URBANIZACIN FRANCISCO OTERO

TR C1 X0 C2
3.00 2079.50 19.70 -1.01

I = C1 * (d + X0)^C2 5.00 2453.30 18.90 -1.02 CLAVE


10.00 3030.80 18.50 -1.03 PAG 4
DISEO: ING. ALBERTO SANCHEZ SOLANO 8"
De A Area Tr T. Concentra Intens Coefic Q Dis Long Pend Diam Q/Q0 Vr Y F D
Ha Aos Incr Total L/H/S lt/s m % m," m/s mts *
61 62 7.18 5 0.87 19.68 164.20 0.75 884.2 74.00 0.22 36.00 1.00 1.42 0.78 0.47 0.94
62 63 7.79 5 0.53 20.55 160.52 0.75 937.8 48.00 0.25 36.00 0.99 1.51 0.78 0.50 0.93
63 E8 8.23 5 0.26 21.08 158.35 0.75 977.4 25.00 0.27 36.00 1.00 1.57 0.78 0.52 0.93
<64 65 0.89 3 1.21 15.00 160.67 0.75 107.3 83.00 0.58 14.00 1.00 1.14 0.30 0.60 0.36
65 E9 1.99 3 0.28 16.21 155.20 0.75 231.6 25.30 0.61 18.00 1.00 1.49 0.39 0.70 0.47
<66 67 0.17 3 2.30 15.00 160.67 0.75 20.5 78.00 0.30 12.00 0.40 0.57 0.15 0.52 0.12
67 68 0.75 3 1.43 17.30 150.59 0.75 84.7 77.00 0.36 14.00 1.00 0.90 0.31 0.47 0.37
68 69 1.51 3 1.02 18.73 144.95 0.75 164.2 65.00 0.31 18.00 0.99 1.06 0.39 0.50 0.46
69 70 2.60 3 1.19 19.75 141.16 0.75 275.3 72.00 0.19 24.00 0.99 1.00 0.52 0.41 0.61
70 E10 3.65 5 0.29 20.94 158.90 0.75 435.0 22.00 0.25 27.00 0.99 1.25 0.59 0.48 0.69
<71 72 0.20 3 2.39 15.00 160.67 0.75 24.1 85.10 0.30 12.00 0.47 0.59 0.17 0.51 0.14
72 73 1.10 3 1.09 17.39 150.22 0.75 123.9 66.00 0.38 16.00 1.00 1.01 0.35 0.50 0.42
73 74 1.54 3 1.05 18.48 145.89 0.75 168.5 68.00 0.32 18.00 1.00 1.08 0.39 0.50 0.47
74 75 2.60 3 1.03 19.53 141.95 0.75 276.8 62.00 0.19 24.00 0.99 1.01 0.52 0.41 0.62
75 77 3.67 5 0.72 20.56 160.48 0.75 441.7 55.00 0.26 27.00 0.99 1.27 0.58 0.49 0.69
<76 77 0.11 3 2.48 15.00 160.67 0.75 13.3 74.00 0.30 12.00 0.26 0.50 0.12 0.54 0.09
77 E11 4.36 5 0.28 17.48 174.34 0.75 570.1 22.00 0.24 30.00 1.00 1.32 0.65 0.47 0.79
<78 79 0.65 3 1.10 15.00 160.67 0.75 78.3 55.0 0.31 14.00 1.00 0.83 0.30 0.44 0.36
79 81 0.91 3 1.35 16.10 155.69 0.75 106.3 70.0 0.28 16.00 1.00 0.87 0.35 0.43 0.41
<80 81 0.78 3 1.89 15.00 160.67 0.75 94.0 91.0 0.25 16.00 0.93 0.80 0.33 0.42 0.37
De A Q0 V0 Caida Cota Clave Caida Cota Rasante Recubrimiento Energia V2/2G Yc Hw Hc
Tramo Super Infer Tramo Super Infer Super Infer Espec. mts mts *
61 62 885.8 1.35 0.16 67.49 67.33 0.16 69.99 69.49 2.50 2.16 0.89 0.10 0.55 1.23 0.78
62 63 944.3 1.44 0.12 67.33 67.21 0.12 69.49 69.16 2.16 1.95 0.90 0.12 0.57 1.28 0.81
63 E8 981.3 1.49 0.07 67.21 67.14 0.07 69.16 68.99 1.95 1.85 0.91 0.13 0.58 1.31 0.83
<64 65 107.6 1.08 0.48 69.20 68.72 0.48 70.80 70.19 1.60 1.47 0.37 0.07 0.24 0.57 0.36
65 E9 232.3 1.41 0.15 68.72 68.57 0.15 70.19 70.00 1.47 1.43 0.51 0.11 0.34 0.82 0.50
<66 67 51.3 0.70 0.23 69.00 68.77 0.23 70.01 69.80 1.01 1.03 0.17 0.02 0.11 0.22 0.15
67 68 84.8 0.85 0.28 68.77 68.49 0.28 69.80 70.03 1.03 1.54 0.35 0.04 0.22 0.48 0.31
68 69 165.6 1.01 0.20 68.49 68.29 0.20 70.03 70.23 1.54 1.94 0.45 0.06 0.28 0.63 0.40
69 70 279.2 0.96 0.14 68.29 68.15 0.14 70.23 70.45 1.94 2.30 0.57 0.05 0.34 0.74 0.48
70 E10 438.5 1.19 0.06 68.13 68.07 0.06 70.45 70.50 2.32 2.43 0.67 0.08 0.42 0.93 0.59
<71 72 51.3 0.70 0.26 69.31 69.05 0.26 70.59 70.26 1.28 1.21 0.19 0.02 0.12 0.24 0.16
72 73 124.4 0.96 0.25 69.05 68.80 0.25 70.26 70.00 1.21 1.20 0.40 0.05 0.25 0.57 0.36
73 74 168.3 1.02 0.22 68.80 68.58 0.22 70.00 70.50 1.20 1.92 0.45 0.06 0.29 0.65 0.41
74 75 279.2 0.96 0.12 68.58 68.46 0.12 70.50 70.28 1.92 1.82 0.57 0.05 0.34 0.74 0.48
75 77 447.1 1.21 0.14 68.46 68.32 0.14 70.28 70.08 1.82 1.76 0.67 0.08 0.42 0.94 0.60
<76 77 51.3 0.70 0.22 69.22 69.00 0.22 70.26 70.08 1.04 1.08 0.13 0.01 0.09 0.18 0.12
77 E11 569.0 1.25 0.05 68.28 68.23 0.05 70.08 70.00 1.80 1.77 0.74 0.09 0.46 1.03 0.66
<78 79 78.7 0.79 0.17 69.30 69.13 0.17 70.50 70.33 1.20 1.20 0.34 0.04 0.21 0.46 0.29
79 81 106.8 0.82 0.20 69.13 68.93 0.20 70.33 70.11 1.20 1.18 0.39 0.04 0.23 0.51 0.33
<80 81 100.9 0.78 0.23 69.32 69.09 0.23 70.50 70.11 1.18 1.02 0.37 0.03 0.22 0.47 0.31
URBANIZACIN FRANCISCO OTERO
DISEO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA
Tipo de Relleno a utilizar: ###
Arcilla plastica(saturada) 1 Tipo de Tuberia Tipo de Zanja ###
Arcilla ordinaria(seca) 2 ###
Suelo nat. saturado(limo) 3 Gres 1 Talud Vertical 1 ###
Mez. arenas gravas(recebo) 4 Concreto simple 2 Talud 1:5 2 ###
Mat. granular sin cohesion 5 Concreto reforzado 3 ###
Turba-Tierra vegetal 6 ###
Greda-marga arcilla pobre 7 Pgina 4 Concreto Ref
Tipo de relleno 1 Camion 8650 kg.|| Ku 0.110 Peso unitario 2100 kg/m3 Long. tubo 1.00 m.
Tipo de zanja 1 ###
Pozo Diam Altura ###
De A Nom Bd De Rell Cd Wd Cs Wv Wt FS CR o CF FCc FCr Tuberia
(mm) (m) (m) (m) (kg/ml) (kg/ml) (kg/ml) (kg/ml) Clase Material
2.50 1.24 7754.5 0.08 691.1 8445.6 1.25 Err:520 Err:520 Err:520 3 3
61 62 900 1.73 1.13 2.33 1.17 7301.9 0.09 787.3 8089.2 1.25 Err:520 Err:520 Err:520 3 3
2.16 1.09 6839.4 0.10 904.2 7743.6 1.25 Err:520 Err:520 Err:520 3 3
2.16 1.09 6839.4 0.10 904.2 7743.6 1.25 Err:520 Err:520 Err:520 3 3
62 63 900 1.73 1.13 2.06 1.05 6548.6 0.11 989.4 7538.1 1.25 Err:520 Err:520 Err:520 3 3
1.95 1.00 6254.0 0.13 1086.7 7340.7 1.25 Err:520 Err:520 Err:520 3 3
1.95 1.00 6254.0 0.13 1086.7 7340.7 1.25 Err:520 Err:520 Err:520 3 3
63 E8 900 1.73 1.13 1.90 0.98 6112.3 0.13 1137.9 7250.3 1.25 Err:520 Err:520 Err:520 3 3
1.85 0.96 5969.7 0.14 1192.7 7162.4 1.25 Err:520 Err:520 Err:520 3 3
1.60 1.56 2297.5 0.07 644.0 2941.5 1.50 Err:520 Err:520 Err:520 1 2
<64 65 350 0.84 0.44 1.54 1.51 2221.7 0.08 694.5 2916.2 1.50 Err:520 Err:520 Err:520 1 2
1.47 1.46 2144.7 0.09 750.9 2895.6 1.50 Err:520 Err:520 Err:520 1 2
1.47 1.30 2523.6 0.11 954.7 3478.3 1.50 Err:520 Err:520 Err:520 1 2
65 E9 450 0.96 0.56 1.45 1.28 2494.6 0.11 978.2 3472.8 1.50 Err:520 Err:520 Err:520 1 2
1.43 1.27 2465.5 0.12 1002.5 3468.1 1.50 Err:520 Err:520 Err:520 1 2
1.54 1.61 2030.3 0.07 594.3 2624.6 1.50 Err:520 Err:520 Err:520 1 2
<66 67 300 0.78 0.38 1.74 1.77 2234.7 0.05 474.7 2709.4 1.50 Err:520 Err:520 Err:520 1 2
1.94 1.92 2427.8 0.04 387.3 2815.1 1.50 Err:520 Err:520 Err:520 1 2
1.03 1.08 1587.1 0.16 1386.3 2973.4 1.50 Err:520 Err:520 Err:520 1 2
67 68 350 0.84 0.44 1.29 1.30 1918.1 0.11 953.2 2871.3 1.50 Err:520 Err:520 Err:520 1 2
1.54 1.51 2227.6 0.08 690.4 2918.0 1.50 Err:520 Err:520 Err:520 1 2
1.54 1.35 2623.9 0.10 878.6 3502.5 1.50 Err:520 Err:520 Err:520 1 2
68 69 450 0.96 0.56 1.74 1.49 2901.8 0.08 703.9 3605.7 1.50 Err:520 Err:520 Err:520 1 2
1.94 1.63 3167.3 0.07 575.5 3742.8 1.50 Err:520 Err:520 Err:520 1 2
1.94 1.41 3914.0 0.09 757.5 4671.5 1.50 Err:520 Err:520 Err:520 1 2
69 70 600 1.15 0.75 2.12 1.52 4208.8 0.07 642.7 4851.5 1.50 Err:520 Err:520 Err:520 1 2
2.30 1.62 4493.6 0.06 551.6 5045.2 1.50 Err:520 Err:520 Err:520 2 2
2.32 1.53 4970.2 0.07 607.2 5577.4 1.25 Err:520 Err:520 Err:520 3 3
70 E10 675 1.24 0.84 2.38 1.56 5065.0 0.07 581.0 5646.0 1.25 Err:520 Err:520 Err:520 3 3
2.43 1.59 5158.9 0.06 556.5 5715.4 1.25 Err:520 Err:520 Err:520 3 3
1.28 1.38 1746.7 0.10 827.5 2574.2 1.50 Err:520 Err:520 Err:520 1 2
<71 72 300 0.78 0.38 1.25 1.35 1706.9 0.10 868.7 2575.6 1.50 Err:520 Err:520 Err:520 1 2
1.21 1.32 1666.7 0.11 912.8 2579.5 1.50 Err:520 Err:520 Err:520 1 2
1.21 1.16 1979.7 0.14 1199.8 3179.5 1.50 Err:520 Err:520 Err:520 1 2
72 73 400 0.90 0.50 1.21 1.16 1972.7 0.14 1208.3 3181.0 1.50 Err:520 Err:520 Err:520 1 2
1.20 1.16 1965.6 0.14 1216.9 3182.5 1.50 Err:520 Err:520 Err:520 1 2
1.20 1.09 2121.3 0.16 1357.2 3478.5 1.50 Err:520 Err:520 Err:520 1 2
73 74 450 0.96 0.56 1.56 1.36 2652.2 0.10 858.4 3510.7 1.50 Err:520 Err:520 Err:520 1 2
1.92 1.61 3141.3 0.07 586.7 3728.0 1.50 Err:520 Err:520 Err:520 1 2

###
URBANIZACIN FRANCISCO OTERO
DISEO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA
Tipo de Relleno a utilizar: ###
Arcilla plastica(saturada) 1 Tipo de Tuberia Tipo de Zanja ###
Arcilla ordinaria(seca) 2 0 0 ###
Suelo nat. saturado(limo) 3 Gres 1 Talud Vertical 1 ###
Mez. arenas gravas(recebo) 4 Concreto simple 2 Talud 1:5 2 ###
Mat. granular sin cohesion 5 Concreto reforzado 3 ###
Turba-Tierra vegetal 6
Greda-marga arcilla pobre 7 Pgina 4
Tipo relleno 3 Camin 8650 kg.|| Ku 0.110 Peso unitario 2100 kg/m3 LONG. TUBO: 1.00 m.
Tipo de zanja 1
Pozo Diam Altura
De A Nom Bd De Rell Cd Wd Cs Wv Wt FS CR o CF FCc FCr Tuberia
(mm) (m) (m) (m) (kg/ml) (kg/ml) (kg/ml) (kg/ml) Clase Material
1.92 1.40 3880.6 0.09 772.1 4652.7 1.50 Err:520 Err:520 Err:520 1 2
74 75 600 1.15 0.75 1.87 1.37 3796.6 0.09 810.4 4606.9 1.50 Err:520 Err:520 Err:520 1 2
1.82 1.34 3711.7 0.10 866.8 4578.5 1.50 Err:520 Err:520 Err:520 1 2
1.82 1.25 4064.4 0.11 949.6 5014.0 1.25 Err:520 Err:520 Err:520 3 3
75 77 675 1.24 0.84 1.79 1.23 4007.4 0.11 978.5 4985.9 1.25 Err:520 Err:520 Err:520 2 3
1.76 1.22 3950.2 0.12 1019.9 4970.0 1.25 Err:520 Err:520 Err:520 2 3
1.04 1.16 1465.6 0.14 1179.9 2645.5 1.50 Err:520 Err:520 Err:520 1 2
<76 77 300 0.78 0.38 1.06 1.18 1489.8 0.13 1143.1 2632.9 1.50 Err:520 Err:520 Err:520 1 2
1.08 1.20 1513.8 0.13 1094.8 2608.6 1.50 Err:520 Err:520 Err:520 1 2
1.80 1.16 4376.0 0.12 1065.9 5442.0 1.25 Err:520 Err:520 Err:520 2 3
77 E11 750 1.34 0.94 1.79 1.16 4344.6 0.13 1082.0 5426.6 1.25 Err:520 Err:520 Err:520 2 3
1.77 1.15 4313.2 0.13 1104.4 5417.6 1.25 Err:520 Err:520 Err:520 2 3
1.20 1.23 1810.2 0.12 1073.0 2883.3 1.50 Err:520 Err:520 Err:520 1 2
<78 79 350 0.84 0.44 1.20 1.23 1810.2 0.12 1073.0 2883.3 1.50 Err:520 Err:520 Err:520 1 2
1.20 1.23 1810.2 0.12 1073.0 2883.3 1.50 Err:520 Err:520 Err:520 1 2
1.20 1.16 1965.6 0.13 1124.5 3090.1 1.50 Err:520 Err:520 Err:520 1 2
79 81 400 0.90 0.50 1.19 1.15 1951.5 0.14 1211.0 3162.5 1.50 Err:520 Err:520 Err:520 1 2
1.18 1.14 1937.4 0.15 1258.9 3196.3 1.50 Err:520 Err:520 Err:520 1 2
1.18 1.14 1937.4 0.14 1252.1 3189.5 1.50 Err:520 Err:520 Err:520 1 2
<80 81 400 0.90 0.50 1.10 1.07 1822.9 0.16 1408.3 3231.2 1.50 Err:520 Err:520 Err:520 1 2
1.02 1.00 1706.3 0.19 1672.8 3379.0 1.50 Err:520 Err:520 Err:520 1 2

URBANIZACIN FRANCISCO OTERO


0 0
CUADRO CALCULO DE VOLUMENES
###
Aguas Lluvias Pgina 4 ###
Pozo Long Diam De Di Diam Bd F.C Cota Terreno Cota Clave Recubrim H med ###
De A (m) Pulg Nom Sup Inf Sup Inf Sup Inf EXC. 1 ###
61 62 74 36.0 1.10 0.91 900 1.50 Err:520 69.99 69.49 67.49 67.33 2.50 2.16 Err:520 ###
62 63 48 36.0 1.10 0.91 900 1.50 Err:520 69.49 69.16 67.33 67.21 2.16 1.95 Err:520 ###
63 E8 25 36.0 1.10 0.91 900 1.50 Err:520 69.16 68.99 67.21 67.14 1.95 1.85 Err:520 atraque
<64 65 83 14.0 0.43 0.36 350 0.83 Err:520 70.80 70.19 69.20 68.72 1.60 1.47 Err:520 ###
65 E9 25.3 18.0 0.55 0.46 450 0.95 Err:520 70.19 70.00 68.72 68.57 1.47 1.43 Err:520 ###
<66 67 78 12.0 0.37 0.30 300 0.77 Err:520 70.01 69.80 69.00 68.77 1.01 1.03 Err:520 ###
67 68 77 14.0 0.43 0.36 350 0.83 Err:520 69.80 70.03 68.77 68.49 1.03 1.54 Err:520 ###
68 69 65 18.0 0.55 0.46 450 0.95 Err:520 70.03 70.23 68.49 68.29 1.54 1.94 Err:520 ###
69 70 72 24.0 0.73 0.61 600 1.13 Err:520 70.23 70.45 68.29 68.15 1.94 2.30 Err:520 ###
70 E10 22 27.0 0.82 0.69 675 1.22 Err:520 70.45 70.50 68.13 68.07 2.32 2.43 Err:520
<71 72 85.1 12.0 0.37 0.30 300 0.77 Err:520 70.59 70.26 69.31 69.05 1.28 1.21 Err:520
72 73 66 16.0 0.49 0.41 400 0.89 Err:520 70.26 70.00 69.05 68.80 1.21 1.20 Err:520
73 74 68 18.0 0.55 0.46 450 0.95 Err:520 70.00 70.50 68.80 68.58 1.20 1.92 Err:520
74 75 62 24.0 0.73 0.61 600 1.13 Err:520 70.50 70.28 68.58 68.46 1.92 1.82 Err:520
75 77 55 27.0 0.82 0.69 675 1.22 Err:520 70.28 70.08 68.46 68.32 1.82 1.76 Err:520
<76 77 74 12.0 0.37 0.30 300 0.77 Err:520 70.26 70.08 69.22 69.00 1.04 1.08 Err:520
77 E11 22 30.0 0.91 0.76 750 1.31 Err:520 70.08 70.00 68.28 68.23 1.80 1.77 Err:520
<78 79 55 14.0 0.43 0.36 350 0.83 Err:520 70.50 70.33 69.30 69.13 1.20 1.20 Err:520
79 81 70 16.0 0.49 0.41 400 0.89 Err:520 70.33 70.11 69.13 68.93 1.20 1.18 Err:520
<80 81 91 16.0 0.49 0.41 400 0.89 Err:520 70.50 70.11 69.32 69.09 1.18 1.02 Err:520
De A H med Diam Pozo Lreal Vexc Vexc V rell V rell Vexc. Vrell 1 Vrell V conc. Volume V exc
EXC. 2 Sup Inf Pozo Tub Base gran Atraq gra gran Recub Tubera bajo caj 1/8De
61 62 Err:520 1.2 1.2 72.8 8.4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 68.8 Err:520 ###
62 63 Err:520 1.2 1.2 46.8 7.6 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 44.3 Err:520 ###
63 E8 Err:520 1.2 1.2 23.8 7.2 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 22.5 Err:520 ###
<64 65 Err:520 1.2 1.2 81.8 5.0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 11.7 Err:520 ###
65 E9 Err:520 1.2 1.2 24.1 4.9 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 5.7 Err:520 ###
<66 67 Err:520 1.2 1.2 76.8 3.5 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 8.1 Err:520 ###
67 68 Err:520 1.2 1.2 75.8 3.7 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 10.8 Err:520 ###
68 69 Err:520 1.2 1.2 63.8 5.1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 15.1 Err:520 ###
69 70 Err:520 1.2 1.2 70.8 6.4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 29.8 Err:520 ###
70 E10 Err:520 1.2 1.2 20.8 7.4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 11.1 Err:520 ###
<71 72 Err:520 1.2 1.2 83.9 4.1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 8.8 Err:520 ###
72 73 Err:520 1.2 1.2 64.8 4.2 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 12.1 Err:520 ###
73 74 Err:520 1.2 1.2 66.8 4.3 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 15.8 Err:520 ###
74 75 Err:520 1.2 1.2 60.8 6.3 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 25.6 Err:520 ###
75 77 Err:520 1.2 1.2 53.8 6.3 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 28.6 Err:520 ###
<76 77 Err:520 1.2 1.2 72.8 3.6 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 7.6 Err:520 ###
77 E11 Err:520 1.2 1.2 20.8 6.4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 13.7 Err:520 ###
<78 79 Err:520 1.2 1.2 53.8 4.1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 7.7 Err:520 ###
79 81 Err:520 1.2 1.2 68.8 4.2 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 12.9 Err:520 ###
<80 81 Err:520 1.2 1.2 89.8 4.1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 16.8 Err:520 ###
Cantidades de obra
Volumen de excavacin Total (m3) Err:520
Volumen de material granular para cimentacin de tubera Err:520
Volumen de concreto para cimentacin de tuberia (m3) Err:520
Volumen de sobrantes (m3) Err:520
Volumen de recebo Err:520

URBANIZACIN FRANCISCO OTERO


0 0
CUADRO DE CANTIDADES DE TUBERIA
AGUAS LLUVIAS Pgina 4

De A Diam Long Clase Material SumadeLong Material


(" , m) real Diam Clase 2.00 3.00
61 62 36.00 72.8 3 3 12.00 1.00 317.40 0.00
62 63 36.00 46.8 3 3 Total12 317.40 0.00
63 E8 36.00 23.8 3 3 14.00 1.00 211.40 0.00
<64 65 14.00 81.8 1 2 Total14 211.40 0.00
65 E9 18.00 24.1 1 2 16.00 1.00 288.20 0.00
<66 67 12.00 76.8 1 2 Total16 288.20 0.00
67 68 14.00 75.8 1 2 18.00 1.00 154.70 0.00
68 69 18.00 63.8 1 2 Total18 154.70 0.00
69 70 24.00 70.8 1 2 36.00 3.00 0.00 143.40
70 E10 27.00 20.8 3 3 Total36 0.00 143.40
<71 72 12.00 83.9 1 2 27.00 2.00 0.00 53.80
72 73 16.00 64.8 1 2 3.00 0.00 20.80
73 74 18.00 66.8 1 2 Total27 0.00 74.60
74 75 24.00 60.8 1 2 30.00 2.00 0.00 20.80
75 77 27.00 53.8 2 3 Total30 0.00 20.80
<76 77 12.00 72.8 1 2
77 E11 30.00 20.8 2 3
<78 79 14.00 53.8 1 2
79 81 16.00 68.8 1 2
<80 81 16.00 89.8 1 2