Professional Documents
Culture Documents
A CORPORATE
COMMITMENT
Company
Location
Date
Document Objectives & Contents
The objective of this document is to facilitate a fast and impartial assessment of current
energy efficiency status in a form that can be directly entered as data. It is aligned to the
Department of the Environment, Transport and the Regions (DETR) Making a Corporate
Commitment (MACC) programme which has 7 key components. The current status for each
of these components is assessed on a scale of 0 to 4 where 4 represents current best
practice, and 0 identifies very little or no progress.
The CURRENT STATUS SUMMARY is a grid that takes results from four
ORGANISATIONAL MATRICES. These provide assessments aligned to an organisations
activity in the areas of Management, Admin & Finance, Operational, and Technical.
Underpinning these, are a number of Detail Matrices defining specific areas of activity to be
used as appropriate.
Contents
Each of the matrices has up to seven columns. Each column covers a discrete topic related to
energy efficiency performance. The current status for that topic is assigned to one of five
levels 0 to 4. Level 4 represents current best practice. Level 0 identifies that very
little attention has been given. The intermediate levels then grade achievement within these
bounds. As a guide to the impact on energy efficiency, each level represents a change in
consumption of 8 10%, or 40 to 50% overall.
Levels 3 and 4 will generally represent compliance with MACC objectives. Level 3 is
likely to be appropriate for smaller organisations where level 4 would not be viable. Larger
organisations may find it appropriate to operate at level 4, providing viability exists.
In assessing information from the Detail Matrices, and the Operational Matrices, due
account must be taken of the matrix balance. For example, it is pointless having high levels
of investment without adequate reporting on achieved performance. Without that reporting,
there will be little justification for future investment. The objective is to operate at, and
advance in balance. Plus or minus one level about the mean is acceptable. Any results
significantly above this mean are unlikely to contribute to the current energy efficiency
status.
Detail Matrices should be used when the topic has been identified for action. It is not
necessary to use all columns they may not be relevant.
Experience from completion of matrices is that once the significance of level 0 and level4
have been explained, very little if any further explanation is required. The time for
completion is 30 to 40 seconds per column.
It is important that the matrices represent the achieved status, and not the image. Should there
be any doubt, then evidence of achievement should be obtained.
Management
Admin &
Finance
Operational
including
Maintenance &
Production
Technical
Policy review Tariff management Monitoring & targeting Contracts - energy Knowledge base List of investment Quality of energy reporting
Lease terms re energy data quality - fixed assets. performance requirements administration awareness candidates
efficiency Energy monitoring Office small power Investment performance
Admin & Energy targeting Contracts energy
Finance efficiency post completion
Energy waste detection
audits
Holiday management
Design briefing to include
energy efficiency
Policy review Maintenance Energy efficient operation - Heating time accuracy Motivation + (awareness Maintenance quality Performance reporting
Heating controls method statements Heating temperature campaign) control operational
Operational Water leak control Staff training in energy
Air infiltration Water l/person/day
including efficiency
Combustion Lighting controls KWh/m 2
Maintenance & Knowledge base on energy
Production Air handling control Energy sub metering Lighting levels lm efficiency
Water use management Lighting maintenance
standards
Policy review Energy efficiency technical Electricity supply Controllable systems Knowledge base on energy Minimisation of Review of environmental
strategy capacity/transformer Boiler-house standing efficiency operational and environmental impact impact annual
loading losses strategic options alternative approaches
Heating balance Commissioning standards
Technical Hot water efficiency Design standards review
Lighting equipment Design philosophy
Pumping control
Air conditioning
Informal policy based on a Formal list of staff Regular comparative Informal checks and Individual initiatives exist Support to annual reporting Basic reporting issued and
number of documents. responsibilities with greater checks on energy costs and contribution to contract in energy efficiency, but no process. regularly in standard
High level of compliance. than 60% able to fully consumption compared terms made by experienced overall co-ordination. Review process internally financial reporting format.
detail their part. with industry figures. persons. and mostly impartial. Reporting to senior
80% of staff aware of the managers and premises
policy. Some identification of
targets and opportunities management staff.
2 for improvement.
Informal policies exist but Informal list of staff Occasional checks on some Occasional checks when Occasional publicity, not Basic facts available on Reports limited in scope,
mainly unwritten. responsibilities. aspects of energy prompted. Some records of to defined programme. request. highlight good news, past
50% of staff are aware of No compliance checking. efficiency. performance targets exist. Information quality mainly forgotten.
the policy. indeterminate.
1
No policy exists No list of energy Insufficient information No awareness of No organisational support No regular reviews. Infrequent reports, not
management available to properly performance targets, to individual initiative. impartial.
responsibilities. support energy efficiency. irregular and informal
check on costs.
No initiatives except those No regular reporting. Very little effort made to No written policy. No staff have explicit No monitoring activity to Only reason for changing
driven by legislation. report to staff and responsibilities or duties. underpin review processes delivered conditions is
customers. complaints.
4
Department has own Most key activities Technical / premises staff Design brief and Continuous professional Technical and premises Current status reports
detailed policy / policies covered by comprehensive and contractors use operational standards kept development for technical staff contribute to review issued annually to
covering most activities. statements. monitored data to help updated and reflect current and premises staff. process on a regular basis. shareholders and staff.
Reviewed annually. All key tasks duties and define problems and best practice. All staff are aware of and Reviews offer comparative Impartial reporting of
Majority of staff aware of responsibilities assigned. confirm solution. Delivered Occasional compliance have access to an energy performance data on both performance to staff and
existence of policy, some performance checked checking. efficiency library. energy consumption and departments at least
All staff have a regularly and deviations
aware of detail content. documented general 'duty Good knowledge of best costs. quarterly.
corrected
3 of care'. practice indicators.
Evidence of informal policy Some key activities covered Delivered performance Design brief and Technical and premises Occasional review process Occasional issue of energy
in place and in operation. by statements of checked irregularly or when operational standards exist staff development mainly that includes key energy efficiency status reports.
Some aspects of policy responsibility. prompted by complaints. as informal objectives that via professional and and financial performance Concentrates on good
issues exis as formally All staff aware of a general Repairs take account of may not always include technical journals. data and comparison with news.
issued documents. No 'duty of care', though this is impact on energy and water current best practice. Occasional initiatives to best practice.
regular update not documented costs. Irregular compliance improve energy efficiency
checks. awareness of all staff.
2
Informal policies practised Informal assignment of Delivered performance Limited knowledge of best Energy efficiency Occasional review process Reports only issued if
by a few staff but no tasks, duties and checked only when practice performance awareness generally low. A mainly based on financial prompted by a business
documentation or review. responsibilities. prompted by complaints. indicators. No formal few staff have knowledge information need.
Some, but not all key Calibrated instruments used structure for setting or of energy efficiency Concentrates on good
activities covered. to take measurements. maintaining improvement techniques and facts. Little news.
targets. if any promotion of energy
efficiency to staff..
1
No evidence of policy Minimal if any evidence of Delivered performance Little if any knowledge of Little if any knowledge of No review process. No reporting.
documentation. assignment of energy checked only in response to best practice indicators. energy efficiency amongst
management tasks, duties complaints. Instruments Very little if any targeting staff. No attempt made to
and responsibilities. sometime used, but or checking of delivered inform staff of techniques
unlikely to be of known performance. and benefits of energy
accuracy. efficiency.
Level System Selection System Design Terminal Unit Control Heating/Cooling Humidity Control
Interlock
Full BMS with extensive Excellent system design Occupancy based control Main plant (and terminal Minimal and efficient
graphical operator facilities. with additional energy with demand based signal units) hardware/software humidification.
efficiency features such as; to main plant. interlocks with P&I mode Uncontrolled
demand based operation of Wide deadband between to prevent unnecessary dehumidification
main plant and occupancy heating and cooling (where simultaneous heating and minimised.
control of terminal units, appropriate). cooling. Alarm output if
etc. interlock fails or is over-
4 ridden.
Modern electronic DDC Good system design with Wide deadband between Main plant (and terminal Efficient humidification.
controls with good user all expected energy heating and cooling (where units) hardware/software No controlled
interfaces, communication efficiency measures such appropriate). interlocks with P&I mode dehumidification.
between controllers and as; free cooling control. to prevent unnecessary
optimum start/stop simultaneous heating and
facilities. cooling.
3
Modern electronic DDC Limited energy efficiency Same as level 0. Score 0 Same as level 0. Score 0 Humidification and
controls with features, free cooling if close control not if no interlocks, controlled dehumidification
communication between control expected. appropriate. provided 10% RH.
controllers, and optimum
start/stop facilities.
2
Standalone electronic Basic control of plant. Same as level 0. Score 0 Same as level 0. Score 0 Humidification and
controls. Lack of expected energy if close control not if no interlocks. controlled dehumidification
Time switch control of all efficiency features such as; appropriate. provided 5% RH.
plant. free cooling control.
Or pneumatic controls with
extensive BMS monitoring
1 and executive control*
Pneumatic controls with no Basic control of plant only. Close control of heating No interlocks to prevent Close control of humidity
monitoring. and cooling where not simultaneous heating and where not appropriate.
Time switch control of all appropriate. cooling.
plant.
* Executive control is plant stop/start time control and override for holidays, etc.
Level System Selection System Design Chillers Fan Power Pump Power
Appropriate system Excellent system design Optimal chiller selection, Most efficient fans, low Well selected pumps, VSDs
selected with additional with additional energy sizing and hydraulic design. loss ductwork, VSD and variable flow control
energy efficiency features. efficiency features. Evaporative cooling of regulation, etc. for distribution system,
condenser water or heat Less than 1W/1/s. VSD regulation for
recovery, etc. constant flow, low loss
system.
Less than ?W1/s.
4
Appropriates system Good system design with Good chiller selection, Good fan selection, good Well selected pumps, VSDs
selected. expected energy efficiency sizing and hydraulic design. ductwork design. and variable flow control
measures. Air cooled condensers or Less than ?W/1/s. for distribution system.
dry air coolers. Less than ?W/1/s.
3
A/C necessary but Reasonably sized but lack Reasonable chiller selection Reasonable fan selection Reasonable pump selection
inappropriate system(s) of expected energy and hydraulic design. and ductwork design. but constant flow.
and/or features selected. efficiency measures. Air cooled condensers or Less than ?W/1/s. Less than ?W/1/s.
dry air coolers.
2
A/C only necessary for Poorly designed - Chiller selection OK but Oversized fans, poor Oversized pumps, high loss
parts of building - yet fully Oversized plant, lack of oversized - poor hydraulics. ductwork design. system.
air-conditioned. expected energy efficiency Air cooled condensers or Less than ?W/1/s Less than ?W/1/s.
measures. dry air coolers.
1
A/C not necessary - yet Very poor design - grossly Chillers poorly selected Very oversized poorly Very oversized pumps,
fully air-conditioned. oversized for application, and/or grossly oversized - selected fans, very poor very high loss system.
etc. lead/lag - poor hydraulics. ductwork design. Less than ?W/1/s.
Air cooled condensers or Less than ?W/1/s.
dry air coolers.
MACC - 6
Level Boiler Selection Parallel Connected Series Connected Modular Boilers with High/Low Fire Boilers Primary/Secondary
Boilers Boilers Common Combustion Circuit Interaction
Chamber
Very low standing loss Score 4 if requirements of Common primary pump. Full sequence control High fire correctly Decoupled via buffer vessel
boilers less than 0.5% of 3 are satisfied and formal Proportional control from system with fixed firing integrated into sequence or large diameter common
rated output. documentation exists on return temperature, or flow order. control. header.
design intent and control temperature control where Individual boiler
settings. adequate margin between thermostats in boiler outlet
set point and boiler for control and high limit as
thermostats. Control per HSE PM5.
4 settings.documented.
Low standing loss boilers Common primary pump. Common primary pump. Only available scores are Score 4 if requirements of Score 4 if requirements of
with losses down to 0.75% Proportional control from Proportional control from 0 , 1 and 4. 4 are satisfied.. 4 are satisfied.
of rated output, common return temperature, or flow return temperature, or flow
primary pump. temperature control where temperature control where
adequate margin between adequate margin between
set point and boiler set point and boiler
3 thermostats *. thermostats *.
High standing loss boilers Only available scores are Only available scores are Only available scores are High fire set at lower Score 1 if requirements of
with losses in the range of 0, 3 and 4. 0, 3 and 4. 0, 1 and 4. temperature than low fire 1 are satisfied.
2% to 5% of rated output, by margin of at least 6oc.
fully isolated and cold
when off line.
2
High standing loss boilers Only available scores are Only available scores are Sequence control with fixed Score 2 if requirements of Partially decoupled
with losses greater than 5% 0, 3 and 4. 0. 3 and 4. order of firing, but module 2 are satisfied header/buffer vessel size
of rated output, fully control thermostats in limited.
isolated and cold when off module inlet in
line. contravention of HSE PM5.
1
High standing loss boilers Individual pumps or Series connected boiler No sequence control, High fire set at higher, or No decoupling, affected by
greater than 7% of rated motorised isolation valves without adequate control as sequence achieved by same, temperature as low compensator valve position,
output, not fully isolated with return temperature defined at level 3. module control thermostats fire. TRVs emitter isolation
when off line. control. in module inlet in valves, etc.
Inadequate margins with contravention of HSE PM5.
flow temperature control.
0
* Margin for flow temperature control must include dilution for parallel connected boilers and boiler firing.
* Boiler thermostats must comply with HSE PM5. Pressurised systems normally required.
4
All windows are double Most external doors are Roof insulation is at least
glazed, and draught draught stripped and have 100mm thick and
stripped. self-closing devices. continuous over whole roof
Door locks hold them area.
tightly closed.
3
Windows generally are External doors generally Roof insulation is 150mm
single glazed and draught draught stripped. to 100mm thick generally,
stripped, and window but there are visible gaps in
catches hold them tightly the insulation.
shut.
2
Windows are single glazed External doors fit well and Parts of the roof are
but fit well with minimal catches hold them tightly insulated.
draughts. closed.
1
Windows are single glazed External doors are poorly There is no roof insulation
and poorly fitting with gaps fitting and gaps are visible installed.
visible around the edges. around the edges.
BMS installed correctly and All sensors checked seasonally Maintenance status report Ensure that desired temperature Summary report of BMS data Ad hoc use of portable monitors
regularly checked to ensure that and calibrated annually. generated weekly profiles are maintained and recorders in both occupied
it is operated in the most and unoccupied areas
effective and efficient manner at
all times to take into account
variations in ambient.
2
Temperature controlled by local Ad hoc checking of sensors Maintenance Department carry Ensure heating is turned off at Weekly report by Maintenance Ad hoc hand checking of
space thermostats out ad hoc checks on space weekends and in the summer. Department of daily space radiator temperatures
temperatures temperatures
1
No BMS. Temperature No procedure for sensor No ability to measure or check None -- heating may even be No measurements taken and no No auditing or monitoring
controlled from boiler checking, setting or calibration operating efficiency allowed to remain on 7 reports prepared
days/week
4
Detailed Schematic with Detailed plant control and Reasonably detailed Reasonably detailed
instruments, balancing operation, basic system schedules of all plant maintenance schedules for
valves, etc. concepts. instrumentation and all plant and control
Similar to GIR 40. controls. systems.
3
System Schematic without Basic plant control and Basic plant instrumentation Basic plant maintenance
some elements such as operation. and control schedules for schedules for greater then
instruments, balancing greater than 95% and 95% plant and control
valves etc. control systems. systems.
2
Basic system Schematic Minimal, or poor plant Minimal or poor plant Basic plant maintenance
without instruments, control and operation. instrumentation and control schedules - less than 85%
balancing valves etc. schedules - Less than 85% of plant control systems.
of plant and control
systems.
1
None available. None available. None available. None available.
Level Management of energy Standards of supply Measurement of Contract terms Physical checks Energy management Fuel and water
management tasks, delivered conditions staff experience purchasing
duties, responsibilities
A comprehensive set of Documents exist defining Scheduled checks using All purchase orders and All premises are covered by All staff / consultants All fuel and water supply
energy management duties internal temperatures, times calibrated instruments are contracts for supply of formal checks made to a undertaking energy purchases and contracts are
is properly assigned to of operation, lighting made of all activities goods and services that schedule. Scope includes management duties have tariff adjudicated to meet
appropriate persons. All levels, permissible levels of covered by the Standards impact on energy and water all items that could impact appropriate levels of formally defined business
actively contribute to standing losses, limits to of Supply documents. efficiency have explicit adversely on energy professional, technical, objectives. These include
energy efficiency. control errors. All areas and Frequency of checks relates consideration for efficient consumption, comfort or commercial, product security of supply, costs
activities covered. to expected rate or reason operation at lowest overall energy related productivity. knowledge, communication and ability to accept
4 for change. cost. and management skills. business change.
A comprehensive set of Direct reference is made to Scheduled checks using Contracts for supply of Informal checks are made All persons (including All fuel and water
energy management duties existing professional, calibrated instruments are goods and services that by appropriately trained consultants) whose work purchases and contracts are
is properly assigned to all technical and best practice made and compared with impact on energy and water staff for all items that could impacts on energy subjected to a competitive
persons whose activity publications. best practice guidance. efficiency are formally adversely impact on energy efficiency have appropriate bidding process. Larger
directly impacts on energy Checks are made to a checked for inclusion of efficiency. levels of professional and accounts are checked for
and water efficiency. defined schedule. energy efficiency technical skills. sensitivity to changing
requirements. patterns of consumption to
3 overall costs of supply.
Energy management duties Knowledge exists of Checks to ensure Contracts for supply of Checks on heating levels All staff whose work Fuel and water purchases
are assigned to premises maximum and minimum conformance with small power devices, and and times of operation are impacts on energy and and contracts are
and technical staff. heating levels as defined by legislation are made at least for maintenance define limited to maintenance water efficiency have at competitively obtained.
legislation. twice a year in all heated energy and water efficiency procedures. Formal reports least basic energy
spaces. requirements. made on existing and efficiency training and
current status. knowledge of best practice.
2
Assumption is made that Knowledge exists of Checks to ensure Specification of energy Checks are made when Staff and contractors whose Fuel and water purchases
energy and water efficiency minimum heating levels as conformance with efficiency requirements is rooms are perceived to be work impacts on energy and contracts are reviewed
tasks, duties and defined by legislation. legislation are required as applied to a limited number uncomfortable. No routine efficient operation have occasionally for lowest
responsibilities are part of part of maintenance of contracts. checks made.. basic energy efficiency costs of supply.
existing duties. Staff may contracts or by landlords knowledge.
not be aware of these agents. No feedback would
responsibilities. normally be obtained from
1 these checks.
No evidence of any Minimal if any knowledge Delivered performance Energy efficiency does not No checks made. No actual skills exist, No attempt made to ensure
assignment of energy of standards of supply of only checked upon receipt appear as a contract though some level of skill purchasing at lowest cost.
efficiency duties. services. of complaints. requirement. may be implied.
Level Primary/Secondary Secondary circuit Zoning Pumps Space Temperature Space Temperature
circuit interaction connections Control Radiators, Control - Fan
natural convectors etc. convectors
Decoupled via buffer vessel All system flows at top of Objective zoning for Variable speed controlled Proportional, or on/off, Full electronic proportional
or large diameter common buffer vessel or at occupancy, solar gain, from representative load, electronic control of each control of each room or
header. appropriate end of common equipment gain, emitters, differential pressure, or room or emitter, with emitter with fan interlock
header. structure, etc. where reducing pump differential occupancy sensing. and occupancy sensing.
Returns at bottom., etc. appropriate. pressure with demand.
4
Score 4 if requirements of Score 4 if requirements of Score 4 if requirements of Score 4 if requirements TRVs sized to provide Full electronic proportional
4 are satisfied. 4 are satisfied. 4 are satisfied. for 4 are satisfied. 5kPa loss or equivalent control of each room or
authority. emitter with fan interlock.
Horizontal or remote heads.
Or electronic proportional
or on/off control.
3
Partially decoupled Score 1 if requirements of Score 1 if requirements of Variable speed pumps TRVs sized to provide Bi-metal strip thermostats,
header/buffer vessel size 1 are satisfied. 1 are satisfied. controlled at constant pump 5kPa loss or equivalent for or TRVs with fan interlock.
limited. differential pressure. system design.
Low level vertical heads.
Or Bi-metal strip
thermostats and zone
2 values.
Score 2 if requirements of Separate flow and return Limited (appropriate) Score 2 if requirements TRVs poorly sized, heads TRVs poorly sized, heads
2 are satisfied. headers with logical zoning of circuits for 2 are satisfied. affected by convector or affected by convector or
connections. system temperature. system temperature.
No fan interlock.
1
No decoupling. Separate flow and return No zoning where zoning Constant speed pumps. None fitted. None fitted.
headers with random desirable, or inappropriate
connections. zoning.
Level Type of Installation Timer/Programmer Calorifier Installation Pipe-work Installation Actual Water
Settings Temperature at Taps
Instantaneous local point of Two or more visual and Not applicable Not applicable Water temperature at the
use water heaters or water functional checks made taps is hot and no cold
heaters with localised each year against a formal water has to be added for
storage and time controls. document and results comfort.
recorded.
No pump or heating fuel
used when building is
4 unoccupied.
Instantaneous local point of Annual visual checks made Not applicable All pipe-work in both Water temperature at the
use water heaters or water using formal procedures unheated and heated spaces taps is hand hot but on
heaters with localised and results recorded. is well insulated and occasions a little cold water
storage without time No pump or heating fuel insulation feels cool to the has to be added for
controls. used when building is touch. comfort.
unoccupied.
3
Hot water is provided from Times of availability The calorifier is well All pipe-work in both Water temperature at the
a central boiler plant with closely matched to demand. insulated with insulation unheated and heated spaces taps is hand hot and cold
7-day timer/programmer Separate time switching for known to be more than in well insulated and water has to be added
that allows different water heaters, boilers and 75mm thick. insulation feels cool to the regularly for comfort.
settings for heating versus pumps. touch.
hot water and for weekend
versus weekday. Regular checks on time
2 switch settings
Hot water is provided from Times of availability not The calorifier is insulated Pipe-work in unheated Water temperature at the
a central boiler plant, with specifically checked. with 25-50mm insulation. spaces is well insulated and taps is too hot for comfort
timer/programmer serving Some pump or heating fuel cool to the touch. and some cold water has
both heating system and hot used when building invariably to be added for
water. unoccupied. comfort.
1
The only boiler controls are Times of availability not The calorifier is poorly Pipe-work generally is not Water temperature at the
on/off and the boiler specifically checked. insulated and losing heat insulated or the insulation taps is very hot, and
thermostat. Significant use of pump(s) badly. is thin, damaged or in poor significant amounts of cold
or heating fuel when condition. water have to be added for
building occupied. safety.
Level Strip Lights Small Lights Switching Equipment Replacement Policy Lighting Diffusers Operation in Use
And Shades
A high proportion of strip All small lights are Lights are switched in Light fittings, including Diffusers and shades are Lights operate only as
lights are 26mm diameter compact fluorescents. separate banks whose diffusers, reflectors and selected for their high required.
high efficiency tubes with locations correspond to ballasts are being upgraded utilisation factor Where daylight is available,
high frequency ballasts and available daylight. to high efficiency (translucency). light output is adjusted to
speccular reflectors. Switches are clearly replacements as a matter of There is an established the minimum required.
labelled to show which urgency. routine for inspecting and There is a routine for
lamps they operate. cleaning diffusers on a regular checking of
4 regular basis. artificial lighting usage.
A high proportion of strip 75% are compact Lights are switched in Light fittings, including Diffusers and shades are Lighting levels and hours
lights are 26mm diameter fluorescent with tungsten in separate rows with switches diffusers, reflectors and selected for their high of operation are well
high efficiency tubes with remainder. located near the lights they ballasts are upgraded utilisation factor and are controlled.
speccular reflectors. operate. whenever opportunities cleaned occasionally. Checks are undertaken
Switches are clearly allow. periodically on an ad-hoc
labelled. basis.
Cleaners light their current
3 working area only.
Most strip lights are 26mm 50% are compact Lights are switched in rows Light fittings, including Diffusers and shades are of Light levels are partially
diameter tubes with fluorescent, with the and switches are in the diffusers, reflectors and high utilisation factor, but controlled.
prismatic reflectors. remainder compact same space as the lights ballasts are being upgraded are not regularly Lights are switched on only
fluorescent. they operate. on an ad-hoc basis. maintained. when they are required, and
But rows do not correspond switched off at the end of
with daylight, nor are the occupation period.
switches labelled. No routine for checking
2 usage.
Strip lights are 38mm 25% are compact Lights have the potential to Lamps and ballasts are Diffusers and shades are of Lighting levels are partially
diameter tubes with fluorescent with the be switched on in banks, sometimes upgraded when fair translucency but are controlled.
prismatic diffusers. remainder tungsten. but in practice all go on they are replaced to high rarely cleaned. All lights are switched on at
together. efficiency types. the beginning of the day
and operate continuously
whenever the building is
occupied, whether required
1 or not.
Strip lights are 38mm Traditional tungsten Lights are switched from Lamps are replaced on a Diffusers and shares are of Lighting levels are
diameter tubes with egg- filament General Lighting central locations and all go breakdown basis with like poor translucency and are uncontrolled.
crate or opal diffusers. System (GLS) lamps on together. for like lamp types. never cleaned. Lighting is frequently left
throughout. on 24 hours per day
whether the building is
occupied or not.
0
Regular surveys using formal Documented procedure for Documented procedure for Blanket open contracts with Check to determine whether the work
condition appraisal methods responding to reported problems. checking that work has been assessed and approved contractors has been completed satisfactorily
carried out rigorously all Procedures include adequate satisfactorily completed and is in with agreed response times and immediately on report from the
equipment and fabric elements reporting on energy efficiency accordance with order. spares holdings. contractor while contractor still on site.
affecting energy efficiency. implications and include formal Full and detailed records kept.
Formal use of energy checks to ensure energy efficient
consumption records and targets. operation is restored.
4 Results formally distributed and
acted upon where necessary.
Condition surveys carried out Documented procedure for Documented procedure for List of assessed and approved Check to determine whether the work
regularly on all equipment and responding to reported faults. Energy checking satisfactory completion contractors with "fast-track" job has been completed satisfactorily
fabric elements affecting energy efficiency specifically considered in of work. authorisation. within one week of contractor reporting
efficiency. Ad-hoc use made of procedures. Records kept. completion.
energy consumption and target
information
3 Results formally distributed.
Condition surveys carried out Repairs and adjustments carried out Ad hoc procedure for checking Contractors regularly assessed and Check with user that the contractor has
regularly on all equipment and by local staff / contractor. Priority is work carried out correctly approved list maintained. completed work satisfactorily.
fabric elements affecting energy maintenance / restoration of service.
efficiency. Nil input from energy Energy efficiency known to be
consumption records and targets considered in actions taken, but not
Remedial work constrained by explicitly checked.
2 budgets.
Condition surveys an occasional Repairs and adjustments carried out User department acceptance of List of contractors kept who have Contractor to confirm that he has
activity, often prompted by plant by local staff / contractor. Priority is work previously carried out work satisfactorily completed the work.
failure or safety considerations. maintenance / restoration of service.
Remedial work only carried on Energy efficiency aspects not
major defects. specified.
1
No regular surveys or No procedure to handle repairs and No follow-up on completion of First available contractor employed No follow up on completion of work.
maintenance carried out adjustments work
All data obtained up to date and Premises inventory and All meter readings taken daily, Energy usage analysis made Reports prepared and provided Premises database checked
competently analysed with occupancy database updated temperature and other recorded with respect to fuel costs, to managers in a concise form annually for accuracy.
minimum delay. Management quarterly. All data sources of data collated and combined with business ratios, building usage allowing both technical and Instrumentation calibration
and operational efficiency assessed quality. Consumption relevant trading and business and other relevant parameters. financial data to be effectively verified. Market fuel prices
information provided in timely data routinely obtained. Internal data recording. Accuracy of energy targeting utilised. Data normalised for checked.
manner and appropriate detail. & external temperatures logged and normalisation formally ease of comparison. Impact of Reports analysed for significant
4 hourly and energy usage assessed against business needs. input data and algorithmic trends and anomalies.
recorded on a shift basis. uncertainties defined.
All data obtained up to date and Premises inventory and All meter readings taken Energy usage analysis with Reports prepared and provided Premises database checked
analysed so as to provide occupancy database updated weekly, temperature and other respect to fuel costs, business to managers in a concise form annually for accuracy.
management information in annually. All data sources recorder data collated and ratios usage and other allowing both technical and Instrumentation calibration
adequate detail. calibrated. Internal & external combined with relevant trading parameters including prevailing financial data to be effectively verified. Market fuel prices
temperatures logged regularly and business data recording weather. Comparisons possible utilised. with deviations from checked.
and energy usage recorded on a with previous periods. Data budget and comparisons with
3 shift basis. accessible on a day by day basis previous period.
Provision of budgetary figures Most data sources calibrated. All meter readings taken Energy usage analysis with Reports prepared and provided Premises database checked
base on usage in corresponding Internal & external temperatures monthly, temperature and other respect to fuel costs, building to managers incorporating both annually for accuracy. Ad hoc
periods adjusted for changes in logged routinely and energy recorder data collated and usage and other parameters technical and financial data cursory check on reports and
base data usage recorded weekly. combined with relevant trading including prevailing weather. together with deviations from comparison with previous year.
and business data recording Comparisons possible with budget and comparisons with
previous periods. Data previous period.
2 accessible on a weekly basis
Provision of budgetary figures Records kept of consumption All meter readings taken Energy usage analysis with Reports prepared and provided Ad hoc checks on premises data
base on usage in corresponding based on bills from suppliers quarterly, temperature and other respect to fuel costs, building to managers incorporating both base .Ad hoc cursory check on
periods recorder data collated and usage and other parameters technical and financial data for reports and comparison with
combined with relevant trading including prevailing weather. the period previous year
and business data recording Comparisons possible with
previous periods.
1
No information of energy No measurements taken and no Information not collected No energy analyses prepared No management reports No auditing function
efficiency or consumption records kept prepared
available
2
Trade journals, literature and other Power efficiency data on products Users instructed to on y have All equipment switched on at start Ad hoc checks carried out to
sources studied for energy obtained as part of selection equipment switched on when of day and remains on when ever determine whether equipment is
implications when a purchase is process required building occupied. switched off out of hours.
imminent
Energy efficiency not a No consideration of energy No policy for ensuring Equipment frequently left running No checks to determine whether
consideration when keeping up to efficiency in product selection equipment switched off when even when building unoccupied equipment is left on even when
date on products or technology not in use. building is unoccupied
Level Boiler Programmer or Boiler output controls Heat Emissions Heating Systems Heating levels Boiler House
Timer and/or And balance Check during Summer
Manager Controlling or Spring
Daily Operation
Boiler operation is Effective automatic control Radiators have thermostatic Rigorous checking of Temperatures are even Boiler-house is cool even
controlled by a building of boiler standing losses. valves, fan connectors have controls function, settings, throughout the building when boilers are working.
energy management Only those boilers whose individual controls and and system balance carried within - within the range
system, programmed for output is required are hot, different areas of the out once per year. 18oC to 20oC during the
weekends and holidays, and all others cold or cooling. building each have internal Documented procedures periods of occupancy, and
with self learning optimum temperature sensors and comprehensive records reducing to lower
start and stop. Boilers and manifolds are (thermostats). temperatures outside those
of results.
4 well insulated. periods.
An optimum start controller Effective manual isolation Radiators and fan Full checking of controls Temperatures are even Boiler -house is warm.
varies the start time of the of boilers to reduce convectors have function, controls settings, throughout the building, but
boiler according to outside standing losses when full individually operated and system balance carried in some parts they
temperatures, and an output is not required. controls. out once per year. occasionally rise over 20oC
optimum stop does the Boiler and manifolds are The water supplying Documented procedures during spring or autumn.
equivalent at the end of the well insulated. radiators only is hotter in exist for each check. 20oC is maintained only
day. mid winter and cooler in during the hours of
Some results on record.
3 autumn and spring. occupancy.
There is an optimum start All boilers become hot only Radiators and fan Informal checking of Temperatures above 20oC Boiler-house is very warm.
filtered to the boiler. when boiler output is convectors have controls function and during spring and autumn,
required. individually operated system balance carried out and the building is warm
Boilers are cold at all other controls but water once per year. for more than an hour
times. temperature to the radiators Schedule of checks exists before or after the periods
is the same all year round. but no proof of occupancy.
2
The boiler has a simple All boilers remain hot Radiators and heat emitters Annual functional check Temperatures vary and they Boiler-house is hot.
timer that can be easily set. during pre-heat and have basic controls, and carried out under contract. are frequently above 20oC
Timer settings are adjusted building occupation hours there is only one internal No evidence exists on for long periods - including
manually to suit seasonal during summer and winter. temperature sensor to extent of checks or of outside periods of
heating requirements. control them. results obtained. occupancy.
1
The timer is in a poor state All boilers remain hot Radiators and heat emitters Maintenance is on For much of the building Boiler house is very hot.
of repair and cannot be including when building is have no controls and get breakdown basis and temperatures are frequently
easily adjusted. unoccupied for at least hot together. controls are checked only too hot, particularly in
seven months of the year. Radiator temperatures when things go wrong. spring and autumn.
appear to be the same all
year round.
0
4
Formal energy policy, but Energy manager Energy committee used as M&T reports for individual Programme of staff Same pay back criteria
no active commitment from accountable to energy main channel together with premises based on sub- awareness and regular employed as for all other
top management. committee representing all direct contact with major metering, but savings not publicity campaigns. investment.
users, chaired by a member users. reported effectively to
of the managing board. users.
3
Un-adopted energy policy Energy manager in post, Contact with major users Monitoring and targeting Some ad-hoc staff Investment using short-
set by energy manager or reporting to ad-hoc through ad-hoc committee reports based on supply awareness training. term payback criteria only.
senior departmental committee, but line chaired by senior meter data. Energy unit has
manager. management and authority departmental manager. ad-hoc involvement in
are unclear. budget setting.
2
An unwritten set of Energy management is the Informal contacts between Cost reporting based on Informal contacts used to Only low cost measures
guidelines part-time responsibility of engineer and a few users. invoice data. Engineer promote energy efficiency. taken.
someone with limited compiles reports for
authority or influence internal use within
technical department.
1
No explicit policy No energy management or No contact with users. No information system. No No promotion of energy No investment in increasing
any formal delegation of accounting for energy efficiency. energy efficiency in
responsibility for energy consumption. premises.
consumption