/cm2 GRADO 60 kg 458.56 7.81 3,581.35 458.56 3,581.35 100.00% 0.00
01.05 VARIOS 3,623.49 1,628.59 44.95%
01.05.01 JUNTA DE TECNOPOR m 29.60 55.02 1,628.59 29.60 1,628.59 100.00% 0.00
01.05.02 JUNTA DE DILATACIN DE 1" EN ASFALTO + ARENA m 196.00 9.60 1,881.60 0.00 - 0.00% 0.00
01.05.03 ESCALERA DE GATO m 1.00 113.30 113.30 0.00 - 0.00% 0.00
02 ARQUITECTURA 393,742.72 45,348.94 11.52%
02.01 ESTRUCTURAS DE MADERA Y COBERTURA 22,041.18 - 0.00%
02.01.01 TIJERAL DE MADERA T-1 und 3.00 2,643.84 7,931.52 0.00 - 0.00% 0.00
02.01.02 COBERTURA DE CALAMINA GALVANIZADA DE 11 CANALES m2 207.04 22.20 4,596.29 0.00 - 0.00% 0.00
02.01.03 CORREAS DE MADERA DE 2"X3" m 281.40 32.09 9,030.13 0.00 - 0.00% 0.00
02.01.04 CUMBRERA DE PLANCHA GALVANIZADA m 19.70 24.53 483.24 0.00 - 0.00% 0.00
02.02 ALBAILERIA 91,917.77 - 0.00%
02.02.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA m2 705.24 116.07 81,857.21 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
02.02.02 MURO DE SOGA CON LADRILLO MACIZO (09X13X24) m2 68.60 106.84 7,329.22 0.00 - 0.00% 0.00
02.02.03 ACERO FY'= 4200 KG/CM2 , GRADO 60 DE REFUERZO HORIZONTAL EN MUROS kg 369.60 7.39 2,731.34 0.00 - 0.00% 0.00
02.03 REVOQUES ENLUCIDOS Y DERRAMES 89,954.80 - 0.00%
02.03.01 TARRAJEO EN COLUMNAS m2 201.40 95.00 19,133.00 0.00 - 0.00% 35.02
02.03.02 TARRAJEO MUROS INTERIORES Y EXTERIORES m2 1,627.70 22.55 36,704.64 0.00 - 0.00% 0.00
02.03.03 TARRAJEO EN SUPERFICIE DE VIGAS DE E= 1.5CM m2 224.57 88.15 19,795.85 0.00 - 0.00% 13.98
02.03.04 TARRAJEO PRIMARIO RAYADO m2 194.38 34.70 6,744.99 0.00 - 0.00% 0.00
02.03.05 VESTIDURAS DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 300.00 18.08 5,424.00 0.00 - 0.00% 0.00
02.03.06 TARRAJEO DE CUNETAS CON MORTERO: C:A 1:5 m2 14.00 48.15 674.10 0.00 - 0.00% 0.00
02.03.07 TARRAJEO DE TANQUE ELEVADO CON MORTERO C:A m2 25.26 58.52 1,478.22 0.00 - 0.00% 25.26
02.04 BRUAS 3,813.45 2,571.69 67.44%
02.04.01 BRUA E= 1 CM. DE LA VEREDA EXTERIOR m 271.71 7.38 2,005.22 271.71 2,005.22 100.00% 0.00
02.04.02 BRUA E= 1 CM. DE LA VEREDA INTERIOR m 73.99 7.38 546.05 73.99 546.05 100.00% 0.00
02.04.03 PISO BRUADO DE CEMENTO PULIDO DE 25 MM DE ESPESOR m2 137.36 5.94 815.92 0.00 - 0.00% 0.00
02.04.04 PISO BRUADO DE CEMENTO PULIDO DE 50 MM DE ESPESOR m2 3.20 6.38 20.42 3.20 20.42 100.00% 0.00
02.04.05 BRUAS EN COLUMNAS Y VIGAS m2 57.78 7.37 425.84 0.00 - 0.00% 57.78
02.05 CERRAMIENTO CON PANEL FIBROCEMENTO 4,883.76 - 0.00%
02.05.01 CIELORRASO CON PANEL FIBROCEMENTO 4 MM m2 179.55 27.20 4,883.76 0.00 - 0.00% 0.00
02.06 PISOS Y PAVIMENTOS 64,701.46 0.00 42,777.25 66.11%
02.06.01 CONCRETO FC'=140 KG/CM2, EN SARDINEL Y VEREDAS m2 169.22 309.82 52,427.74 103.69 32,125.24 61.28% 25.15
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
02.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE SARDINEL Y VEREDA EXTERIOR m2 210.78 58.23 12,273.72 182.93 10,652.01 86.79% 0.00

02.07 CUNETAS 12,842.16 - 0.00%


02.07.01 CONCRETO FC'=140 KG/CM2, EN CUNETAS m3 18.68 445.68 8,325.30 0.00 - 0.00% 18.68
02.07.02 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 83.00 54.42 4,516.86 0.00 - 0.00% 83.00
02.08 CONTRAZOCALOS 11,981.32 - 0.00%
02.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.30 m m 60.14 15.83 952.02 0.00 - 0.00% 0.00
02.08.02 CONTRAZOCALO DE CEMENTO PULIDO, H = 45CM m 28.00 16.80 470.40 0.00 - 0.00% 0.00

02.08.03 CONTRAZOCALO ALTO RELIEVE CEMENTO FROTACHADO DE H=20 E=1.50CM m 14.68 12.59 184.82 0.00 - 0.00% 14.68

02.08.04 CONTRAZOCALO DE CEMENTO PULIDO C:A 1:3 H = 0.15M m 316.40 13.26 4,195.46 0.00 - 0.00% 0.00
02.08.05 ZOCALO MAYOLICA BLANCA .20X0.20 m2 63.06 97.98 6,178.62 0.00 - 0.00% 0.00
02.09 CARPINTERIA DE MADERA 26,682.55 - 0.00%
02.09.01 PUERTA DE MADERA CEDRO TIPO 1 m2 13.90 424.06 5,894.43 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
02.09.02 PUERTA DE MADERA CEDRO TIPO 2 m2 10.00 424.06 4,240.60 0.00 - 0.00% 0.00
02.09.03 VENTANA DE MADERA CEDRO Y FIERRO LISO DE 1/2" m2 103.28 160.22 16,547.52 0.00 - 0.00% 0.00
02.10 CARPINTERIA METALICA 15,694.29 - 0.00%
02.10.01 SUMINISTROS E INSTALACION DE ARCOS PARA FUTBOL =2" und 2.00 2,624.34 5,248.68 0.00 - 0.00% 0.00
02.10.02 SUMINISTROS E INSTALACION DE TABLERO DE BASKET und 2.00 1,541.68 3,083.36 0.00 - 0.00% 0.00
02.10.03 SUMINISTROS E INSTALACION DE POSTES DE VOLEY + MALLA (NET) und 1.00 2,391.68 2,391.68 0.00 - 0.00% 0.00
02.10.04 PUERTA METALICA DE DOS HOJAS C/ ACCESORIOS und 1.00 2,189.71 2,189.71 0.00 - 0.00% 0.00
02.10.05 PUERTA METALICA DE UNA HOJA C/ ACCESORIOS und 1.00 806.30 806.30 0.00 - 0.00% 0.00
02.10.06 ASTA DE BANDERA und 1.00 1,974.56 1,974.56 0.00 - 0.00% 0.00
02.11 CERRAJERIA 2,645.60 - 0.00%
02.11.01 CERRADURA PARA PUERTA GOLPES EXTERIOR pza 10.00 115.20 1,152.00 0.00 - 0.00% 0.00
02.11.02 MANIJA DE BRONCE PARA PUERTA pza 4.00 50.80 203.20 0.00 - 0.00% 0.00
02.11.03 PICAPORTE DE 1/4" x 2" pza 10.00 22.08 220.80 0.00 - 0.00% 0.00
02.11.04 BISAGRA ALUMINIZADA DE 3" X 3" PESADA EN PUERTA CAPUCHINA pza 20.00 24.20 484.00 0.00 - 0.00% 0.00
02.11.05 BISAGRA ALUMINIZADA DE 4" X 4" PESADA EN PUERTA CAPUCHINA pza 24.00 24.40 585.60 0.00 - 0.00% 0.00
02.12 PINTURAS 45,609.27 - 0.00%
02.12.01 PINTURA LATEX 2 MANOS EN CIELORRASO m2 179.61 13.40 2,406.77 0.00 - 0.00% 0.00
02.12.02 PINTURA SUPERMATE EN PAREDES LATERALES DE TANQUE ELEVADO m2 19.89 9.21 183.19 0.00 - 0.00% 0.00

02.12.03 PINTURA OLEO MATE VERDE ESMERALDA EN COLUMNAS Y VIGAS (EXTERIORES) m2 29.64 14.92 442.23 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
02.12.04 PINTURA LATEX 2 MANOS EN MUROS INTERIOR Y EXTERIOR m2 946.24 16.61 15,717.05 0.00 - 0.00% 0.00
02.12.05 PINTURA LATEX 2 MANOS EN COLUMNAS Y VIGAS m2 219.58 13.14 2,885.28 0.00 - 0.00% 0.00
02.12.06 PINTURA LATEX EN MUROS EXTERIORES m2 601.44 21.59 12,985.09 0.00 - 0.00% 0.00
02.12.07 PINTURA LATEX EN COLUMNAS m2 86.28 17.59 1,517.67 0.00 - 0.00% 0.00
02.12.08 PINTURA LATEX EN VIGAS m2 45.58 17.59 801.75 0.00 - 0.00% 0.00
02.12.09 PINTURA OLEO MATE ALABASTRO EN EXTERIORES m2 5.40 14.92 80.57 0.00 - 0.00% 0.00
02.12.10 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO m2 60.14 10.34 621.85 0.00 - 0.00% 0.00
02.12.11 PINT. ANTICOR. Y ESMALTE 2 MANOS CARP. METALICA m 14.30 16.23 232.09 0.00 - 0.00% 0.00
02.12.12 PINTURA EN CONTRAZOCALOS H= 15CM m 316.40 13.48 4,265.07 0.00 - 0.00% 0.00
02.12.13 PINTURA TIPO TRAFICO EN LOSA DE CONCRETO und 1.00 997.52 997.52 0.00 - 0.00% 0.00

02.12.14 PINTURA OLEO MATE VERDE ESMERALDA EN CONTRAZOLOCALOS Y PASAMANO) m 14.68 14.92 219.03 0.00 - 0.00% 0.00

02.12.15 PINTADO DEL PISO m2 3.20 704.41 2,254.11 0.00 - 0.00% 0.00
02.13 OTROS 975.11 - 0.00%
02.13.01 LIMPIEZA FINAL DE LA OBRA m2 1,477.44 0.66 975.11 0.00 - 0.00% 0.00
03 INSTALACIONES SANITARIAS 50,442.94 314.98 0.62%
03.01 APARATOS SANITARIOS Y ACCESORIOS 14,153.25 125.18 0.88%
03.01.01 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) pza 9.00 507.70 4,569.30 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
03.01.02 URINARIO CORRIDO SEGUN DISEO REV. C/MAYOLICA 20 x 20 m 5.25 209.18 1,098.20 0.00 - 0.00% 0.00
03.01.03 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA 20x20 m 6.40 298.05 1,907.52 0.00 - 0.00% 0.00
03.01.04 DUCHA CROMADA SIMPLE und 1.00 64.23 64.23 0.00 - 0.00% 0.00
03.01.05 LAVATORIO DE ALUMINIO pza 1.00 319.67 319.67 0.00 - 0.00% 0.00
03.01.06 LLAVE TIPO CUELLO DE CISNE DE BRONCE 1/2" pza 1.00 182.16 182.16 0.00 - 0.00% 0.00
03.01.07 SALIDA DESAGUE DE PVC-SAL 4" pto 10.00 76.30 763.00 0.00 - 0.00% 0.00
03.01.08 SALIDA DESAGUE DE PVC SAL 2" pto 5.00 20.14 100.70 2.00 40.28 40.00% 0.00
03.01.09 SALIDA DE PVC PARA VENTILACIN 2" pto 8.00 96.68 773.44 0.00 - 0.00% 0.00
03.01.10 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 50.40 16.98 855.79 5.00 84.90 9.92% 0.00
03.01.11 RED DE COLECTORAS TUB, PVC -SAL 4" m 16.95 36.36 616.30 0.00 - 0.00% 0.00
03.01.12 TUBERA PVC - SAL 2" REBOSE m 11.32 30.27 342.66 0.00 - 0.00% 0.00
03.01.13 SUMIDERO DE BRONCE DE 2" PROVICION Y COLOCACION und 9.00 136.51 1,228.59 0.00 - 0.00% 0.00
03.01.14 REGISTRO DE BRONCE 4" PROVICION Y COLOCACION pza 1.00 29.29 29.29 0.00 - 0.00% 0.00
03.01.15 CAJA DE REG. 0.60 X 0.30 und 4.00 325.60 1,302.40 0.00 - 0.00% 0.00
03.02 SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS 36,289.69 189.80 0.52%
03.02.01 SALIDA DE AGUA FRA CON TUBERIA DE PVC- SAP 1/2" CON ROSCA pto 23.00 131.60 3,026.80 1.00 131.60 4.35% 0.00
03.02.02 TUBERA PVC SAP PARA AGUA CLASE A- 10 - EC 1/2" m 59.40 9.70 576.18 6.00 58.20 10.10% 0.00
03.02.03 TUBERA PVC CLASE A- 10 / AGUA POTABLE DE 1 - 1/2" m 15.83 33.08 523.66 0.00 - 0.00% 0.00
03.02.04 VLVULA DE COMPUERTA DE BRONCE UNION ROSCADO DE 1/2" und 8.00 59.59 476.72 0.00 - 0.00% 0.00
03.02.05 VALVULA DE GLOBO, UNION ROSCADA DE 1/2" und 3.00 28.80 86.40 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
03.02.06 CAJA PARA VALVULA ( NICHO DE MAYOLICA ) und 7.00 419.60 2,937.20 0.00 - 0.00% 0.00
03.02.07 VALVULA DE COMPUERTA DE BRONCE 1- 1/2" pza 2.00 68.59 137.18 0.00 - 0.00% 0.00
03.02.08 TUBERIA PVC CLASE 10 - 3/4" m 45.00 9.73 437.85 0.00 - 0.00% 0.00
03.02.09 CANALETA DE PLANCHAS GALVANIZADAS D=6" m 39.40 39.77 1,566.94 0.00 - 0.00% 0.00
03.02.10 MONTANTE CIRCULAR DE PVC D=4" m 27.40 30.92 847.21 0.00 - 0.00% 0.00
03.02.11 REJILLA CON PL 3/16" x 1 1/4" PARA CANALETAS DE PISO m 45.48 511.83 23,278.03 0.00 - 0.00% 0.00
03.02.12 ABRAZADERA DE FIJACIN DE TUBO pza 8.00 67.18 537.44 0.00 - 0.00% 0.00
03.02.13 ABRAZADERA DE FIJACIN DE TUBERA DE 6" pza 24.00 77.42 1,858.08 0.00 - 0.00% 0.00
04 INSTALACIONES ELECTRICAS 13,683.52 1,295.98 9.47%
04.01 SALIDA DE CENTRO DE LUZ ALUMBRADO EMPOTRADO pto 21.00 210.46 4,419.66 0.00 - 0.00% 0.00
04.02 SALIDA DE INTERRUPTOR SIMPLE pto 7.00 210.46 1,473.22 0.00 - 0.00% 0.00
04.03 SALIDA TOMACORRIENTE DOBLE pto 7.00 185.14 1,295.98 7.00 1,295.98 100.00% 0.00
04.04 ALIMENTADOR TW N 12 m 110.70 10.48 1,160.14 0.00 - 0.00% 0.00
04.05 CAJAS 238.04 - 0.00%
04.05.01 CAJA DE PASE DE FG LIVIANO DE 6X6X3 und 2.00 119.02 238.04 0.00 - 0.00% 0.00
04.06 TABLEROS 1,168.60 - 0.00%
04.06.01 TABLERO AUTOMTICO 1-2X30, 1-2X20, 1-2X15 A und 1.00 1,168.60 1,168.60 0.00 - 0.00% 0.00
04.07 ARTEFACTOS 3,927.88 - 0.00%
04.07.01 FOCO AHORRADOR ISPE 1X45 WA. - ESPIRAL und 10.00 45.10 451.00 0.00 - 0.00% 0.00
04.07.02 ARTEFACTO FLUORESCENTE RECTO ISPE 1x40 W INCLUYENDO EQUIPO und 11.00 316.08 3,476.88 0.00 - 0.00% 0.00
VALORIZACIN DE AVANCE DE OBRA N 03 - OBRA PRINCIPAL
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PROVINCIA DE P
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
UBICACIN DISTRITO DE PUCACACA, PROVINCIA DE PICOTA, REGION SAN MARTIN

PRESUPUESTO PROGRAMADO VALORIZACIN ANTERIOR VALORIZACI


ITEM DESCRIPCIN METRA PRECIO METRAD METRAD
UND PARCIAL VALORIZ. %
DO UNITARIO O O
05 MOBILIARIO Y EQUIPAMIENTO 80,372.27 - 0.00%
05.01 EQUIPAMIENTO DEPORTIVO und 1.00 11,700.00 11,700.00 0.00 - - 0.00
05.02 MOBILIARIO PARA COMEDOR und 1.00 39,500.00 39,500.00 0.00 - 0.00% 0.00
05.03 MOBILIARIO PARA COCINA und 1.00 19,142.27 19,142.27 0.00 - 0.00% 0.00
05.04 JUEGOS INFANTILES glb 1.00 10,030.00 10,030.00 0.00 - 0.00% 0.00
COSTO DIRECTO 814,483.06 180,408.14
GASTOS GENERALES (14.99%CD) 122,131.03 27,052.04
UTILIDAD (10.00%CD) 81,448.31 18,040.81
TOTAL VALORIZACION 1,018,062.40 225,500.99 22.15%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

72,634.00 26.29% 206,082.23 74.60% 70,159.37 25.40%


260.39 5.63% 2,136.97 46.19% 2,489.19 53.81%

- 0.00% 206.32 891.30 100.00% 0.00 - 0.00%


17.16 5.60% 622.81 149.47 48.76% 654.40 157.06 51.24%
243.23 7.09% 317.74 1,096.20 31.97% 675.98 2,332.13 68.03%
4,657.49 14.78% 18,228.65 57.86% 13,274.90 42.14%
495.19 84.23% 16.74 587.91 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 65.44 1,183.81 100.00%
117.84 31.69% 142.49 371.90 100.00% 0.00 - 0.00%
151.70 20.07% 118.30 755.94 100.00% 0.00 - 0.00%
- 0.00% 5.76 404.64 100.00% 0.00 - 0.00%
- 0.00% 30.76 2,574.92 100.00% 0.00 - 0.00%
- 0.00% 9.15 1,268.92 100.00% 0.00 - 0.00%
230.27 46.01% 7.02 500.46 100.00% 0.00 - 0.00%
1,170.84 12.70% 70.50 9,222.81 100.00% 0.00 - 0.00%
2,491.65 51.01% 136.23 2,491.65 51.01% 130.83 2,392.88 48.99%
- 0.00% 3.34 49.50 0.51% 654.40 9,698.21 99.49%
18,038.63 19.77% 57,365.13 62.88% 33,870.24 37.12%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
3,303.47 16.21% 74.07 20,373.69 100.00% 0.00 - 0.00%
- 0.00% 51.73 1,760.37 100.00% 0.00 - 0.00%
853.13 15.49% 13.30 5,508.06 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 64.88 22,469.24 100.00%
- 0.00% - - 0.00% 50.80 3,442.72 100.00%
1,325.81 14.16% 192.68 9,364.25 100.00% 0.00 - 0.00%
6,887.82 35.46% 140.23 14,156.22 72.87% 52.20 5,269.59 27.13%
5,668.40 66.39% 116.18 5,849.66 68.51% 53.40 2,688.69 31.49%
- 0.00% 0.24 141.68 100.00% 0.00 - 0.00%
- 0.00% 3.84 211.20 100.00% 0.00 - 0.00%
49,677.49 34.20% 126,722.89 87.24% 18,530.14 12.76%
- 0.00% 13,430.30 100.00% - 0.00%
- 0.00% 21.88 11,515.44 100.00% 0.00 - 0.00%
- 0.00% 245.18 1,914.86 100.00% 0.00 - 0.00%
4,143.84 40.16% - 10,317.69 100.00% - 0.00%
1,623.97 34.08% 8.92 4,765.06 100.00% 0.00 - 0.00%
1,086.89 43.65% 69.56 2,490.25 100.00% 0.00 - 0.00%
1,432.98 46.79% 392.11 3,062.38 100.00% 0.00 - 0.00%
14,882.30 30.88% - 46,676.65 96.85% 1,519.61 3.15%
4,398.91 56.10% 12.59 7,127.70 90.90% 1.26 713.34 9.10%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
8,839.15 41.19% 373.48 20,653.44 96.24% 14.58 806.27 3.76%
1,644.24 8.70% 2,419.40 18,895.51 100.00% 0.00 - 0.00%
29,749.44 51.31% - 46,353.46 79.94% 11,628.82 20.06%
8,891.32 56.33% 23.53 13,956.82 88.43% 3.08 1,826.90 11.57%
11,510.10 45.32% 167.89 19,085.74 75.15% 55.53 6,312.65 24.85%
9,348.02 55.64% 1,704.34 13,310.90 79.23% 446.77 3,489.27 20.77%
901.91 100.00% - 901.91 100.00% - 0.00%
170.76 100.00% 0.38 170.76 100.00% 0.00 - 0.00%
548.86 100.00% 5.40 548.86 100.00% 0.00 - 0.00%
182.29 100.00% 23.34 182.29 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 237.90 100.00%
- 0.00% - - 0.00% 0.35 162.04 100.00%
- 0.00% - - 0.00% 0.23 23.38 100.00%
- 0.00% - - 0.00% 6.72 52.48 100.00%
- 0.00% 1,186.73 18.75% 5,143.81 81.25%

- 0.00% - - 0.00% 0.74 285.29 100.00%

- 0.00% - - 0.00% 35.50 3,608.22 100.00%

- 0.00% - - 0.00% 160.09 1,250.30 100.00%


CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

- 0.00% 1.35 499.64 100.00% 0.00 - 0.00%

- 0.00% 6.76 687.09 100.00% 0.00 - 0.00%

- 0.00% - 7,856.15 100.00% - 0.00%


- 0.00% 2.78 1,419.66 100.00% 0.00 - 0.00%
- 0.00 25.26 2,855.14 100.00% 0.00 - 0.00
- 0.00% 458.56 3,581.35 100.00% 0.00 - 0.00%
- 0.00% 1,628.59 44.95% 1,994.90 55.05%
- 0.00% 29.60 1,628.59 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 196.00 1,881.60 100.00%
- 0.00% - - 0.00% 1.00 113.30 100.00%
27,282.25 6.93% 72,631.19 18.45% 321,111.53 81.55%
- 0.00% - 0.00% 22,041.18 100.00%
- 0.00% - - 0.00% 3.00 7,931.52 100.00%
- 0.00% - - 0.00% 207.04 4,596.29 100.00%
- 0.00% - - 0.00% 281.40 9,030.13 100.00%
- 0.00% - - 0.00% 19.70 483.24 100.00%
- 0.00% - 0.00% 91,917.77 100.00%
- 0.00% - - 0.00% 705.24 81,857.21 100.00%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - - 0.00% 68.60 7,329.22 100.00%
- 0.00% - - 0.00% 369.60 2,731.34 100.00%
6,037.46 6.71% 6,037.46 6.71% 83,917.34 93.29%
3,326.90 17.39% 35.02 3,326.90 17.39% 166.38 15,806.10 82.61%
- 0.00% - - 0.00% 1,627.70 36,704.64 100.00%
1,232.34 6.23% 13.98 1,232.34 6.23% 210.59 18,563.51 93.77%
- 0.00% - - 0.00% 194.38 6,744.99 100.00%
- 0.00% - - 0.00% 300.00 5,424.00 100.00%
- 0.00% - - 0.00% 14.00 674.10 100.00%
1,478.22 100.00% 25.26 1,478.22 100.00% 0.00 - 0.00%
425.84 11.17% 2,997.53 78.60% 0.00 815.92 21.40%
- 0.00% 271.71 2,005.22 100.00% 0.00 - 0.00%
- 0.00% 73.99 546.05 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 137.36 815.92 100.00%
- 0.00% 3.20 20.42 100.00% 0.00 - 0.00%
425.84 100.00% 57.78 425.84 100.00% 0.00 - 0.00%
- 0.00% - 0.00% 4,883.76 100.00%
- 0.00% - - 0.00% 179.55 4,883.76 100.00%
7,791.97 12.04% 50,569.22 78.16% 14,132.24 21.84%
7,791.97 14.86% 128.84 39,917.21 76.14% 40.38 12,510.53 23.86%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

- 0.00% 182.93 10,652.01 86.79% 27.85 1,621.71 13.21%

12,842.16 100.00% 12,842.16 100.00% - 0.00%


8,325.30 100.00% 18.68 8,325.30 100.00% 0.00 - 0.00%
4,516.86 100.00% 83.00 4,516.86 100.00% 0.00 - 0.00%
184.82 1.54% 184.82 1.54% 11,796.50 98.46%
- 0.00% - - 0.00% 60.14 952.02 100.00%
- 0.00% - - 0.00% 28.00 470.40 100.00%

184.82 100.00% 14.68 184.82 100.00% 0.00 - 0.00%

- 0.00% - - 0.00% 316.40 4,195.46 100.00%


- 0.00% - - 0.00% 63.06 6,178.62 100.00%
- 0.00% - 0.00% 26,682.55 100.00%
- 0.00% - - 0.00% 13.90 5,894.43 100.00%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - - 0.00% 10.00 4,240.60 100.00%
- 0.00% - - 0.00% 103.28 16,547.52 100.00%
- 0.00% - 0.00% 15,694.29 100.00%
- 0.00% - - 0.00% 2.00 5,248.68 100.00%
- 0.00% - - 0.00% 2.00 3,083.36 100.00%
- 0.00% - - 0.00% 1.00 2,391.68 100.00%
- 0.00% - - 0.00% 1.00 2,189.71 100.00%
- 0.00% - - 0.00% 1.00 806.30 100.00%
- 0.00% - - 0.00% 1.00 1,974.56 100.00%
- 0.00% - 0.00% 2,645.60 100.00%
- 0.00% - - 0.00% 10.00 1,152.00 100.00%
- 0.00% - - 0.00% 4.00 203.20 100.00%
- 0.00% - - 0.00% 10.00 220.80 100.00%
- 0.00% - - 0.00% 20.00 484.00 100.00%
- 0.00% - - 0.00% 24.00 585.60 100.00%
- 0.00% - 0.00% 45,609.27 100.00%
- 0.00% - - 0.00% 179.61 2,406.77 100.00%
- 0.00% - - 0.00% 19.89 183.19 100.00%

- 0.00% - - 0.00% 29.64 442.23 100.00%


CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - - 0.00% 946.24 15,717.05 100.00%
- 0.00% - - 0.00% 219.58 2,885.28 100.00%
- 0.00% - - 0.00% 601.44 12,985.09 100.00%
- 0.00% - - 0.00% 86.28 1,517.67 100.00%
- 0.00% - - 0.00% 45.58 801.75 100.00%
- 0.00% - - 0.00% 5.40 80.57 100.00%
- 0.00% - - 0.00% 60.14 621.85 100.00%
- 0.00% - - 0.00% 14.30 232.09 100.00%
- 0.00% - - 0.00% 316.40 4,265.07 100.00%
- 0.00% - - 0.00% 1.00 997.52 100.00%

- 0.00% - - 0.00% 14.68 219.03 100.00%


- 0.00% - - 0.00% 3.20 2,254.11 100.00%
- 0.00% - 0.00% 975.11 100.00%
- 0.00% - - 0.00% 1,477.44 975.11 100.00%
- 0.00% 314.98 0.62% 50,127.96 99.38%
- 0.00% 125.18 0.88% 14,028.07 99.12%
- 0.00% - - 0.00% 9.00 4,569.30 100.00%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - - 0.00% 5.25 1,098.20 100.00%
- 0.00% - - 0.00% 6.40 1,907.52 100.00%
- 0.00% - - 0.00% 1.00 64.23 100.00%
- 0.00% - - 0.00% 1.00 319.67 100.00%
- 0.00% - - 0.00% 1.00 182.16 100.00%
- 0.00% - - 0.00% 10.00 763.00 100.00%
- 0.00% 2.00 40.28 40.00% 3.00 60.42 60.00%
- 0.00% - - 0.00% 8.00 773.44 100.00%
- 0.00% 5.00 84.90 9.92% 45.40 770.89 90.08%
- 0.00% - - 0.00% 16.95 616.30 100.00%
- 0.00% - - 0.00% 11.32 342.66 100.00%
- 0.00% - - 0.00% 9.00 1,228.59 100.00%
- 0.00% - - 0.00% 1.00 29.29 100.00%
- 0.00% - - 0.00% 4.00 1,302.40 100.00%
- 0.00% 189.80 0.52% 36,099.89 99.48%
- 0.00% 1.00 131.60 4.35% 22.00 2,895.20 95.65%
- 0.00% 6.00 58.20 10.10% 53.40 517.98 89.90%
- 0.00% - - 0.00% 15.83 523.66 100.00%
- 0.00% - - 0.00% 8.00 476.72 100.00%
- 0.00% - - 0.00% 3.00 86.40 100.00%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - - 0.00% 7.00 2,937.20 100.00%
- 0.00% - - 0.00% 2.00 137.18 100.00%
- 0.00% - - 0.00% 45.00 437.85 100.00%
- 0.00% - - 0.00% 39.40 1,566.94 100.00%
- 0.00% - - 0.00% 27.40 847.21 100.00%
- 0.00% - - 0.00% 45.48 23,278.03 100.00%
- 0.00% - - 0.00% 8.00 537.44 100.00%
- 0.00% - - 0.00% 24.00 1,858.08 100.00%
- 0.00% 1,295.98 9.47% 12,387.54 90.53%
- 0.00% - - 0.00% 21.00 4,419.66 100.00%
- 0.00% - - 0.00% 7.00 1,473.22 100.00%
- 0.00% 7.00 1,295.98 100.00% 0.00 - 0.00%
- 0.00% - - 0.00% 110.70 1,160.14 100.00%
- 0.00% - 0.00% 238.04 100.00%
- 0.00% - - 0.00% 2.00 238.04 100.00%
- 0.00% - 0.00% 1,168.60 100.00%
- 0.00% - - 0.00% 1.00 1,168.60 100.00%
- 0.00% - 0.00% 3,927.88 100.00%
- 0.00% - - 0.00% 10.00 451.00 100.00%
- 0.00% - - 0.00% 11.00 3,476.88 100.00%
CE DE OBRA N 03 - OBRA PRINCIPAL
May-17

06, DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

FECHA BASE Feb-17


PPTO. REF. 1,018,062.40 SIN IGV
PPTO. OFER. 1,018,062.40 SIN. IGV

VALORIZACIN ACTUAL VALORIZACIN ACUMULADA VALORIZACIN SALDO


VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
- 0.00% - 0.00% 80,372.27 100.00%
- 0.00% - - 0.00% 1.00 11,700.00 100.00%
- 0.00% - - 0.00% 1.00 39,500.00 100.00%
- 0.00% - - 0.00% 1.00 19,142.27 100.00%
- 0.00% - - 0.00% 1.00 10,030.00 100.00%
99,916.25 280,324.38 534,158.67
14,982.36 42,034.40 80,096.63
9,991.63 28,032.44 53,415.87
124,890.24 12.27% 350,391.22 34.42% 667,671.17 65.58%
CALCULO DE AMORTIZACIN DEL ADELANTO DIRECTO
May-17

"MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. I


OBRA
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISIN ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
MONTO CONT. S/. 1,018,062.40 SIN. IGV
ADELANTO DIRECTO S/. 0.00 SIN. IGV 0.00% MC
FECHA ADELANTO 11-Jan-17

VALORIZACIN EJECUTADA AMORTIZACIN DEL ADELANT


VALORIZ. N MES MONTO % AVANCE MES
OBRA PRINCIPAL
01 Apr-17 124,890.24 12.27% 0.00

TOTAL 124,890.24 0.00


TO DIRECTO

EDUCATIVOS DE LA I.E. INICIAL N 306, DEL


SAN MARTIN"

TIZACIN DEL ADELANTO DIRECTO (SIN IGV)


ACUMULADO SALDO

0.00 0.00
CALCULO DE AMORTIZACIN DEL ADELANTO PARA MATERIA
May-17

OBRA "MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO DE PUCACACA, PRO
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISIN ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
MONTO CONT. S/. 1,018,062.40 1/14/2014
ADELANTO P/MATER. S/. 0.00 0.00% MC
FECHA ADELANTO 2-Feb-17

ADELANTO
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT.
OTORGADO

21 CEMENTO PORTLAND TIPO I S/. 0.00


CEMENTO PORTLAND TIPO I (42.5KG) Bol 0.00 26.00 S/. 0.00

38 HORMIGON S/. 0.00


ARENA GRUESA m3 0.00 115.00 S/. 0.00
PIEDRA CHANCADA DE 3/4" m3 0.00 115.00 S/. 0.00

72 TUBERIA DE PVC PARA AGUA S/. 0.00


TUBERIA PVC - SAP C-10, D=110MM m 0.00 25.00 S/. 0.00
TUBERIA PVC - SAP C-10, D=75MM m 0.00 18.00 S/. 0.00
TUBERIA PVC-U UF DN= 160 mm x 6 m - SDR=51 S20 m 0.00 26.00 S/. 0.00

TOTAL SOLICITUD DE MATERALES S/. 0.00

AMORTIZACION = MATERIAL UTILIZADO x PRECIO UNITARIO (P.B.) x (Ima/Imo) 1


ADELANTO OTORGADO
MONTO VALORIZACION MATERIAL
MONTO MES
FECHA DEFLACTADO N UTILIZADO
OTORGADO
DE P. BASE
ADELANTO N : 01 CEMENTO PORTLAND TIPO I
CEMENTO PORTLAND TIPO I (42.5KG)
OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17

ADELANTO N : 01 HORMIGON
ARENA GRUESA
OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17

PIEDRA CHANCADA DE 3/4"


OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17

ADELANTO N : 01 TUBERIA DE PVC PARA AGUA

TUBERIA PVC - SAP C-10, D=110MM


OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17

TUBERIA PVC - SAP C-10, D=75MM


OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17

TUBERIA PVC-U UF DN= 160 mm x 6 m - SDR=51 S20


OBRA PRINCIPAL
Feb-17 0.00 0.00 01 Feb-17 0.00
Mar-17 0.00 0.00 02 Mar-17
Apr-17 0.00 0.00 03 Apr-17
May-17 0.00 0.00 04 May-17
Jun-17 0.00 0.00 05 Jun-17
Jul-17 0.00 0.00 06 Jul-17
Aug-17 0.00 0.00 07 Aug-17
Sep-17 0.00 0.00 08 Sep-17
RESUMEN DE AMORTIZACION DE ADELANTO DE MATERIALES

MESES AMORTIZ.
OBRA PRINCIPAL
Feb-17 S/. 0.00
Mar-17 S/. 0.00
Apr-17 S/. 0.00
May-17 S/. 0.00
Jun-17 S/. 0.00
Jul-17 S/. 0.00
Aug-17 S/. 0.00
Sep-17 S/. 0.00
TOTALES S/. 0.00
L ADELANTO PARA MATERIALES
y-17

DEL DISTRITO DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"

INCIDENCIA DEL
MATERIAL
INCIDENCIA SOLICITADO CON
FECHA
DEL ADELANTO RESPECTO AL
PRESUPUESTO
TOTAL

2/2/2017 #DIV/0! 0.00%

2/2/2017 #DIV/0! 0.00%


2/2/2017 #DIV/0! 0.00%

2/2/2017 #DIV/0! 0.00%


2/2/2017 #DIV/0! 0.00%
2/2/2017 #DIV/0! 0.00%

2 3=1x2 4 5 6 7 9
PRECIO
MONTO SALDO POR
UNITARIO AMORTIZACION AMORTIZACIN
CONTRATO Ima Imo AMORTIZAR
( PRECIOS DE 6 = 3*(4/5) ACUMULADA
AMORTIZABLE
P.B.)
ND TIPO I IU = 21

26.00 0.00 462.57 462.57 0.00 0.00 0.00


26.00 0.00 462.57 462.57 0.00 0.00 0.00
26.00 0.00 462.57 462.57 0.00 0.00 0.00
26.00 0.00 462.57 462.57 0.00 0.00 0.00
26.00 0.00 462.57 462.57 0.00 0.00 0.00
26.00 0.00 462.57 462.57 0.00 0.00 0.00
26.00 0.00 462.57 462.57 0.00 0.00 0.00
28.60 0.00 462.57 462.57 0.00 0.00 0.00

N IU = 38

115.00 0.00 421.40 422.27 0.00 0.00 0.00


115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
126.50 0.00 421.40 422.27 0.00 0.00 0.00

115.00 0.00 421.40 422.27 0.00 0.00 0.00


115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
115.00 0.00 421.40 422.27 0.00 0.00 0.00
126.50 0.00 421.40 422.27 0.00 0.00 0.00

RA AGUA IU = 72

25.00 0.00 413.21 411.73 0.00 0.00 0.00


25.00 0.00 413.21 411.73 0.00 0.00 0.00
25.00 0.00 413.21 411.73 0.00 0.00 0.00
25.00 0.00 413.21 411.73 0.00 0.00 0.00
25.00 0.00 413.21 411.73 0.00 0.00 0.00
25.00 0.00 413.21 411.73 0.00 0.00 0.00
25.00 0.00 413.21 411.73 0.00 0.00 0.00
27.50 0.00 413.21 411.73 0.00 0.00 0.00

18.00 0.00 413.21 411.73 0.00 0.00 0.00


18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00
18.00 0.00 413.21 411.73 0.00 0.00 0.00

26.00 0.00 413.21 411.73 0.00 0.00 0.00


26.00 0.00 413.21 411.73 0.00 0.00 0.00
26.00 0.00 413.21 411.73 0.00 0.00 0.00
26.00 0.00 413.21 411.73 0.00 0.00 0.00
26.00 0.00 413.21 411.73 0.00 0.00 0.00
26.00 0.00 413.21 411.73 0.00 0.00 0.00
26.00 0.00 413.21 411.73 0.00 0.00 0.00
28.60 0.00 413.21 411.73 0.00 0.00 0.00
DE MATERIALES
HOJA RESUMEN DE VALORIZACION N 01
May-17

"MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS SERVICIOS EDUCATIVOS DE LA I.E. I


OBRA
DE PUCACACA, PROVINCIA DE PICOTA - REGION DE SAN MARTIN"
PROPIETARIO GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA CONSORCIO CONSTRUCCION
SUPERVISOR ING.HILDEFONSO TUESTA VELA CIP N 64022
RESIDENTE ING. DAISY LUZ CHVEZ ARVILDO CIP N 70899
FECHA P. BASE: Feb-17
Contrato de Obra N: N 044-2017-GRSM-GTBM-T.
Ubicacin : DISTRITO:

PROVINCIA:

DEPARTAMENTO:

Presupuesto Referencial:
MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS
SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL
Frmula N 01:
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA REGION
SAN MARTIN

Presupuesto Contratado:

Inicio de Obra:

Plazo de Ejecucin:

Fin de Obra Programado:

Fecha Trmino Real de Obra:

1.- MONTO SUB TOTAL DE LA VALORIZACION:


Frmula N 01: MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS
SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA
REGION SAN MARTIN

2.- REINTEGROS:
Frmula N 01: MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS
SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA
REGION SAN MARTIN
Reintegro de la Valorizacin Actual:

TOTAL REINTEGROS
3.- AMORTIZACION POR ADELANTOS:
Frmula N 01: MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS
SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA
REGION SAN MARTIN
Adelanto Directo N 01:
Adelanto de Materiales N 01:

TOTAL DESCUENTOS

4.- DEDUCCIONES POR REAJUSTES QUE NO CORRESPONDEN:


Frmula N 01: MEJORAMIENTO DE LA INFRAESTRUCTURA Y LOS
SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL
DISTRITO DE PUCACACA, PROVINCIA DE PICOTA
REGION SAN MARTIN
Adelanto Directo N 01:
Adelanto de Materiales N 01:

TOTAL DESCUENTOS

MONTO A FACTURAR

5.- SENCICO:
(1 + 2 + 4) x 2 / 1000
VALORIZACION N 01
y-17

OS SERVICIOS EDUCATIVOS DE LA I.E. INICIAL N 306, DEL DISTRITO


DE SAN MARTIN"

PUCACACA

PICOTA

SAN MARTIN

S/. 1,018,062.40

S/. 1,018,062.40

S/. 1,018,062.40

2/28/2017

120 das calendario

7/17/2017

7/17/2017

ANTERIOR ACTUAL ACUMULADO

S/.
FRAESTRUCTURA Y LOS 225,500.99 124,890.24 350,391.22
LA I.E. INICIAL N 306, DEL
ROVINCIA DE PICOTA

FRAESTRUCTURA Y LOS
LA I.E. INICIAL N 306, DEL
ROVINCIA DE PICOTA

0.00 0.00 0.00

S/. 0.00 0.00 0.00


FRAESTRUCTURA Y LOS
LA I.E. INICIAL N 306, DEL
ROVINCIA DE PICOTA

0.00 0.00 0.00


0.00 0.00 0.00

S/. 0.00 0.00 0.00

FRAESTRUCTURA Y LOS
LA I.E. INICIAL N 306, DEL
ROVINCIA DE PICOTA

0.00 0.00 0.00


0.00 0.00 0.00

S/. 0.00 0.00 0.00

S/. 225,500.99 124,890.24 350,391.23

S/. 249.78
CRONOGRAMA 01

PERIODO Feb-17 Mar-17 Apr-17 May-17 Jun-17


PARCIAL 0.00 44,982.82 135,469.04 567,466.35 270,144.19
ACUMULADO 0.00 44,982.82 180,451.86 747,918.21 1,018,062.40
AVANCE PARCIAL % 0.00% 4.42% 13.31% 55.74% 26.54%
AVANCE ACUM. % 0.00% 4.42% 17.73% 73.46% 100.00%

CURVA "S" PROGRAMADO Vs EJECUTADO


120.00%

100.00%

80.00%

73.46%
60.00%

40.00% 34.42%

22.15%
17.73%
20.00% 14.01%

0.00% 4.42%
0.00%
28 Febrero. Mar-17 Apr-17 May-17

PROGRAMADO EJECUTADO

PROGRAMADO
PROGRAMADO MENSUAL EJECUTADO MENSUAL
MES ACUMULADO
S/. % S/. % S/.
28 Febrero. 0.00 0.00% 0.00 0.00% 0.00
Mar-17 44,982.82 4.42% 142,599.80 14.01% 44,982.82
Apr-17 135,469.04 13.31% 82,901.24 8.14% 180,451.86
May-17 567,466.35 55.74% 124,890.24 12.27% 747,918.21
Jun-17 270,144.19 26.54% 1,018,062.40
1,018,062.40 100.00% 350,391.28 34.42% 1,018,062.40
0.00 #REF! #REF! #REF!
TOTAL
1,018,062.40

UTADO

100.00%

73.46%

34.42%

May-17 Jun-17

PROGRAMADO
EJECUTADO ACUMULADO
ACUMULADO
% S/. %
0.00% 0.00 0.00%
4.42% 142,599.80 14.01%
17.73% 225,501.04 22.15%
73.46% 350,391.28 34.42%
100.00%
100.00% 350,391.28 34.42%

-100.00%
REGISTRO Y CONTROL DE CARTAS FIANZAS

CARTA FIANZA ENTIDAD FECHA DE


ITEM TIPO C.F. MONTO S/.
N FINANCIERA VENCIMIENTO
AVLA
GARANTA DE FIEL
01 3002017001528-00 COMPAA DE S/. 101,806.24 5/19/2017
CUMPLIMIENTO
SEGUROS S.A

CARTA FIANZA ENTIDAD FECHA DE


ITEM TIPO C.F. MONTO S/.
N FINANCIERA VENC.
AVLA
GARANTA POR ADELANTO
01 3002017001529-00 COMPAA DE S/. 101,806.24 4/16/2017
DIRECTO
SEGUROS S.A

CARTA FIANZA ENTIDAD FECHA DE


ITEM TIPO C.F. MONTO S/.
N FINANCIERA VENC.
GARANTA POR ADELANTO
01 0-00 - S/. 0.00 -
PARA MATERIALES
GARANTA POR ADELANTO
02 0-000 - S/. 0.00 -
PARA MATERIALES
S/. 0.00
SALDO EN A FAVOR DEL A FAVOR DEL SALDO POR
ITEM DESCRIPCION
CUENTA SUPERVISOR CONTRATISTA FACTURAR
VALORIZACION N 01 -
01 S/. 311,221.00 S/. 46,348.38 S/. 264,872.62 S/. 27,376.63
MAR. 2017
RESUMEN VALORIZACIN - OBRA PRINCIPAL

VALORIZ. VALORIZ. VALORIZ.


DESCRIPCIN PPTO. PROG.
ANTERIOR ACTUAL ACUMUL.
COSTO DIRECTO 814,483.06 180408.14 99,916.25 280,324.38
GASTOS GENERALES 14.99% 122,131.03 27052.04 14,982.36 42,034.40
UTILIDAD 10.00% 81,448.31 18040.81 9,991.63 28,032.44
TOTAL VALORIZ. 1,018,062.40 225500.99 124,890.24 350,391.22
22.15% 12.27% 34.42%

RESUMEN VALORIZACIN - OBRA PRINCIPAL

VALORIZ. VALORIZ. VALORIZ.


DESCRIPCIN PPTO. PROG.
MARZO 2017 ACUMUL. SALDO
COSTO DIRECTO 814,483.06 99,916.25 280,324.38 534,158.67
GASTOS GENERALES 14.99% 122,131.03 14,982.36 42,034.40 80,096.63
UTILIDAD 10.00% 81,448.31 9,991.63 28,032.44 53,415.87
TOTAL VALORIZ. 1,018,062.40 124,890.24 350,391.22 667,671.17
AVANCE PARCIAL 12.27% 34.42% 65.58%
AVANCE ACUM. 34.42%
VALORIZ.
SALDO
534,158.67
80,096.63
53,415.87
667,671.17
65.58%