260 SAMPLE DIVISION 01 GENERAL REQUIREMENTS

2. Instruct recipients to promptly report, in writing, problems anticipated by projections shown in schedules.

End of Section 01 32 00

Section 01 33 00 - Submittal Procedures

A. SUBMITTALS FOR REVIEW BY ARCHITECT

1. Submit the following for review when specified in Specifications Sections:


a. Product data.
b. Shop drawings.
c. Samples for selection.
d. Samples for verification.

2. Make submittals to Architect for review for the limited purpose of checking for conformance with information
given and the design concept expressed in the Contract Documents.

3. Samples will be reviewed only for aesthetic, color, or finish selection.

4. After review, provide copies and distribute submittals as specified below.

B. SUBMITTALS FOR INFORMATION

1. When the following are specified in individual sections, submit them for information:
a. Design data.
b. Certificates.
c. Test reports.
d. Inspection reports.
e. Manufacturer's instructions.
f. Manufacturer's field reports.
g. Other types specified.

2. Submittals for information shall be made for Architect's knowledge as Contract administrator or for
Owner. No review action will be taken.

C. SUBMITTALS FOR PROJECT CLOSEOUT

1. Submit the following at Contract Closeout when specified in Specifications Sections:


a. Project record documents.
b. Operation and maintenance data.
c. Warranties.
d. Bonds.
e. Permits.
f. Other types if specified.

D. ADMINISTRATIVE REQUIREMENTS

1. Submission: Transmit each submittal with Letter of Transmittal, AIA Document G810, or other form
containing substantially the same information, as acceptable to Architect.

a. Deliver submittals to Architect at Architect's business address.


b. Schedule submittals to expedite the Project and coordinate submission of related items.