MARINE ENVIRONMENT PROTECTION MEPC 70/INF.14


COMMITTEE 19 August 2016
70th session ENGLISH ONLY
Agenda item 5

AIR POLLUTION AND ENERGY EFFICIENCY

EEDI database Review of status of technological development


(Regulation 21.6 of MARPOL Annex VI)

Note by the Secretariat

SUMMARY

Executive summary: This document provides in the annex the third summary of data and
information in the EEDI database

Strategic direction: 7.3

High-level action: 7.3.2

Output: 7.3.2.5

Action to be taken: Paragraph 12

Related documents: MEPC 66/21; MEPC 67/4/3, MEPC 67/20, MEPC 67/INF.4;
MEPC 68/INF.13; MEPC 69/5/5 and MEPC 69/INF.16

Background

1 In accordance with regulation 21.6 of MARPOL Annex VI, at the beginning of phase 1
(1 January 2015 to 31 December 2019) and at the midpoint of phase 2 (1 January 2020
to 31 December 2024), the Organization shall review the status of technological developments
and, if proven necessary, amend the time periods, the EEDI reference line parameters for
relevant ship types and the reduction rates set out in regulation 21.

2 In this regard, MEPC 66 agreed to the minimum data needed to support the review
and invited IACS to submit these data to the Secretariat on an ad hoc basis in a timely manner
to support the review (MEPC 66/21, paragraph 4.53).

3 Following MEPC 66, the Secretariat established an email address for data
submissions (eedi@imo.org) and developed an EEDI database.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Page 2

4 At MEPC 68, the Committee:

.1 noted document MEPC 68/INF.13 which provided the second summary of


data and information on the EEDI and requested the Secretariat to continue
to submit this information to the Committee (MEPC 68/21, paragraph 3.70);
and

.2 to avoid duplication of data, agreed that the ship identification number should
be included in the data set submitted to the Secretariat for inclusion in the
EEDI database, noting that such information would be held and used by the
Secretariat only (MEPC 68/21, paragraphs 3.70 and 3.71).

5 As a result, the EEDI database currently includes the following data to support the
review of the status of technological development under regulation 21.6 of MARPOL Annex VI:

.1 ship identification number (used by the Secretariat only);

.2 type of ship;

.3 capacity of ship (GT/DWT as appropriate);

.4 year of delivery;

.5 applicable Phase;

.6 required EEDI;

.7 attained EEDI; and

.8 use of innovative energy efficiency technologies (tick-box indication of


whether the fourth and fifth terms of the numerator of the EEDI equation are
employed).

EEDI information forwarded to the Correspondence Group on EEDI review

6 At MEPC 67, the Committee established a Correspondence Group on EEDI review,


under the coordination of Japan, in order to review the status of technological developments
relevant to implementing phase 2 of the EEDI regulations.

7 Following a request from the coordinator of the correspondence group, and noting
that the group was instructed to consider what information and data are pertinent for the review
and how that information and data should be collated and analysed, including information
obtained from the EEDI database, the Secretariat forwarded the latest information from the
database to the coordinator on 4 May 2016, for consideration by the group in the same format
as given in annexes 1 and 2 of document MEPC 69/INF.16.

Information in the EEDI database

8 By the date of this document, data had been received from eight IACS members
for 1,917 ships in total. These data, aggregated and anonymized by the Secretariat, are
provided in annex 1. To illustrate distribution for each type of ship, graphical representations
are also provided in annex 2.

9 The Committee should note that some IACS members have provided EEDI data not
only for ships for which EEDI regulations are mandatory but also for ships to which the EEDI
was applied on a voluntary basis. These data are identified and also provided in annexes 1
and 2, respectively.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Page 3

10 The numbers of ships in each type of ship category in the EEDI database are as
follows:

Voluntary Phase 0 Phase 1


Ship type Total
(ships) (ships) (ships)
Bulk carrier 111 811 1 923
Gas carrier 19 106 0 125
Tanker 152 360 6 518
Containership 102 181 0 283
General cargo ship 11 30 0 41
Refrigerated cargo carrier 0 0 0 0
Combination carrier 0 0 0 0
LNG carrier 0 n/a1 0 0
Ro-ro cargo ship (vehicle 6 12 0 18
carrier)
Ro-ro cargo ship 2 7 0 9
Ro-ro passenger ship 0 0 0 0
Cruise passenger ship 0 n/a2 0 0
having non-conventional
propulsion
Total 403 1,507 7 1,917

11 The Committee should also note that the Secretariat has included in the database
additional information on the "attained EEDI reduction rate relative to reference line value",
to provide the attained reduction factor for each of the ships in the database.

Action requested of the Committee

12 The Committee is invited to note the information provided in the annexes.

***

1
LNG carriers are included under gas carriers in the Phase 0 period.
2
EEDI regulations apply to cruise passenger ships having non-conventional propulsion
from 1 September 2015.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 1

ANNEX 1

EEDI DATABASE

Table 1: EEDI database for bulk carriers (923 ships: 111 ships for non-mandatory, 811 ships for Phase 0 and 1 ship for Phase 1)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 1 34,500 2012 6.63 6.39 No No 3.6%


Non-mandatory 2 34,500 2012 6.63 6.26 No No 5.5%
Non-mandatory 3 34,500 2012 6.62 6.24 No No 5.8%
Non-mandatory 4 36,500 2014 6.45 5.35 No No 17.0%
Non-mandatory 5 36,500 2015 6.45 5.27 No No 18.3%
Non-mandatory 6 36,500 2013 6.45 5.43 No No 15.8%
Non-mandatory 7 36,500 2014 6.45 5.44 No No 15.7%
Non-mandatory 8 36,500 2014 6.45 5.43 No No 15.8%
Non-mandatory 9 36,500 2013 6.45 5.43 No No 15.8%
Non-mandatory 10 36,500 2014 6.45 5.43 No No 15.7%
Non-mandatory 11 37,500 2012 6.37 5.66 No No 11.1%
Non-mandatory 12 37,500 2013 6.36 5.50 No No 13.5%
Non-mandatory 13 37,500 2011 6.36 5.82 No No 8.6%
Non-mandatory 14 37,500 2014 6.36 5.74 No No 9.8%
Non-mandatory 15 37,500 2011 6.36 5.77 No No 9.2%
Non-mandatory 16 37,500 2012 6.36 5.80 No No 8.8%
Non-mandatory 17 38,000 2014 6.31 5.59 No No 11.4%
Non-mandatory 18 38,500 2015 6.29 5.02 No No 20.1%
Non-mandatory 19 39,000 2013 6.22 6.09 No No 2.2%
Non-mandatory 20 39,000 2013 6.22 6.13 No No 1.6%
Non-mandatory 21 40,000 2014 6.15 4.68 No No 24.0%
Non-mandatory 22 40,000 2015 6.15 4.53 No No 26.4%
Non-mandatory 23 40,000 2015 6.15 4.53 No No 26.3%
Non-mandatory 24 40,000 2014 6.15 4.61 No No 25.1%
Non-mandatory 25 40,000 2014 6.15 4.81 No No 21.7%
Non-mandatory 26 40,000 2014 6.15 4.81 No No 21.7%
Non-mandatory 27 40,000 2014 6.15 4.65 No No 24.4%
Non-mandatory 28 40,000 2014 6.15 4.81 No No 21.7%
Non-mandatory 29 40,000 2014 6.15 4.49 No No 26.9%
Non-mandatory 30 40,000 2014 6.15 4.47 No No 27.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 2

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 31 43,500 2015 5.90 3.98 No No 32.5%


Non-mandatory 32 43,500 2015 5.90 4.19 No No 29.0%
Non-mandatory 33 43,500 2015 5.90 4.15 No No 29.7%
Non-mandatory 34 45,000 2014 5.83 4.89 No No 16.1%
Non-mandatory 35 45,000 2014 5.83 4.91 No No 15.8%
Non-mandatory 36 49,000 2013 5.59 4.57 No No 18.2%
Non-mandatory 37 49,000 2013 5.59 4.56 No No 18.4%
Non-mandatory 38 49,000 2013 5.59 4.65 No No 16.8%
Non-mandatory 39 49,000 2013 5.59 4.61 No No 17.5%
Non-mandatory 40 49,000 2013 5.59 4.56 No No 18.4%
Non-mandatory 41 49,000 2013 5.59 4.57 No No 18.2%
Non-mandatory 42 56,500 2013 5.21 4.99 No No 4.1%
Non-mandatory 43 57,000 2013 5.20 4.83 No No 7.2%
Non-mandatory 44 57,000 2012 5.20 4.67 No No 10.3%
Non-mandatory 45 57,000 2012 5.20 4.73 No No 9.0%
Non-mandatory 46 57,000 2013 5.20 4.64 No No 10.8%
Non-mandatory 47 57,000 2012 5.20 4.79 No No 7.9%
Non-mandatory 48 57,000 2013 5.20 4.88 No No 6.2%
Non-mandatory 49 57,000 2013 5.20 4.74 No No 8.8%
Non-mandatory 50 59,000 2012 5.12 5.40 No No -5.5%
Non-mandatory 51 59,000 2012 5.12 5.38 No No -5.1%
Non-mandatory 52 61,500 2014 5.01 4.05 No No 19.2%
Non-mandatory 53 63,000 2014 4.94 3.94 No No 20.2%
Non-mandatory 54 63,000 2014 4.94 3.90 No No 21.1%
Non-mandatory 55 63,000 2014 4.94 3.83 No No 22.6%
Non-mandatory 56 63,500 2014 4.94 3.87 No No 21.8%
Non-mandatory 57 63,500 2014 4.94 3.92 No No 20.6%
Non-mandatory 58 63,500 2014 4.94 3.92 No No 20.6%
Non-mandatory 59 63,500 2014 4.93 3.87 No No 21.5%
Non-mandatory 60 63,500 2014 4.93 3.86 No No 21.7%
Non-mandatory 61 63,500 2014 4.93 3.91 No No 20.7%
Non-mandatory 62 63,500 2014 4.93 3.91 No No 20.7%
Non-mandatory 63 63,500 2014 4.92 3.96 No No 19.5%
Non-mandatory 64 63,500 2014 4.92 3.96 No No 19.5%
Non-mandatory 65 63,500 2014 4.92 3.96 No No 19.5%
Non-mandatory 66 63,500 2014 4.92 3.82 No No 22.4%
Non-mandatory 67 64,000 2014 4.92 3.69 No No 25.1%
Non-mandatory 68 64,000 2014 4.92 3.91 No No 20.5%
Non-mandatory 69 64,000 2014 4.92 3.78 No No 23.2%
Non-mandatory 70 64,000 2013 4.92 3.83 No No 22.1%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 3

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 71 64,000 2014 4.92 3.84 No No 21.9%


Non-mandatory 72 75,000 2013 4.55 3.69 No No 19.0%
Non-mandatory 73 75,500 2014 4.54 3.61 No No 20.5%
Non-mandatory 74 75,500 2015 4.53 3.61 No No 20.3%
Non-mandatory 75 76,500 2014 4.51 3.60 No No 20.2%
Non-mandatory 76 76,500 2013 4.51 3.59 No No 20.4%
Non-mandatory 77 77,000 2013 n/a 6.00 No No n/a
Non-mandatory 78 79,500 2014 4.43 4.33 No No 2.3%
Non-mandatory 79 79,500 2014 4.43 4.37 No No 1.4%
Non-mandatory 80 80,500 2014 4.40 3.56 No No 19.1%
Non-mandatory 81 81,000 2014 4.39 3.56 No No 18.9%
Non-mandatory 82 81,000 2015 4.39 3.55 No No 19.1%
Non-mandatory 83 81,500 2015 4.38 3.52 No No 19.6%
Non-mandatory 84 81,500 2015 4.38 3.50 No No 20.1%
Non-mandatory 85 81,500 2014 4.38 3.89 No No 11.2%
Non-mandatory 86 81,500 2014 4.38 3.60 No No 17.8%
Non-mandatory 87 81,500 2012 4.38 4.12 No No 5.9%
Non-mandatory 88 81,500 2012 4.38 4.07 No No 7.1%
Non-mandatory 89 81,500 2012 4.38 4.10 No No 6.4%
Non-mandatory 90 81,500 2012 4.38 4.15 No No 5.1%
Non-mandatory 91 81,500 2012 3.94 3.84 No No 2.4%
Non-mandatory 92 81,500 2012 4.37 3.89 No No 10.9%
Non-mandatory 93 81,500 2012 4.37 3.81 No No 12.7%
Non-mandatory 94 82,000 2013 4.37 3.94 No No 9.8%
Non-mandatory 95 82,000 2013 4.37 4.01 No No 8.2%
Non-mandatory 96 82,000 2012 4.37 4.02 No No 7.9%
Non-mandatory 97 82,000 2012 4.37 4.04 No No 7.4%
Non-mandatory 98 85,000 2013 4.28 3.44 No No 19.6%
Non-mandatory 99 85,000 2014 4.28 3.40 No No 20.7%
Non-mandatory 100 87,500 2013 4.23 3.83 No No 9.6%
Non-mandatory 101 87,500 2013 4.23 3.83 No No 9.6%
Non-mandatory 102 95,500 2013 4.06 3.70 No No 8.7%
Non-mandatory 103 117,500 2015 3.67 2.83 No No 22.9%
Non-mandatory 104 179,500 2014 3.00 2.39 No No 20.5%
Non-mandatory 105 179,500 2014 3.00 2.38 No No 20.8%
Non-mandatory 106 180,000 2014 3.00 2.88 No No 3.8%
Non-mandatory 107 180,000 2014 3.00 2.82 No No 6.0%
Non-mandatory 108 181,000 2014 2.99 2.43 No No 18.6%
Non-mandatory 109 181,000 2014 2.99 2.43 No No 18.6%
Non-mandatory 110 181,500 2014 2.99 2.44 No No 18.5%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 4

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 111 181,500 2014 2.99 2.43 No No 18.6%


0 112 5,500 2015 n/a 10.4 No No n/a
0 113 5,500 2016 n/a 12.5 No No n/a
0 114 9,000 2014 n/a 13.1 No No n/a
0 115 10,000 2016 n/a 11.8 No No n/a
0 116 10,000 2016 n/a 11.7 No No n/a
0 117 11,000 2015 n/a 12.2 No No n/a
0 118 11,500 2015 n/a 13.1 No No n/a
0 119 11,500 2014 n/a 11.9 No No n/a
0 120 11,500 2014 n/a 12.0 No No n/a
0 121 12,000 2014 n/a 11.4 No No n/a
0 122 12,000 2015 n/a 11.6 No No n/a
0 123 12,500 2015 n/a 13.2 No No n/a
0 124 12,500 2014 n/a 13.1 No No n/a
0 125 14,000 2015 n/a 10.2 No No n/a
0 126 14,000 2015 n/a 10.1 No No n/a
0 127 14,000 2016 n/a 9.42 No No n/a
0 128 14,000 2016 n/a 9.35 No No n/a
0 129 14,000 2016 n/a 9.18 No No n/a
0 130 14,500 2016 n/a 8.49 No No n/a
0 131 14,500 2015 n/a 8.48 No No n/a
0 132 14,500 2016 n/a 8.66 No No n/a
0 133 14,500 2016 n/a 8.51 No No n/a
0 134 14,500 2014 n/a 8.36 No No n/a
0 135 14,500 2015 n/a 8.47 No No n/a
0 136 14,500 2014 n/a 8.39 No No n/a
0 137 14,500 2015 n/a 8.66 No No n/a
0 138 16,500 2015 n/a 9.03 No No n/a
0 139 16,500 2015 n/a 8.97 No No n/a
0 140 17,000 2015 n/a 10.2 No No n/a
0 141 17,000 2016 n/a 10.3 No No n/a
0 142 17,000 2016 n/a 10.2 No No n/a
0 143 17,000 2015 n/a 10.2 No No n/a
0 144 28,000 2016 7.32 5.49 No No 25.0%
0 145 28,000 2015 7.32 5.67 No No 22.5%
0 146 33,000 2014 6.75 5.76 No No 14.7%
0 147 33,500 2015 6.71 5.18 No No 22.8%
0 148 33,500 2015 6.68 5.33 No No 20.2%
0 149 33,500 2016 6.71 5.36 No No 20.1%
0 150 33,500 2015 6.71 5.47 No No 18.5%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 5

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 151 33,500 2016 6.71 5.31 No No 20.8%


0 152 33,500 2015 6.71 5.45 No No 18.8%
0 153 33,500 2014 6.70 5.26 No No 21.5%
0 154 33,500 2016 6.70 5.38 No No 19.7%
0 155 33,500 2015 6.69 5.11 No No 23.6%
0 156 33,500 2015 6.69 5.22 No No 22.0%
0 157 33,500 2015 6.69 5.47 No No 18.2%
0 158 33,500 2016 6.68 5.15 No No 22.9%
0 159 33,500 2014 6.69 4.98 No No 25.6%
0 160 33,500 2015 6.69 5.41 No No 19.1%
0 161 33,500 2016 6.69 5.42 No No 19.0%
0 162 33,500 2014 6.69 5.01 No No 25.1%
0 163 33,500 2014 6.68 5.50 No No 17.7%
0 164 34,500 2016 6.63 5.72 No No 13.7%
0 165 34,500 2016 6.63 5.63 No No 15.1%
0 166 34,500 2015 6.59 5.91 No No 10.3%
0 167 34,500 2015 6.59 5.97 No No 9.4%
0 168 34,500 2016 6.60 5.87 No No 11.1%
0 169 34,500 2016 6.60 5.94 No No 10.0%
0 170 34,500 2016 6.60 6.03 No No 8.6%
0 171 34,500 2016 6.60 6.01 No No 8.9%
0 172 34,500 2015 6.59 5.30 No No 19.6%
0 173 34,500 2015 6.59 5.27 No No 20.0%
0 174 34,500 2015 6.59 5.29 No No 19.7%
0 175 34,500 2015 6.59 5.32 No No 19.3%
0 176 34,500 2015 6.59 5.10 No No 22.6%
0 177 35,000 2015 6.58 5.11 No No 22.3%
0 178 35,000 2015 6.58 5.08 No No 22.8%
0 179 35,000 2015 6.58 5.10 No No 22.5%
0 180 35,000 2016 6.58 5.10 No No 22.5%
0 181 35,000 2016 6.58 5.15 No No 21.7%
0 182 35,000 2015 6.58 5.23 No No 20.5%
0 183 35,000 2016 6.55 5.27 No No 19.5%
0 184 35,000 2016 6.55 5.22 No No 20.3%
0 185 35,000 2016 6.55 5.27 No No 19.5%
0 186 35,000 2016 6.54 5.49 No No 16.1%
0 187 35,500 2015 6.54 5.08 No No 22.3%
0 188 35,500 2015 6.53 5.11 No No 21.7%
0 189 36,000 2015 6.49 5.67 No No 12.6%
0 190 36,000 2015 6.48 5.56 No No 14.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 6

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 191 36,000 2016 6.48 5.60 No No 13.6%


0 192 36,000 2014 6.46 5.40 No No 16.4%
0 193 36,000 2015 6.46 5.15 No No 20.3%
0 194 36,000 2015 6.46 5.15 No No 20.3%
0 195 36,000 2015 6.46 5.17 No No 20.0%
0 196 36,000 2014 6.45 5.58 No No 13.5%
0 197 36,500 2016 6.43 4.94 No No 23.2%
0 198 36,500 2014 6.42 5.11 No No 20.4%
0 199 36,500 2014 6.42 5.10 No No 20.6%
0 200 36,500 2016 6.42 5.09 No No 20.7%
0 201 37,000 2015 6.39 5.08 No No 20.5%
0 202 37,000 2015 6.36 6.06 No No 4.7%
0 203 37,000 2015 6.38 6.05 No No 5.2%
0 204 37,500 2014 6.36 6.06 No No 4.7%
0 205 37,500 2014 6.36 6.19 No No 2.7%
0 206 37,500 2013 6.34 5.09 No No 19.7%
0 207 37,500 2014 6.33 5.02 No No 20.7%
0 208 37,500 2015 6.33 4.62 No No 27.0%
0 209 37,500 2014 6.33 5.09 No No 19.6%
0 210 37,500 2015 6.33 5.55 No No 12.3%
0 211 37,500 2016 6.33 5.42 No No 14.4%
0 212 37,500 2013 6.33 5.21 No No 17.7%
0 213 37,500 2015 6.33 5.45 No No 13.9%
0 214 38,000 2015 6.33 5.53 No No 12.6%
0 215 38,000 2015 6.33 5.50 No No 13.1%
0 216 38,000 2014 6.32 4.73 No No 25.2%
0 217 38,000 2015 7.13 5.07 No No 28.9%
0 218 38,000 2016 6.32 5.24 No No 17.1%
0 219 38,000 2016 6.32 5.54 No No 12.3%
0 220 38,000 2016 6.32 5.49 No No 13.1%
0 221 38,000 2015 6.31 5.56 No No 11.9%
0 222 38,000 2016 6.31 5.71 No No 9.5%
0 223 38,000 2015 6.31 5.55 No No 12.0%
0 224 38,000 2016 6.31 5.68 No No 10.0%
0 225 38,000 2015 6.31 5.66 No No 10.3%
0 226 38,000 2015 6.31 5.60 No No 11.3%
0 227 38,000 2015 6.31 5.57 No No 11.7%
0 228 38,000 2014 6.31 5.62 No No 10.9%
0 229 38,000 2015 6.31 5.64 No No 10.6%
0 230 38,000 2015 6.31 5.28 No No 16.3%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 7

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 231 38,000 2016 6.31 5.45 No No 13.6%


0 232 38,000 2014 6.31 5.28 No No 16.3%
0 233 38,000 2016 6.31 5.44 No No 13.8%
0 234 38,000 2016 6.31 5.30 No No 16.0%
0 235 38,000 2015 6.31 5.53 No No 12.4%
0 236 38,000 2014 6.31 5.66 No No 10.3%
0 237 38,000 2016 6.30 5.55 No No 11.9%
0 238 38,000 2015 6.30 5.57 No No 11.6%
0 239 38,000 2015 6.30 5.42 No No 14.0%
0 240 38,000 2016 6.30 5.35 No No 15.1%
0 241 38,000 2015 6.30 4.91 No No 22.1%
0 242 38,000 2016 6.30 5.52 No No 12.4%
0 243 38,000 2015 6.29 4.76 No No 24.3%
0 244 38,000 2016 6.30 4.94 No No 21.6%
0 245 38,000 2016 6.29 5.51 No No 12.4%
0 246 38,000 2015 6.29 5.63 No No 10.5%
0 247 38,000 2016 6.29 5.53 No No 12.1%
0 248 38,000 2015 6.29 5.03 No No 20.0%
0 249 38,000 2015 6.29 5.08 No No 19.2%
0 250 38,500 2015 6.29 5.04 No No 19.8%
0 251 38,500 2015 6.29 5.07 No No 19.4%
0 252 38,500 2015 6.28 5.53 No No 11.9%
0 253 38,500 2015 6.28 5.53 No No 11.9%
0 254 38,500 2016 6.27 5.73 No No 8.6%
0 255 38,500 2015 6.25 5.04 No No 19.4%
0 256 38,500 2015 6.25 5.07 No No 18.9%
0 257 38,500 2015 6.25 4.68 No No 25.1%
0 258 38,500 2015 6.25 5.02 No No 19.7%
0 259 38,500 2015 6.25 5.04 No No 19.4%
0 260 39,000 2015 6.25 5.03 No No 19.5%
0 261 39,000 2015 6.24 4.68 No No 25.0%
0 262 39,000 2015 6.24 5.08 No No 18.6%
0 263 39,000 2015 6.24 4.81 No No 22.9%
0 264 39,000 2015 6.24 4.80 No No 23.1%
0 265 39,000 2015 6.24 4.74 No No 24.1%
0 266 39,000 2015 6.24 4.54 No No 27.2%
0 267 39,000 2015 6.24 4.71 No No 24.6%
0 268 39,000 2016 6.24 4.75 No No 23.9%
0 269 39,000 2015 6.24 4.54 No No 27.2%
0 270 39,000 2015 6.24 4.50 No No 27.9%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 8

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 271 39,000 2015 6.23 4.72 No No 24.3%


0 272 39,000 2015 6.23 4.53 No No 27.3%
0 273 39,000 2015 6.23 4.47 No No 28.3%
0 274 39,000 2016 6.23 4.76 No No 23.6%
0 275 39,000 2016 6.23 4.45 No No 28.6%
0 276 39,000 2013 6.23 4.62 No No 25.8%
0 277 39,000 2015 6.23 4.48 No No 28.1%
0 278 39,000 2015 6.23 4.71 No No 24.4%
0 279 39,000 2016 6.23 4.48 No No 28.1%
0 280 39,000 2015 6.23 4.52 No No 27.4%
0 281 39,000 2016 6.23 4.47 No No 28.3%
0 282 39,000 2015 6.23 4.50 No No 27.8%
0 283 39,000 2013 6.23 4.64 No No 25.5%
0 284 39,000 2015 6.22 4.67 No No 24.9%
0 285 39,000 2015 6.22 4.57 No No 26.5%
0 286 39,000 2016 6.22 5.28 No No 15.1%
0 287 39,000 2015 6.22 4.68 No No 24.8%
0 288 39,000 2015 6.22 5.19 No No 16.6%
0 289 39,000 2014 6.19 4.61 No No 25.5%
0 290 39,500 2014 6.21 4.89 No No 21.3%
0 291 39,500 2014 6.20 4.77 No No 23.1%
0 292 39,500 2014 6.20 4.71 No No 24.0%
0 293 39,500 2013 6.20 4.71 No No 24.0%
0 294 39,500 2013 6.20 4.74 No No 23.5%
0 295 39,500 2014 6.20 4.71 No No 24.0%
0 296 39,500 2015 6.20 4.80 No No 22.6%
0 297 39,500 2015 6.20 4.77 No No 23.1%
0 298 39,500 2013 6.19 4.66 No No 24.7%
0 299 39,500 2013 6.19 4.63 No No 25.2%
0 300 39,500 2013 6.19 4.63 No No 25.2%
0 301 39,500 2016 6.18 4.64 No No 24.9%
0 302 39,500 2016 6.18 4.63 No No 25.1%
0 303 40,000 2015 6.16 4.72 No No 23.4%
0 304 40,000 2015 6.16 4.62 No No 25.0%
0 305 40,000 2016 6.16 4.55 No No 26.1%
0 306 40,000 2015 6.16 4.65 No No 24.5%
0 307 40,000 2016 6.16 4.60 No No 25.3%
0 308 40,000 2016 6.16 4.55 No No 26.1%
0 309 40,000 2015 6.15 4.56 No No 25.9%
0 310 40,000 2015 6.15 4.74 No No 22.9%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 9

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 311 40,000 2016 6.15 4.61 No No 25.0%


0 312 40,000 2015 6.15 4.58 No No 25.5%
0 313 40,000 2015 6.15 4.64 No No 24.6%
0 314 40,000 2015 6.15 4.66 No No 24.2%
0 315 40,000 2016 6.15 4.70 No No 23.6%
0 316 40,000 2015 6.15 4.66 No No 24.2%
0 317 40,000 2015 6.15 4.44 No No 27.7%
0 318 40,000 2015 6.15 4.44 No No 27.8%
0 319 40,000 2015 6.15 4.53 No No 26.3%
0 320 40,500 2013 6.10 4.51 No No 26.1%
0 321 43,500 2016 5.90 4.06 No No 31.2%
0 322 43,500 2015 5.90 4.22 No No 28.5%
0 323 50,000 2016 6.21 4.34 No No 30.1%
0 324 51,500 2016 5.46 4.68 No No 14.3%
0 325 51,500 2015 5.46 4.65 No No 14.8%
0 326 51,500 2014 5.46 4.65 No No 14.8%
0 327 55,500 2016 5.26 3.92 No No 25.5%
0 328 55,500 2016 5.26 3.91 No No 25.7%
0 329 55,500 2015 5.26 4.28 No No 18.6%
0 330 55,500 2015 5.25 4.28 No No 18.5%
0 331 55,500 2016 5.25 4.19 No No 20.2%
0 332 55,500 2016 5.26 4.18 No No 20.5%
0 333 56,000 2015 5.25 4.02 No No 23.4%
0 334 56,000 2015 5.24 3.88 No No 26.0%
0 335 56,000 2014 5.24 4.30 No No 17.9%
0 336 56,000 2014 5.24 4.32 No No 17.6%
0 337 56,000 2016 5.24 4.08 No No 22.1%
0 338 56,000 2016 5.23 4.27 No No 18.4%
0 339 56,000 2016 5.23 4.11 No No 21.4%
0 340 56,000 2016 5.23 3.98 No No 23.9%
0 341 58,000 2016 5.16 4.08 No No 20.9%
0 342 58,000 2016 5.15 4.09 No No 20.6%
0 343 58,000 2015 5.16 4.04 No No 21.7%
0 344 58,000 2016 5.16 4.13 No No 20.0%
0 345 58,000 2014 5.15 4.24 No No 17.7%
0 346 58,000 2015 5.14 4.17 No No 18.9%
0 347 58,000 2015 5.15 4.23 No No 17.9%
0 348 58,000 2016 5.15 4.20 No No 18.4%
0 349 58,000 2016 5.15 4.22 No No 18.1%
0 350 58,000 2014 5.14 4.27 No No 16.9%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 10

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 351 58,000 2015 5.14 4.28 No No 16.7%


0 352 58,000 2015 5.14 4.27 No No 16.9%
0 353 58,500 2016 5.14 4.21 No No 18.1%
0 354 58,500 2014 5.14 4.23 No No 17.7%
0 355 58,500 2014 5.14 4.16 No No 19.1%
0 356 58,500 2015 5.14 4.21 No No 18.1%
0 357 58,500 2016 5.13 4.27 No No 16.8%
0 358 58,500 2014 5.13 4.25 No No 17.2%
0 359 58,500 2014 5.14 4.28 No No 16.7%
0 360 58,500 2015 5.14 4.27 No No 16.9%
0 361 58,500 2015 5.13 4.31 No No 16.0%
0 362 58,500 2014 5.13 4.19 No No 18.3%
0 363 59,000 2016 5.12 4.10 No No 19.9%
0 364 59,000 2016 5.11 3.98 No No 22.1%
0 365 60,000 2016 5.06 4.52 No No 10.7%
0 366 60,500 2016 5.06 4.53 No No 10.5%
0 367 60,500 2016 5.05 4.54 No No 10.1%
0 368 60,500 2016 5.05 4.51 No No 10.7%
0 369 60,500 2016 5.05 4.10 No No 18.8%
0 370 60,500 2015 5.05 4.47 No No 11.5%
0 371 60,500 2015 5.05 4.13 No No 18.2%
0 372 60,500 2015 5.05 4.14 No No 18.0%
0 373 60,500 2015 5.04 4.04 No No 19.8%
0 374 60,500 2016 5.04 4.01 No No 20.4%
0 375 60,500 2016 5.04 4.00 No No 20.6%
0 376 60,500 2016 5.04 4.05 No No 19.6%
0 377 60,500 2014 5.04 4.03 No No 20.0%
0 378 60,500 2015 5.04 4.08 No No 19.0%
0 379 60,500 2016 5.04 3.91 No No 22.4%
0 380 60,500 2015 5.04 3.93 No No 22.0%
0 381 60,500 2015 5.04 3.96 No No 21.4%
0 382 60,500 2016 5.04 3.65 No No 27.6%
0 383 60,500 2015 5.04 3.92 No No 22.2%
0 384 60,500 2015 5.04 3.89 No No 22.8%
0 385 60,500 2016 5.04 3.94 No No 21.8%
0 386 60,500 2015 5.04 3.86 No No 23.4%
0 387 60,500 2016 5.04 3.93 No No 22.0%
0 388 60,500 2015 5.04 3.84 No No 23.8%
0 389 60,500 2016 5.04 4.00 No No 20.6%
0 390 60,500 2016 5.04 3.64 No No 27.8%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 11

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 391 60,500 2016 5.04 3.89 No No 22.8%


0 392 61,000 2015 4.45 3.92 No No 11.9%
0 393 61,000 2015 5.04 3.67 No No 27.2%
0 394 61,000 2015 5.04 3.66 No No 27.4%
0 395 61,000 2016 5.04 3.67 No No 27.2%
0 396 61,000 2015 5.03 3.66 No No 27.2%
0 397 61,000 2016 5.03 3.67 No No 27.0%
0 398 61,000 2016 5.03 4.10 No No 18.5%
0 399 61,000 2015 5.03 4.06 No No 19.3%
0 400 61,000 2015 5.02 4.04 No No 19.5%
0 401 61,000 2014 5.02 3.98 No No 20.7%
0 402 61,000 2014 5.02 4.00 No No 20.3%
0 403 61,000 2013 5.02 4.02 No No 19.9%
0 404 61,000 2013 5.02 4.01 No No 20.1%
0 405 61,000 2015 5.02 4.04 No No 19.5%
0 406 61,000 2015 5.02 4.05 No No 19.3%
0 407 61,000 2015 5.02 4.05 No No 19.3%
0 408 61,000 2015 5.01 4.14 No No 17.4%
0 409 61,500 2015 5.02 3.94 No No 21.5%
0 410 61,500 2014 5.02 3.94 No No 21.5%
0 411 61,500 2015 5.02 3.93 No No 21.7%
0 412 61,500 2014 5.01 3.95 No No 21.2%
0 413 61,500 2016 5.01 4.17 No No 16.8%
0 414 61,500 2015 5.01 3.91 No No 22.0%
0 415 61,500 2015 5.01 3.91 No No 22.0%
0 416 61,500 2014 5.01 3.88 No No 22.6%
0 417 61,500 2016 5.01 4.17 No No 16.8%
0 418 61,500 2016 5.01 3.93 No No 21.6%
0 419 61,500 2016 5.01 4.16 No No 17.0%
0 420 61,500 2016 5.01 4.10 No No 18.2%
0 421 61,500 2016 5.01 3.92 No No 21.8%
0 422 61,500 2015 5.01 4.06 No No 19.0%
0 423 61,500 2015 5.01 3.90 No No 22.2%
0 424 61,500 2016 5.01 4.24 No No 15.4%
0 425 61,500 2016 5.01 4.12 No No 17.8%
0 426 61,500 2016 5.01 4.11 No No 18.0%
0 427 61,500 2015 5.01 4.11 No No 18.0%
0 428 61,500 2016 5.01 4.00 No No 20.2%
0 429 61,500 2016 5.01 4.00 No No 20.2%
0 430 61,500 2016 5.02 4.19 No No 16.5%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 12

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 431 61,500 2016 5.01 4.22 No No 15.8%


0 432 61,500 2016 5.01 4.27 No No 14.8%
0 433 61,500 2016 5.01 4.15 No No 17.2%
0 434 61,500 2016 5.01 4.18 No No 16.6%
0 435 61,500 2015 5.01 4.08 No No 18.6%
0 436 61,500 2016 5.01 4.09 No No 18.4%
0 437 61,500 2016 5.01 4.22 No No 15.8%
0 438 61,500 2015 5.01 4.15 No No 17.2%
0 439 61,500 2016 5.01 4.18 No No 16.6%
0 440 61,500 2013 5.01 3.90 No No 22.2%
0 441 61,500 2015 5.01 4.07 No No 18.8%
0 442 61,500 2016 5.01 4.12 No No 17.8%
0 443 61,500 2016 5.01 4.07 No No 18.8%
0 444 61,500 2016 5.01 4.09 No No 18.3%
0 445 61,500 2015 5.01 4.06 No No 19.0%
0 446 61,500 2015 5.01 4.12 No No 17.8%
0 447 61,500 2013 5.01 3.91 No No 22.0%
0 448 61,500 2015 5.01 4.06 No No 19.0%
0 449 61,500 2015 5.01 4.18 No No 16.6%
0 450 61,500 2015 5.01 4.08 No No 18.6%
0 451 61,500 2015 5.01 3.90 No No 22.2%
0 452 61,500 2016 5.01 4.13 No No 17.6%
0 453 61,500 2016 5.01 3.87 No No 22.8%
0 454 61,500 2015 5.01 4.06 No No 19.0%
0 455 61,500 2015 5.01 4.09 No No 18.4%
0 456 61,500 2013 5.00 3.91 No No 21.8%
0 457 61,500 2015 5.00 4.21 No No 15.8%
0 458 61,500 2015 5.00 4.24 No No 15.2%
0 459 61,500 2015 5.00 4.03 No No 19.4%
0 460 61,500 2013 5.00 3.82 No No 23.6%
0 461 61,500 2015 5.00 3.90 No No 22.0%
0 462 61,500 2015 5.00 3.91 No No 21.8%
0 463 61,500 2016 5.00 3.98 No No 20.4%
0 464 61,500 2017 5.00 3.85 No No 23.0%
0 465 61,500 2017 5.00 3.85 No No 23.0%
0 466 62,000 2016 5.00 3.82 No No 23.6%
0 467 62,000 2015 5.00 3.86 No No 22.8%
0 468 62,000 2015 4.99 3.93 No No 21.2%
0 469 62,000 2015 4.99 3.85 No No 22.8%
0 470 62,000 2015 4.99 3.87 No No 22.4%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 13

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 471 62,000 2015 4.99 3.86 No No 22.6%


0 472 62,000 2016 4.99 3.79 No No 24.0%
0 473 62,000 2015 4.99 3.86 No No 22.6%
0 474 62,000 2016 4.99 3.92 No No 21.4%
0 475 62,000 2015 4.99 3.85 No No 22.8%
0 476 62,000 2015 4.99 3.86 No No 22.6%
0 477 62,000 2015 4.99 3.83 No No 23.2%
0 478 63,000 2015 4.95 3.99 No No 19.4%
0 479 63,000 2015 4.95 3.99 No No 19.4%
0 480 63,000 2015 4.95 3.97 No No 19.8%
0 481 63,000 2015 4.95 3.82 No No 22.8%
0 482 63,000 2015 4.95 3.97 No No 19.8%
0 483 63,000 2015 4.95 3.88 No No 21.6%
0 484 63,000 2015 4.95 3.88 No No 21.6%
0 485 63,000 2014 4.94 3.82 No No 22.7%
0 486 63,000 2016 4.94 4.06 No No 17.8%
0 487 63,000 2016 4.94 3.89 No No 21.3%
0 488 63,500 2013 4.94 3.91 No No 20.9%
0 489 63,500 2015 4.94 3.93 No No 20.4%
0 490 63,500 2016 4.94 3.93 No No 20.4%
0 491 63,500 2016 4.94 3.93 No No 20.4%
0 492 63,500 2013 4.94 3.91 No No 20.9%
0 493 63,500 2015 4.94 3.95 No No 20.0%
0 494 63,500 2014 4.94 3.94 No No 20.2%
0 495 63,500 2015 4.94 3.98 No No 19.4%
0 496 63,500 2015 4.94 3.94 No No 20.3%
0 497 63,500 2014 4.93 3.93 No No 20.3%
0 498 63,500 2015 4.93 3.94 No No 20.1%
0 499 63,500 2015 4.94 3.93 No No 20.4%
0 500 63,500 2015 4.94 3.91 No No 20.9%
0 501 63,500 2014 4.93 3.91 No No 20.7%
0 502 63,500 2014 4.93 3.84 No No 22.1%
0 503 63,500 2015 4.93 3.95 No No 19.9%
0 504 63,500 2015 4.93 4.00 No No 18.9%
0 505 63,500 2015 4.93 3.96 No No 19.7%
0 506 63,500 2015 4.93 3.97 No No 19.5%
0 507 63,500 2015 4.93 3.94 No No 20.1%
0 508 63,500 2013 4.93 3.91 No No 20.7%
0 509 63,500 2016 4.93 3.87 No No 21.5%
0 510 63,500 2013 4.93 3.99 No No 19.1%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 14

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 511 63,500 2013 4.93 3.99 No No 19.1%


0 512 63,500 2013 4.93 3.89 No No 21.1%
0 513 63,500 2013 4.93 3.98 No No 19.3%
0 514 63,500 2013 4.93 3.87 No No 21.5%
0 515 63,500 2014 4.93 3.90 No No 20.9%
0 516 63,500 2013 4.93 3.89 No No 21.1%
0 517 63,500 2016 4.93 4.01 No No 18.7%
0 518 63,500 2016 4.93 3.99 No No 19.1%
0 519 63,500 2015 4.93 3.95 No No 19.9%
0 520 63,500 2015 4.93 3.86 No No 21.7%
0 521 63,500 2015 4.93 3.86 No No 21.7%
0 522 63,500 2015 4.93 4.05 No No 17.8%
0 523 63,500 2015 4.93 4.07 No No 17.4%
0 524 63,500 2013 4.93 3.99 No No 19.1%
0 525 63,500 2016 4.93 4.51 No No 8.5%
0 526 63,500 2015 4.93 4.06 No No 17.6%
0 527 63,500 2016 4.93 3.98 No No 19.3%
0 528 63,500 2013 4.93 3.87 No No 21.5%
0 529 63,500 2013 4.93 3.86 No No 21.8%
0 530 63,500 2015 4.93 3.91 No No 20.7%
0 531 63,500 2015 4.93 3.85 No No 21.9%
0 532 63,500 2015 4.93 3.97 No No 19.5%
0 533 63,500 2013 4.93 3.86 No No 21.7%
0 534 63,500 2013 4.93 3.86 No No 21.7%
0 535 63,500 2013 4.93 3.88 No No 21.3%
0 536 63,500 2016 4.93 3.78 No No 23.3%
0 537 63,500 2013 4.93 3.85 No No 21.9%
0 538 63,500 2013 4.93 3.87 No No 21.6%
0 539 63,500 2013 4.93 3.89 No No 21.1%
0 540 63,500 2013 4.93 3.84 No No 22.1%
0 541 63,500 2015 4.93 3.95 No No 19.8%
0 542 63,500 2015 4.93 3.82 No No 22.5%
0 543 63,500 2015 4.93 3.94 No No 20.1%
0 544 63,500 2016 4.93 3.68 No No 25.4%
0 545 63,500 2016 4.93 3.63 No No 26.4%
0 546 63,500 2015 4.93 3.78 No No 23.3%
0 547 63,500 2016 4.93 3.90 No No 20.9%
0 548 63,500 2014 4.93 3.79 No No 23.1%
0 549 63,500 2016 4.93 3.76 No No 23.7%
0 550 63,500 2013 4.93 3.94 No No 20.1%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 15

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 551 63,500 2015 4.93 3.95 No No 19.9%


0 552 63,500 2016 4.93 3.92 No No 20.5%
0 553 63,500 2015 4.93 3.98 No No 19.3%
0 554 63,500 2015 4.93 3.76 No No 23.7%
0 555 63,500 2013 4.92 3.95 No No 19.7%
0 556 63,500 2016 4.92 3.71 No No 24.6%
0 557 63,500 2015 4.92 3.81 No No 22.6%
0 558 63,500 2016 4.92 3.77 No No 23.4%
0 559 63,500 2016 4.92 3.95 No No 19.7%
0 560 63,500 2014 4.92 3.87 No No 21.3%
0 561 63,500 2013 4.92 3.99 No No 18.9%
0 562 63,500 2016 4.92 3.96 No No 19.5%
0 563 63,500 2015 4.92 3.76 No No 23.6%
0 564 63,500 2015 4.92 3.84 No No 22.0%
0 565 63,500 2016 4.92 3.80 No No 22.8%
0 566 63,500 2015 4.92 3.84 No No 22.0%
0 567 63,500 2016 4.92 3.67 No No 25.4%
0 568 63,500 2013 4.92 3.84 No No 21.9%
0 569 63,500 2015 4.92 3.91 No No 20.6%
0 570 63,500 2015 4.92 3.85 No No 21.8%
0 571 63,500 2015 4.92 3.99 No No 19.0%
0 572 63,500 2015 4.92 3.77 No No 23.4%
0 573 63,500 2014 4.92 3.85 No No 21.7%
0 574 63,500 2016 4.92 3.82 No No 22.4%
0 575 63,500 2016 4.92 3.80 No No 22.8%
0 576 63,500 2015 4.92 3.83 No No 22.2%
0 577 63,500 2015 4.92 3.90 No No 20.7%
0 578 63,500 2013 4.92 3.91 No No 20.5%
0 579 63,500 2015 4.92 3.84 No No 22.0%
0 580 63,500 2015 4.92 3.86 No No 21.6%
0 581 63,500 2015 4.92 3.86 No No 21.6%
0 582 63,500 2015 4.92 3.93 No No 20.1%
0 583 63,500 2016 4.92 3.69 No No 25.0%
0 584 64,000 2015 4.92 3.83 No No 22.2%
0 585 64,000 2014 4.92 3.86 No No 21.5%
0 586 64,000 2014 4.92 3.90 No No 20.9%
0 587 64,000 2015 4.92 4.06 No No 17.5%
0 588 64,000 2013 4.92 3.90 No No 20.7%
0 589 64,000 2016 4.92 3.91 No No 20.5%
0 590 64,000 2016 4.92 3.73 No No 24.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 16

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 591 64,000 2014 4.92 3.84 No No 22.0%


0 592 64,000 2015 4.92 3.78 No No 23.2%
0 593 64,000 2015 4.92 3.88 No No 21.1%
0 594 64,000 2015 4.92 3.87 No No 21.3%
0 595 64,000 2015 4.92 3.88 No No 21.1%
0 596 64,000 2014 4.92 3.87 No No 21.3%
0 597 64,000 2015 4.92 3.96 No No 19.5%
0 598 64,000 2015 4.92 3.93 No No 20.1%
0 599 64,000 2016 4.92 3.82 No No 22.4%
0 600 64,000 2015 4.92 3.89 No No 20.9%
0 601 64,000 2016 4.90 3.90 No No 20.4%
0 602 64,000 2015 4.92 3.91 No No 20.5%
0 603 64,000 2016 4.92 3.90 No No 20.7%
0 604 64,000 2015 4.92 3.87 No No 21.3%
0 605 64,000 2016 4.92 3.92 No No 20.3%
0 606 64,000 2015 4.92 3.88 No No 21.1%
0 607 64,000 2015 4.92 3.90 No No 20.7%
0 608 64,000 2016 4.92 3.75 No No 23.8%
0 609 64,000 2014 4.92 3.78 No No 23.2%
0 610 64,000 2015 4.92 3.86 No No 21.6%
0 611 64,000 2015 4.92 3.95 No No 19.7%
0 612 64,000 2014 4.92 3.92 No No 20.3%
0 613 64,000 2014 4.92 3.86 No No 21.6%
0 614 64,000 2015 4.92 3.69 No No 25.0%
0 615 64,000 2016 4.92 3.60 No No 26.8%
0 616 64,000 2015 4.92 3.92 No No 20.3%
0 617 64,000 2015 4.92 4.02 No No 18.3%
0 618 64,000 2015 4.92 3.92 No No 20.3%
0 619 64,000 2016 4.92 3.98 No No 19.1%
0 620 64,000 2013 4.92 3.84 No No 21.9%
0 621 64,000 2015 4.92 3.76 No No 23.5%
0 622 64,000 2015 4.92 3.81 No No 22.4%
0 623 64,000 2016 4.92 3.97 No No 19.3%
0 624 64,000 2014 4.92 3.85 No No 21.8%
0 625 64,000 2014 4.92 3.81 No No 22.6%
0 626 64,000 2015 4.92 3.76 No No 23.6%
0 627 64,000 2015 4.92 3.80 No No 22.8%
0 628 64,000 2015 4.92 3.80 No No 22.7%
0 629 64,000 2015 4.92 3.79 No No 22.9%
0 630 64,000 2015 4.92 3.91 No No 20.5%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 17

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 631 64,000 2015 4.92 3.80 No No 22.8%


0 632 64,000 2015 4.92 3.83 No No 22.2%
0 633 64,000 2015 4.91 3.84 No No 21.8%
0 634 64,000 2015 4.91 3.78 No No 23.0%
0 635 65,000 2014 4.87 4.20 No No 13.8%
0 636 67,000 2016 4.81 3.87 No No 19.5%
0 637 67,000 2015 4.81 3.86 No No 19.8%
0 638 67,000 2015 4.81 3.84 No No 20.2%
0 639 67,000 2016 4.81 3.84 No No 20.2%
0 640 67,000 2015 4.81 3.85 No No 20.0%
0 641 76,500 2015 4.51 3.73 No No 17.3%
0 642 76,500 2015 4.51 3.70 No No 18.0%
0 643 77,500 2015 4.49 3.42 No No 23.8%
0 644 77,500 2015 4.49 3.36 No No 25.2%
0 645 78,000 2014 4.47 3.92 No No 12.3%
0 646 78,000 2014 4.47 3.88 No No 13.2%
0 647 78,000 2015 4.47 3.39 No No 24.2%
0 648 78,000 2015 4.47 3.48 No No 22.1%
0 649 78,000 2015 4.47 3.41 No No 23.6%
0 650 78,000 2013 4.47 3.37 No No 24.6%
0 651 78,000 2015 4.46 3.48 No No 22.0%
0 652 78,000 2013 4.46 3.74 No No 16.1%
0 653 78,000 2016 4.46 3.70 No No 17.0%
0 654 78,500 2015 4.46 3.70 No No 17.0%
0 655 78,500 2013 4.46 3.68 No No 17.4%
0 656 78,500 2015 4.46 3.76 No No 15.7%
0 657 78,500 2015 4.46 3.78 No No 15.2%
0 658 81,000 2015 4.38 3.23 No No 26.3%
0 659 81,000 2015 4.39 3.57 No No 18.7%
0 660 81,000 2016 4.38 3.65 No No 16.7%
0 661 81,000 2015 4.38 3.56 No No 18.7%
0 662 81,000 2016 4.38 3.55 No No 18.9%
0 663 81,500 2014 4.38 3.22 No No 26.5%
0 664 81,500 2015 4.38 3.24 No No 26.0%
0 665 81,500 2016 4.38 3.29 No No 24.9%
0 666 81,500 2016 4.38 3.27 No No 25.3%
0 667 81,500 2016 4.38 3.64 No No 16.9%
0 668 81,500 2014 4.38 3.66 No No 16.4%
0 669 81,500 2016 4.38 3.19 No No 27.2%
0 670 81,500 2013 4.38 3.30 No No 24.7%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 18

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 671 81,500 2016 4.38 3.24 No No 26.0%


0 672 81,500 2015 4.38 3.24 No No 26.0%
0 673 81,500 2013 4.38 3.60 No No 17.8%
0 674 81,500 2015 4.38 3.22 No No 26.5%
0 675 81,500 2015 4.38 3.25 No No 25.8%
0 676 81,500 2015 4.38 3.19 No No 27.2%
0 677 81,500 2016 4.38 3.61 No No 17.6%
0 678 81,500 2016 4.38 3.64 No No 16.9%
0 679 81,500 2015 4.38 3.63 No No 17.1%
0 680 81,500 2015 4.38 3.64 No No 16.9%
0 681 81,500 2015 4.38 3.69 No No 15.8%
0 682 81,500 2015 4.38 3.58 No No 18.3%
0 683 81,500 2015 4.38 3.56 No No 18.7%
0 684 81,500 2016 4.38 3.60 No No 17.8%
0 685 81,500 2015 4.38 3.57 No No 18.5%
0 686 81,500 2016 4.38 3.58 No No 18.3%
0 687 81,500 2015 4.38 3.54 No No 19.2%
0 688 81,500 2015 4.38 3.60 No No 17.8%
0 689 81,500 2015 4.38 3.55 No No 18.9%
0 690 81,500 2015 4.37 3.67 No No 16.0%
0 691 81,500 2016 4.38 3.25 No No 25.7%
0 692 81,500 2016 4.37 3.27 No No 25.2%
0 693 82,000 2016 4.27 3.99 No No 6.6%
0 694 82,000 2013 4.37 3.51 No No 19.7%
0 695 82,000 2014 4.37 3.64 No No 16.7%
0 696 82,000 2015 4.38 3.53 No No 19.4%
0 697 82,000 2016 4.37 3.57 No No 18.3%
0 698 82,000 2016 4.37 3.58 No No 18.1%
0 699 82,000 2015 4.36 3.37 No No 22.7%
0 700 82,000 2015 4.36 3.50 No No 19.7%
0 701 82,000 2015 4.36 3.52 No No 19.3%
0 702 82,000 2016 4.36 3.61 No No 17.2%
0 703 82,000 2016 4.36 3.53 No No 19.0%
0 704 82,000 2015 4.36 3.55 No No 18.6%
0 705 82,000 2015 4.36 3.47 No No 20.4%
0 706 82,000 2016 4.36 3.56 No No 18.4%
0 707 82,000 2015 4.36 3.56 No No 18.3%
0 708 82,000 2016 4.36 3.53 No No 19.0%
0 709 82,000 2016 4.37 3.55 No No 18.8%
0 710 82,000 2016 4.36 3.55 No No 18.6%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 19

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 711 82,000 2015 4.36 3.55 No No 18.6%


0 712 82,000 2016 4.36 3.42 No No 21.6%
0 713 82,000 2016 4.36 3.53 No No 19.0%
0 714 82,000 2016 4.36 3.52 No No 19.3%
0 715 82,000 2015 4.36 3.53 No No 19.0%
0 716 82,000 2015 4.36 3.93 No No 9.9%
0 717 82,000 2016 4.36 3.57 No No 18.1%
0 718 82,000 2016 4.36 3.58 No No 17.9%
0 719 82,500 2015 4.36 3.59 No No 17.7%
0 720 82,500 2015 4.36 3.36 No No 22.9%
0 721 82,500 2015 4.36 3.59 No No 17.7%
0 722 82,500 2015 4.36 3.54 No No 18.7%
0 723 82,500 2015 4.36 3.60 No No 17.4%
0 724 82,500 2015 4.36 3.38 No No 22.5%
0 725 82,500 2015 4.36 3.62 No No 17.0%
0 726 82,500 2016 4.36 3.47 No No 20.4%
0 727 82,500 2015 4.36 3.47 No No 20.4%
0 728 82,500 2015 4.36 3.56 No No 18.5%
0 729 82,500 2015 4.36 3.50 No No 19.7%
0 730 82,500 2015 4.36 3.53 No No 19.0%
0 731 82,500 2016 4.36 3.60 No No 17.4%
0 732 82,500 2016 4.36 3.44 No No 21.1%
0 733 82,500 2015 4.36 3.56 No No 18.3%
0 734 82,500 2015 4.36 3.38 No No 22.5%
0 735 82,500 2017 4.36 3.52 No No 19.3%
0 736 82,500 2016 4.35 3.60 No No 17.2%
0 737 82,500 2015 4.36 3.44 No No 21.1%
0 738 82,500 2016 4.35 3.57 No No 17.9%
0 739 82,500 2015 4.35 3.57 No No 17.9%
0 740 82,500 2015 4.35 3.54 No No 18.6%
0 741 82,500 2016 4.35 3.56 No No 18.2%
0 742 82,500 2016 4.35 3.51 No No 19.3%
0 743 82,500 2016 4.35 3.22 No No 26.0%
0 744 82,500 2016 4.35 3.39 No No 22.1%
0 745 85,000 2016 4.29 3.36 No No 21.7%
0 746 85,000 2016 4.29 3.38 No No 21.2%
0 747 85,000 2016 4.29 3.29 No No 23.3%
0 748 85,000 2016 4.29 3.36 No No 21.7%
0 749 85,000 2016 4.29 3.41 No No 20.5%
0 750 85,000 2016 4.29 3.38 No No 21.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 20

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 751 85,000 2016 4.29 3.34 No No 22.1%


0 752 85,000 2016 4.29 3.40 No No 20.7%
0 753 85,000 2015 4.29 3.35 No No 21.9%
0 754 85,000 2016 4.29 3.39 No No 21.0%
0 755 85,000 2016 4.29 3.39 No No 21.0%
0 756 85,000 2016 4.28 3.41 No No 20.3%
0 757 85,000 2016 4.28 3.52 No No 17.8%
0 758 85,000 2015 4.28 3.46 No No 19.2%
0 759 85,500 2015 4.28 3.61 No No 15.7%
0 760 85,500 2016 4.28 3.53 No No 17.5%
0 761 85,500 2016 4.28 3.51 No No 18.0%
0 762 85,500 2015 4.28 3.14 No No 26.6%
0 763 85,500 2015 4.28 3.14 No No 26.6%
0 764 88,000 2015 4.22 3.28 No No 22.3%
0 765 88,000 2016 4.22 3.35 No No 20.6%
0 766 88,000 2015 4.22 3.33 No No 21.1%
0 767 89,000 2016 4.19 3.43 No No 18.1%
0 768 89,000 2016 4.19 3.49 No No 16.7%
0 769 89,000 2016 4.19 3.43 No No 18.1%
0 770 91,000 2016 4.15 3.34 No No 19.5%
0 771 94,000 2015 4.09 3.25 No No 20.4%
0 772 94,000 2015 4.09 3.25 No No 20.4%
0 773 96,000 2015 4.05 3.28 No No 19.0%
0 774 100,500 2015 3.96 3.16 No No 20.2%
0 775 105,000 2015 3.87 2.89 No No 25.4%
0 776 117,500 2016 3.67 2.81 No No 23.4%
0 777 118,000 2016 3.67 2.86 No No 22.1%
0 778 120,000 2015 3.64 2.94 No No 19.2%
0 779 150,000 2015 3.27 2.27 No No 30.6%
0 780 150,000 2016 3.27 2.25 No No 31.2%
0 781 150,000 2016 3.27 2.26 No No 30.9%
0 782 151,500 2015 3.25 2.35 No No 27.7%
0 783 175,000 2015 3.04 2.84 No No 6.6%
0 784 175,500 2015 3.03 2.85 No No 5.9%
0 785 179,500 2014 3.00 2.76 No No 8.1%
0 786 179,500 2016 3.00 2.44 No No 18.7%
0 787 179,500 2016 3.00 2.46 No No 18.0%
0 788 179,500 2014 3.00 2.46 No No 18.0%
0 789 179,500 2016 3.00 2.58 No No 14.0%
0 790 179,500 2016 3.00 2.52 No No 16.0%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 21

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 791 179,500 2016 3.00 2.53 No No 15.6%


0 792 179,500 2015 3.00 2.54 No No 15.3%
0 793 179,500 2015 3.00 2.52 No No 16.0%
0 794 179,500 2015 3.00 2.52 No No 16.0%
0 795 179,500 2015 3.00 2.55 No No 15.0%
0 796 179,500 2015 3.00 2.49 No No 17.0%
0 797 179,500 2015 3.00 2.50 No No 16.7%
0 798 179,500 2015 3.00 2.54 No No 15.3%
0 799 179,500 2016 3.00 2.47 No No 17.7%
0 800 179,500 2015 3.00 2.47 No No 17.7%
0 801 179,500 2015 3.00 2.55 No No 15.0%
0 802 179,500 2016 3.00 2.47 No No 17.7%
0 803 180,000 2016 3.00 2.31 No No 23.0%
0 804 180,000 2016 3.00 2.49 No No 17.0%
0 805 180,000 2015 3.00 2.32 No No 22.6%
0 806 180,000 2016 3.00 2.51 No No 16.3%
0 807 180,000 2015 3.00 2.45 No No 18.2%
0 808 180,000 2015 3.00 2.48 No No 17.4%
0 809 180,000 2016 3.00 2.48 No No 17.3%
0 810 180,000 2015 3.00 2.30 No No 23.3%
0 811 180,000 2014 3.00 2.54 No No 15.1%
0 812 180,000 2014 2.99 2.54 No No 15.3%
0 813 180,500 2015 2.99 2.31 No No 22.7%
0 814 180,500 2015 2.99 2.62 No No 12.4%
0 815 180,500 2016 2.99 2.45 No No 18.1%
0 816 180,500 2015 2.99 2.43 No No 18.7%
0 817 180,500 2015 2.99 2.43 No No 18.7%
0 818 180,500 2016 2.99 2.43 No No 18.7%
0 819 180,500 2016 2.99 2.55 No No 14.7%
0 820 180,500 2015 2.99 2.57 No No 14.0%
0 821 180,500 2017 2.99 2.44 No No 18.4%
0 822 180,500 2015 2.99 2.47 No No 17.4%
0 823 181,000 2017 2.99 2.42 No No 19.1%
0 824 181,000 2015 2.99 2.44 No No 18.4%
0 825 181,000 2016 2.99 2.43 No No 18.7%
0 826 181,000 2015 2.95 2.42 No No 18.0%
0 827 181,000 2015 2.99 2.46 No No 17.7%
0 828 181,000 2016 2.99 2.67 No No 10.7%
0 829 181,000 2016 2.99 2.48 No No 17.1%
0 830 181,500 2015 2.99 2.43 No No 18.7%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 22

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 831 181,500 2016 2.99 2.42 No No 19.1%


0 832 181,500 2015 2.99 2.43 No No 18.7%
0 833 181,500 2014 2.99 2.43 No No 18.6%
0 834 181,500 2015 2.99 2.44 No No 18.4%
0 835 181,500 2016 2.99 2.52 No No 15.7%
0 836 181,500 2016 2.99 2.49 No No 16.7%
0 837 181,500 2014 2.99 2.43 No No 18.7%
0 838 181,500 2015 2.99 2.46 No No 17.7%
0 839 181,500 2014 2.99 2.43 No No 18.6%
0 840 181,500 2015 2.99 2.43 No No 18.7%
0 841 181,500 2014 2.99 2.43 No No 18.7%
0 842 181,500 2015 2.99 2.49 No No 16.7%
0 843 181,500 2016 2.99 2.62 No No 12.4%
0 844 181,500 2016 2.99 2.52 No No 15.7%
0 845 181,500 2015 2.99 2.50 No No 16.4%
0 846 181,500 2014 2.99 2.49 No No 16.6%
0 847 181,500 2015 2.99 2.51 No No 16.1%
0 848 181,500 2016 2.99 2.65 No No 11.4%
0 849 181,500 2014 2.98 2.66 No No 10.7%
0 850 181,500 2014 2.98 2.72 No No 8.7%
0 851 181,500 2016 2.98 2.54 No No 14.8%
0 852 181,500 2016 2.98 2.60 No No 12.9%
0 853 181,500 2016 2.98 2.50 No No 16.1%
0 854 181,500 2015 2.98 2.54 No No 14.8%
0 855 182,500 2015 2.98 2.42 No No 18.8%
0 856 182,500 2015 2.98 2.42 No No 18.8%
0 857 182,500 2015 2.98 2.42 No No 18.8%
0 858 182,500 2015 2.97 2.46 No No 17.2%
0 859 182,500 2015 2.97 2.43 No No 18.2%
0 860 183,000 2015 2.97 2.39 No No 19.6%
0 861 183,000 2015 2.97 2.41 No No 18.9%
0 862 183,000 2016 2.97 2.44 No No 17.8%
0 863 183,000 2016 2.97 2.39 No No 19.5%
0 864 183,000 2015 2.97 2.40 No No 19.3%
0 865 183,000 2016 2.97 2.39 No No 19.5%
0 866 183,000 2016 2.97 2.43 No No 18.2%
0 867 183,000 2016 2.97 2.39 No No 19.5%
0 868 188,000 2014 2.93 2.42 No No 17.4%
0 869 188,000 2014 2.93 2.43 No No 17.1%
0 870 188,000 2014 2.93 2.42 No No 17.4%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 23

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 871 188,000 2014 2.93 2.43 No No 17.1%


0 872 188,000 2013 2.93 2.33 No No 20.5%
0 873 188,000 2016 2.93 2.33 No No 20.5%
0 874 205,500 2015 2.81 2.56 No No 8.9%
0 875 206,500 2013 2.81 2.58 No No 8.2%
0 876 207,000 2016 2.80 2.40 No No 14.3%
0 877 207,500 2015 2.80 2.26 No No 19.3%
0 878 207,500 2015 2.80 2.42 No No 13.6%
0 879 207,500 2014 2.80 2.36 No No 15.7%
0 880 207,500 2016 2.80 2.44 No No 12.9%
0 881 208,000 2014 2.80 2.36 No No 15.7%
0 882 208,000 2014 2.80 2.34 No No 16.4%
0 883 208,000 2014 2.80 2.24 No No 20.0%
0 884 208,000 2014 2.80 2.24 No No 20.0%
0 885 208,000 2015 2.80 2.23 No No 20.4%
0 886 208,000 2016 2.80 2.34 No No 16.4%
0 887 208,000 2017 2.80 2.34 No No 16.4%
0 888 208,000 2016 2.80 2.33 No No 16.8%
0 889 208,000 2017 2.80 2.36 No No 15.7%
0 890 208,000 2016 2.80 2.33 No No 16.8%
0 891 209,500 2016 2.79 2.18 No No 21.9%
0 892 209,500 2016 2.79 2.30 No No 17.6%
0 893 209,500 2016 2.79 2.14 No No 23.3%
0 894 209,500 2016 2.79 2.12 No No 24.0%
0 895 209,500 2016 2.79 2.13 No No 23.7%
0 896 209,500 2016 2.79 2.13 No No 23.7%
0 897 209,500 2016 2.79 2.15 No No 22.9%
0 898 209,500 2016 2.79 2.12 No No 24.0%
0 899 209,500 2015 2.79 2.12 No No 24.0%
0 900 209,500 2016 2.79 2.13 No No 23.7%
0 901 210,000 2016 2.79 2.15 No No 22.9%
0 902 210,000 2015 2.79 2.13 No No 23.7%
0 903 210,000 2015 2.79 2.11 No No 24.4%
0 904 210,000 2016 2.79 2.17 No No 22.1%
0 905 210,000 2014 2.78 2.17 No No 21.9%
0 906 210,000 2015 2.78 2.23 No No 19.8%
0 907 210,000 2015 2.78 2.19 No No 21.2%
0 908 210,000 2015 2.78 2.21 No No 20.5%
0 909 210,000 2015 2.78 2.19 No No 21.2%
0 910 211,500 2015 2.78 2.41 No No 13.3%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 24

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 911 211,500 2016 2.77 2.36 No No 14.8%


0 912 250,500 2014 2.56 2.12 No No 17.2%
0 913 250,500 2014 2.56 2.11 No No 17.6%
0 914 250,500 2014 2.56 2.10 No No 18.0%
0 915 250,500 2015 2.56 2.03 No No 20.5%
0 916 250,500 2015 2.56 2.05 No No 19.9%
0 917 262,500 2014 2.50 1.99 No No 20.7%
0 918 262,500 2014 2.50 1.97 No No 21.3%
0 919 262,500 2015 2.50 1.97 No No 21.2%
0 920 262,500 2015 2.50 1.99 No No 20.6%
0 921 263,000 2015 2.50 2.03 No No 18.8%
0 922 301,000 2015 2.34 1.94 No No 17.1%
1 923 82,000 2016 3.92 3.51 No No 10.5%
* Required EEDI value is calculated voluntarily.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 25

Table 2: EEDI database for gas carriers (125 ships: 19 ships for non-mandatory and 106 ships for Phase 0)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 1 3,500 2014 n/a 26.8 No No n/a


Non-mandatory 2 23,000 2013 11.5 10.6 No No 8.0%
Non-mandatory 3 23,000 2013 11.5 10.7 No No 6.9%
Non-mandatory 4 24,500 2015 11.2 8.69 No No 22.5%
Non-mandatory 5 24,500 2015 11.2 8.53 No No 24.0%
Non-mandatory 6 24,500 2014 11.2 8.55 No No 23.8%
Non-mandatory 7 29,000 2014 9.37 8.17 No No 12.8%
Non-mandatory 8 29,000 2014 9.37 8.15 No No 13.0%
Non-mandatory 9 29,000 2015 9.36 8.19 No No 12.5%
Non-mandatory 10 54,000 2015 7.82 4.63 No No 40.8%
Non-mandatory 11 54,000 2015 7.81 4.59 No No 41.2%
Non-mandatory 12 54,000 2015 7.81 4.61 No No 41.0%
Non-mandatory 13 54,000 2015 7.81 4.66 No No 40.3%
Non-mandatory 14 54,000 2015 7.81 4.58 No No 41.4%
Non-mandatory 15 54,000 2015 7.80 4.60 No No 41.0%
Non-mandatory 16 54,000 2015 7.80 4.71 No No 39.6%
Non-mandatory 17 54,000 2015 7.79 4.69 No No 39.8%
Non-mandatory 18 54,500 2014 7.76 5.87 No No 24.3%
Non-mandatory 19 96,500 2014 5.98 4.96 No No 17.1%
0 20 1,500 2015 n/a 49.2 No No n/a
0 21 3,500 2014 n/a 27.9 No No n/a
0 22 3,500 2014 n/a 26.4 No No n/a
0 23 3,500 2016 n/a 25.3 No No n/a
0 24 3,500 2015 n/a 25.4 No No n/a
0 25 3,500 2015 n/a 24.1 No No n/a
0 26 4,000 2014 n/a 23.8 No No n/a
0 27 4,000 2014 n/a 23.8 No No n/a
0 28 4,000 2014 n/a 23.4 No No n/a
0 29 4,000 2015 n/a 23.4 No No n/a
0 30 4,000 2015 n/a 23.5 No No n/a
0 31 4,000 2014 n/a 23.3 No No n/a
0 32 4,000 2014 n/a 23.0 No No n/a
0 33 4,000 2014 n/a 23.1 No No n/a
0 34 4,000 2015 n/a 22.2 No No n/a
0 35 4,000 2015 n/a 20.1 No No n/a

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 26

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 36 5,000 2014 n/a 22.6 No No n/a


0 37 5,000 2015 n/a 22.7 No No n/a
0 38 5,000 2015 n/a 22.7 No No n/a
0 39 5,000 2014 n/a 22.3 No No n/a
0 40 5,500 2015 n/a 20.2 No No n/a
0 41 5,500 2015 n/a 20.2 No No n/a
0 42 5,500 2015 n/a 19.9 No No n/a
0 43 5,500 2015 n/a 19.8 No No n/a
0 44 6,000 2014 n/a 21.0 No No n/a
0 45 6,000 2015 n/a 20.6 No No n/a
0 46 6,000 2014 n/a 20.6 No No n/a
0 47 6,000 2016 n/a 20.8 No No n/a
0 48 6,500 2015 n/a 22.4 No No n/a
0 49 6,500 2015 n/a 22.2 No No n/a
0 50 6,500 2014 n/a 22.4 No No n/a
0 51 9,000 2015 n/a 18.1 No No n/a
0 52 9,500 2016 n/a 18.0 No No n/a
0 53 15,500 2016 14.0 12.3 No No 12.1%
0 54 15,500 2015 14.0 12.4 No No 11.4%
0 55 15,500 2015 13.9 12.3 No No 11.5%
0 56 15,500 2015 13.9 12.4 No No 10.8%
0 57 15,500 2016 13.9 12.3 No No 11.5%
0 58 15,500 2015 13.9 13.1 No No 6.0%
0 59 15,500 2015 13.9 12.9 No No 7.1%
0 60 16,000 2016 13.6 8.06 No No 40.6%
0 61 17,000 2015 13.3 11.3 No No 15.4%
0 62 17,000 2015 13.3 11.1 No No 16.6%
0 63 17,500 2015 13.2 10.8 No No 17.8%
0 64 19,500 2015 7.76 5.93 No No 23.6%
0 65 21,000 2013 12.0 8.28 No No 31.0%
0 66 21,000 2016 12.0 8.28 No No 31.0%
0 67 21,000 2013 12.0 8.27 No No 31.1%
0 68 27,500 2016 10.7 8.48 No No 20.5%
0 69 28,500 2015 10.4 7.52 No No 28.0%
0 70 28,500 2015 10.4 7.40 No No 28.8%
0 71 28,500 2016 10.4 7.38 No No 29.0%
0 72 28,500 2016 10.4 7.67 No No 26.3%
0 73 29,500 2016 10.2 8.20 No No 19.6%
0 74 30,000 2015 10.3 8.10 No No 21.0%
0 75 43,000 2015 8.68 6.61 No No 23.8%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 27

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 76 49,500 2013 6.26 4.32 No No 31.0%


0 77 49,500 2013 6.26 4.35 No No 30.5%
0 78 50,000 2013 6.22 4.41 No No 29.1%
0 79 50,000 2013 6.22 4.34 No No 30.2%
0 80 52,000 2015 7.76 6.03 No No 22.3%
0 81 54,000 2016 7.81 4.66 No No 40.3%
0 82 54,000 2015 7.80 4.66 No No 40.3%
0 83 54,000 2016 7.79 6.27 No No 19.5%
0 84 54,000 2016 7.79 5.99 No No 23.1%
0 85 54,500 2016 7.77 6.20 No No 20.2%
0 86 54,500 2014 7.76 5.88 No No 24.2%
0 87 54,500 2015 7.76 5.96 No No 23.2%
0 88 54,500 2015 7.76 6.25 No No 19.5%
0 89 54,500 2014 7.76 5.69 No No 26.7%
0 90 54,500 2014 7.76 5.89 No No 24.1%
0 91 54,500 2016 7.76 5.97 No No 23.1%
0 92 54,500 2016 7.75 5.93 No No 23.5%
0 93 54,500 2015 7.75 5.90 No No 23.9%
0 94 55,000 2015 7.75 5.89 No No 24.0%
0 95 55,000 2015 7.75 5.88 No No 24.1%
0 96 55,000 2015 7.75 6.06 No No 21.8%
0 97 55,000 2015 7.75 5.91 No No 23.7%
0 98 55,000 2015 7.75 5.77 No No 25.6%
0 99 55,000 2015 7.75 6.01 No No 22.5%
0 100 55,000 2016 7.75 5.96 No No 23.1%
0 101 55,000 2016 7.75 6.06 No No 21.8%
0 102 55,000 2016 7.75 5.95 No No 23.2%
0 103 55,000 2015 7.75 5.87 No No 24.3%
0 104 55,000 2015 7.75 6.00 No No 22.6%
0 105 55,000 2015 7.75 5.92 No No 23.6%
0 106 55,000 2015 7.75 5.72 No No 26.2%
0 107 55,000 2016 7.74 5.82 No No 24.8%
0 108 55,000 2015 7.75 5.94 No No 23.4%
0 109 55,000 2016 7.75 5.83 No No 24.8%
0 110 55,000 2015 7.75 5.91 No No 23.7%
0 111 55,000 2015 7.74 5.83 No No 24.7%
0 112 55,000 2016 7.74 5.91 No No 23.6%
0 113 55,000 2015 7.74 5.78 No No 25.3%
0 114 55,000 2016 7.74 5.76 No No 25.6%
0 115 55,000 2016 7.74 5.93 No No 23.4%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 28

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 116 55,000 2014 7.74 6.31 No No 18.5%


0 117 55,000 2016 7.74 5.94 No No 23.3%
0 118 55,000 2016 7.74 5.85 No No 24.4%
0 119 55,000 2016 7.74 5.86 No No 24.3%
0 120 55,000 2016 7.73 5.80 No No 25.0%
0 121 96,500 2015 5.98 4.96 No No 17.1%
0 122 96,500 2016 5.98 5.10 No No 14.7%
0 123 96,500 2015 5.98 4.96 No No 17.1%
0 124 99,000 2015 5.07 4.19 No No 17.4%
0 125 99,500 2016 5.07 4.19 No No 17.4%
* Required EEDI value is calculated voluntarily.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 29

Table 3: EEDI database for tankers (518 ships: 152 ships for non-mandatory, 360 ships for Phase 0 and 6 ships for Phase 1)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 1 3,500 2015 n/a 22.1 No No n/a


Non-mandatory 2 18,000 2013 10.3 8.42 No No 18.0%
Non-mandatory 3 46,500 2010 6.46 5.76 No No 10.8%
Non-mandatory 4 47,000 2014 6.22 4.35 No No 30.1%
Non-mandatory 5 47,500 2011 6.38 5.67 No No 11.2%
Non-mandatory 6 47,500 2011 6.38 5.65 No No 11.5%
Non-mandatory 7 47,500 2011 6.38 5.64 No No 11.6%
Non-mandatory 8 50,000 2014 6.22 4.58 No No 26.4%
Non-mandatory 9 50,000 2014 6.22 4.47 No No 28.2%
Non-mandatory 10 50,000 2014 6.22 4.37 No No 29.7%
Non-mandatory 11 50,000 2014 6.22 4.43 No No 28.8%
Non-mandatory 12 50,000 2014 6.22 4.45 No No 28.5%
Non-mandatory 13 50,000 2014 6.22 4.45 No No 28.6%
Non-mandatory 14 50,000 2014 6.22 4.40 No No 29.3%
Non-mandatory 15 50,000 2015 6.22 4.36 No No 29.9%
Non-mandatory 16 50,000 2015 6.22 4.30 No No 30.9%
Non-mandatory 17 50,000 2015 6.22 4.34 No No 30.2%
Non-mandatory 18 50,000 2012 6.21 5.27 No No 15.1%
Non-mandatory 19 50,000 2012 6.21 5.24 No No 15.6%
Non-mandatory 20 50,000 2012 6.21 5.19 No No 16.3%
Non-mandatory 21 50,000 2012 6.21 5.26 No No 15.3%
Non-mandatory 22 50,000 2012 6.21 5.20 No No 16.2%
Non-mandatory 23 50,000 2013 6.21 5.19 No No 16.4%
Non-mandatory 24 50,000 2013 6.21 4.79 No No 22.8%
Non-mandatory 25 50,000 2013 6.21 4.88 No No 21.4%
Non-mandatory 26 50,000 2013 6.21 5.23 No No 15.7%
Non-mandatory 27 50,000 2013 6.21 5.26 No No 15.3%
Non-mandatory 28 50,000 2013 6.21 5.26 No No 15.3%
Non-mandatory 29 50,000 2013 6.21 5.26 No No 15.3%
Non-mandatory 30 50,000 2014 6.21 4.81 No No 22.5%
Non-mandatory 31 50,000 2014 6.21 4.82 No No 22.4%
Non-mandatory 32 50,000 2014 6.21 4.81 No No 22.5%
Non-mandatory 33 50,000 2014 6.21 4.56 No No 26.5%
Non-mandatory 34 50,000 2014 6.21 4.53 No No 27.0%
Non-mandatory 35 50,000 2014 6.21 4.29 No No 31.0%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 30

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 36 50,000 2014 6.21 4.31 No No 30.6%


Non-mandatory 37 50,000 2014 6.21 4.31 No No 30.6%
Non-mandatory 38 50,000 2014 6.21 4.47 No No 28.0%
Non-mandatory 39 50,000 2014 6.21 4.58 No No 26.2%
Non-mandatory 40 50,000 2014 6.21 4.49 No No 27.7%
Non-mandatory 41 50,000 2014 6.21 4.31 No No 30.6%
Non-mandatory 42 50,000 2014 6.21 4.31 No No 30.6%
Non-mandatory 43 50,000 2014 6.21 4.23 No No 31.9%
Non-mandatory 44 50,000 2014 6.21 4.49 No No 27.7%
Non-mandatory 45 50,000 2014 6.21 4.51 No No 27.4%
Non-mandatory 46 50,000 2014 6.21 4.53 No No 27.1%
Non-mandatory 47 50,000 2015 6.21 5.15 No No 17.1%
Non-mandatory 48 50,000 2015 6.21 4.16 No No 33.0%
Non-mandatory 49 50,000 2015 6.21 5.12 No No 17.6%
Non-mandatory 50 50,000 2015 6.21 4.19 No No 32.5%
Non-mandatory 51 50,000 2014 6.21 4.30 No No 30.8%
Non-mandatory 52 50,000 2013 6.21 5.38 No No 13.3%
Non-mandatory 53 50,000 2014 6.21 4.88 No No 21.4%
Non-mandatory 54 50,000 2014 6.21 4.85 No No 21.8%
Non-mandatory 55 50,000 2013 6.21 5.38 No No 13.3%
Non-mandatory 56 50,000 2013 6.21 4.20 No No 32.4%
Non-mandatory 57 50,000 2014 6.21 4.18 No No 32.6%
Non-mandatory 58 50,000 2014 6.21 4.12 No No 33.5%
Non-mandatory 59 50,000 2014 6.21 4.22 No No 32.1%
Non-mandatory 60 50,000 2014 6.21 4.25 No No 31.4%
Non-mandatory 61 50,000 2014 6.21 4.16 No No 33.0%
Non-mandatory 62 50,000 2014 6.21 4.22 No No 32.0%
Non-mandatory 63 50,000 2014 6.21 4.24 No No 31.7%
Non-mandatory 64 50,000 2014 6.21 4.09 No No 34.0%
Non-mandatory 65 50,000 2014 6.21 4.09 No No 34.0%
Non-mandatory 66 50,000 2012 6.21 5.66 No No 8.9%
Non-mandatory 67 50,000 2013 6.21 5.70 No No 8.2%
Non-mandatory 68 50,500 2013 6.21 5.75 No No 7.4%
Non-mandatory 69 50,500 2013 6.21 5.66 No No 8.9%
Non-mandatory 70 51,000 2013 6.17 5.31 No No 13.9%
Non-mandatory 71 51,000 2013 6.17 5.39 No No 12.6%
Non-mandatory 72 51,000 2013 6.17 5.39 No No 12.6%
Non-mandatory 73 51,000 2013 6.17 5.36 No No 13.2%
Non-mandatory 74 51,000 2014 6.16 4.35 No No 29.4%
Non-mandatory 75 51,000 2014 6.16 4.33 No No 29.6%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 31

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 76 51,500 2013 6.12 4.93 No No 19.4%


Non-mandatory 77 52,000 2013 6.11 4.78 No No 21.8%
Non-mandatory 78 52,000 2013 6.11 4.86 No No 20.5%
Non-mandatory 79 52,000 2012 6.10 4.85 No No 20.6%
Non-mandatory 80 52,000 2012 6.10 5.62 No No 8.0%
Non-mandatory 81 72,500 2014 5.18 4.23 No No 18.4%
Non-mandatory 82 72,500 2014 5.18 4.28 No No 17.4%
Non-mandatory 83 75,000 2011 5.11 4.35 No No 14.9%
Non-mandatory 84 75,000 2011 5.11 4.36 No No 14.7%
Non-mandatory 85 75,000 2011 5.11 4.33 No No 15.3%
Non-mandatory 86 75,000 2011 5.11 4.35 No No 14.8%
Non-mandatory 87 75,000 2012 5.11 4.28 No No 16.2%
Non-mandatory 88 75,000 2011 5.11 4.30 No No 15.7%
Non-mandatory 89 75,000 2012 5.11 4.28 No No 16.3%
Non-mandatory 90 75,000 2011 5.11 4.26 No No 16.5%
Non-mandatory 91 75,000 2013 5.10 4.50 No No 11.6%
Non-mandatory 92 75,000 2012 5.09 4.45 No No 12.6%
Non-mandatory 93 75,000 2013 5.09 4.40 No No 13.6%
Non-mandatory 94 75,000 2013 5.09 4.48 No No 12.1%
Non-mandatory 95 104,500 2012 4.33 3.75 No No 13.3%
Non-mandatory 96 105,000 2012 4.33 3.69 No No 14.7%
Non-mandatory 97 105,000 2012 4.33 3.71 No No 14.4%
Non-mandatory 98 105,500 2012 4.32 4.07 No No 5.6%
Non-mandatory 99 105,500 2012 4.32 3.30 No No 23.5%
Non-mandatory 100 105,500 2012 4.32 3.30 No No 23.5%
Non-mandatory 101 105,500 2012 4.32 4.07 No No 5.7%
Non-mandatory 102 105,500 2011 4.32 3.96 No No 8.3%
Non-mandatory 103 106,000 2013 4.31 3.70 No No 14.2%
Non-mandatory 104 106,000 2013 4.31 3.68 No No 14.6%
Non-mandatory 105 106,000 2013 4.31 3.68 No No 14.5%
Non-mandatory 106 112,500 2012 4.18 3.85 No No 8.0%
Non-mandatory 107 115,500 2015 4.13 3.37 No No 18.4%
Non-mandatory 108 115,500 2014 4.13 3.37 No No 18.4%
Non-mandatory 109 115,500 2014 4.13 3.69 No No 10.7%
Non-mandatory 110 116,000 2012 4.12 3.73 No No 9.4%
Non-mandatory 111 116,000 2011 4.12 3.60 No No 12.7%
Non-mandatory 112 116,000 2012 4.12 3.60 No No 12.7%
Non-mandatory 113 116,000 2012 4.12 3.59 No No 12.9%
Non-mandatory 114 116,000 2012 4.12 3.59 No No 13.0%
Non-mandatory 115 116,000 2012 4.12 3.59 No No 12.9%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 32

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 116 118,500 2013 4.08 3.49 No No 14.6%


Non-mandatory 117 118,500 2013 4.08 3.49 No No 14.4%
Non-mandatory 118 122,500 2012 4.02 3.48 No No 13.2%
Non-mandatory 119 122,500 2012 4.02 3.55 No No 11.6%
Non-mandatory 120 150,000 2012 3.63 3.12 No No 14.1%
Non-mandatory 121 154,500 2013 3.58 2.75 No No 23.3%
Non-mandatory 122 154,500 2013 3.58 2.77 No No 22.8%
Non-mandatory 123 154,500 2013 3.58 2.73 No No 23.9%
Non-mandatory 124 154,500 2013 3.58 2.73 No No 23.7%
Non-mandatory 125 156,500 2013 3.56 3.10 No No 12.8%
Non-mandatory 126 158,000 2012 3.54 3.16 No No 10.9%
Non-mandatory 127 158,000 2011 3.54 3.06 No No 13.7%
Non-mandatory 128 158,000 2011 3.54 3.29 No No 7.0%
Non-mandatory 129 158,000 2012 3.54 3.29 No No 7.1%
Non-mandatory 130 158,000 2012 3.54 3.33 No No 6.1%
Non-mandatory 131 158,000 2012 3.54 3.04 No No 14.2%
Non-mandatory 132 158,000 2013 3.54 3.04 No No 14.3%
Non-mandatory 133 158,000 2013 3.54 3.04 No No 14.3%
Non-mandatory 134 158,000 2013 3.54 3.03 No No 14.5%
Non-mandatory 135 158,000 2012 3.54 3.02 No No 14.7%
Non-mandatory 136 158,000 2012 3.54 3.01 No No 15.0%
Non-mandatory 137 158,000 2012 3.54 3.00 No No 15.2%
Non-mandatory 138 158,000 2012 3.54 3.04 No No 14.1%
Non-mandatory 139 158,000 2011 3.54 3.06 No No 13.7%
Non-mandatory 140 159,000 2012 3.53 3.30 No No 6.8%
Non-mandatory 141 159,000 2012 3.53 3.43 No No 2.9%
Non-mandatory 142 159,500 2012 3.53 3.41 No No 3.4%
Non-mandatory 143 319,000 2011 2.51 2.64 No No -4.9%
Non-mandatory 144 319,500 2013 2.51 2.39 No No 5.0%
Non-mandatory 145 319,500 2013 2.51 2.36 No No 6.0%
Non-mandatory 146 319,500 2012 2.51 2.44 No No 2.7%
Non-mandatory 147 319,500 2013 2.51 2.12 No No 15.6%
Non-mandatory 148 320,500 2013 2.51 2.09 No No 16.9%
Non-mandatory 149 320,500 2013 2.51 2.31 No No 7.9%
Non-mandatory 150 320,500 2013 2.51 2.09 No No 16.8%
Non-mandatory 151 320,500 2012 2.51 2.33 No No 6.9%
Non-mandatory 152 320,500 2013 2.51 2.33 No No 6.9%
0 153 1,000 2014 n/a 64.7 No No n/a
0 154 1,000 2015 n/a 64.8 No No n/a
0 155 1,000 2015 n/a 64.7 No No n/a

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 33

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 156 2,000 2014 n/a 40.9 No No n/a


0 157 2,000 2016 n/a 33.7 No No n/a
0 158 2,500 2016 n/a 31.6 No No n/a
0 159 2,500 2015 n/a 31.6 No No n/a
0 160 2,500 2015 n/a 35.4 No No n/a
0 161 3,000 2014 n/a 48.2 No No n/a
0 162 3,000 2016 n/a 24.9 No No n/a
0 163 3,500 2016 n/a 21.8 No No n/a
0 164 4,000 2016 n/a 22.1 No No n/a
0 165 4,000 2016 n/a 23.1 No No n/a
0 166 4,000 2015 n/a 23.0 No No n/a
0 167 4,000 2015 n/a 23.5 No No n/a
0 168 4,000 2015 n/a 23.1 No No n/a
0 169 4,500 2014 n/a 20.0 No No n/a
0 170 4,500 2015 n/a 18.2 No No n/a
0 171 4,500 2015 n/a 19.0 No No n/a
0 172 4,500 2013 n/a 19.8 No No n/a
0 173 4,500 2013 n/a 19.5 No No n/a
0 174 4,500 2014 n/a 20.0 No No n/a
0 175 5,500 2013 n/a 16.8 No No n/a
0 176 5,500 2014 n/a 16.8 No No n/a
0 177 6,500 2015 n/a 15.1 No No n/a
0 178 7,000 2014 n/a 14.0 No No n/a
0 179 8,000 2015 n/a 14.5 No No n/a
0 180 8,000 2015 n/a 14.5 No No n/a
0 181 8,000 2014 n/a 13.3 No No n/a
0 182 9,000 2014 n/a 13.9 No No n/a
0 183 9,000 2016 n/a 14.8 No No n/a
0 184 9,000 2014 n/a 14.2 No No n/a
0 185 9,000 2014 n/a 14.1 No No n/a
0 186 10,000 2016 n/a 12.1 No No n/a
0 187 12,000 2016 n/a 10.1 No No n/a
0 188 12,000 2014 n/a 9.73 No No n/a
0 189 12,500 2016 n/a 10.5 No No n/a
0 190 12,500 2015 n/a 10.8 No No n/a
0 191 12,500 2015 n/a 10.9 No No n/a
0 192 12,500 2015 n/a 10.6 No No n/a
0 193 13,000 2016 n/a 10.0 No No n/a
0 194 13,000 2014 n/a 13.3 No No n/a
0 195 13,000 2016 n/a 10.9 No No n/a

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 34

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 196 13,000 2016 n/a 11.4 No No n/a


0 197 13,000 2016 n/a 9.08 No No n/a
0 198 13,500 2014 n/a 10.5 No No n/a
0 199 14,500 2015 n/a 10.5 No No n/a
0 200 16,500 2015 n/a 8.46 No No n/a
0 201 16,500 2015 n/a 8.44 No No n/a
0 202 16,500 2015 n/a 8.50 No No n/a
0 203 16,500 2015 n/a 9.25 No No n/a
0 204 16,500 2016 n/a 9.04 No No n/a
0 205 17,000 2015 n/a 8.49 No No n/a
0 206 17,500 2015 n/a 7.54 No No n/a
0 207 18,000 2014 n/a 7.49 No No n/a
0 208 19,000 2014 n/a 8.86 No No n/a
0 209 20,000 2015 n/a 6.94 No No n/a
0 210 20,000 2015 n/a 7.17 No No n/a
0 211 20,000 2016 n/a 7.09 No No n/a
0 212 20,000 2016 n/a 7.19 No No n/a
0 213 20,000 2016 n/a 7.29 No No n/a
0 214 20,000 2014 n/a 7.46 No No n/a
0 215 20,000 2014 n/a 7.99 No No n/a
0 216 20,000 2016 n/a 7.37 No No n/a
0 217 20,000 2015 n/a 7.42 No No n/a
0 218 20,000 2015 n/a 7.41 No No n/a
0 219 20,000 2015 n/a 6.88 No No n/a
0 220 20,000 2016 n/a 7.26 No No n/a
0 221 20,000 2016 n/a 7.02 No No n/a
0 222 20,000 2014 n/a 7.42 No No n/a
0 223 20,000 2015 n/a 7.29 No No n/a
0 224 20,000 2015 n/a 7.23 No No n/a
0 225 20,000 2016 n/a 6.81 No No n/a
0 226 20,000 2016 n/a 7.14 No No n/a
0 227 20,000 2016 n/a 6.97 No No n/a
0 228 20,000 2015 n/a 7.32 No No n/a
0 229 20,000 2015 n/a 7.22 No No n/a
0 230 22,500 2015 9.18 6.94 No No 24.4%
0 231 22,500 2016 9.18 6.91 No No 24.7%
0 232 22,500 2015 9.18 7.27 No No 20.8%
0 233 22,500 2016 9.18 6.77 No No 26.3%
0 234 22,500 2015 9.18 6.81 No No 25.8%
0 235 25,500 2016 8.68 5.71 No No 34.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 35

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 236 25,500 2016 8.68 5.74 No No 33.9%


0 237 25,500 2016 8.67 6.05 No No 30.2%
0 238 25,500 2015 8.67 6.68 No No 23.0%
0 239 25,500 2015 8.67 6.84 No No 21.1%
0 240 25,500 2015 8.67 6.82 No No 21.3%
0 241 25,500 2015 8.67 6.63 No No 23.5%
0 242 26,500 2016 8.53 6.44 No No 24.5%
0 243 31,000 2015 7.87 5.84 No No 25.8%
0 244 31,000 2015 7.84 5.63 No No 28.2%
0 245 34,000 2016 7.49 5.51 No No 26.4%
0 246 36,000 2015 7.30 5.02 No No 31.2%
0 247 36,000 2016 7.30 5.42 No No 25.8%
0 248 36,500 2016 7.28 5.55 No No 23.8%
0 249 36,500 2016 7.32 5.53 No No 24.5%
0 250 37,000 2013 7.19 5.30 No No 26.3%
0 251 38,000 2015 7.13 5.15 No No 27.8%
0 252 38,000 2015 7.13 5.27 No No 26.1%
0 253 38,000 2015 7.13 5.15 No No 27.8%
0 254 38,000 2015 7.13 5.21 No No 26.9%
0 255 38,000 2015 7.13 5.19 No No 27.2%
0 256 38,000 2015 7.13 5.19 No No 27.2%
0 257 38,000 2015 7.13 5.15 No No 27.8%
0 258 38,000 2015 7.13 5.18 No No 27.3%
0 259 38,000 2015 7.13 5.16 No No 27.6%
0 260 38,000 2015 7.13 5.14 No No 27.9%
0 261 38,000 2015 7.13 5.20 No No 27.1%
0 262 38,000 2015 7.13 5.16 No No 27.6%
0 263 38,000 2015 7.13 5.15 No No 27.8%
0 264 38,000 2015 7.13 5.15 No No 27.8%
0 265 38,000 2015 7.13 5.15 No No 27.8%
0 266 38,000 2015 7.13 5.12 No No 28.2%
0 267 38,000 2016 7.13 5.18 No No 27.3%
0 268 38,000 2015 7.12 5.10 No No 28.4%
0 269 38,000 2015 7.12 5.04 No No 29.2%
0 270 39,000 2014 7.03 5.73 No No 18.5%
0 271 39,000 2014 7.03 5.73 No No 18.5%
0 272 39,000 2014 7.03 5.78 No No 17.8%
0 273 39,000 2014 7.03 5.68 No No 19.2%
0 274 39,000 2014 7.03 5.73 No No 18.5%
0 275 39,000 2014 7.03 5.73 No No 18.5%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 36

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 276 39,000 2014 7.03 5.70 No No 18.9%


0 277 39,000 2014 7.03 5.68 No No 19.2%
0 278 39,000 2014 7.03 5.69 No No 19.1%
0 279 39,000 2014 7.03 5.73 No No 18.5%
0 280 39,000 2014 7.03 5.73 No No 18.5%
0 281 39,000 2014 7.03 5.73 No No 18.5%
0 282 39,000 2014 7.03 5.74 No No 18.3%
0 283 39,000 2014 7.03 5.64 No No 19.8%
0 284 39,500 2015 7.00 5.09 No No 27.3%
0 285 39,500 2015 7.00 4.73 No No 32.4%
0 286 39,500 2015 7.00 4.76 No No 32.0%
0 287 39,500 2015 7.00 4.79 No No 31.6%
0 288 39,500 2015 7.00 4.92 No No 29.7%
0 289 39,500 2015 7.00 4.81 No No 31.3%
0 290 39,500 2016 7.00 4.86 No No 30.6%
0 291 39,500 2013 7.00 4.81 No No 31.3%
0 292 39,500 2016 7.00 4.72 No No 32.6%
0 293 39,500 2015 6.99 5.12 No No 26.8%
0 294 39,500 2016 6.99 5.12 No No 26.8%
0 295 40,000 2014 6.93 5.36 No No 22.7%
0 296 40,000 2014 6.92 5.30 No No 23.4%
0 297 41,000 2016 6.87 5.74 No No 16.4%
0 298 41,000 2016 6.87 5.77 No No 16.0%
0 299 45,000 2015 6.53 4.11 No No 37.1%
0 300 46,000 2016 6.47 4.25 No No 34.3%
0 301 46,000 2015 6.47 4.33 No No 33.1%
0 302 46,000 2015 6.47 4.22 No No 34.8%
0 303 46,000 2016 6.47 4.22 No No 34.8%
0 304 46,000 2016 6.47 4.26 No No 34.2%
0 305 46,000 2015 6.21 4.11 No No 33.8%
0 306 46,000 2016 6.46 5.05 No No 21.8%
0 307 46,000 2016 6.46 4.97 No No 23.1%
0 308 49,500 2016 6.26 4.17 No No 33.4%
0 309 49,500 2015 6.26 4.16 No No 33.5%
0 310 49,500 2016 6.26 4.16 No No 33.5%
0 311 50,000 2016 6.24 4.24 No No 32.1%
0 312 50,000 2014 6.23 4.36 No No 30.0%
0 313 50,000 2015 6.23 4.39 No No 29.5%
0 314 50,000 2015 6.23 4.32 No No 30.7%
0 315 50,000 2015 6.23 4.31 No No 30.8%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 37

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 316 50,000 2015 6.23 4.32 No No 30.7%


0 317 50,000 2015 6.23 4.29 No No 31.1%
0 318 50,000 2015 6.21 4.34 No No 30.1%
0 319 50,000 2013 6.23 4.37 No No 29.9%
0 320 50,000 2016 6.23 4.31 No No 30.8%
0 321 50,000 2015 6.23 4.47 No No 28.3%
0 322 50,000 2015 6.23 4.56 No No 26.8%
0 323 50,000 2016 6.23 4.14 No No 33.5%
0 324 50,000 2016 6.23 4.77 No No 23.4%
0 325 50,000 2016 6.22 4.37 No No 29.7%
0 326 50,000 2015 6.22 4.67 No No 24.9%
0 327 50,000 2016 6.22 4.32 No No 30.5%
0 328 50,000 2016 6.22 4.13 No No 33.6%
0 329 50,000 2015 6.22 4.38 No No 29.6%
0 330 50,000 2014 6.22 4.85 No No 22.0%
0 331 50,000 2015 6.22 4.37 No No 29.7%
0 332 50,000 2013 6.22 4.40 No No 29.3%
0 333 50,000 2015 6.22 4.34 No No 30.2%
0 334 50,000 2015 6.22 4.14 No No 33.4%
0 335 50,000 2015 6.22 4.19 No No 32.6%
0 336 50,000 2015 6.22 4.11 No No 33.9%
0 337 50,000 2016 6.22 4.07 No No 34.6%
0 338 50,000 2016 6.22 4.07 No No 34.6%
0 339 50,000 2016 6.22 4.08 No No 34.4%
0 340 50,000 2015 6.22 4.15 No No 33.3%
0 341 50,000 2015 6.22 4.10 No No 34.1%
0 342 50,000 2016 6.22 4.02 No No 35.4%
0 343 50,000 2016 6.21 4.35 No No 30.0%
0 344 50,000 2016 6.21 4.30 No No 30.8%
0 345 50,000 2016 6.21 4.35 No No 30.0%
0 346 50,000 2016 6.21 4.31 No No 30.6%
0 347 50,000 2016 6.20 4.12 No No 33.5%
0 348 50,000 2014 6.21 4.18 No No 32.7%
0 349 50,000 2014 6.21 4.18 No No 32.7%
0 350 50,000 2015 6.21 4.19 No No 32.5%
0 351 50,000 2015 6.21 5.17 No No 16.7%
0 352 50,000 2015 6.21 4.14 No No 33.3%
0 353 50,000 2015 6.21 4.50 No No 27.5%
0 354 50,000 2015 6.21 4.46 No No 28.2%
0 355 50,000 2015 6.21 4.51 No No 27.4%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 38

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 356 50,000 2015 6.21 5.06 No No 18.5%


0 357 50,000 2015 6.21 5.16 No No 16.9%
0 358 50,000 2015 6.21 4.44 No No 28.5%
0 359 50,000 2015 6.21 4.45 No No 28.3%
0 360 50,000 2015 6.21 4.19 No No 32.5%
0 361 50,000 2015 6.21 4.20 No No 32.4%
0 362 50,000 2015 6.21 4.22 No No 32.0%
0 363 50,000 2016 6.21 4.20 No No 32.4%
0 364 50,000 2016 6.21 4.20 No No 32.4%
0 365 50,000 2016 6.21 4.19 No No 32.5%
0 366 50,000 2016 6.21 4.34 No No 30.1%
0 367 50,000 2015 6.20 4.11 No No 33.7%
0 368 50,000 2015 6.20 4.12 No No 33.5%
0 369 50,000 2015 6.21 4.19 No No 32.5%
0 370 50,000 2015 6.21 4.15 No No 33.2%
0 371 50,000 2015 6.21 4.04 No No 34.9%
0 372 50,000 2014 6.21 4.43 No No 28.7%
0 373 50,000 2013 6.21 4.12 No No 33.6%
0 374 50,000 2014 6.21 4.34 No No 30.0%
0 375 50,000 2015 6.21 4.34 No No 30.1%
0 376 50,000 2015 6.21 4.36 No No 29.8%
0 377 50,000 2015 6.21 4.43 No No 28.6%
0 378 50,000 2015 6.21 4.80 No No 22.7%
0 379 50,000 2015 6.21 4.09 No No 34.1%
0 380 50,000 2015 6.21 4.09 No No 34.1%
0 381 50,000 2015 6.21 4.18 No No 32.7%
0 382 50,000 2015 6.21 4.11 No No 33.8%
0 383 50,000 2015 6.21 4.23 No No 31.9%
0 384 50,000 2015 6.21 4.16 No No 33.0%
0 385 50,000 2015 6.21 4.22 No No 32.0%
0 386 50,000 2015 6.21 4.15 No No 33.2%
0 387 50,000 2015 6.21 4.19 No No 32.5%
0 388 50,000 2015 6.21 4.11 No No 33.8%
0 389 50,000 2016 6.21 4.07 No No 34.5%
0 390 50,500 2015 6.20 4.12 No No 33.5%
0 391 50,500 2016 6.20 4.26 No No 31.3%
0 392 50,500 2015 6.20 4.07 No No 34.4%
0 393 50,500 2015 6.20 4.02 No No 35.2%
0 394 50,500 2015 6.20 4.13 No No 33.4%
0 395 50,500 2014 6.20 4.30 No No 30.6%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 39

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 396 50,500 2014 6.20 4.26 No No 31.3%


0 397 50,500 2014 6.20 4.30 No No 30.6%
0 398 50,500 2015 6.20 4.27 No No 31.1%
0 399 50,500 2015 6.19 4.27 No No 31.0%
0 400 50,500 2015 6.20 4.11 No No 33.7%
0 401 50,500 2014 6.20 4.31 No No 30.5%
0 402 50,500 2014 4.13 2.81 No No 32.0%
0 403 50,500 2014 6.20 4.31 No No 30.5%
0 404 50,500 2014 6.20 4.31 No No 30.5%
0 405 50,500 2014 6.20 4.32 No No 30.2%
0 406 50,500 2015 6.19 4.28 No No 30.9%
0 407 50,500 2015 6.20 4.12 No No 33.5%
0 408 50,500 2015 6.20 4.09 No No 34.0%
0 409 50,500 2015 6.20 4.26 No No 31.2%
0 410 50,500 2015 6.20 4.26 No No 31.3%
0 411 50,500 2015 6.18 4.75 No No 23.2%
0 412 51,500 2012 6.12 4.88 No No 20.3%
0 413 51,500 2016 6.12 4.54 No No 25.8%
0 414 52,000 2013 6.12 4.93 No No 19.4%
0 415 52,000 2016 6.11 4.37 No No 28.5%
0 416 54,500 2015 6.21 4.19 No No 32.5%
0 417 54,500 2014 6.20 4.26 No No 31.2%
0 418 74,500 2016 5.11 3.80 No No 25.6%
0 419 75,000 2015 5.11 3.87 No No 24.3%
0 420 75,000 2016 5.11 3.83 No No 25.0%
0 421 75,000 2016 5.10 3.88 No No 23.9%
0 422 75,000 2016 5.10 3.84 No No 24.7%
0 423 75,000 2016 5.10 3.88 No No 23.9%
0 424 75,000 2016 5.10 3.86 No No 24.3%
0 425 75,000 2016 5.10 3.79 No No 25.7%
0 426 105,500 2015 4.32 3.50 No No 19.0%
0 427 105,500 2015 4.32 3.50 No No 19.0%
0 428 106,500 2016 4.30 3.32 No No 22.8%
0 429 106,500 2016 4.30 3.29 No No 23.5%
0 430 106,500 2015 4.29 3.17 No No 26.1%
0 431 109,500 2016 4.23 3.07 No No 27.4%
0 432 110,000 2016 4.23 3.15 No No 25.5%
0 433 110,000 2016 4.23 3.14 No No 25.8%
0 434 110,000 2015 4.22 3.22 No No 23.7%
0 435 110,000 2016 4.22 3.22 No No 23.7%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 40

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 436 110,000 2015 4.22 2.73 No No 35.3%


0 437 110,000 2015 4.13 2.80 No No 32.2%
0 438 110,000 2015 4.22 2.58 No No 38.9%
0 439 110,000 2015 4.22 2.63 No No 37.7%
0 440 110,000 2015 4.22 3.11 No No 26.3%
0 441 110,000 2015 4.22 3.11 No No 26.3%
0 442 110,000 2015 4.22 3.08 No No 27.0%
0 443 110,000 2015 4.22 3.08 No No 27.0%
0 444 110,000 2016 4.22 3.06 No No 27.5%
0 445 110,000 2016 4.22 3.01 No No 28.7%
0 446 110,000 2016 4.22 3.11 No No 26.3%
0 447 110,000 2016 4.22 3.10 No No 26.5%
0 448 110,000 2016 4.22 3.10 No No 26.5%
0 449 110,000 2016 4.22 3.10 No No 26.5%
0 450 110,000 2016 4.22 3.10 No No 26.5%
0 451 113,000 2016 4.17 3.03 No No 27.3%
0 452 113,000 2016 4.17 3.03 No No 27.3%
0 453 113,500 2014 4.17 3.04 No No 27.1%
0 454 113,500 2014 4.17 3.07 No No 26.4%
0 455 113,500 2014 4.17 3.04 No No 27.1%
0 456 113,500 2014 4.17 3.08 No No 26.1%
0 457 113,500 2014 4.17 3.08 No No 26.1%
0 458 113,500 2015 4.17 3.05 No No 26.9%
0 459 113,500 2015 4.17 3.05 No No 26.9%
0 460 113,500 2015 4.17 3.08 No No 26.1%
0 461 113,500 2015 4.17 3.04 No No 27.1%
0 462 114,000 2014 4.16 2.96 No No 28.9%
0 463 114,000 2014 4.15 2.88 No No 30.6%
0 464 114,000 2014 4.15 2.88 No No 30.6%
0 465 114,000 2015 4.15 2.86 No No 31.1%
0 466 114,000 2015 4.15 2.89 No No 30.4%
0 467 114,500 2014 4.15 2.91 No No 29.9%
0 468 115,000 2016 4.14 3.18 No No 23.2%
0 469 115,000 2016 4.14 3.12 No No 24.6%
0 470 115,000 2016 4.14 3.08 No No 25.6%
0 471 115,000 2014 4.13 2.94 No No 28.8%
0 472 115,000 2015 4.13 2.81 No No 32.0%
0 473 115,000 2015 4.13 2.88 No No 30.3%
0 474 115,000 2014 4.13 2.95 No No 28.6%
0 475 115,500 2015 4.13 3.37 No No 18.4%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 41

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 476 115,500 2015 4.13 2.88 No No 30.2%


0 477 115,500 2014 4.13 2.81 No No 32.0%
0 478 150,000 2016 3.63 3.00 No No 17.4%
0 479 150,000 2016 3.63 3.02 No No 16.8%
0 480 157,500 2015 3.55 2.85 No No 19.7%
0 481 157,500 2015 3.55 2.85 No No 19.7%
0 482 159,000 2016 3.53 2.70 No No 23.5%
0 483 159,000 2016 3.53 2.67 No No 24.4%
0 484 159,000 2016 3.53 2.85 No No 19.3%
0 485 159,000 2016 3.53 2.88 No No 18.4%
0 486 299,500 2016 2.59 2.18 No No 15.8%
0 487 299,500 2016 2.59 2.21 No No 14.7%
0 488 300,000 2016 2.59 2.20 No No 15.1%
0 489 300,000 2015 2.59 2.19 No No 15.4%
0 490 300,000 2016 2.59 2.20 No No 15.1%
0 491 300,000 2015 2.59 2.20 No No 15.1%
0 492 300,500 2016 2.59 2.16 No No 16.6%
0 493 301,000 2016 2.58 2.10 No No 18.6%
0 494 301,000 2015 2.59 2.11 No No 18.5%
0 495 301,500 2016 2.58 2.09 No No 19.0%
0 496 303,000 2016 2.58 2.08 No No 19.4%
0 497 308,500 2014 2.56 2.20 No No 13.9%
0 498 308,500 2015 2.56 2.20 No No 14.1%
0 499 309,000 2015 2.55 2.29 No No 10.4%
0 500 310,500 2015 2.55 2.14 No No 16.1%
0 501 314,000 2015 2.53 2.01 No No 20.6%
0 502 314,000 2015 2.53 2.10 No No 17.0%
0 503 314,000 2015 2.53 2.10 No No 17.0%
0 504 319,000 2015 2.51 2.20 No No 12.3%
0 505 319,000 2014 2.51 2.22 No No 11.8%
0 506 319,000 2014 2.51 2.20 No No 12.3%
0 507 319,000 2015 2.51 2.21 No No 12.1%
0 508 319,500 2016 2.51 2.14 No No 14.7%
0 509 319,500 2016 2.51 2.12 No No 15.5%
0 510 320,000 2015 2.51 2.16 No No 13.9%
0 511 320,000 2015 2.51 2.15 No No 14.3%
0 512 321,000 2013 2.51 1.86 No No 25.8%
1 513 7,000 2016 16.0 14.7 No No 8.1%
1 514 110,000 2016 3.80 3.15 No No 17.1%
1 515 110,000 2016 3.80 3.07 No No 19.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 42

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

1 516 115,500 2016 3.72 2.96 No No 20.4%


1 517 115,500 2016 3.72 2.95 No No 20.7%
1 518 159,000 2016 3.18 2.89 No No 9.1%
* Required EEDI value is calculated voluntarily.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 43

Table 4: EEDI database for containerships (283 ships: 102 ships for non-mandatory and 181 ships for Phase 0)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 1 9,500 2015 24.4 19.4 No No 20.4%


Non-mandatory 2 9,500 2015 24.4 19.3 No No 20.7%
Non-mandatory 3 12,500 2014 n/a 20.5 No No n/a
Non-mandatory 4 12,500 2014 n/a 20.1 No No n/a
Non-mandatory 5 12,500 2014 n/a 20.1 No No n/a
Non-mandatory 6 12,500 2014 n/a 18.8 No No n/a
Non-mandatory 7 13,500 2014 24.3 18.5 No No 23.9%
Non-mandatory 8 13,500 2014 23.3 18.5 No No 20.7%
Non-mandatory 9 13,500 2014 25.9 22.2 No No 14.3%
Non-mandatory 10 13,500 2015 25.9 22.1 No No 14.6%
Non-mandatory 11 13,500 2015 25.9 22.4 No No 13.5%
Non-mandatory 12 13,500 2014 25.9 22.3 No No 13.8%
Non-mandatory 13 13,500 2014 25.8 22.2 No No 14.2%
Non-mandatory 14 13,500 2014 25.8 22.3 No No 13.6%
Non-mandatory 15 21,500 2015 21.9 14.3 No No 34.9%
Non-mandatory 16 21,500 2015 21.9 13.9 No No 36.4%
Non-mandatory 17 21,500 2015 21.9 14.5 No No 33.7%
Non-mandatory 18 31,000 2014 21.8 14.8 No No 32.1%
Non-mandatory 19 31,000 2013 21.8 14.7 No No 32.6%
Non-mandatory 20 31,000 2014 21.8 14.4 No No 33.9%
Non-mandatory 21 31,000 2013 21.8 14.7 No No 32.6%
Non-mandatory 22 31,000 2013 21.8 14.9 No No 31.9%
Non-mandatory 23 31,000 2013 21.8 14.4 No No 33.8%
Non-mandatory 24 31,000 2013 21.8 14.5 No No 33.4%
Non-mandatory 25 32,000 2013 20.2 14.7 No No 27.0%
Non-mandatory 26 32,000 2013 20.2 14.9 No No 26.3%
Non-mandatory 27 36,500 2014 19.7 12.0 No No 38.8%
Non-mandatory 28 36,500 2014 19.7 12.2 No No 38.1%
Non-mandatory 29 36,500 2014 19.7 12.1 No No 38.6%
Non-mandatory 30 36,500 2014 19.7 12.1 No No 38.5%
Non-mandatory 31 36,500 2014 19.7 12.1 No No 38.5%
Non-mandatory 32 36,500 2014 19.7 12.1 No No 38.5%
Non-mandatory 33 36,500 2015 19.7 11.9 No No 39.4%
Non-mandatory 34 36,500 2015 19.7 11.9 No No 39.7%
Non-mandatory 35 36,500 2013 19.7 15.7 No No 20.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 44

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 36 36,500 2013 19.7 14.7 No No 25.1%


Non-mandatory 37 36,500 2013 19.7 14.9 No No 24.3%
Non-mandatory 38 36,500 2013 19.7 14.6 No No 25.7%
Non-mandatory 39 44,000 2013 18.9 11.1 No No 41.2%
Non-mandatory 40 44,000 2014 18.9 10.9 No No 42.2%
Non-mandatory 41 57,500 2015 19.3 16.2 No No 16.1%
Non-mandatory 42 59,000 2012 17.8 17.7 No No 0.9%
Non-mandatory 43 59,000 2012 17.8 17.7 No No 0.9%
Non-mandatory 44 59,000 2013 17.8 17.8 No No 0.1%
Non-mandatory 45 59,500 2013 17.8 14.9 No No 16.4%
Non-mandatory 46 59,500 2013 17.8 14.7 No No 17.5%
Non-mandatory 47 73,000 2014 17.1 13.8 No No 19.5%
Non-mandatory 48 73,000 2014 17.1 13.7 No No 20.0%
Non-mandatory 49 73,000 2013 17.1 13.8 No No 19.4%
Non-mandatory 50 73,500 2013 17.1 13.7 No No 19.9%
Non-mandatory 51 73,500 2012 17.1 13.8 No No 19.3%
Non-mandatory 52 73,500 2012 17.1 13.7 No No 19.6%
Non-mandatory 53 73,500 2012 17.1 13.8 No No 19.4%
Non-mandatory 54 73,500 2012 17.1 13.7 No No 20.0%
Non-mandatory 55 73,500 2014 17.1 13.6 No No 20.2%
Non-mandatory 56 73,500 2014 17.1 13.7 No No 19.9%
Non-mandatory 57 73,500 2013 17.1 13.7 No No 19.9%
Non-mandatory 58 80,500 2013 18.0 11.2 No No 38.0%
Non-mandatory 59 80,500 2013 18.0 11.2 No No 37.8%
Non-mandatory 60 83,500 2011 17.8 17.1 No No 4.3%
Non-mandatory 61 86,500 2011 16.5 12.2 No No 26.0%
Non-mandatory 62 86,500 2011 16.5 12.1 No No 27.0%
Non-mandatory 63 86,500 2011 16.5 12.2 No No 26.0%
Non-mandatory 64 86,500 2012 16.5 12.3 No No 25.4%
Non-mandatory 65 86,500 2012 16.5 12.4 No No 25.0%
Non-mandatory 66 104,500 2014 17.1 13.7 No No 19.6%
Non-mandatory 67 104,500 2013 17.1 13.9 No No 18.6%
Non-mandatory 68 104,500 2013 17.1 13.8 No No 19.3%
Non-mandatory 69 104,500 2012 17.1 13.7 No No 20.0%
Non-mandatory 70 104,500 2013 17.1 13.8 No No 19.3%
Non-mandatory 71 104,500 2015 17.1 13.6 No No 20.4%
Non-mandatory 72 104,500 2012 17.1 13.7 No No 19.8%
Non-mandatory 73 105,000 2013 17.1 13.6 No No 20.1%
Non-mandatory 74 105,000 2015 17.1 13.6 No No 20.5%
Non-mandatory 75 109,000 2013 16.9 11.7 No No 31.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 45

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 76 109,000 2013 16.9 11.7 No No 31.0%


Non-mandatory 77 109,000 2013 16.9 11.7 No No 31.0%
Non-mandatory 78 109,000 2013 16.9 11.7 No No 30.8%
Non-mandatory 79 109,000 2013 16.9 11.8 No No 30.5%
Non-mandatory 80 109,000 2013 16.9 11.7 No No 30.8%
Non-mandatory 81 109,000 2013 16.9 11.8 No No 30.5%
Non-mandatory 82 109,000 2014 16.9 11.7 No No 30.8%
Non-mandatory 83 109,000 2014 16.9 11.7 No No 30.7%
Non-mandatory 84 109,000 2014 16.9 11.6 No No 31.4%
Non-mandatory 85 109,000 2014 16.9 11.7 No No 31.2%
Non-mandatory 86 109,000 2014 16.9 11.8 No No 30.4%
Non-mandatory 87 111,000 2013 16.9 11.8 No No 30.0%
Non-mandatory 88 111,000 2013 16.9 11.8 No No 30.1%
Non-mandatory 89 121,500 2014 16.6 11.6 No No 30.0%
Non-mandatory 90 121,500 2014 16.6 11.6 No No 30.1%
Non-mandatory 91 121,500 2014 16.6 11.6 No No 30.1%
Non-mandatory 92 121,500 2014 16.6 11.6 No No 30.1%
Non-mandatory 93 144,500 2013 16.0 8.90 No No 44.4%
Non-mandatory 94 144,500 2013 16.0 8.93 No No 44.2%
Non-mandatory 95 144,500 2013 16.0 8.87 No No 44.6%
Non-mandatory 96 144,500 2013 16.0 8.87 No No 44.6%
Non-mandatory 97 144,500 2013 16.0 8.87 No No 44.6%
Non-mandatory 98 144,500 2014 16.0 8.84 No No 44.8%
Non-mandatory 99 144,500 2014 16.0 8.83 No No 44.9%
Non-mandatory 100 144,500 2013 16.0 8.88 No No 44.5%
Non-mandatory 101 144,500 2013 16.0 8.87 No No 44.6%
Non-mandatory 102 144,500 2013 16.0 8.90 No No 44.3%
0 103 9,500 2016 n/a 19.6 No No n/a
0 104 12,000 2015 n/a 22.4 No No n/a
0 105 12,000 2015 n/a 22.3 No No n/a
0 106 12,000 2014 n/a 25.1 No No n/a
0 107 12,000 2014 n/a 24.4 No No n/a
0 108 12,500 2014 n/a 20.1 No No n/a
0 109 12,500 2014 n/a 20.1 No No n/a
0 110 12,500 2016 n/a 19.1 No No n/a
0 111 12,500 2016 n/a 19.0 No No n/a
0 112 12,500 2015 n/a 20.7 No No n/a
0 113 12,500 2015 n/a 20.6 No No n/a
0 114 12,500 2015 n/a 19.3 No No n/a
0 115 12,500 2016 n/a 19.1 No No n/a

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 46

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 116 12,500 2016 n/a 19.1 No No n/a


0 117 12,500 2015 n/a 19.4 No No n/a
0 118 12,500 2015 n/a 18.9 No No n/a
0 119 12,500 2015 n/a 18.9 No No n/a
0 120 12,500 2014 n/a 19.0 No No n/a
0 121 12,500 2015 n/a 18.1 No No n/a
0 122 13,000 2014 n/a 18.3 No No n/a
0 123 13,000 2015 n/a 24.5 No No n/a
0 124 13,000 2015 n/a 23.8 No No n/a
0 125 13,000 2016 n/a 18.9 No No n/a
0 126 13,000 2016 n/a 18.8 No No n/a
0 127 13,500 2016 n/a 21.8 No No n/a
0 128 15,500 2015 23.3 15.2 No No 35.0%
0 129 15,500 2015 23.3 14.9 No No 36.4%
0 130 15,500 2015 23.3 14.9 No No 36.1%
0 131 15,500 2015 23.3 15.0 No No 35.8%
0 132 19,500 2013 22.4 18.4 No No 17.9%
0 133 19,500 2013 22.4 18.4 No No 17.8%
0 134 19,500 2013 22.4 18.5 No No 17.2%
0 135 21,500 2015 21.9 14.3 No No 34.9%
0 136 21,500 2015 21.9 14.0 No No 36.1%
0 137 21,500 2015 21.9 13.5 No No 38.4%
0 138 21,500 2015 23.5 18.2 No No 22.7%
0 139 21,500 2015 21.1 17.9 No No 15.5%
0 140 21,500 2015 23.5 18.1 No No 23.1%
0 141 21,500 2015 23.5 18.2 No No 22.5%
0 142 21,500 2015 23.5 18.3 No No 22.0%
0 143 21,500 2015 23.5 18.7 No No 20.2%
0 144 21,500 2015 23.5 18.2 No No 22.6%
0 145 21,500 2015 23.5 18.4 No No 21.7%
0 146 21,500 2015 23.5 18.2 No No 22.5%
0 147 21,500 2015 23.5 18.2 No No 22.5%
0 148 22,000 2015 23.4 19.4 No No 17.3%
0 149 22,000 2015 23.4 19.3 No No 17.7%
0 150 22,000 2015 23.4 19.3 No No 17.8%
0 151 22,000 2015 23.4 19.1 No No 18.5%
0 152 22,000 2014 23.4 19.1 No No 18.4%
0 153 22,000 2015 21.9 14.2 No No 35.3%
0 154 23,000 2015 21.9 14.1 No No 35.6%
0 155 25,500 2015 22.8 17.4 No No 23.7%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 47

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 156 25,500 2015 22.7 17.3 No No 24.0%


0 157 28,000 2015 22.3 20.4 No No 8.5%
0 158 33,500 2015 21.5 21.2 No No 1.4%
0 159 33,500 2016 21.5 21.2 No No 1.4%
0 160 36,000 2015 21.2 11.9 No No 43.7%
0 161 36,500 2015 19.7 11.8 No No 40.0%
0 162 36,500 2015 19.7 12.1 No No 38.5%
0 163 46,000 2014 18.8 10.5 No No 44.0%
0 164 46,000 2014 18.8 10.5 No No 44.1%
0 165 46,000 2014 18.8 10.5 No No 44.1%
0 166 46,000 2014 18.8 10.5 No No 43.9%
0 167 46,000 2014 18.8 10.6 No No 43.6%
0 168 46,000 2014 18.8 10.5 No No 44.1%
0 169 46,000 2014 18.8 10.5 No No 43.8%
0 170 54,500 2015 19.5 11.6 No No 40.3%
0 171 57,500 2015 19.3 16.4 No No 15.1%
0 172 65,500 2015 18.8 10.5 No No 44.1%
0 173 73,500 2015 17.1 11.0 No No 35.4%
0 174 73,500 2015 17.1 11.0 No No 35.5%
0 175 73,500 2015 17.1 11.1 No No 35.1%
0 176 73,500 2015 17.1 11.1 No No 35.1%
0 177 73,500 2015 17.1 10.9 No No 36.1%
0 178 77,500 2013 16.9 10.4 No No 38.2%
0 179 77,500 2016 16.9 10.4 No No 38.6%
0 180 77,500 2016 16.9 10.7 No No 36.8%
0 181 77,500 2013 16.9 10.4 No No 38.6%
0 182 77,500 2013 16.9 10.4 No No 38.2%
0 183 77,500 2016 16.9 10.3 No No 38.9%
0 184 77,500 2013 16.9 10.3 No No 38.9%
0 185 78,500 2013 16.8 11.0 No No 34.6%
0 186 78,500 2013 16.8 10.8 No No 35.6%
0 187 78,500 2013 16.8 11.1 No No 34.0%
0 188 79,500 2015 18.1 11.0 No No 38.9%
0 189 79,500 2015 18.0 11.0 No No 39.1%
0 190 79,500 2015 18.0 11.0 No No 38.9%
0 191 81,000 2014 16.7 9.66 No No 42.3%
0 192 81,000 2014 16.7 9.63 No No 42.5%
0 193 81,000 2015 16.7 8.62 No No 48.5%
0 194 81,000 2016 16.7 8.66 No No 48.2%
0 195 81,000 2015 16.7 8.66 No No 48.2%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 48

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 196 82,500 2014 16.7 8.45 No No 49.3%


0 197 82,500 2016 16.7 8.45 No No 49.3%
0 198 82,500 2014 16.7 8.44 No No 49.4%
0 199 82,500 2016 16.7 8.33 No No 50.1%
0 200 87,000 2016 16.5 8.13 No No 50.7%
0 201 87,000 2016 16.5 8.06 No No 51.1%
0 202 87,000 2016 16.5 7.96 No No 51.7%
0 203 101,500 2015 17.2 14.0 No No 18.6%
0 204 101,500 2015 17.2 14.0 No No 18.7%
0 205 102,000 2015 16.0 9.21 No No 42.3%
0 206 102,000 2015 16.0 9.15 No No 42.7%
0 207 102,000 2015 16.0 9.17 No No 42.6%
0 208 102,000 2015 16.0 9.19 No No 42.5%
0 209 102,000 2015 16.0 9.34 No No 41.5%
0 210 102,000 2015 16.0 9.18 No No 42.5%
0 211 102,000 2015 16.0 9.14 No No 42.8%
0 212 102,000 2015 16.0 9.18 No No 42.5%
0 213 102,000 2015 16.0 9.18 No No 42.5%
0 214 102,000 2015 16.0 9.46 No No 40.8%
0 215 105,000 2014 15.9 6.31 Yes No 60.3%
0 216 105,000 2014 15.9 6.28 Yes No 60.5%
0 217 110,000 2015 16.9 10.8 Yes No 36.4%
0 218 110,000 2015 16.9 11.3 Yes No 32.9%
0 219 110,000 2015 16.9 10.9 Yes No 35.6%
0 220 110,000 2015 16.9 11.0 Yes No 34.9%
0 221 110,000 2015 16.9 10.9 Yes No 35.4%
0 222 110,000 2015 16.9 11.0 Yes No 34.9%
0 223 110,000 2015 16.9 10.8 Yes No 36.2%
0 224 110,000 2015 16.9 10.9 Yes No 35.8%
0 225 110,000 2015 16.9 10.8 Yes No 35.9%
0 226 110,500 2015 16.9 10.9 Yes No 35.7%
0 227 110,500 2015 16.9 12.0 No No 29.1%
0 228 111,000 2015 16.9 12.0 No No 29.1%
0 229 111,000 2015 16.9 12.1 No No 28.5%
0 230 111,000 2015 16.9 9.82 No No 41.8%
0 231 111,000 2015 16.9 9.66 No No 42.7%
0 232 111,500 2015 16.9 9.82 No No 41.8%
0 233 111,500 2015 16.9 9.68 No No 42.6%
0 234 111,500 2015 16.9 9.70 No No 42.6%
0 235 111,500 2015 16.9 9.58 No No 43.3%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 49

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 236 111,500 2015 16.9 9.68 No No 42.6%


0 237 111,500 2015 16.9 9.68 No No 42.7%
0 238 111,500 2016 16.9 9.19 No No 45.6%
0 239 112,000 2015 16.8 9.13 No No 45.7%
0 240 112,000 2016 16.8 9.14 No No 45.6%
0 241 112,000 2015 16.8 9.13 No No 45.7%
0 242 112,000 2014 16.8 8.68 No No 48.4%
0 243 112,500 2014 16.8 8.64 No No 48.7%
0 244 112,500 2014 16.8 8.62 No No 48.8%
0 245 112,500 2014 16.8 8.67 No No 48.5%
0 246 112,500 2014 16.8 8.68 No No 48.4%
0 247 112,500 2014 16.8 8.69 No No 48.4%
0 248 112,500 2014 16.8 8.71 No No 48.2%
0 249 113,500 2015 16.8 10.3 No No 38.9%
0 250 116,000 2015 16.7 9.11 No No 45.6%
0 251 116,000 2015 16.7 9.10 No No 45.6%
0 252 117,500 2015 16.7 9.16 No No 45.1%
0 253 117,500 2015 16.7 9.35 No No 44.0%
0 254 117,500 2015 16.7 9.15 No No 45.2%
0 255 117,500 2015 16.7 9.38 No No 43.8%
0 256 123,500 2015 16.5 9.23 No No 44.1%
0 257 123,500 2015 16.5 9.23 No No 44.1%
0 258 123,500 2015 16.5 9.26 No No 43.9%
0 259 129,500 2013 15.2 8.78 No No 42.3%
0 260 130,000 2013 15.2 8.62 No No 43.4%
0 261 130,000 2013 15.2 8.74 No No 42.6%
0 262 131,000 2013 15.2 8.76 No No 42.3%
0 263 131,000 2015 15.2 8.52 No No 43.9%
0 264 131,000 2016 15.2 8.58 No No 43.5%
0 265 131,000 2013 15.2 8.65 No No 43.1%
0 266 139,500 2016 16.1 5.90 No No 63.4%
0 267 145,500 2015 15.9 8.58 No No 46.1%
0 268 146,500 2016 16.0 8.83 No No 44.8%
0 269 147,500 2015 15.9 8.71 No No 45.2%
0 270 147,500 2015 17.1 8.61 No No 49.6%
0 271 147,500 2015 15.9 8.61 No No 46.0%
0 272 147,500 2015 15.9 8.60 No No 46.0%
0 273 184,500 2014 15.2 7.90 No No 48.1%
0 274 184,500 2014 15.2 7.89 No No 48.2%
0 275 184,500 2014 15.2 7.90 No No 48.1%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 50

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity** Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 276 184,500 2015 15.2 7.90 No No 48.1%


0 277 184,500 2015 15.2 7.89 No No 48.2%
0 278 199,500 2014 15.0 8.34 No No 44.4%
0 279 199,500 2015 15.0 8.30 No No 44.6%
0 280 199,500 2015 15.0 8.34 No No 44.4%
0 281 199,500 2015 15.0 8.34 No No 44.4%
0 282 199,500 2015 15.0 8.47 No No 43.5%
0 283 199,500 2015 15.0 8.51 No No 43.3%
* Required EEDI value is calculated voluntarily.
* *Capacity for containership is shown 100% DWT in this table.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 51

Table 5: EEDI database for general cargo ships (41 ships: 11 ships for non-mandatory and 30 ships for Phase 0)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

Non-mandatory 1 17,500 2012 13.1 10.5 No No 19.4%


Non-mandatory 2 17,500 2012 13.1 10.5 No No 19.7%
Non-mandatory 3 17,500 2012 13.1 10.5 No No 19.3%
Non-mandatory 4 25,000 2011 12.1 11.8 No No 2.0%
Non-mandatory 5 25,000 2012 12.1 11.8 No No 2.1%
Non-mandatory 6 25,000 2012 12.1 11.7 No No 3.0%
Non-mandatory 7 25,000 2013 12.1 11.6 No No 4.0%
Non-mandatory 8 31,000 2013 11.5 10.6 No No 8.5%
Non-mandatory 9 31,000 2013 11.5 10.4 No No 9.4%
Non-mandatory 10 31,000 2013 11.5 10.4 No No 9.7%
Non-mandatory 11 31,000 2013 11.5 10.3 No No 11.0%
0 12 3,000 2014 n/a 30.0 No No n/a
0 13 5,500 2016 n/a 13.2 No No n/a
0 14 11,000 2013 n/a 10.4 No No n/a
0 15 24,500 2014 12.2 7.23 No No 40.7%
0 16 27,500 2013 11.8 8.61 No No 27.3%
0 17 27,500 2013 11.8 8.56 No No 27.7%
0 18 34,500 2015 11.3 5.36 No No 52.4%
0 19 37,000 2015 11.1 5.50 No No 50.4%
0 20 37,000 2015 11.1 5.79 No No 47.7%
0 21 37,000 2015 11.1 5.51 No No 50.4%
0 22 38,500 2016 11.0 5.58 No No 49.3%
0 23 38,500 2015 11.0 5.57 No No 49.4%
0 24 38,500 2016 11.0 5.56 No No 49.5%
0 25 38,500 2015 11.0 5.51 No No 49.9%
0 26 38,500 2014 11.1 4.81 No No 56.5%
0 27 39,000 2014 11.0 4.83 No No 56.1%
0 28 39,000 2014 11.0 4.82 No No 56.2%
0 29 39,000 2014 11.0 4.81 No No 56.2%
0 30 39,000 2014 10.9 4.70 No No 56.9%
0 31 39,000 2015 11.0 4.75 No No 56.7%
0 32 39,000 2015 11.0 4.73 No No 56.9%
0 33 39,000 2015 11.0 4.72 No No 57.0%
0 34 39,000 2015 11.0 4.80 No No 56.3%
0 35 39,000 2014 10.9 4.70 No No 56.9%

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 52

Required EEDI Attained EEDI Attained EEDI


Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory* Mandatory Non-mandatory to reference line value

0 36 39,000 2015 11.0 4.74 No No 56.8%


0 37 63,500 2015 4.93 3.89 No No 21.1%
0 38 63,500 2015 4.93 3.89 No No 21.0%
0 39 63,500 2015 4.93 3.88 No No 21.4%
0 40 63,500 2015 4.93 3.93 No No 20.3%
0 41 63,500 2015 4.93 3.94 No No 20.1%
* Required EEDI value is calculated voluntarily.

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 53

Table 6: EEDI database for ro-ro cargo ships (vehicle carriers) (18 ships: 6 ships for non-mandatory and 12 ships for Phase 0)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory Mandatory Non-mandatory to reference line value

Non-mandatory 1 20,000 2015 n/a 15.2 No No n/a


Non-mandatory 2 20,000 2015 n/a 14.9 No No n/a
Non-mandatory 3 20,500 2014 n/a 15.1 No No n/a
Non-mandatory 4 20,500 2014 n/a 15.4 No No n/a
Non-mandatory 5 20,500 2014 n/a 15.2 No No n/a
Non-mandatory 6 20,500 2015 n/a 15.1 No No n/a
0 7 6,000 2015 n/a 24.4 No No n/a
0 8 20,500 2014 n/a 15.3 No No n/a
0 9 20,500 2014 n/a 15.2 No No n/a
0 10 21,000 2015 n/a 14.2 No No n/a
0 11 21,000 2016 n/a 14.4 No No n/a
0 12 21,000 2015 n/a 14.4 No No n/a
0 13 21,000 2015 n/a 14.4 Yes Yes n/a
0 14 21,000 2015 n/a 15.2 No No n/a
0 15 21,000 2015 n/a 15.4 No No n/a
0 16 21,500 2015 n/a 14.6 Yes Yes n/a
0 17 22,500 2015 n/a 10.1 Yes No n/a
0 18 22,500 2015 n/a 10.5 Yes No n/a

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 1, page 54

Table 7: EEDI database for ro-ro cargo ships (9 ships: 2 ships for non-mandatory and 7 ships for Phase 0)
Required EEDI Attained EEDI Attained EEDI
Applicable Ship Capacity Year of EEDI 4th term EEDI 5th term
reduction rate relative
Phase no. (DWT) delivery (innovative electrical technology) (innovative mechanical technology)
Mandatory Non-mandatory Mandatory Non-mandatory to reference line value

Non-mandatory 1 7,500 2015 n/a 25.3 No No n/a


Non-mandatory 2 20,000 2015 n/a 15.9 No No n/a
0 3 20,000 2016 n/a 15.8 No No n/a
0 4 20,000 2016 n/a 15.7 No No n/a
0 5 20,000 2016 n/a 15.6 No No n/a
0 6 21,000 2014 n/a 15.5 No No n/a
0 7 31,000 2015 n/a 7.54 No No n/a
0 8 31,000 2015 n/a 8.26 No No n/a
0 9 56,000 2015 n/a 8.27 No No n/a

***

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 2, page 1

ANNEX 2

EEDI DATABASE GRAPHICAL REPRESENTATIONS OF THE DISTRIBUTION

Figure 1: EEDI database for bulk carriers


(923 ships: 111 ships for non-mandatory, 811 ships for Phase 0 and 1 ship for Phase 1)

Figure 2: EEDI database for gas carriers


(125 ships: 19 ships for non-mandatory and 106 ships for Phase 0)

Figure 3: EEDI database for tankers

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 2, page 2

(518 ships: 152 ships for non-mandatory, 360 ships for Phase 0 and 6 ships for Phase 1)

Figure 4: EEDI database for containerships


(283 ships: 102 ships for non-mandatory and 181 ships for Phase 0)

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 2, page 3

Figure 5: EEDI database for general cargo ships


(41 ships: 11 ships for non-mandatory and 30 ships for Phase 0)

Figure 6: EEDI database for ro-ro cargo ships (vehicle carriers)


(18 ships: 6 ships for non-mandatory and 12 ships for Phase 0 (9 ships DWT/GT0.3
and 9 ships DWT/GT<0.3))

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx


MEPC 70/INF.14
Annex 2, page 4

Figure 7: EEDI database for ro-ro cargo ships


(9 ships: 2 ships for non-mandatory and 7 ships for Phase 0)

___________

https://edocs.imo.org/Final Documents/English/MEPC 70-INF.14 (E).docx