N de Pisos= 7
Altura = 2.4
h + losa = 2.6
N N DE N*N DOTACIO
PISOS N DEMANDA
PERSON NIVELES PERSON N
1 - 5 4 5 5 20 150 15000
Jardin 1 1 1 1 5 5
6-7 4 2 2 8 150 2400
17405 lt/dia
3 ALMACENAMIENTO
3demanda
Cisterna= +Re servaC . I . Vc = 38.05 m3
4
Vt = 30.80 m3
demanda
T . E .= + R . contraI .
3
4 DIMENCIONAMIENTO DEL ALMACENAMIENTO
* Cisterna
AREA = 25 m2 5x5
R= 6 " 0.1524 m Cisterna:
H u= Altura util
H u= Vc / A Vc= Volumen de cisterna
H u= 1.52 A= Area de cisterna
Vr= Vol. De reserva C.I.
Haci= Vr / A Haci= Altura de agua contra incendios
Haci= 1.000 Hacd= Altura de agua de consumo domestico
Ht= Altura total
Hacd= Hu - Haci R= Diametro de rebose
Hacd= 0.522
HtHu
= + 3R + 0.20
Ht = 2.18 m
Tanque:
AREA = 20 m2 4x5
R= 6 " 0.1524 m
H u= Vc / A
H u= 1.54
Haci= Vr / A
Haci= 1.25
Hacd= Hu - Haci
Hacd= 0.29
HtHu
= + 3R + 0.20
Ht = 2.20 m
N de TOTAL U.H.
PISOS N U.H. (N*)
niveles (U.H.*N)
1-5 4 5 12 20 100
1 1 0 0
6-7 4 2 12 8 16
116 UH
UH QMDS
UH . por .nivel
#de UH c/alimentador = 29 UH NU . H .=
N de .alimentadores
T.E.
7 2 2 29 2 2 a
6 2 2 27 2 2 b
5 5 5 25 5 5 c
4 5 5 20 5 5 d
3 5 5 15 5 5 e
2 5 5 10 5 5 f
1 5 5 5 5 5 g
6 DETERMINACION DE LA COTA DE FONDO DEL TANQUE ELEVADO
C= 150
Pd = 2 mca
h de ducha: 1.8
Codo
Diametro nominal Tee
Recto 28 0.71
13 1/2" 0.739 1.064 29 X
19 3/4" 1.08 1.554 30 0.75
25 1" 1.42 2.045
32 11/4" 1.818 2.618 QMDS = 0.73 l/s
38 11/2" 2.159 3.109
50 2" 2.841 4.091
PRESION
1 L - 0.0030 L = 4.75
0.9970 L = 4.75
L= 4.7667
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
TE - a 29 0.73 2 0.36 2.60 6.932 9.532 0.03 7.34 7
a-b 27 0.69 2 0.34 2.60 4.091 6.691 0.02 9.92 6
b-c 25 0.64 2 0.32 2.60 4.091 6.691 0.02 12.50 5
c-d 20 0.54 2 0.27 2.60 4.091 6.691 0.01 15.09 4
d-e 15 0.44 2 0.22 2.60 4.091 6.691 0.01 17.68 3
e-f 10 0.43 2 0.21 2.60 4.091 6.691 0.01 20.27 2
f-g 5 0.23 2.00 0.11 2.60 4.091 6.691 0.00 22.87 1
CALCULO DE LA PRESION EN EL NIVEL 7
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 3.14 4.89 8.025 0.02 7.31
b-c 6 0.25 1 0.49 4.52 9.11 13.634 0.17 7.13
c-d 5 0.23 1 0.45 0.58 1.55 2.134 0.02 7.11
d-D 2 0.08 1 0.16 2.03 1.48 3.508 0.0 5.31
b - Lp 3 0.12 1/2 0.95 2.5 6.237 8.737 0.83 5.52
Lp - Lr 3 0.12 1/2 0.95 3.32 1.478 4.798 0.46 5.97
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 3.14 4.885 8.025 0.02 9.90
b-c 6 0.25 1 0.49 4.52 9.114 13.634 0.17 9.72
c-d 5 0.23 1 0.45 0.58 1.554 2.134 0.02 9.70
d-D 2 0.08 1 0.16 2.03 1.478 3.508 0.01 7.90
b - Lp 3 0.12 1/2 0.95 2.5 6.237 8.737 0.83 8.11
Lp - Lr 3 0.12 1/2 0.95 3.32 1.478 4.798 0.46 8.56
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 3.14 4.885 8.025 0.02 12.48
b-c 6 0.25 1 0.49 4.52 9.114 13.634 0.17 12.31
c-d 5 0.23 1 0.45 0.58 1.554 2.134 0.02 12.28
d-D 2 0.08 1 0.16 2.03 1.478 3.508 0.01 10.48
b - Lp 3 0.12 1/2 0.95 2.5 6.237 8.737 0.83 10.69
Lp - Lr 3 0.12 1/2 0.95 3.32 1.478 4.798 0.46 11.14
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 3.14 4.885 8.025 0.02 15.07
b-c 6 0.25 1 0.49 4.52 9.114 13.634 0.17 14.90
c-d 5 0.23 1 0.45 0.58 1.554 2.134 0.02 14.87
d-D 2 0.08 1 0.16 2.03 1.478 3.508 0.01 13.07
b - Lp 3 0.12 1/2 0.95 2.5 6.237 8.737 0.83 13.28
Lp - Lr 3 0.12 1/2 0.95 3.32 1.478 4.798 0.46 13.73
CALCULO DE LA PRESION EN EL NIVEL 3
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 2.91 2.102 5.012 0.01 17.67
b-c 5 0.25 1 0.49 1.11 3.05 4.16 0.05 17.61
c-d 2 0.23 1 0.45 0.99 1.478 2.468 0.03 17.59
d-D 2 0.08 1 0.16 1.8 1.478 3.278 0.01 15.78
b - Lp 3 0.12 1/2 0.95 1.46 0.739 2.199 0.21 16.50
Lp - Lr 3 0.12 1/2 0.95 1.3 0.739 2.039 0.19 16.71
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 2.91 2.102 5.012 0.01 20.26
b-c 5 0.25 1 0.49 1.11 3.05 4.16 0.05 20.21
c-d 2 0.23 1 0.45 0.99 1.478 2.468 0.03 20.18
d-D 2 0.08 1 0.16 1.8 1.478 3.278 0.01 18.38
b - Lp 3 0.12 1/2 0.95 1.46 0.739 2.199 0.21 19.09
Lp - Lr 3 0.12 1/2 0.95 1.3 0.739 2.039 0.19 19.30
Tramo U.H. Q (Lt/seg) " Vel. (m/s) l (m) le (m) lt (m) h (m) P (mca)
a-b 9 0.32 1 1/2 0.28 2.91 2.102 5.012 0.01 22.87
b-c 5 0.25 1 0.49 1.11 3.05 4.16 0.05 22.82
c-d 2 0.23 1 0.45 0.99 1.478 2.468 0.03 22.79
d-D 2 0.08 1 0.16 1.8 1.478 3.278 0.01 20.99
b - Lp 3 0.12 1/2 0.95 1.46 0.739 2.199 0.21 21.70
Lp - Lr 3 0.12 1/2 0.95 1.3 0.739 2.039 0.19 21.91
* Caudal de Bombeo
t= 2 horas
i= 2 "
Pb = Q*HDT /50
HDT hg hf hl Pd
HDT = 23.13 m
hg = 22.97 m
hf = 0.16 m
Pb = 1.979 HP 2 redondear
Pm = 1.25*Pb
Pm = 2.47
* Calculo de la Acometida
Qe = Vc / Tc
Qe = 2.642
*Carga disponible:
H= 21.04 m
L= 14
= (1.741 * (Q/ C) ^1.85 * L / Hf )^4.87