Project ?
Design Project
Supervision Project
Construction Project
Resources in Management
4 Ms
1. Manpower 1st M
2. Material 2nd M
3. Machinery 3rd M
4. Money 4th M
Parties of the Project
Employer / Owner/ Client
Design Consultants
Contractor
Supervision Consultants
Components of the Project
Scope
Schedule Project
Budget
Engineering Project
Classification of the Project
Electrical
Construction Mechanical
Industrial
Engineering Telecommunication
Project
Disciplines of Construction Project
Highways and Motorways
Multistory Buildings
Dams and Barrages
Canals and Hydraulic Structures
Power Plants
Steel structures and Buildings
Oil Refineries
Telecommunication Towers
Harbor Construction
Railways and Airports
Bridges etc.
Leading Clients in Pakistan
Federal Govt.
PIA/CAA
NHA
Pakistan Railways
WAPDA
Provincial Govt.
C&W
P&D
Private Sector
Eden Pvt Limited
Bahria Pvt Limited
Leading Design Consultants in Pakistan
NESPAK
ACE
REC
Mott MacDonalds
AAA Associates
Indus Associates
Leading Contractors in Pakistan
DESCON
NLC
FWO
SKB
ECHO WEST
KRC
HRL
Leading Supervision Consultants in
Pakistan
NESPAK
ACE
REC
Mott MacDonalds
AAA Associates
Examples of Engineering Projects
Construction of Fly over at Canal Crossing of
Ferozepur Road Lahore.
Client : Govt. of Punjab C & W Dept.
Design Consultant : NESPAK
Contractor: NLC
Supervision Consultants: NESPAK
Examples of Engineering Projects
Construction of Chechawatni Sahiwal Section
of N-5 (GT Road) by Cold Recycling.
Client : Govt. of Pakistan , NHA .
Design Consultant : SMEC
Contractor: SKB
Supervision Consultants: SMEC
Examples of Engineering Projects
Construction of PACE Towers, Gulberg
Client : PACE Pvt. Limited.
Design Consultant : NDA
Contractor: PACE Pakistan
Supervision Consultants: NDA
Contract Management
Contract Management
Prequalification of
Design Consultants
Tendering of
Design Consultants
Tender Documents
Prequalification of Contractor
Tendering of
Contractor
Prequalification in Engineering
Technical Ability
Financial Ability
Technical Ability
Tendering for
1. Design Consultant
2. Contractor
3. Supervision Consultant
Tendering of Design Consultant
Tender Documents
Tendering of Design Consultants
Should always after Prequalification of Design
Consultants.
Will only be between Prequalified Companies of
Design Consultants.
Tender Date
Tender Time
Presence of Representatives
Non responsiveness
Sealing of the Tender
Preparation of tender summary
Unofficial declaration
Tender Documents
Total 488,300
Total 486,300
Post Tendering Issues
Detailed evaluation of tender documents
especially BOQ submitted by all contractors.
Return of Earnest Money to Unsuccessful
Bidders
Two Bidders come on same price
Officially deceleration of Project Contractor
Tendering of Supervision Consultants
If design and supervision consultants are same
If design and supervision consultants are not
same
Preparation of Tender documents require 2 months to
three years depending on the nature of the project.
The charges asked for supervision of the project by
Design consultants is more than the originally
anticipated by the Client
Overloaded design consultants
Design consultant do not have in house supervision
consultancy facilities
Tendering of Supervision Consultants
Only Prequalified design consultants can
participate