OUTCOME BUDGET
2017-2018
FEBRUARY, 2017
OUTCOME BUDGET 2017-18
The Government of Gujarat has taken a decision to introduce the Outcome Budget from the year 2017-18. The Outcome Budget is being
brought out as Budget publication No.56. The purpose of the Outcome Budget is to link budgetary provisions to Development Outcomes of
Government Programmes. In that sense it is a departure from the traditional budgeting which focuses on public spending as a method of monitoring
the implementation of the Budget. The Outcomes would be the result of Government initiatives and schematic programmes and would be measured
not in terms of rupees spent but in terms of physical units. Therefore it is aimed to give a clearer picture of the implementation of the Government
Programmes vis--vis stated objectives of all those Programmes.
It is expected that Outcome Budget would help the policy makers and decision makers to arrive at a better understanding of the efficiency
and effectiveness of Government spending. The Outcome Budget is also an important step towards increasing transparency in governance and in
budgeting. The outcome budget is expected to facilitate the utilization of government funds in the interest of the public so that citizens may be
benefited to the maximum and unnecessary and less useful expenditure can be avoided.
As this is the first year of Outcome Budget in Gujarat, GAD (Planning Division) has carried out extensive consultation with the Departments
to identify those Government Schemes that could be included in the Outcome Budget. Generally schemes having large outlays, schemes related
to physical output such as construction and procurement, schemes intended to improve developmental indicators and schemes designed to extend
subsidy or benefit to individual, have been selected. Thereafter indicators have been identified by the Department for each of these schemes and
physical targets have been indicated for the next 3 years. These targets are projections subject to modification based on actual requirements and
budgetary provisions of the relevant year.
Another exercise that has been taken in tandem with the Outcome Budget is the revision of the Annual Development Programme to include
the developmental objectives and strategies for each Department and the sector that they are being dealing with. The schematic details such as the
components and activities under taken under the scheme, intended beneficiaries, the scale of assistance , if applicable, implementing agency, the
funding pattern and the intended outcomes have also been articulated for these selected schemes and included in Part-II of the Budget Publication
35: Development Programme.
Finally attempt has also been made to indicate Macro Outcomes for each Department and related Demand for Grant. The quantitative
targets for the indicator which will be used to measure these Macro Outcomes will be finalized by the Planning Division in consultation with the
Department concerned over the next couple of months. Therefore, at this stage the quantitative indicators and targets in respect of the Macro
Outcomes have not been included in the Outcome Budget for each Department.
Since this is the first year of the Outcome Budget, there would be room for improvement and modifications on the basis of our experience
going forward. The Department would welcome suggestions and feedback for transforming the Outcome Budget into an effective and meaningful
instrument to gauge the impact of development spending by the Government.
Planning Division
General Administration Department
Government of Gujarat
INDEX
Sr. No. Name of Department Page No.
1. Agriculture & Co-operation 1
2. Education 16
3. Energy & Petro-Chemicals 27
4. General Administration 31
5. Food, Civil Supplies & Consumer Affairs 34
6. Forests & Environment 36
7. Health & Family Welfare 44
8. Home 51
9. Labour & Employment 55
10. Information & Broadcasting 58
11. Industries and Mines 59
12. Legal 64
13. Narmada, Water Resources, Water Supply and Kalpsar 66
14. Ports & Transport 73
15. Panchayat, Rural Housing & Rural Development 75
16. Revenue 79
17. Roads & Buildings 83
18. Social Justice & Empowerment 88
19. Science & Technology 95
20. Tribal Development 98
21. Sports, Youth & Cultural Activities 103
22. Urban Development & Urban Housing 108
23. Women & Child Development 113
24. Climate Change 117
Demand Nos.:1,2,3,4,5,6,7,95,96
Name of Department: AGRICULTURE AND CO-OPERATION DEPARTMENT
Provision
Demand No. Demand Detail Macro Outcome
( Rs in Cr.)
1 Agriculture and Co-operation Department 18.46
2 Agriculture 3382.07
Minor Irrigation, Soil Conservation and Area
3 247.59
Development
4 Animal Husbandry & Dairy Development 568.26
5 Co-operation 850.19
6 Fisheries 489.43
56-OB-1
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesGypsum - (ha.) 43435 47778 52556
Cluster Demonstration - (ha.) 38157 41973 46170
SCSP 2.41
AGR 5 Rotavator - (Nos.) 383 421 463
002:2401 : 00 : 102 : 03 Pump Set - (Nos.) 3136 3449 3794
National Food Security Mission (NFSM) Cropping System based
3772 4150 4565
Demonstration - (ha.)
TASP 5.00
Power Snapback Sprayer -
1113 1225 1347
(Nos.)
Production of certified
13282 13500 14000
seed(Qtls.)
Normal 35.39
Block Demonstration (ha.) 13097 14407 15848
Farmers Training (Nos.) 553 609 670
Distribution of
Pyrite/liming/dolomite/ SSP 46117 50729 55802
(ha.)
SCSP 002 2401 00 114 01 0.80
P.P.Chemicals
,National Mission on Oilseed &Oilpalm
/insecticides/Bio pesticides 3966 4363 4799
(NMOOP)
(ha.)
P.P.Equipments (Nos.) 738 812 893
Impr. Farm Implements-
756 832 915
TASP 1.00 Power Operated (Nos.)
Oil Engine (Nos.) 553 609 670
Tarpaulin (Nos.) 11900 12500 13000
Normal 226.24 123265 177750 182750
SCSP AGR 10, 28.97 15750 15750 18250
002 2401 00 119 53 ,
Area in Hectare
Scheme on Micro Irrigation under Pradhan
TASP 57.84 31500 31500 33400
MantriKrishiSinchayeeYojana (PMKSY)
Normal 300.00
SCSP 002 2401 00 800 18, 20.00 No. of projects 50 55 60
TASP RashtriyaKrishiVikasYojna 45.00
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesRAD-Rainfed Area
Normal 43.18 50 60 65
Development-Cluster
SHC-SOIL HEALTH CARD-
SCSP 3.83 2700000 2700000 2700000
AGR 66, No.
002 2401 00 800 21 ,
National Mission for Sustainable Agriculture PKVY-
(NMSA) ParamparagatKrushivikasyoja 250 260 265
TASP 7.65 na-Cluster
SMAF- Submission on Agro
4000 4200 4250
forestry-Ha
HRT-8, Establishment of Regional
68750 72100 75700
02:2401:00:119:51, coconut nursery
Normal 0.57
Scheme for Centrally Sponsored Programme Laying out of demonstration
200 210 220
for Coconut Development plots
Area expansion of fruit crops.
3500 3650 3800
(Hectares)
Normal HRT-9, 131.04 Area expansion of vegetables
HRT-13, 700 780 880
crops. (Hectares)
HRT-14
Shed Net House (Nos.) 25 35 45
SCSP 02:2401:00:119:11, 11.76
No, of plastic tunnels 25 35 45
95:2401:00:119:02,
Mulching (Hectares) 940 980 1020
96:2401:00:796:42
Centrally sponsored Scheme on Mission on
TASP Integrated Development of Horticulture 25.20
(MIDH)- For General Categories Farmers, Green House Structure (Nos.) 32 37 43
SC Farmers & ST Farmers
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
Examination of samples (No.) 53200 53200 53200
HS Vaccine Production
40 80 90
(Lakh dose)
FMD Vaccination of
2.1 2.1 2.1
Livestock (Crore)
ANH-3, Brucella Vaccination of
04:2403:00:101:02, 1 1 1
Livestock (Lakhs)
Normal 04:2403:00:101:15, 46.86 PPR Vaccination of Sheep-
04:2403:00:101:16, 20 20 20
Goat (Lakhs.)
Disease Prevention and Control Programmes Training of Veterinary
200 200 200
Officers (No.)
Training of Livestock
100 100 100
Inspectors (No.)
Village Search (No.) 46200 46200 46200
Day Book Inspection (No.) 3300 3300 3300
Stock Route Search (No.) 1500 1500 1500
ANH-5
Projects of Gaucher
Normal 04:2403:00:102:16, 18.70
development to be 7 7 7
95:2403:00:107:02
implemented (No.)
SCSP National Livestock Mission 3.00
Bulk Milk Cooler (No.) 135 135 135
Automatic Milk Collection
Normal 69.35 system (No.) 375 375 375
DMS-1 Dudhghar (No.) 225 225 225
(04:2404:00:001:03, 04:2404:00:001:05,
95:2404:00:001:01, 96:2404:00:796:02) Milk Adulteration Detection
Dairy Development Programmes 325 325 325
Machine (No.)
SCSP 3.67
Beneficiary of Milking
750 750 750
Machine (No.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesLivestock Insurance (No.) 2400 2400 2400
DMS-1
Beneficiary of Cattle Feed
(04:2404:00:001:03, 04:2404:00:001:05, 10000 10000 10000
TASP 5.61 (No.)
95:2404:00:001:01, 96:2404:00:796:02)
Area Specific Mineral
Dairy Development Programmes 6 6 6
Mixture Plant (No.)
FSH-06 ,
Normal 06-5051-02-200-01 200.00 F.H./F.L.C. 4 4 6
Construction of docks,berths and jetties
FSH-08 06-
2 stroke and 4 stroke OBM's
Normal 2405-00-103-04 Mechanisation 3.60 400 400 400
/IBM's (Boats)
of Fishing Crafts
FSH-20,
Normal 06-2405-00-103-14, 1.53 DAT Boat 1000 1000 1000
Safety of Fishermen at Sea
06 2405 00 103 15
Ha. (Shrimp farming) 200 200 200
Blue Revolution integrated development and
Normal management of Fisheries (Partially Centrally 9.45
sponsored) scheme *New Item
Ha. (For ponds) 60 60 60
Ha. of land (for rearing space
40 40 40
development)
Total 1,155.82
State Funded Schemes
No. of farmers
400000 400000 400000
AGR 1, (KrushiMahotsav)
002-2401 : 00 : 001 : 06,
Normal 92.73 Awards to No. of farmers 30 30 30
Administration & Infrastructure Facilities For
Agriculture Development No. of visitor farmers (Agri
- 500000 -
summit)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesPlant Protection Equipments
10000 11000 12100
(No.)
Secondary and Micro
30000 33000 36000
nutrients (Ha)
AGR-2 Under ground pipeline (No.) 7477 8300 9100
Normal Agriculture support programme for other than 107.30 Tarpolin (No.) 24000 26400 29000
SC/ ST farmers Pump set (No.) 7407 8400 9800
Field Demonstaration (No.) 2500 2700 2900
100 % Water Soluble
200000 220000 235000
Fertilizer (Ha)
No. of farm equipments 14400 15900 17500
AGR-02,
Normal 21.30 47400 52000 57000
002 2401 00 105 29 ,
No. of Framers
SCSP Assistance to SC-ST and small-marginal 1.90 4200 4700 5000
TASP Farmers for provision of Hand Tools kit. 3.80 8400 9300 10000
Plant protection equipments
2266 2334 2404
(Nos)
AGR 3,
Tadpatri (Nos) 13500 13905 14322
096 2401 00 796 03,
Field Demonstrations (Ha.) 10900 11227 11564
Distribution of Seeds of more productions
TASP 34.95 Micronutrients (HA) 8866 9132 9406
verities/ Hybrids varities Seeds and fertilizer
Open Pipeline (HA) 1244 1281 1320
at subsidies etc. to Adivasi farmers in Tribal
Organic Fertiliser quntity up
Area (TASP) 11600 11948 12306
to 1 Ton (HA)
Farm equipments 1392 1547 1702
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesPP Equipment (Nos.) 1222 1344 1478
Tarpaulin (Nos.) 5280 5808 6388
Field demonstration (Nos.) 12950 14245 15670
AGR 4,
Pump set (Nos.) 2097 2307 2538
095 2401 00 103 01,
SCSP 15.55 Under ground pipeline
Distribution of Seeds and Fertilizers input 935 1028 1131
(PVC) (Nos.)
Kits at Subsidised rates to S.C. cultivators
Secondary & micro nutrient
8933 9826 10809
(Hectares)
Other farm equipments 450 500 550
Crop Insurance premium
AGR 11, 21 lakhs 22 lakhs 23 lakhs
(No. of farmers)
Normal 002 2401 00 110 04, 506.43
No. of farmers and their
Risk Management in Agriculture 159000 161000 163000
families insured (KKVY)
Plant protection equipments
89 92 94
(Nos)
Tadpatri (Nos) 800 824 849
AGR 14, Field Demonstration (Hectare) 275 283 292
TASP 096 2575 01 305 05,Supply of seeds and 0.65
Agriculture
fertilisers and pesticides to Dang Cultivators.)
fair/Exhibition/Farmers 3 3 3
Training (Nos)
Organic Fertiliser (Hectare) 233 240 247
Pump set (Nos) 139 143 147
AGR 16,
Normal 002 4401 00 103 01, 126.00 Storage capacity in warehouse 63000 150000 136000
Construction Activity under RIDF Scheme
Staff/Farmer Training and
73 90 110
Demonstration -Nos
Target for organic farming
7500 8500 10000
AGR 17,2401 00 104 105 34,Gujarat Organic area (Ha.)
Normal 10.72
Products Certification Agency, GOPCA Agriculture Inputs - Nos of
7500 8500 10000
Farmers
Pack House -Nos 73 100 125
Vermi compost Unit (Nos.) 90 150 175
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
AGR 22,002 2401 00 105 33,Corpus Fund Fertilizer Storage in off
Normal 28.50 233000 233000 233000
for Chemical Fertilizer season (MT)
AGR-61, 002 2401 00 109 04, Agro Service Agro service provider Unit
Normal 101.17 110 120 130
Provider (Nos.)
Normal HRT-2, 194.46 Water storage tank 1400 1,520.00 1600
HRT-3,
TASP 28.70 Shed net house 35 40.00 45
HRT-4
2401:00:119:01,
Training to farmers (Nos.) 3000 3,100.00 3200
96:2401:00:796:01,
SCSP 95:2401:00:119:01 11.25 Water soluble fertilizers
600 650.00 700
Integrated Development Programme for (Hectares)
Horticulture in State
Provide packets of vegetable
171000 175000 180000
seed. (Nos.)
Provide seedling and planting
122000 125000 130000
material. (Nos.)
Provide technical guidance.
5500 5800 6000
HRT-5, (Nos.)
02:2401:00:119:06, Provide packets of fertilizer
Normal 3.06 31600 35000 40000
Establishment of Kitchen garden and Canning and organic material. (Nos.)
Centre 15 days short term training 172 172 172
classes 5000 /5000 5000
7 days short term training 325 325 325
classes (Nos.) 12740 12740 12740
Canning/ Dabba packing
10500 15000 20000
(Nos.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesField Bunding (Ha) 1050 1100 1150
SWC-1, Terracing (Ha.) 500 550 605
03-2402-102-01,
Soil Conservation Activities carried out on
Normal watershed basis like field bunding, terracing, 20.75
Land leveling/land shapping
Nala plugging, Land shapping/ land leveling 1550 1600 1700
(Ha.)
in non tribal area and construction of
percolation tank in Darkzone area.
56-OB-2
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
SWC-12,03-2402-102-30,Financial
assistance to farmers to install barbed wire Barbed wire fencing (Lakh
Normal 200.00 97.50 107.00 118.00
fencing surrounding their farms to protect the mt.)
crop from the wild animals.
Normal ANH-2 ,Improvement of Veterinary Services 133.36 Castration (No.) 49725 49725 49725
(04:2403:00:101:04, 04:2403:00:101:18, Vaccination (No.) 310000 310000 310000
SCSP 12.83
04:2403:00:101:19, 95:2403:00:101:01, Disease investigation of 56950 56950 56950
96:2403:00:796:11, 84:2403:00:101:42,
TASP 84:4403:00:101:42, 96:4403:00:796:01) 19.39
Animal Health Camps(No.) 5367 5367 5367
Construction of building of
3 - -
veterinary polyclinics (No.)
ANH-2 ,Improvement of Veterinary Services Construction and repairing of
(04:2403:00:101:04, 04:2403:00:101:18, buildings of various
92 - -
Works 04:2403:00:101:19, 95:2403:00:101:01, 19.39 veterinary institutes under
96:2403:00:796:11, 84:2403:00:101:42, district panchayat (No.)
84:4403:00:101:42, 96:4403:00:796:01)
Construction/Repairing of
2 - -
building of IPDP blocks (No.)
Artificial Insemination (No.) 455968 501564 551720
Castration (No.) 27750 27750 27750
Sexual Health Camp (No.) 2418 2418 2418
ANH-6, (04:2403:00:102:05, Frozen Semen Dose
22.81 22.81 22.81
96:00:2403:796:03, Production (Lakh)
Normal 50.87
84:00:4403:102:42),Intensive Cattle Pashuutpadaktavruddhishibir
1800 1800 1800
Development Programme and Camp (No.)
Incentives to livestock
owners rearing AI born 3666 3666 3666
female calf (No.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesArtificial Insemination (No.) 85372 93909 103299
Castration (No.) 6675 6800 7000
ANH-6, (04:2403:00:102:05,
Sexual Health Camp (No.) 693 693 693
96:00:2403:796:03,
TASP 9.50 Beneficiaries for 12% interest
84:00:4403:102:42),Intensive Cattle
subvention to establish unit
Development Programme 2000 2000 2000
of up to twenty milch animals
(No.)
Construction of building of
5 - -
ICDP (No.)
Construction of Bull-shed
1 - -
ANH-6, (04:2403:00:102:05, (No.)
96:00:2403:796:03, Construction of Quarantine
Works 43.35 1 - -
84:00:4403:102:42),Intensive Cattle Station(No.)
Development Programme Construction of Frozen
2 - -
Semen Station(No.)
Construction work for
2 - -
Buffalo Breeding Farm, Bhuj
Assistance to SPCA (No.) 33 33 33
Electronic Identification and
Registration of livestock 7 7 7
(Lakhs)
Normal 3.72
Beneficiaries of Milk Yield
1500 1500 1500
Competition (No.)
ANH-7 ,(04:2403:00:102:06,
Assistance for establishment
95:00:2403:102:02), Upgradation and 5
of Breeder Association (No.)
Conservation of Livestock
Artificial Insemination (No.) 6900 6900 6900
Castration (No.) 600 600 600
Beneficiaries for 12% interest
SCSP 3.70
subvention to establish unit
2000 2000 2000
of up to twenty milch animals
(No.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesBeneficiaries for 12% interest
300 300 300
subvention (No.)
Purchase of animals with 5%
20000 20000 20000
ANH-8,04:2403:102:01, Interest subvention interest subvention
Normal 9.60
for purchase of milch animals Beneficiaries for 12% interest
subvention to establish unit
6000 6000 6000
of up to twenty milch animals
(No.)
Stallion Services (No.) 1000 1000 1000
Antisurra-Anti Eczema
20000 20000 20000
treatment in Camel(No.)
Normal 3.48 Assistance for organization of
3 3 3
Horse Show (No.)
ANH 14, 4:2403:00:106:02, Assistance for establishment
1 1 1
04:2403:00:106:42,Other Livestock of Breeder Association (No.)
Development Programme
Construction/Repairing o
2 - -
building of ISDP blocks (No.)
Works 7.10
Construction/Repairing o
building of Horse Breeding 2 - -
Farms (No.)
Fish seed Beneficiaries 600 600 600
FSH-02,06-2405-00-101-02,Fish seed Farm Renovation (No.) 9 9 9
production Boat nets (No.) 97 97 97
Normal and inland fisheries resources 6.18 Rearing space development
1 1 1
(In non-tribal area) (Ha.)
Insulated Box (No.) 84 84 84
Pagadia (No.) 650 650 650
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored SchemesFish seed rearing 213 213 213
Matsayvechansahay 50 50 50
Boat Net 8 8 8
Trainee 3360 3360 3360
FSH-02 ,95-2405-00-800-01,Subsidy to
SCSP 1.50 Avass 10 10 10
Scheduled castes for fisheries
Fish collection cum petroling
11 11 11
boat
Spawn stocking 60 60 60
Fish seed stocking 49.5 49.5 49.5
Farm renovation (No.) 9 9 9
Fish seed rearing 550 550 550
FSH-02,
Boat Net 100 100 100
96-2405-00-796-02,
TASP 8.15 No. of trainees 600 600 600
Development of Inland fisheries in Tribal
No. of kits 600 600 600
Areas.
Housing to tribal fishermen
20 20 20
(No.)
Electric Equipments(No) 900 925 950
Life Saving Equipment (No) 2175 2200 2300
PagadiyaSahay (No) 2080 2200 2300
Cash dolls to families of
Fishers in Pakistan custody 462 462 462
(No)
Gill net Above 4"(No) 1440 1440 1440
FSH-07 ,06-2405-00-103-01 ,Providing Hygenic Toilets (No) 600 600 600
Navigational Financial assistance to
Normal 55.00
Aids and other Infrastructural MahilaMachhimar for
266 266 266
facilities Marketing (womanFishers)
(No of females)
Subsidy for Solar light (No) 500 550 600
Financial assistance to retailer
for purchase of Insulated 2330 2330 2330
boxes (No)
Subsidy for Generator set &
300 300 300
Flesh light (No)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
Financial assistance toFRP
boat owner for purchase of 2000 2100 2200
Insulated boxes (No)
Subsidy for GPS (No of
FSH-07 ,06-2405-00-103-01 ,Providing 1500 1500 1500
boats)
Navigational
Normal 55.00 Sea cage culture (No) 213 213 213
Aids and other Infrastructural
Conversion of Trawler in to
facilities 265 265 265
Gillnetter (No)
Hygienic Fish Market 3 3 3
Deep freezer 50 50 50
Refrigerator Van. 10 10 10
No. of fibre ropes 1000 1000 1000
Total 2,796.91
Total of Major Outcomes Based Schemes
3,952.73
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 8,9,10,95,96
Name of Department: EDUCATION DEPARTMENT
MDM-01
Normal 09-2236-02-102-01 684.74
09-2236-02-102-02
SCSP 09-2236-02-102-03 87.11
95-2236-02-102-01
Number of Children
95-2236-02-102-02 43.66 45.33 47.33
(in lakh)
95-2236-02-102-03
TASP 96-2236-02-796-03 177.33
96-2236-02-796-10
Mid-Day Meal Scheme for Children in Primary
Schools
Total 2397.02
Type of Financial Provision for the year
Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored
State Funded Schemes
Schemes
COS-02,
Normal 09-2202-02-110-01, 1.45 No. of Teachers 6500 7000 7500
Training To Secondary Teacher
COS-02,
Normal 09-2202-02-110-01, 2.25 Girl Student 11250 10800 10200
Vidyalaxmi bond
COS-02,
Normal 09-2202-02-110-01, 1.10 Students (in Lakh) 21.03 21.10 21.24
Vidyadeep Scheme
Teacher 758 858 838
Normal COS-02, 13.84
Students 30300 34320 33520
09-2202-02-110-01 ,
Teacher 984 1024 1009
TASP 096-2202-02-796-02, 2.69
Students 39360 40960 40360
095-2202-02-110-01,
Teacher 246 261 266
SCP Additional Classes (Granted) 16.06
Students 9840 10440 10640
Normal COS-02, 34.20 45600 47000 51000
09-2202-02-110-01,
TASP 096-2202-02-796-02, 14.40 Students 19200 19500 21000
095-2202-02-110-01,
SCP Financial assistance to Non-granted schools 1.65 2200 2300 2600
COS-02,
Normal 09-2202-02-110-01, 131.50 12.01 12.05 12.10
096-2202-02-796-02, Students (in Lakh)
TASP 095-2202-02-110-01, 34.88 1.69 1.72 1.75
SCP Free Concessionpass Scheme 19.54 0.35 0.38 0.40
Type of Financial Provision for the year
Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
Normal COS-04, 81.10 16.03 16.04 16.10
09-2202-02-106-01,
TASP 096-2202-02-796-04, 11.30 Students (in Lakh) 1.74 1.76 1.80
095-2202-02-106-01,
SCP Free textbook scheme 7.60 3.27 3.30 3.34
Normal 134.64 24 24 24
Construction of New
18 4 5
Buildings at Govt.
New / Increase capacity for
Girls Hostel at Govt. 192 48 48
Institutions
TED-08
New / Increase capacity for
84:4202:02:105:42
Normal 176.37 Boys Hostel at Govt. 200 96 96
85-4216-01-700-25
Institutions
Buildings
Construction of Staff
Quarters at Govt. 2 1 1
Institutions
Renovation / Repairing of
27 7 7
Govt. Institutions
Type of Financial Provision for the year
Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
TED-1
09-2203-00-001-01 Number of Student
Normal 10.00 3.00 3.00 4.00
Strengthening Administrative Set up of Technical (in Lakh)
education Dept. (New)
Fee reimbursement to 25 %
DPE-07 10.70 private unaided schools 10700 17700 27700
09:2202:01:106:18 (Students)
SCSP 95-2202-01-106-03
96-2202-01-796-39 Payment of other expenses
Fee reimbursement to 25 % private unaided schools 3.21 to 25 % Private unaided 10700 17700 27700
schools (Students)
Fee reimbursement to 25 %
16.85 private unaided schools 16853 33700 48700
(Students)
TASP
Payment of other expenses
5.05 to 25 % Private unaided 16853 33700 48700
schools (Students)
Type of Financial Provision for the year
Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
MDM-02
TASP 96-2236-02-79-08 76.00 Tribal families (in lakhs ) 5.75 5.8 5.85
Aanna Triveni Scheme
56-OB-4
25
Type of Financial Provision for the year
Physical
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
CHE-4
09-2202-03-102-09
Normal 5.00 No. of Students 500 500 500
Building for B.K.School of Business Management
(New)
CHE-04
09-2202-03-102-09
Normal 1.00 No. of Students 1000 1500 2000
For new machinery purchase in saurastra university
(New)
Total 1558.28
Total of Major Outcomes Based Schemes 3,955.30
26
Demand Nos.:11,12,13,14,95,96
Name of Department: ENERGY AND PETRO-CHEMICALS DEPARTMENT
Demand No. Demand Detail Provision ( Rs in Cr.) Macro Outcome
11 Energy and Petro-Chemicals Department 4.44
12 Tax colletion charges 23.55
13 Power Projects 7,542.14
Other Expenditure pertaining to Energy and Petro-
14 1.08
Chemicals Department
93 Welfare of Scheduled Tribes 1.04
95 Scheduled Caste Sub Plan 33.50
96 Tribal Area Sub Plan 494.25
TOTAL 8,100.00
PWR 30,
13 4801 05 190 14,
Normal 214.00 PLF 55.23% 56.48% 59.55%
Share Capital Contribution to GUVNL for New
initiatives in R & M of GSECL's Power plants
PWR 31,
13 4801 05 190 15,
Share Capital Contribution to GUVNL for
Normal 100.00 Circuit KMs, Lines 750 750 750
shifting/replacement of Poles and Distribution
Lines in the area of Municipal Corporations and
Nagarpalikas
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
PWR 36, State Funded Schemes
TASP 13 2801 06 796 05, 6.05 Nos. of HHs 8500 8500 8500
Subsidy to GUVNL for KutirJyotiYojana
PWR 39,
13 4801 06 796 03, 18200 13545 & 13145 &
TASP 320.00
Contribution to GUVNL for Electrification of No. of Electrified &15 5 5
Wells and Pumps under TASP Wells &Petaparas
PWR 40,
13 4801 06 796 04, Sub stations & Partial
TASP 160.00 24+4 14+4 14+2
Capital contribution to GUVNL for erection of Sub stations
Sub-station and transmission lines in Tribal Areas
PWR 41,
13 2801 80 800 01,
SCSP Subsidy to GUVNL for Electrification of 5.00 No. of connections 5500 5500 5500
Sub Plan
PWR 42,
13 4801 05 190 01,
SCSP Share capital Contribution to GUVNL for 28.50 Nos. of electrified wells 1670 1500 1500
providing of new Agriculture Connection to
Scheduled Caste farmers
Total of Major Outcomes Based Schemes 7,056.55
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 29,30,31,32,33,34,35,95,96
Name of Department: GENERAL ADMINISTRATION DEPARTMENT
Demand
Demand Detail Provision ( Rs in Cr.) Macro Outcome
No.
29 Governor 7.70
30 Council of Ministers 5.78
31 Elections 320.16
32 Public Service Commission 48.15
government functioning
33 General Administration Department 107.42
34 Economic Advice and Statistics 30.04
human resources in Government
Other Expenditure pertaining to General Administration
35 1033.50
Department (Reveune+Capital)
84 Capital Expenditure for Public Works 20.00
87 Capital Expenditure for Urban Development 8.00
development needs
95 Scheduled Caste Sub Plan 68.48
96 Tribal Area Sub Plan (Revenue+Capital) 169.60
Total 1818.83
56-OB-5
Demand Nos.: 21,22,23,24,95,96
Name of Department: FOOD,CIVIL SUPPLY AND CONSUMER AFFAIRS DEPARTMENT
Demand No. Demand Detail Provision ( Rs in Cr.) Macro Outcome
Food, Civil Supply and Cosumer Affairs
21 35.73
Department
22 Civil Supppies 615.05
23 Food 170.76
Other Expenditure pertaining to Food, Civil
24 0.01
Supply and Cosumer Affairs Department
95 Scheduled Caste Sub Plan 67.21
96 Tribal Area Sub Plan 160.99
Total 1,049.75
Kerosene
PDS-15,
Ration
Normal 22 3456 00 190 15, 15.00 2.30 8.64 11.53
Card
Direct Benefit Transfer in Kerosene
Holders ( in lakh)
PDS-16,
Kerosene
22 3456 00 190 16,
Normal 0.93 Tanker 555 - -
GPS base vehicle tracking system in PDS SKO
Tanker
Total 271.39
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored
State Funded Schemes
Schemes
Normal PDS-1,
Ration card holders
22 3456 00 190 02, 21.17 35.50 35.75 36.00
(in lakh)
Loses on Sale of Edible Oil
Normal PDS-3,
22 3456 00 190 07, 0.16 No. of persons 2290 2404 2590
Annpurna Scheme
Normal PDS-04,
22 3456 00 190 08, 0.17 No. of persons 1355 1395 1436
Food Help Line
Normal PDS-5,
22 3456 00 190 09, 5.04
Number of ration card
95 3456 00 190 02, 35.50 35.75 36.00
holders (in lakh)
SCSP 96 3456 00 796 01, 0.63
TASP Distribution of Iodised Salt to BPL & AAY family 2.36
PDS-7,
No. of ration card
Normal 22 3456 00 190 13, 180.33
holder families 35.50 35.75 36.00
95 3456 00 190 01,
(in lakh )
SCSP Distribution of Sugar to BPL & AAY family 6.79
PDS-13,
Normal 23 4408 02 800 02 , 106.8 No. of Godown 30 64 84
Storage and ware housing(Loan from NABARD)
PDS-14, No of LPG
22 3456 00 190 14, Cylinder Customer
Normal 95.00 40 45 50
Subsidy Scheme On Domestic Subsidized LPG (Monthly in lakh)
Cylinders
PDS- 32
21 3451 00 800 01
Normal 6.39 No. of Godown 100 100 100
Installation of CC TV Cameras (Information
Technology)
Normal PDS- 33 0.50
No. of FPS 2000 2000 2000
TASP Modernisation of Fairprice Shops 0.50
Total 415.56
Total of Major Outcomes Based Schemes 686.95
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 25,26,27,28,95,96
Name of Department: FOREST AND ENVIRONMENT DEPARTMENT
Demand No. Demand Detail Provision ( Rs in Cr.) Macro Outcome
25 Forests and Environment Department 13.31
26 Forests 849.12
27 Environment 24.33
28 Other expenditure pertaining to Forest and Environment Department0.34
93 Tribal Area Sub Plan 0.32
95 Scheduled Caste Sub Plan 51.01
96 Tribal Area Sub Plan 287.43
Total 1225.86
FST 44,
26-2406-02-110-17,
Normal Action Plan for Conservation and 4.50 Ha. 2350 2500 2500
Management of Coral Reef in Gulf of
Kutchh and Khambhat
Total 43.74
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored
State Funded Schemes
Schemes
Fire watchers teams 379 390 405
Normal FST 01, 5.53 Main. Of Fireline in Km 5169 5169 5169
26-2406-1-800-5, No. of Chowkies 18 18 18
96-2406-1-796-12, No. of Watch towers 6 6 6
TASP Forest Protection 18.4 No. of Cairns 18095 18500 19200
No. of Wireless sets 76 76 76
FST 5,
26-4406-01-101 -1,
Normal 167.97 4649 18000 18000
26-4406- 01-796 -1, Ha.
Soil and Moisture Conservation and
Afforestation in Degraded Forest Area
TASP 86.08 7414 14100 14100
FST-05,
96-2575-01-313 -6,
TASP Economic plantation scheme for Teak, 15.40 Ha. 1000 1000 1000
Kheir and Bamboo plantation (special
area programme)
FST 8
Area (Ha.) 11010 11000 11000
Normal 26-4406-01-101-10, 132.37
96-4406-01-796-06
Gujarat Community Forestry Project
No. of seedlings 530 600 600
No. of Beneficiaries 550 550 550
TASP 45.19
Van Kutir 30 30 30
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes Area In (ha) 1200 1300 1400
No. of Seedlings (in
FST 8,95-4406-01-101-01,Scheduled 300 320 350
lakhs)
SCSP Castes Sub-Plan Scheme for Fruit 48.18
Van kutir No. 40 40 40
Plantations
Crematoria No. 200 200 200
Panchvati No. 10 10 10
96-2575-01-313,
TASP Wood Workshop Waghai Development 0.46 Nos. 6000 6000 6000
Project (Special area Programme)
26-2406-02-110,
Normal Action Plan for Creation af Eco-Task 3.30 HA. 1570 2000 2000
Force and Mangrove Plantation
96-4406-01-796-32, Bamboo Plantations in
TASP 6.31 2530 3000 3000
Bamboo Development Scheme Ha.
Watch towers/
Checkposts, chowki to
monitor rail and road 17 20 24
traffic (nos. @ Rs.2.00
lakh )
Food for Wildlife, water
facility, water points,
100 100 100
checkdams etc. ( no. of
points)
Fire protection, Fireline(
5000 6000 7000
in km)
FST 16,26-2406-02-110-22,Integrated
Normal 11.00 Fencing (Mtr) 1000 1500 2000
Development of Wildlife Habitat
Checking Nakas( nos.) 2 3 4
Nature Education camp(
500 600 700
no. of camps)
Development & Nature
15 20 25
Education sites( in nos.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes Demarcation 2500 2400 2600
Compensation for kill of
1500 1600 1800
domestic animals
56-OB-6
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
No. of visitors to Indroda
5.25 5.5 5.6
park (in lakhs)
No. of enclosure 64 64 64
FST 26,26 2406 02 800 01,Grant-in-aid No. of Visitors to
Normal to Gujarat Ecological Education and 11.75 Hingolgadh sanctuary (in 0.15 0.16 0.17
Research (GEER) Foundation lakhs)
FST-44,26-4406-01-101-24,Grass
Normal 55.00 HA. 5550 5550 5550
Development Project (Banni Project)
Campaign programs 10 12 14
EPC 2,27-3435-03-003-01,Gujarat No. of workshops 2 3 4
Normal 6.67
Ecology Commission Activities Taluka profile 10 10 10
Environment &
4 5 6
Ecological Project
EPC - 7
27-2215-02-106-02 Total Environmental
Normal 14.74 13 17 20
Gujarat Environment Management Research Study (Nos.)
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
No. of awareness
30 38 40
programs
Provision
Demand No. Demand Detail Macro Outcome Indcators
( Rs. In Crore)
Physical Target
Financial Provision for the year
Sr. No. Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
HLT-3 Annual Parasitic Incidence
API(<1) API(<1) API(<1)
39-2210-06-101-04 (API)
Normal 0.92
39-2210-06-101-05 Annual Blood Examination ABER(18 ABER(18 ABER(18
National Fileria Control Programme Rate (ABER) %) %) %)
HLT-4 Annual Parasitic Incidence
Normal 66.07 API(<1) API(<1) API(<1)
39-2210-06-101-07 (API)
95-2210-06-101-01
SCSP 7.00 Annual Blood Examination ABER (- ABER (- ABER (-
96-2210-06-796-01
Rate (ABER) 18%) 18%) 18%)
TASP National Vector Borne Disease Control Programme 11.25
Physical Target
Financial Provision for the year
Sr. No. Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
HLT-37
Normal 40-2211-00-102-03 66.10
Pay and Allowances of
95-2211-00-102-01
Medical & Non-Medical
96-2211-00-796-03
SCSP 5.00 Existing & additional Staff 5364 6589 6589
40-2211-00-102-04
for 198 U-PHC/
95-2211-00-102-02
40 U-CHC
TASP 96-2211-00-796-09 10.00
Urban Health Project
Physical Target
Financial Provision for the year
Sr. No. Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
HLT-11:
39-2210-80-004-01 NO. OF BIRTHS
Normal 1.75 12.50 12.35 12.00
VITAL STATISTICS REGISTERED ( in lakh)
HEALTH STATISTICS
Assistance to be provided (no.
HLT-15:
of
Normal 39-2210-06-101-22 2.55 30,000 28,000 27,000
Patients )
State AIDS Control Programme
HLT-42
Normal 351.32 33.56 36 39
40-2211-00-103-06
95-2211-00-103-04
SCSP 60.00 Enrolled Families ( in lakh) 2.52 3 3.5
96-2211-00-796-05
Arogya Suraksha Yojana
TASP 90.00 4.91 6 6.5
Physical Target
Financial Provision for the year
Sr. No. Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes Pregnant Women of KPSY
Normal HLT-41: 72.50 3.1 3.2 3.3
(Cheques given in lakh)
40-2211-00-103-05
SCSP 95-2211-00-103-02 6.00 Pregnant Mothers of HPT 40000 38000 36000
96-2211-796-04
TASP Nutrition Project 16.50
HLT - 95
95-2210-01-110-02
SCSP 21.80 No. of Patient 160000 175000 193000
Free Treatment of the Scheduled Castes Patients
under Medical Education
HLT-103
96-2210-01-796-04
TASP 0.50 No of students 700 750 800
Free Medical/Dental/ Physiotherapy books to
scheduled Tribal students
HLT-105
96-2210-01-796-06
TASP 17.00 - 210000 231000 254000
GIA for free cardiac, Kidney, Cancer and other
treatment of tribal patients
Testing of Drug samples 8025 8587 9188
HLT-117
Testing of Food Sample 15317 16389 17536
39-2210-06-104-02
Normal 22.42 st nd
Strengthening of Food & Drugs Laboratory Construction of New Building 1 Phase 2 Phase Building
Vadodara, Rajkot & Bhuj for Vadodara Lab Ready Ready ready
HLT-48 :
Normal 40-4210-01-110-02 22.50 No. of Vehicle 30 40 40
Providing Equipment & Vehicle
HLT-49 :
No.of Hospital of the Medical
Normal 40-4210-01-110-42 58.67 8 10 12
services
Hospital & Dispensaries
56-OB-7
Physical Target
Financial Provision for the year
Sr. No. Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
HLT - 50 Centrally Sponsored Schemes
No. of School and Hostel
Normal 39-4210-03-105-42 11.85 1 10 12
Building
Buildings
HLT -53 :
95-4210-01-110-01
SCSP 6.50 No. of ambulances. 20 30 30
Providing various Equipment & Vehicle for
Hospital
HLT -54 :
95-4210-01-110-02 No.of Hospital of the Medical
SCSP 4.29 2 2 2
Buildings Construction work for District and services
Taluka Hospitals
HLT -55 :
SCSP 5.00 Construction of 10
95-4210-02-104-01
Community Health Center:
HLT 60 : 30% 70% 100%
SCSP: 2
96 - 4210-02-796-42
TASP 43.02 TASP: 8
Building Community Health Center
HLT 61 :
96-4210-01-796-07
TASP 8.00 No. of ambulances. 20 30 30
Providing Various Equipment & Vehicles for
Hospital
Total 3,521.41
Total of Major Outcomes Based Schemes 4,471.67
096 2235:02:796:03
TASP 1.50 100000 125000 150000
Integrated prohibition drive in the tribal areas.
MEP-29
043:2055:00:113:02
Normal 5.00 Training 53064 59750 68050
Grant for Police Welfare Activities and Traffic
Amenities - Suraksha Setu Society
MEP-08
Normal 043:2055:00:003:01 10.00 Man Power 212 212 212
Police Training Schools
MEP-17
Normal 043:2055:00:109:01 450.68 Manpower 18078 18078 18078
District Police Proper
Type of Financial Provision for the year Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
MEP-18 Centrally Sponsored Schemes
Normal 043:2055:00:109:02 320.00 Manpower 10866 10866 10866
State Reserve Police Force
MEP-22
Normal 043:2055:00:109:06 60.00 Manpower 2593 2593 2593
Ahmedabad City Police
MEP-26
Normal 043:2055:00:109:12 20.00 Manpower 1358 1358 1358
Establishment for Coastal Security
MEP-6
Normal 43 2055 109 01, 20.00 Number of Vehicles 500 - -
Purchase of New vehicles
046:4055:00:800:05 District Head Quarters 34 - -
Normal SASGUJ (Safe and Secure Gujarat) 200.00 Cities 4 - -
Information Technology Reiligious Places 6 - -
Total 1,389.88
Total of Major Outcomes Based Schemes 1,512.88
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 56,57,58,95,96
Name of Department: LABOUR AND EMPLOYMENT DEPARTMENT
Demand Provision
Demand Detail Macro Outcome
No. ( Rs. In Crore)
56 Labour and Employment Department 15.16
57 Labour and Employment 871.82
Other Expenditure pertaining to Labour
58 0
and Employment Department
95 Scheduled Caste Sub Plan 46.79
96 Tribal Area Sub Plan 170.86
Total 1104.63
EMP-3
57-2230-03-101-03
Normal 3.93 ITI, Seats 25411 25411 25411
Craftsman Training Scheme in Govt.
ITI (Costal Area Development Scheme)
EMP-4
Normal 57 2230 03 102 01 32.42 Apprentice Trainee 27000 30000 35000
National Apprentice scheme
Financial Provision for the year 2017- Physical Target
Sr. No. Name of Scheme 18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
EMP-6 Centrally Sponsored Schemes
57-2230-02-001-01
Normal 8.02 Placement 300000 350000 400000
96-2230-02-796-04
95-2230-02-001-01
TASP Employment Services & Extension 0.01 Self Emp. Sibir 112500 123000 135000
SCSP Scheme 0.51 KVK Sibir 50250 55000 60000
EMP-7
Normal 57 2230 03 001 02 3.14 PM KVY 16000 17000 17000
Gujarat Skill Development Mission
Total 94.59
Total of Major Outcomes Based
132.52
Schemes
56-OB-8
Demand Nos.: 53,54,55,95,96
Name of Department: INFORMATION AND BROADCASTING DEPARTMENT
Demand Provision
Demand Detail Macro Outcome
No. ( Rs. In Crore)
53 Information and Broadcasting Department 0.15
54 Information and Publicity 81.47
Other Expenditure pertaining to Information and
55
Broadcasting Department 14.00 programs
95 Scheduled Caste Sub Plan 8.09
96 Tribal Area Sub Plan 20.28
TOTAL 123.99
56-OB-9
Demand Nos.: 64,65,66,67,68,95,96
Name of Department: NARMADA, WATER RESOURCES, WATER SUPPLY AND KALPSAR DEPARTMENT
Demand Provision
Demand Detail Macro Outcome
No. (Rs. In Crore)
Narmada,Water Resources,Water Supply and Kalpsar
64 0.04
Department
65 Narmada Development Scheme 4,700.00
Irrigation and Soil conservation MIS-I (General Category
66 4,048.18
Farmers)
67 Water Supply 2,133.52
households
93 Tribal Area Sub Plan 2.00
95 Scheduled Caste Sub Plan 318.90
96 Tribal Area Sub Plan 1,908.17
conservation and protection of water resources
Total 13,110.81
Generation of
Normal Purchase of Desalinated Water from GWIL -New Item 10.00 Desalinated Water in Nil Nil 100
MLD
66:4700:11:800:43
Extension, Renovation, Modernisation and improvement of
Normal 125.34 Hectare 25068 26321 27637
existing schemes and canal systems including rehabilitation of
building road and other assets Canal and branches
66:4700:11:800:46
Extension, Renovation, Modernisation and improvement of
Normal 18.36 Hectare 3671 3855 4047
existing schemes and canal systems including rehabilitation of
building road and other assets:Ditributaries & water courses
Type of Financial Provision for the year Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
66:4701:83:800:43
Extension, Renovation Modernisation and improvement of
Normal 89.13 Hectare 17825 18716 19652
existing schemes canal systems including rehabilitation of
building,road and other assets (ERM):Canal and Branches
66:4701:83:800:43(02)
Extension, Renovation Modernisation and improvement of
existing schemes canal systems including rehabilitation of
Normal 18.66 Hectare 3732 3919 4115
building,road and other assets (ERM):Converting existing
canal flow system into Lift Irrigation Scheme of Saurashtra
region
66:4701:83:800:46
Extension, Renovation Modernisation and improvement of
Normal 4.65 Hectare 929 975 1024
existing schemes canal systems including rehabilitation of
building,road and other assets :Ditributaries & water courses
66:4701:83:800:80
Extension, Renovation Modernisation and improvement of
Normal 5.68 Hectare 1136 1193 1252
existing schemes canal systems including rehabilitation of
building,road and other assets :
66:4701:77:800:80
Normal 1.27 Hectare 254 267 280
Long term restoration of Fatewadi Irrigation Scheme
66:2702:03:101:11
Normal Extension, Renovation & Modernisation of Minor Irrigation 8.86 Hectare 1773 1862 1955
Scheme
95:4700:11:800:01
Extension, Renovation , Modernisation and improvement of
SCSP 12.08 Hectare 2417 2538 2665
existing schemes and canal systems including rehabilitation of
building road and other assets. (ERM):Canal and Branches
Type of Financial Provision for the year Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
95:4701:83:800:01
Extension, Renovation , Modernisation and improvement of
SCSP 5.15 Hectare 1030 1082 1136
existing schemes and canal systems including rehabilitation of
building road and other assets. (ERM):Canal and Branches
96:4700:01:796:47
TASP 84.60 Hectare 16920 17766 18654
Extension, Renovation & Modernisation (ERM)
96:4701:80:796:61
TASP Extension, Renovation , Modernisation and improvement of 12.18 Hectare 2435 2557 2685
existing scheme (ERM)
66:4700:15:800:80
Normal Improvement of Irrigation Management through Farmer's 16.33 Hectare 8166 8574 9003
Participation
66:4701:44:800:80
Normal Improvement of Irrigation Management through Farmer's 15.94 Hectare 7968 8366 8785
Participation:Other Expenditure
66:2702:01:103:13
Normal Minor Irrigation works for Participatory Irrigation 2.06 Hectare 1032 1084 1138
Management GIA to Panchayat
96:4700:01:796:46
TASP Improvement of Irrigation Management through Farmer's 10.34 Hectare 5172 5431 5702
Participation
96:4701:80:796:53
TASP Improvement of Irrigation Management through Farmer's 5.33 Hectare 2663 2796 2936
Participation
66:4702:00:101:02
Normal 191.52 Hectare 8890 9335 9801
Check Dam,Pond,Desilting
66:4701:57:800:80
Normal 6.71 Hectare 670 704 739
Augmentation of Surface Water Recharge: Other Expenditure
Type of Financial Provision for the year Physical Target
Name of Scheme 2017-18 (Rs. In Crore)
Scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
One Million Acre Feet flood water for Irrigation & Ground
Normal Water recharge in Saurashtra region (other related works 1.25 Hectare 49 54 59
including Big Check Dams):Other Expenditure
66:2702:01:103:13
Normal Provision for construction of Checkdams below 6.42 Hectare 321 337 354
Rs 1 lakh GIA to Panchayat
95:4702:00:800:02
SCSP Water Conservation works :Construction of check dams, 13.05 Hectare 558 586 615
deepening of ponds and restoration of water bodies etc.
96:4702:00:796:02
TASP 60.47 Hectare 2307 2422 2543
Check dam ,Pond
66:4701:41:800:80
Normal 70.00 Nos of Dams 250 250 250
Dam Safety works of old irrigation scheme: Other Expenditure
66:4701:73:800:80
Normal Lift Irrigation Schemes from Narmada Main Canal to various 191.00 Hectare - 3906 4101
reservoirs / ponds
66:4701:71:800:80
Normal One Million Acre Feet flood water for Irrigation & Ground 16.98 Hectare 12100 70363 112590
Water recharge in Saurashtra region: Sauni Yojana
2702:80:052:40
Lac Cubic meter of earth
Normal Machinery and Equipment 4.62 3.84 4.03 4.23
work
Tools and Plant
66-2700-80-005-11
Normal 40.43 Kalpsar Project at DPR Stage
Kalpasar Project
66-4702-00-101-03 Majority of items are in reports form & construction of
Normal 100.00
Bhadbhut Project barrage
Total 2,452.90
Total of Major Outcomes Based Schemes 7,670.89
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 74,75,95,96
Name of Department: PORT & TRANSPORT DEPARTMENT
Demand No. Demand Detail Provision Macro Outcome
74 Transport 1063.82
Other Expenditure pertaining to Port & Transport
75 25.01
Department
84 Non Residential Building 53.89
96 Tribal Area Sub Plan 133.50
Total 1276.22
Total 25.01
56-OB-10
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored
State Funded Schemes
Schemes
Number of RTO Offices 6 4 5
Awareness for Road
Safety (No. of People in 10 12 15
lakh)
Service provided
individuals 41 45 50
RTS-4, ( in lakh)
Normal 74-2041-00-102-01 , 136.36 Check Post Up gradation
4 6 8
Inspection of Motor Vehicle (No. of Offices)
Land
acquisition Tender
Establishment of Completio
and Plan Process
Checkposts at Port Sites n of
estimates will be
(New Item) Project
will be completed
finalised
RTS-6,
No. of GSRTC Passengers
Normal 74-3055-00-190-02, 301.14 8283.7 8532.21 8702.85
( in lakh)
Subsidy to GSRTC
Normal RTS-1, 522.47 No of Buses 1319 1650 1815
5055-00-190-01, 5055-00-796-01,
TASP 111.37 No of Buses 281 350 385
Capital outlay on Road Transport
Total 959.97
Total of Major Outcomes Based Schemes 984.98
Provision
Demand No. Demand Detail Macro Outcome
(Rs. In Crore)
Panchayats, Rural Housing and Rural
69 10.02
Development Department
70 Community Development 1938.71
71 Rural Housing and Rural Development 2166.66
72 Compensation and Assignments 132.85
Other Expenditure pertaining to Panchayats, Rural
73 706.39
Housing and Rural Development Department
93 Welfare of Scheduled Tribes 1.35
95 Scheduled Caste Sub Plan 395.70
96 Tribal Area Sub Plan 1348.32
Total 6700.00
Physical Target
Type of Financial Provision for the
Name of Scheme year 2017-18 (Rs. In Crore)
Scheme
Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
LND-7,
Normal 84-4059-01-051-45, 28.07 Construction of Building 5 1 -
Collector Office Buildings for Revenue Department
85-4216-01-700-26,
Normal Provision for Construction of residential quarters for 18.00 No. of Building Constructed 35 4 -
Collector, Prant Officer and Mamlatdar
4059-01-051-47,
Normal Mamlatdar Office Buildings for Revenue 2.41 Building 3 3 3
Department
56-OB-11
Physical Target
Type of Financial Provision for the
Name of Scheme year 2017-18 (Rs. In Crore)
Scheme
Unit 2017-18 2018-19 2019-20
LND-19, Centrally Sponsored Schemes
Training of
Normal 78-2053-00-101-01, 3.07 1400 1500 1600
Employees (approx)
Revenue Inspection Commissioner
Total 242.99
Total of Major Outcomes Based Schemes 964.19
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 83,84,85,86,87,88,95,96
Name of Department: ROAD & BUILDING DEPARTMENT
Provision
Demand No. Demand Detail Macro Outcome
(Rs in Crore)
83 Road & Building Department 2.25
84 Non Residential Building 96.00
85 Residential Building 184.23
86 Roads and Bridges 4336.92
87 Gujarat Capital Construction Scheme 210.00
Other Expenditure pertaining toRoad & Building population)
88 5.00
Department
95 Scheduled Caste Sub Plan 450.12
96 Tribal Area Sub Plan 1137.90
Total 6422.42
RBD-14
2 Bridges 5 ROB/ 2 ROB/
Normal 086:5054:03:337:15:01 70.00 No. / K.M.
/ 65 Km 375 Km 371 Km
CRF Interstate Connectivity roads
086:3054:04:338:01:00
Normal Rural Roads - PMGSY 55.00 K.M. 25 - -
RBD-1
086:5054:03:337:11:00
Normal Constructing and maintenance of railway over 38.00 8 2 6 -
bridge under project on Public Private Partnership
(PPP) mode basis various places
Financial Provision for the year
Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
RBD-1
086:5054:03:337:11:00
Normal Connecting railway over Bridge/Under bridge in 20.00 11 4 4 3
place of existing level crossing having more than 1
lac TVU on cost sharing basis with railways
RBD-1
086:5054:03:337:11:00 The expenditure to be incurred as required by Railway
Normal 25.00
Provision for equity contribution in SPV for Department
Ahmedabad Mumbai high speed rail
RBD-1
086:5054:03:337:11:00 The expenditure to be incurred as required by Railway
Normal 5.00
Assistance and related activity for development of Department
20 Railway Station on PPP basis in the State
RBD-1
086:5054:03:337:11:00
Normal Construction of railway over bridge on level 40.00 53 (ROB) 5 14 34
crossing under cost sharing with railway on DFCC
Route
Total 253.00
State Funded Schemes
RBD-4
Normal 086:3054:04:337:11:00 136.94 K.m. 300 320 160
District Roads
RBD-5/RBD-101 -
TASP 096:3054:04:796:11:00 55.29 K.m. 150 160 80
District Roads
RBD-6/RBD-4(24b) -
SCSP 095:3054:04:337:01:00 24.12 K.m. 50 60 30
District Roads
Financial Provision for the year
Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
RBD-2/RBD-2(A) Centrally Sponsored Schemes
Normal 86:5054:03:101:11:00 196.30 No. of structures 10 11 12
State Highway
79.00 No. of structures 5 12 15
RBD-7
Normal 86:5054:03:337:11:00
1541.42 No. of k.m. 950 1000 1100
State Highway (Normal)
RBD-11
TASP 096:3054:80:796:02:00 32.00 K.m. 80 85 85
Enmarked for TASP (GP)
RBD-11
TASP 096:3054: 40:800:01:00 1.00 K.m. - - -
Enmarked for TASP (GP)
085:4216:01:106:02:00
Normal Construction of Residential Building for R&B 184.23 No. of quarter 876 700 700
Department
096:4216:01:796:02:00
TASP 7.00 No. of quarter 24 42 62
Construction R & B
096:4575:03:796:42
Normal 26.14 K.M. 40 45 50
Other special Area Programme
Financial Provision for the year
Physical Target
Type of Scheme Name of Scheme 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
6.87 120 (Km) 40 40 40
RBD-1
Normal 086:5054:01:337:11:00
45.00 201 (Km) 10 95 96
National Highway
086:5054:03:337:20 :00
Normal 100.00 No. 86000 88000 90000
Payment To Concessioner in lieu of Toll Tax
RBD-7/RBD-7(1)
Normal 086:5054:03:337:14:00 200.22 Km 60 125 184
Roads Works (Institutional Finance World Bank)
RBD-8/RBD-102
Normal 086:5054:04:800:06:00 50.00 K.M. 120 145 160
Village Connectivity -Rural Roads
086:3054:04:337:15:00
Normal 1577.59 Km. 4000 4030 2250
MukhyaMantri Gram SadakYojana
096:3054:04:796:12:00
TASP 496.41 Km. 1400 1460 700
MukhyaMantri Gram SadakYojana
095:3054:04:337:02:0
SCSP 426.00 km. 950 960 1050
MukhyaMantri Gram SadakYojana
Normal 4217- Capital Outlay on Urban Development 210.00 No. of Quarter 800 336 560
Total 4,468.71
Total of Major Outcomes Based Schemes 4,721.71
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 91,92,94,95,96
Name of Department: SOCIAL JUSTICE & EMPOWERMENT DEPARTMENT
Provision (Rs in
Demand No. Demand Detail Macro Outcome
Crore)
SCW-4
SCSP 2225 01 277 35 21.00 Student 72000 85000 100000
Govt. of India Pre Matric Scholarship Std. 9 & 10.
SCW-5
SCSP 2225 01 277 05 256.00 Students 195000 205000 220000
Govt. of India Post Matric Scholarship
SCW-18
SCSP 2225 01 793 01 20.00 Person 33000 34000 35000
Financial Assistance for Economic Upliftment
OBC-4
2225 03 277 28
Normal 75.00 SEBC Students (Scholarship) 100000 110000 120000
students
Total 110.55
State Funded Schemes
01-SSW-02
Normal 2235 02 102 01 12.24 No. of Children 2000 2100 2125
Development of foster care program
Normal 01-SSW-05 3.30 20000 22000 25000
SCSP 2235 02 101 01 0.60 Disabled Students 2600 2800 3000
TASP Scholarship for the disabled students 0.65 4000 4200 4500
56-OB-12
Financial Provision for the Physical Target
Type of Scheme Name of Scheme year 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Normal Centrally Sponsored Schemes
4.00 6500 7000 7500
01-SSW-05
2235 02 101 01
SCSP 0.50 Disabled Persons 750 800 850
Prosthetic aids/appliances and other relief to
TASP disabled persons 0.50 800 850 900
Normal 01-SSW-05 32.22 8100 8700 9000
SCSP 2235 02 101 01 3.00 Disabled student 2700 2900 2800
TASP Grant in aid to schools and institutions for disabled 3.00 2700 2900 4200
01-SSW-05
Normal 0.40 Disabled persons 340000 409000 466000
Insurance scheme for disabled
01-SSW-05
2235 02 101 01
Normal 0.11 Disabled Children 100 105 106
Operative and post-operative programme for polio
patients
Normal 01-SSW-05 24.00 40000 52000 62400
SCSP 2235 02 101 01 3.50 Disabled persons 5000 6500 7800
TASP Sant Surdas 3.50 5000 6500 7800
Normal SSW-09 222.89 335000 347000 353000
2235 02 200 02
SCSP 44.46 Older Persons 70000 72000 74000
Indira Gandhi national old age pension scheme
TASP (IGNOAPS) 94.95 155000 188000 224000
Normal SSW-11 41.91 70000 72000 75000
SCSP 2235 02 101 01 5.94 Older Persons 10000 10250 10500
TASP Cash assistance to infirm and aged 12.73 18000 18500 18800
SSW-05
Normal 0.50 Disabled Persons 3500 3600 3700
Disable Finance and Development Corporation
Financial Provision for the Physical Target
Type of Scheme Name of Scheme year 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
Bright Student 8 8 8
SCW-1
2225 01 277 01
SCSP 40.12 Girls Students 24000 24500 25000
Scholarship and Incentives for the Pre-metric
Education (Scholarship, Uniform, Cycle Etc.)
Student 795130 795330 795330
SCW-6
2225 01 277 04
Scholarship & Incentives for Post-Metric
SCSP 21.83 Student 29410 29620 29900
Education. (Coaching Fees, Awards, Food Bill,
Thesis Schemes, Study Equipments and Post
Metric Scholarship
SCW-12
2225 01 277 02
SCSP 12.09 Beneficiaries 39170 42250 45000
Scheme for Income & Employment Generation
and Economic Upliftment
SCW-16
SCSP 2225 01 282 01 3.25 Patient 29365 30000 30000
Financial Assistance for Health Care & Nutrition
SCW-17,
SCSP 2225 01 283 01 33.40 Person 4770 4770 4770
Dr. Ambedkar Awas Yojana
Financial Provision for the Physical Target
Type of Scheme Name of Scheme year 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
SCW-19 Centrally Sponsored Schemes
2225 01 800 01 Couple 8600 8600 8600
SCSP Social and Gender Empowerment (Kunvarbainu 18.01
Mameru & Mai Rama Bai Sat Fera Samuh Lagna,
Hostel 1 1 1
Social Education Camp)
SEBC Students
3532000 3600000 3700000
(Scholarship)
SEBC Students
322.00 2933333 3050200 3100000
(Uniform)
OBC-1 SEBC Girls
135000 140000 150000
2225 03 277 01 (Cycle)
Normal
Incentives for Pre Metric Education EBC Students
672000 705000 725000
(Scholarship, Uniform, Cycle etc.) (Scholarship)
EBC Students
59.50 466000 470000 480000
(Uniform)
EBC Girls
25000 27000 30000
(Cycle)
SEBC Students
OBC-2 350500 365000 385000
57.88 (Scholarship)
2225 03 277 03
Normal Tablet (SEBC Students) 8000 9000 9500
Incentives for Post Metric Education
(Scholarship, Stipend, Instrument, Food Bill etc.) EBC Students
4.00 28500 30000 31000
(Scholarship)
OBC-5 SEBC Students
2225 03 277 11 155.68
(Scholarship)
DNT-3
Normal 71000 72000 73000
2225 80 101 11
NTDNT Students
Grant in aid to Voluntary organization of Hostel 4.20
(Scholarship)
and Ashram Shala
Financial Provision for the Physical Target
Type of Scheme Name of Scheme year 2017-18
(Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes Employment Kits to SEBC 16000 17000 18000
Beneficiaries of subsidy
OBC-7 13.10 5000 5500 6000
(SEBC)
2225 03 102 01
Normal Artisans (SEBC) 200 225 250
Financial Assistance for Self-Employment
Employment Kits to EBC 900 950 1000
0.50 Beneficiaries of subsidy
165 170 175
(EBC)
DNT-2
2225 80 101 05 NTDNT Students
Normal 10.73 20870 21500 22735
Incentives for Post Metric Education (Scholarship, (Scholarship)
Uniform, etc.)
DNT- 7
Normal 2225 80 101 17 5.00 NT-DNT Persons 1100 1100 1100
Pandit Dindayal Upadhyay Awas Yojana
MNT-7
Normal 2225 04 102 01 0.53 Employment kits to Minority 1500 1500 1800
Financial Assistance for Self-Employment
Total 1,114.94
Total of Major Outcomes Based Schemes 1,225.49
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 89,90
Name of Department: SCIENCE AND TECHNOLOGY DEPARTMENT
Demand
Demand Detail Provision (Rs. In Cr.) Macro Outcome
No.
in STEM
Other Expenditure pertaining to Science and
90 201.46
Technology Department temper
Total 449.99
Physical Target
Type of Financial Provision for the
Name of Scheme year 2017-18 (Rs. In Crore)
Scheme
Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
DIT-5
89-2052-0-90-8-0 Additional Central Assistance For
Normal 20.00 No of Online Services 100 150 200
Capacity Building Scheme under National e-Governance
Action Plan(NEGAP)
Total 20.00
State Funded Schemes
No of telecasting Channels 8 16 16
BSG-1
90-3425-60-200-3-0
Normal 17.00 GIS based Application to
Remote sensing and Communication Centre-Bhaskaracharya 18 36 54
developed
Institute of Space Application and Geo-Informatics (BISAG)
Physical Target
Type of Financial Provision for the
Name of Scheme year 2017-18 (Rs. In Crore)
Scheme
Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes Government internet Users 60000 60000 60000
DIT-1
Bandwidth usage (MBPS) 7500 10000 12000
Normal 89-2052-0-90-1-0 120.00
Wifi Project in (Districts) 22 11 -
Science and Technology Department
GSWAN in Villages of Gujarat 3000 4000 5000
New Item
90-3425-60-200-02
Normal Proposal on Establishing Design Labs in the frontier areas of 2.00 No of Projects 400 500 700
Science & Technology and Information Technology in the
State
Geological mapping of Area
1600 1600 1600
(sq. km)
ISR-1
Research publications in
Normal 90-3425-60-200-4-0 1.28
national and international 1 1 1
Institute of Seismological Research
journals
Enrollment of PhD student 1 0 0
DBT-2
90-3425-60-4-1 No. of Bioinformatics Labs to be
Normal 2.00 8 8 8
Financial Support to Universities/Colleges/Institutions for Setup
setting up Bioinformatics labs in the state
DIT -1 89-2052-0-90-1-0
Normal 30.00 No of Hotspot 1000 2000 2000
To provide Free Wi-Fi facilities at Various Municipalities
Total 383.28
Total of Major Outcomes Based Schemes 403.28
56-OB-13
Demand Nos.: 93, 96
Name of Department: TRIBAL DEVELOPMENT DEPARTMENT
education
96 Tribal Area Sub Plan 1631.64
knowledge
Total 2,000.00
Sub type of Financial Provision for the year 2017- Physical Target
Type of Scheme Name of Scheme 18 (Rs. In Crore)
scheme Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
VKY-2
DST 10.00 35000 38500 42350
93-2225-02-277-36
TASP 96-2225-02-796-91 Student
Govt. of India Pre Matric
TASP 45.00 165000 181500 196650
Scholarship for Std. IXth& Xth.
VKY-20
TASP 96-2225-02-796-06 TASP 110.40 No. of Projects 23 25 27
Article 275(1)
VKY-30
96-2225-02-794-11 No. of
TASP TASP 118.80 150000 155000 160000
Special Central Assistance for TSP Beneficiaries
(SCA to TSP)
VKY-4
93-2225-02-277-03
TASP DST 127.00 Student 200000 220000 250000
Govt. of India Post Matric
Scholarship
VKY-21
96-2225-02-796-11
TASP TASP 14.00 Beneficiaries 10600 12000 14000
Development of PTGs under
C.C.D. Project
VKY-15
TASP 96-2225-02-796-89 TASP 110.86 Student 26000 28000 30000
Gujarat Tribal Educational Society
VKY-18
96-2225-02-796-81
TASP Implementation of F.R.A. for TASP 11.10 Beneficiaries 10000 12000 15000
various benefits to tribal with
purchase of MFP by G.F.D.C.
33.20 Women 13000 10000 10000
8.00 Beneficiaries 1320 1320 1320
VKY-19
VTC
96-2225-02-796-62 12.74
Construction 2 2 0
TASP Dairy / Wadi, Irrigation schemes TASP
2.00 Beneficiaries 444 489 538
etc. project implemented under D-
0.77 Fair 5 5 5
SAG
0.60 Centre 10 11 12
0.25 Beneficiaries 500 550 605
VKY-69
TASP 96-2225-02-796-68 TASP 20.00 University 1 1 1
Tribal University
VKY-10
93-2225-02-277-11
DST 12.63 7328 7428 7600
TASP 96-2225-02-796-05 Student
G.I.A. to Hostels run by Voluntary
Organizations TASP 66.83 41060 42000 45000
VKY-11
93-2225-02-277-09 DST 38.47 9560 10070 10580
Student
96-2225-02-796-10
G.I.A. to Ashram Schools, and TASP 248.59 61780 67400 68370
TASP
Post Basic Ashram Schools run by
Voluntary Organizations (including
construction of Ashram Schools & Ashram School
DST 1.50 11 11 11
Post Basic Ashram Schools)
TASP 8.50 535 535 535
VKY-32 DST 6.40 700 700 700
93-2225-02-282-01
TASP Beneficiaries 285/
96-2225-02-796-29
TASP 30.00 4000 300/ 4000 400/ 4000
Housing on Individual basis
Halpati
VKY-12
93-2225-02-277-15 DST 25.16 5750 5800 5900
TASP 96-2225-02-796-09 Student
Establishment and Development of
TASP 40.07 10700 12300 14000
Government Hostel, Dry Hostels
VKY-17
93-2225-02-102-13
DST 2.00 3250 4400 4840
TASP 96-2225-02-796-76 Beneficiaries
Economic assistance for Self-
Employment
TASP 6.00 9750 13200 14520
VKY-36
93-2225-02-800-03 DST 0.50 Adm. 0 0 0
TASP 96-2225-02-796-14
Development of PVTGs and
Halpati TASP 33.00 No. of works 800 900 1000
VKY-51 DST 14.98 Hostel 3 3 3
TASP
96-4225-02-796-42 TASP 122.08 Institution 49 49 49
VKY-70
96-2225-02-796-70 No of Nahari
TASP TASP 0.60 12 13 14
Mukhy Mantrishari Nahari Kendra Kendra
Yojana
ART 23
95-2205-105-01
Normal 4.00 GIA Libraries 2000 2250 2500
State share to Raja RamMohan Roy Library
Foundation
END 54
Normal 17.13 No. of Museums to be
96-2205-796-05 4 4 4
upgraded
TASP Development of Museums 1.14
Book publication 10 10 10
ART 11
98-2202-05-102-01 assistance to litterateurs, 12 12 12
Normal 3.95
Promotion & Development of Guajarati Language &
Literature Literary Programs 50 50 50
Financial Provision Physical Target
Sr.No Name of the Scheme for the Year 2017-18 Units Of Physical Target
(Rs. In Crore) 2017-18 2018-19 2019-20
56-OB-14
Financial Provision Physical Target
Sr.No Name of the Scheme for the Year 2017-18 Units Of Physical Target
(Rs. In Crore) 2017-18 2018-19 2019-20
ART 4 State Funded Schemes
SCSP 96-2205-796-04 0.30 No. of Plays 20 25 30
Production of Turi barot drama (SCSP)
Construction 30% 70% 100%
98-2204-104-07
Normal 5.14
Establishment of Sports University
No.of program 144 144 144
Normal 19.65 85300 113000 136000
No. of Students
TASP 4.91 2050 2150 2570
ART 8 (Adventure Training)
2450 2655 2960
98-2205-102-08
Cultural Activities of Commissionorate of Youth No. of Artists (Ek
SCSP 0.54 1000 1500 2000
Services and Cultural Activities Bharat)
No. of Artists (Kala
50000 55000 60000
Mahakumbh)
ART 17
98-2204-103-01 No. of campers &
Normal 2.00 1100 1200 1300
For youth of Gujarat State Adventure like difficult adventurers
mountain, sea and difficult air activities
EDN 52
Normal 98 2204 103 02 1.65 Participants (in lakh) 1.65 2.00 2.25
Celebration of World Yoga Day
EDN 53
Normal 98 2204 104 02 0.75 No. of Vyayam Shala 30 30 30
Promotion of Akhada Activities
Financial Provision Physical Target
Sr.No Name of the Scheme for the Year 2017-18 Units Of Physical Target
(Rs. In Crore) 2017-18 2018-19 2019-20
Normal 12.00
98-4202-03-800-01,
96-4202-03-796-01 No. of Sports complex 6 9 15
TASP 7.25
Development of Sports Complex under P.I.U.
SYS 5
SCSP 95 2204 103 01 2.23 Beneficiaries 16500 17000 17500
Awareness & Personality Development & yoga
Total of Major Outcomes Based Schemes 300.84
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 100,101,102,103,104,95,96
Name of Department: URBAN DEVELOPMENT & URBAN HOUSING DEPARTMENT
101-2216-02-192-03
Normal 95-2216-02-192-03 66.49 2329 3430 2710
96-2216-02-192-03 No. of houses
Assistance to Municipalities for Housing for
SCSP Economically Weaker Section 12.87 451 664 525
TASP 6.43 225 332 262
Total 1,608.80
Total of Major Outcomes Based Schemes 3,331.70
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 105,106,95,96
Name of Department: WOMEN AND CHILD DEPARTMENT
Demand No. Demand Detail Provision Macro Outcome
105 Women and Child Development Department 3.76
Other Expenditure pertaining to Women and
106 2053.19
Child Development
95 Scheduled Caste Sub Plan 108.64 governance
96 Tribal Area Sub Plan 634.40
Total 2799.99
56-OB-15
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
16.81 6M-3 years children 93391 95259 97164
6M-3 years Severe
1.39 5168 5271 5377
underweight children
NTR-3
15.01 3-6 years children 69971 71370 72798
Supplementary
SCSP 3-6 years Severe underweight
Nutrition (SCSP) 1.48 4860 4957 5056
children
8.63 41075 41897 42734
Pregnant and Lactating mother
7.99 Adolescent girls 31302 31928 32567
NTR-13
SCSP 106:2236:02:800:14 8.99 42794 43650 44523
96:2236:02:796:09 Students & Out of school
TASP 95:2235:02:800:02 children 167827 171183 174607
35.24
Rajiv Gandhi Scheme for Empowerment of
Normal Adolescent Girl (SABLA) 546949 557888 569045
114.86
NTR-13
95:2235:02:800:02
Normal 5.09 Blocks 134 134 134
Rajiv Gandhi Scheme for Empowerment of
Adolescent girls (Sabla)(Non-Nutrition)
NTR-5
106-4236-02-800-01
Construction of Anganwadis 22.00 New Building construction 700 700 700
NTR-09
106-4236-02-800-03
Normal
Repairing of Anganwadis 26.40 Upgradation & Repairing 34000 34000 34000
NTR-22
106-4236-02-800-04
Construction-Repairing & Upgradation of Block 4.00 CDPO Office 11 11 11
Office
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
WCD-18
No. of calls processed per
Normal 106:2235:02:103:32 81.09 8000 8100 8300
month
Women Helpline
NTR-01
Normal 106:2236:02:800:11 76.76 Blocks 202 202 202
Kishori Shakti Yojana
NTR-15
Normal 106:2236:02:800:15 18.89 Pregnant & Lactating mother 27500 28050 28350
Matrutva Sahyog Yojana (Cont. Item)
NTR-15
Normal 106-2236:02:800:15 377.51 Pregnant & Lactating mother 552800 56856 575133
Matrutva Sahyog Yojana (New Item)
Total 1295.31
State Funded Schemes
WCD-5
2235:02:103:17
Normal Exhibition-cum-sale 5.00 No. of beneficiaries 500 600 650
(Development Programme of Gujarat Women
Economic Development corporation)
WCD-17
Normal 106:2235:02:103:31 6.60 Avg cases handled per year 2500 2600 2700
Nari Adalat
Financial Provision for the year Physical Target
Type of Scheme Name of Scheme 2017-18 (Rs. In Crore) Unit 2017-18 2018-19 2019-20
Centrally Sponsored Schemes
WCD-5
2235:02:103:17
Normal Mahila Jagruti Shibir 0.17 No. of beneficiaries 8500 9000 9500
(Development Programme of Gujarat Women
Economic Development corporation)
NTR-20
Normal 106:2236:02:800:17 55.65 No. of beneficiaries (In lakhs) 20.12 20.42 20.72
Mission Balam Sukham-ICDS Mission
SCW-25
106:2235:02:103:01
106:2235:02:796:06
Normal 235.26 No. of beneficiaries 160000 165000 165500
106:2235:02:103:04
Grant for financial assistance to destitute
widows of their rehabilitation (For Pension)
SCW-27
106:2235:02:103:27
GIA for Subsidy F.A. to destitute widows
Normal 7.70 No. of beneficiaries 7000 7200 7500
deserted and divorce women to make them
Financial independent (For Training)
NTR-02
Pregnant and Lactating
Normal 96:2236:02:796:02 12.39 27555 29555 31555
Women
Spot Feeding Programme (New Item)
Total 322.77
Total of Major Outcomes Based Schemes 1,618.08
*The table includes selected schemes
** Since units of physical targets varies as per units, summation is not mentioned
Demand Nos.: 107,108,95,96
Name of Department: CLIMATE CHANGE DEPARTMENT
119