CIRCULAR
With reference to the above cited, Government have issued detailed guidelines for
implementation of CPWD data in LSGD. Accordingly, detailed discussions were made at different
levels and meetings and workshops were conducted among LSGD engineers in the district. Technical
aid from retired CPWD engineers is also availed. After finalizing the items to be included/ modified
for the smooth implementation of CPWD specifications in LSGD, the following tentative guidelines
are issued.
Formation with cutting and Cutting and filling the existing road and
1 filling the existing road
2.25 compacting by ramming
Formation (filling)
Conveying filling earth and compacting
2 2.25 modified
by ramming
Filling up low lying and water
Applicable to waterlogged, flood prone
3 logged areas with local 16.78 modified
material/quarry muck or spring prone areas.
4 CC 1:4:8 using 40mm metal 4.1.8
This item includes labour for finishing
5 CC 1:2:4 using 20mm metal 11.7 the surface of road and constructing
wearing surface in panels.
C Building
10 Shoring 2.16-2.23
62 Ridges 12.51
63 Cement plastering walls 13.4, 13.5