Plant Address :
Rated By : RPA Lean
Rating Sheet
Tour Date : Table - I
Ratings
Excellent (9)
S.
Average (5)
Related Questions in
Above (7)
Below (3)
No RPA Questionnaire
Poor (1)
Average
Average
Categories
1 Customer Satisfaction 1, 2, 20
Ratings
Best in Class
Category
Score
(11)
0
Questions should be answered YES only if the plant adheres to the principle implied by the question. In case of doubt,
S.no Question
1 Are visitors welcomed and given information about plant layout, workforce, customers & products?
3 Is the facility safe, clean, orderly, and well lit? Is the air quality good and are noise levels low?
4 Does a visual labeling system identify and locate inventory, tools, processes, and flow?
5 Does everything have its own place, and is everything stored in its place?
6 Are up-to-date operational goals and performance measures for those goals prominently posted?
7 Are production materials brought to and stored at line side rather than in separate inventory storage areas?
8 Are work instructions and product quality specifications visible at all work areas?
9 Are updated charts on productivity, quality, safety, and problem solving visible for all teams?
10 Can the current state of the operation be viewed from a central control room, on a status board, or on a Computer
11 Are production lines scheduled off a single pacing process with appropriate inventory levels at each stage?
12 Is material moved only once as short a distance as possible and in appropriate containers?
13 Is the plant laid out in continuous product flow lines rather than in "shops"?
14 Are work teams trained, empowered, and involved in problem solving and ongoing improvements?
16 Is a timetable posted for equipment preventive maintenance and continuous improvement of tools and processes?
17 Is there an effective project management process, with cost and timing goals, for new product start-ups?
18 Is a supplier certification process - with measures for quality, delivery, and cost performance - displayed?
19 Have key product characteristics been identified and are fail-safe methods used to forestall propagation of defects
eres to the principle implied by the question. In case of doubt, answer NO.
stion Yes No
layed?
in its place?
d in appropriate containers?
an in "shops"?
Data
Rapid Plant Assessment
Plant Address :
Rated By : RPA Holistic
Cost of Sales (RPA
Tour Date : Cut) Table - IV
Sales
Other Cost
Gross Margin
of COS Data
All plant costs including material, people with fringes, fixed and variable pla
MRO, etc.
Cost of materials in the net sales above at standard, budgeted costs including
freight in and and contracted for freight out. Does not include scrap, rework
internal plant labor or staff costs.
Includes all people wages, salaries, fringes, and budgeted overtime. Includes
budgeted training & T&E costs.
Includes all plant & equipment fixed costs (depreciation, taxes, insurance, etc
and other variable costs, preventative maintenance, environmental control co
budgeted amounts
Includes all other plant costs including warranty, scrap & rework costs, etc. I
"plug" number so that this RPA cut of COS equals the COS computed vai the
traditional way. "Other" is a measure of leanness; the lower it is as a % of CO
leaner the plant
Service operations may have high lease costs that skew the PP&E costs
Shop rate is the direct labor hourly rate plus the overhead rate in Re. or DL*(
puted for the RPA cut. It groups costs into categories of material, people,
d other.
costs including material, people with fringes, fixed and variable plant costs,
.
aterials in the net sales above at standard, budgeted costs including budged
and and contracted for freight out. Does not include scrap, rework or
ant labor or staff costs.
ll plant & equipment fixed costs (depreciation, taxes, insurance, etc.), utility
variable costs, preventative maintenance, environmental control costs at
amounts
ll other plant costs including warranty, scrap & rework costs, etc. It is a
mber so that this RPA cut of COS equals the COS computed vai the
way. "Other" is a measure of leanness; the lower it is as a % of COS, the
plant
perations may have high lease costs that skew the PP&E costs
assets
is the direct labor hourly rate plus the overhead rate in Re. or DL*(1+OH)
Rapid Plant Assessment
Plant Address :
Rated By : RPA Cost of
Sales Table -
Tour Date : V
S.No. Plant Data Value
1 Yearly Sales (Re.) 100,000,000
2 Gross Margin % 0.15
3 Total production workers 350
4 Indirect workers (in above) 110
5 Salaried staff 55
6 Standard Hours/yr 1,800
7 Average Direct Labor Rate (Re.) 15
8 Average Indirect Labor Rate (Re.) 17
9 Average Hourly Overtime % 0.10
10 Fringe % 0.42
11 Average Salary (Re.) 50,000
12 Salaried Fringes (%) 0.3
13 Salaried Overtime (%) 0.1
14 Material % of COS 0.56
15 Freight in % of Material 0.04
16 Scrap & Rework in Material (%) 0.03
17 Plant Size Sq Ft 150,000
18 Plant fixed cost Re/Sq ft 5
19 Plant variable cost Re/Sq ft 4.5
20 Equipment fixed cost 4,000,000
21 Equipment variable cost 750,000
22 PP&E 6,175,000
23 Manufacturing O/H rate (%) 3
24 Salaried O/H rate (%) 0.6
25 Corporate allocation %/sales 0.02
S.No. Tour Data Rupee Value
1 Table 1 Rating 55
2 Table 2 Rating 5
S.No. COS RPA CUT RPA COS
1 Yearly Sales 100,000,000
2 Direct Materials and Freight In 48,018,880
3 Production People Costs 15,379,452
4 Salaried People Costs 3,932,500
5 Total People Costs 19,311,952
6 PP&E 6,175,000
7 Other 9,494,168
8 Corporate Allocation 2,000,000
9 COS 85,000,000
10 Gross Profit 15,000,000
11 Gross Margin 0.15
12 Sales per Employee 246,914
S.No. Traditional COS Computation Value
1 Sales 100,000,000
2 Material % of COS 49,504,000
3 Direct Labor 7,128,000
4 Manufacturing Overhead 21,384,000
5 Salaried Overhead 4,840,000
6 Corporate allocation 2,000,000
7 Cost of Sales 85,000,000
Derived from Tour
Estimates from Table 3
Computed from Table itself
56.5 Computed by material COS% times COS minus scrap plus freight in
18.1 Computed from production workers minus indirects times wage rate + indirect work
4.6 Number of salaried people times average salary times 1+fringes times 1+overtime
22.7 Addition of salaried and production people costs
Sum of plant fixed and variable cost per sq ft times plant size + equipment fixed and
7.3
costs
11.2 Remainder after all other costs are computed to total COS. If COS not know, estima
2.4 Computed as percent of Sales
100.0 Either given because gross margin is given and sales known or computed from all c
% COS
+ indirect workers times their wage rate all times hours/year times 1+fringe times 1+overtime
s 1+overtime
Safety & environment record, place for everything & everything in its place, cleanline
Safety, Environment, exterior & interior, floors, equipment, spills, leaks, noise, lighting, paint, dust, air qua
2
Cleanliness & Order restroom conditions, desks & workbench order & cleanliness, degree of "spiffing" for
inventory order, material flow order & cleanliness, color & other coding for safety &
Operations mission & performance objectives visible; visibility of labeling & coding
inventory, equipment, & tooling; color coding & differentiation ; visibility of custome
Visual Management ratings; visibility of charts tracking operation's & teams' safety, quality, & productivit
3
Deployment showing status of total operation, customer order & order fulfillment visibility, Kanba
inventory count can be made visually, machines & tool labeling--costs, preventive ma
product displays, audit results visible.
Degree of scheduling to customer order, order process efficiency, product line schedu
scheduling buckets (each order, hourly, daily, weekly, or monthly), supplier schedulin
4 Scheduling System
replenishment versus order fulfillment, computer scheduling versus kanban, pull vers
time efficiencies, backroom costs of scheduling, MRP costs, data entry costs
Product line versus shop layout, rolling carts pulled by tractors or by hand or conveye
Product & Material Flows travel distances between processes, material movement responsibility--process owned
5
and Space Use staff, container size (forklift requirement?), containers designed for parts families, sin
docks to minimize material travel, space utilization, goals for space use reduction
WIP levels at each process, WIP in transit in plant, separate stores versus line side sto
inventory storage areas, finished product levels, total inventory to sales ratio, process
6 Inventory & WIP Levels
time ratios, countability of inventory, WIP movemend triggered by computer, materia
process, theoretical versus actual flow times
Team problem solving capability & history, employee willingness to talk about custom
company; uniformity of dress; communications & recognition environment; sales per
People Teamwork, Skill meeting areas & performance charts; training investments, educational support, benef
7
Level, & Motivation unionization activity, workforce-management relationship, community support, comp
activities (picnics, open houses, sports teams, local involvement, employee knowledg
customers & business, work instructions standards
Preventive maintenance system, setup change times, integrated go-no go quality chec
performance data availability, knowledge & utilization of bottleneck processes, proce
Equipment & Tooling State
8 total asset utilization, operator routine maintenance, maintenance staff & teams, MRO
& Maintenance
efficiency, tool & fixture orderliness, cleanliness, & storage location, equipment impr
equipment technology strategy
Use of common parts, processes, & procedures prototype process, paper transactions
keyboard entries versus bar coding, backroom paperwork & computer transactions co
collected with data needed, simplicity & clarity of operations layout, indirect to direct
Ability to Manage
9 staff to total workforce ratio, overhead cost ratios, commonality of tooling & fixturing
Complexity & Variability
equipment & tools, commonality of support software & applications programs across
among sister plants, equipment efficiencies, ability to handle variable demand, ability
controllable variations, ability to smooth demand, ability to handle supply chain, num
Quality certification, quality process & measurement at each process & for each prod
problem solving process, product & customer quality data, quality ratings, new produ
11 Quality System Deployment continuous improvement environment, degree of focus on customer satisfaction , imp
practices, degree operational strategies are linked to corporate strategy, total quality s
& deployed
iderations - Chart 1
Factors
fications & ratings, warranty & product liability costs, employee knowledge
mer requirements, visitor materials & welcome, market share, rate of new
ance.
mer order, order process efficiency, product line scheduling at single point,
r, hourly, daily, weekly, or monthly), supplier scheduling & delivery,
fillment, computer scheduling versus kanban, pull versus push systems, flow
osts of scheduling, MRP costs, data entry costs
ity & history, employee willingness to talk about customers, products, &
communications & recognition environment; sales per employee; team
charts; training investments, educational support, benefit package & costs,
ce-management relationship, community support, company-supported
s, sports teams, local involvement, employee knowledge of & support of
nstructions standards
rocess & measurement at each process & for each product, scrap & rework,
uct & customer quality data, quality ratings, new product startup process,
ronment, degree of focus on customer satisfaction , implementation of best
trategies are linked to corporate strategy, total quality system well-developed
Rapid Plant Assessment Rating - Table 1
Typical Operations Measure - Chart 2
S.No. Variable Low Side High Side
1 Yearly Sales per Employee - Manufacturing
2 Yearly Sales per Employee - Assembly
3 Production Hourly Wage Rate - Manufacturing
4 Production Hourly Wage Rate - Assembly
5 Hourly Wage Rate - Retail
6 Production hours per year (less vacation & holidays; see Note 2)