SOLUTION DIAGRAM AND TYPICAL PROCESS

12 Ports Antenna Connection

L1800 U2100 system


4T4R G900 system
Reuse RRU L1800 system

RET cable

ASI4518R10

LT y2 LB y1 RB y3 LT y2

U2100 GU900 S1 S1 S1 S1
U2100 L1800 L1800 GU900
RRU RRU RRU RRU

ASI4518R10 ASI4518R10

LT y2 LB y1 RB y3 LT y2 LT y2 LB y1 RB y3 LT y2

S2 S2 S2 S2 S3 S3 S3 S3
U2100 L1800 L1800 GU900 U2100 L1800 L1800 GU900
RRU RRU RRU RRU RRU RRU RRU RRU
NoteIf site serves multiple systems, the feeders and jumpers of different systems must be distinguished.
For example, in system 2, one additional white ring must be respectively added to the red, yellow, and blue
rings of system 1; in system 3, two additional white rings must be respectively added to the red, yellow, and
blue rings of system 1.

Telkomsel Site Implementation V1.1 Huawei Proprietary - Restricted Distribution 1


SOLUTION DIAGRAM AND TYPICAL PROCESS
8 Ports Antenna Connection-L1800 Reuse RRU

U2100 system
L1800
4T4R L1800 system
Reuse RRU RET cable
U2100

AQU4518R21 AQU4518R21 AQU4518R21

yyyCR yL yyCL yyyCR yL yyCL yyyCR yL yyCL

S1 S1 S1 S2 S2 S2 S3 S3 S3
U2100 L1800 L1800 U2100 L1800 L1800 U2100 L1800 L1800
RRU RRU RRU RRU RRU RRU RRU RRU RRU
NoteIf site serves multiple systems, the feeders and jumpers of different systems must be distinguished.
For example, in system 2, one additional white ring must be respectively added to the red, yellow, and blue
rings of system 1; in system 3, two additional white rings must be respectively added to the red, yellow, and
blue rings of system 1.

Telkomsel Site Implementation V1.1 Huawei Proprietary - Restricted Distribution 2


SOLUTION DIAGRAM AND TYPICAL PROCESS
LTE 4T4R 12 ports Antenna &RF connection

L1800
4T4R
Reuse RRU
A B A B

U2100 system
U2100 GU900 G900 system
L1800 system

RET cable

RET and color coding, will configure RET in OSS

Telkomsel Site Implementation V1.1


3
Huawei Proprietary - Restricted Distribution

Notes :the antenna use 4.3-10 connector


Jumper selection: Depend on the RRU connector type
SOLUTION DIAGRAM AND TYPICAL PROCESS
LTE 4T4R 8 ports Antenna &RF connection

A B A B

L1800
4T4R
Reuse RRU
U2100
U2100 system

L1800 system

RET cable

RET and color coding, will configure RET in OSS


Cross feeder audit solution(4 steps)
4 steps to control Cross Feeder issues

ISDP Smart QC shoot the picture of Ant


System to control Cross issues

Step1.Pic-01
ASI4518R10

LT y2 LB y1 RB y3 LT y2

Step2.Pic-02

S1 S1 S1
U2100 L1800 GU900
RRU 4T4R RRU RRU
Step3.Pic-03
RRU ESN RRU ESN RRU ESN
yyyy yyyy yyyy

LTE 1800 - Sect 1

LTE
1800 -
Step4. NOC Compare RRU SN
Sect 1 Sec Subon NOC

1 yyxx YYXX

2 xxyy XXYY
3 xxyy XXYY

NOC compare the reported SN of the


RRU by the Subcon Site Engineer with 5
the one queried on the U2000
Telkomsel Site Implementation V1.1 Huawei Proprietary - Restricted Distribution