Professional Documents
Culture Documents
23/11/2015
24/11/2015
25/11/2015
25/11/2015
26/11/2015
DAILY WORK REPORT
WORK
ACTIVITY
ORDER
32"#150 GATE VALVE - 02 NOS 161
SORF FLANGE - IS 1538 - 16" - 12 NOS
SORF FLANGE - B16.5 - 3" #150 - 22 NOS
SORF FLANGE - B16.5 - 12" #150 - 60 NOS
SORF FLANGE - B16.5 - 2" #150 - 12 NOS
SORF FLANGE - B16.5 - 4" #150 - 08 NOS
SORF FLANGE - B16.5 - 6" #150 - 30 NOS
SORF FLANGE - B16.5 - 8" #150 - 56 NOS
SORF FLANGE - IS 1538 - 8" - 70 NOS
SORF FLANGE - IS 1538 - 10" - 12 NOS
SORF FLANGE - IS 1538 - 4" - 16 NOS
SORF FLANGE - IS 1538 - 6" - 62 NOS
SORF FLANGE - IS 1538 - 3" - 90 NOS
ATTENDED MEETING FROM 4.30 - 6.00 PM
SORF FLANGES - B16.5 - 8"#150 - 08 NOS
SOFF FLANGES - B16.5 - 20"#150 - 10 NOS
SORF FLANGES - B16.5 - 20"#150 - 10 NOS
SORF FLANGES - B16.5 - 20"#150 - 04 NOS
SORF FLANGES - B16.5 - 18"#150 - 10 NOS
SOFF FLANGES - B16.5 - 18"#150 - 10 NOS
SOFF FLANGES - B16.5 - 16"#150 - 36 NOS
SORF FLANGES - B16.5 - 14"#150 - 10 NOS
SORF FLANGES - IS1538 - 14"#150 - 04 NOS
SORF FLANGES - B16.5 - 10"#150 - 36 NOS
SORF FLANGES - IS1538 - 2-1/2"#150 - 40 NOS
KNIFE GTV - CF8 - 03 NOS 237
GLOBE VALVE - 65MM #150 - O1 NO 264
WO 298 INSPECTION -
1-1/2"#800 GTV - 03 NOS
3"PN10 DPCV FULLY RUBBER - 03 NOS
3"PN10 DPCV - 01 NOS
8"PN10 DPCV - 01 NOS
16"PN10 DPCV - 02 NOS
12" STRAINER - 01 NO
8" STRAINER - 01 NO
16" STRAINER - 01 NO
1"#800 GBV F316 - 06 NOS
INTERNAL TESTING
1"#150 BLV - 07 NOS WO 266
1"#800 BLV - 40 NOS A105 WO 298
3"PN 10 DPCV - 09NOS FULLY RUBBER WO 298
3"PN 10 DPCV - 01NO WO 298
4"#150 GBV - 01 NO WO 278
5"#150 GBV - 01 NO WO 278
1-1/2"#150 BLV - 10 NOS WO 284
INSPECTION - WO 298
20"BFV - 01 NO
14" PN10 DPCV - 01 NO
6"PN10 DPCV - 01 NO
2"#800 GTV - 04 SW F316
1-1/2" #800 GBV - 02 SW F316
INTERNAL TESTING
6"PN10 DPCV - 02 NOS WO 284
20"BFV - 02 NOS WO 298
16"BFV - 08 NOS WO 298
14"PN10 DPCV - 02 NOS WO 298
16"PN10 DPCV - 08 NOS WO 298
ILY WORK REPORT - (D. P. SINGH)
REMARKS
ALL THE FLANGES INSPECTED, BUT DUE TO UNAVAILABILITY OF PURCHASE ORDER, WE ARE UNABLE T
NO CHALLAN, NO PO
13.12.2o15 9.ooto6.3o pm
14.12.2O15 9.ooto6.3o pm
2O.12.2O15 8.45 AM
TO 6.3O PM
21.12.2O15 8.45 AM TO
7.3O PM
22.12.2O15 8.5O AM
TO
7.4O PM
23.12.2O15 8.5O AM
TO
7.4O PM
24.12.2O15 8.45 AM
TO
8.45 PM
26.12.2O15 8.45 AM
TO
8.PM
27,12.2O15 8.5O AM
TO
6.3OPM
28.12.2O15 8.5O AM
TO
8.PM
29.12.2O15 8.5O AM
TO
8. PM
3O.12.2O15 8.45 AM
TO
6.30 PM
31.12.2O15 8.5O AM
TO
7.OOPM
O 2.O1.2O16 8.45 AM
TO
9.1O PM
O 3.O1.2O16 8.45 AM
TO
8.2O PM
O4.O1.2O15 8.5O AM
TO
8.1O PM
O 5.O1.2O16 8.45 PM
TO
8. PM
O 6.O1.2O16 8.45 AM
TO
7.35 PM
O 7.O1.2O16 8.45 AM
TO
8. PM
O 9.O1.2O16 8.45 AM
TO
8. PM
1O.O1.2O16 8.45 AM
TO
7.PM
11.01.2016 8.45 AM
TO
12. PM
TO 2.30 PM
7. PM
12.O1.2O16 8.45 AM
TO
8.PM
13.01.2016 8.45 AM
TO
7.30 PM
14.01.2016 8.45AM
TO
7.30 PM
16.01.2016 8.45 AM
TO
7.45 AM
17.O1.2016 8.45 AM
TO
7.30 PM
18.01.2016 8.45 AM
TO
7.30 PM
19.01.2016 9. AM
T0
8. PM
20.01.2016 8.45 AM
TO
7.30 PM
21.01.2016 21.01.2016
23.01.2016 8.45 AM
TO
7.45 PM
24.01.2016 8.45 AM
TO
7.45 PM
25.01.2016 8.45 AM
TO
7.50 PM
27.01.2016 8.45 AM
TO
7.45 PM
28.01.2016 8.45 AM
TO
7.45 PM
29.01.2016 10AMT0 1O PM
30.01 2016 8.45 AM
TO
7.45 PM
01.02.2016 8.45 AM
TO
7.40 PM
0 2.02.2016 8.45 AM
TO
7.45 PM
0 3.02.2016 8.45 AM
TO
10. PM
22.02.2016 8.45 AM
T0
7. PM
23.02.2016 8.45 AM
7. PM
24.02.2016 8.45 AM
TO
7. PM
25.02.2016 8.45 AM
TO
7. PM
27.0 2.2016 8. 45 AM
7. PM
28.02.2016 8.50 AM
TO
7.50 PM
29.02.2016 8.50 AM
TO
7.50 PM
01.03.2016 8.45 AM
TO
7.30 PM
02.03.2016 8.45 AM
TO
7.30 PM
0 3.03.2016 8.45 AM
TO
1. PM
1.00 PM
T0
6. 30 PM
0 6.03.2016 8.35 AM
TO
7.0 PM
07.03.2016 8.40 AM
TO
7.40 PM
08.03.2016 8.40 AM
TO
9.0 PM
09.03.2016 8.40 AM
TO
9.0 PM
10.03.2016 8.45 AM
TO
9.20 PM
12.03.2016 8.5O AM
TO
7.50 PM
13.03.2016 8.50 AM
TO
7.15 PM
14.03.2016 8.45 AM
TO
7.25 PM
15.03.2016 8.45 AM
TO
7.40 PM
16.03.2016 8.45 AM
TO
8.15 PM
17.03.2016 7.30 AM
TO
4.0 PM
T0
7.15 PM
19.03.2016 7.40 AM
TO
7.0 PM
20.03.2016 8.45 AM
TO
7.15 PM
21.03.2016 8.45 AM
TO
12.O PM
TO.9.3O PM
22.03.2016 8.45 AM
TO
8.0 pm
23.03.2016 8.35 AM
TO
5.30 PM
24.03.2016
25.03.2016
26.03.2016 8.35 AM
TO
8. PM
27.03.2016 8.40 AM
TO
8. PM
28.03.2016 8.50 AM
TO
8.0 PM
29.03.2016 8.340 AM
TO
7.40 PM
30.03.2016 8.40 AM
TO
7.45 PM
31.03.2016 8.50 AM
TO
7.15 PM
0 2 .03.2016 8.45 AM
12.15 PM
TO
9.15 PM
03.04.2016 8.35 AM
TO
7.30 PM
0 4.04.2016 8.40 AM
TO
7.40 PM
TWO TIME
TESTING
05.04.2016 8.40 AM
TO
7.15 PM
0 6 .04.2016 8.45 AM
TO
7.40 PM
THREE TIME
TESTING
FIRST SIDE >
"
"
SECEND SIDE >
"
"
SECEND SIDE
0 9.04.2016 8.45 AM
TO
7. 20 PM
FIRST SIDE
SECEND SIDE
TWO TIME TEST
10.04.2016 8.40 AM
TO
7.0 pm
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
FIRST SIDE
11.04.2016 8.45 AM
TO
8.10 PM
FIRST .SIDE
SECEND SIDE
12.04.2016 8.45 AM
TO
7.45 PM
13.0 4 .2016 8.45 AM
TO
7.15 PM
14.04.2016 8.35 AM
TO
7.50 PM
17.04.2016 8.35 AM
TO
7.15 PM
18.04.2016 8.50 AM
TO
8.55 PM
FIRST
SECEND
REJECKET
REJECKET
O.K
LEACK
19.04.2016 8.40 AM
TO
8. PM
FIRST SIDE.
SECEND SIDE.
20.04.2016 8.40 AM
TO
7.25 PM
FIRST SIDE.
SECEND SIDE
21.04.2016 8.45 AM
TO
7.25 PM
FIRST SIDE
SECEND SIDE
23.0 4 .2016 8.35 AM
TO
7. 0 PM
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
24 .04 .2016 8.35 AM
TO
6.30 PM
FIRST SIDE
SECEND SIDE
SECEND SIDE
REPAIRING
TESTING THREE
TIME
REPLESHMENT
TESTING SIX
TIME
REPAIRING
26.04.2016 8.40 AM
TO
7.30 PM
FIRST SIDE
SECEND SIDE
NOTE >
27.04.2016 8.35 AM
TO
7.45 PM
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
30.04.2016 8.40 AM
TO
6.45 PM
FIRST SIDE
SECEND SIDE
NOTE >
0 2.05.2016 8.40 AM
TO
7. PM
FIRST SIDE
SECEND SIDE
03.05.2016 8.40 AM
TO
7. PM
FIRST SIDE
SECEND SIDE
0 4 .05.2016 8.40 AM
TO
7.15 PM
FIRST SIDE
SECEND SIDE
05.05.2016 8.40 AM
TO
7.15 PM
07.05.2016 8.45 AM
TO
7.15 PM
08.05.2016 8.45 AM
TO
6.40 PM
0.9.05.2016 0.9 AM
TO
6.45 PM
10.05.2016 8.40 AM
TO
7.15 PM
11.05.2016 8.40 A M
T0
6.45 PM
12.05.2016 8.35 AM
TO
6.45 PM
REPAIRING
14.05.2016 8.45 AM
TO
7.0 PM
THREE TIME TEST
15.05.2016 8.55 AM
TO
6.45 PM
REPAIRING
16.05.2016 8.45 AM
TO
7. 0 PM
17.05.2016 8.45 AM
TO
7.30 PM
FOUR TIME TEST
DISC.C.L.REPAIR
18.05.2016 8. 45 AM
TO
6.50 PM
REPAIRING
MR.ANIL
FITTER
19.05.2016 8.45 AM
TO
6.45 PM
21.05.2016 8.45 AM
TO
6.45 PM
BONNET &
WEDGE.CASTING
LEACK
REPAIR
FIRST SIDE
SECEND SIDE
22.05.2016 8.45 AM
TO
6.45 PM
FIRST SIDE
SECEND SIDE
23.05.2016 8.45 AM
TO
6.45 AM
24.05.2016 8.35 AM
TO
4.O PM
25.05.2016 8.40 AM
TO
6.35 PM
26.05.2016 8.40 AM
TO
8.0 PM
27.O 5.2016 10.30 AM
TO
6.30 PM
28.05.2016 8.40 AM
TO
6. 40 PM
30.05.2016 8.40 AM
TO
6.45 PM
A105
A105
31.O5.2016 8.35 AM
TO
6.45 PM
FIRST SIDE
SECEND SIDE
FIRST SIDE
SECEND SIDE
01.06,2016 8.35 AM
TO
9.30 AM
02.06.2016 8.40 AM
TO
6.50 PM
0 4.06.2016 8.40 AM
TO
6.45 PM
WELDING LEACK
REPAIR
05.06.2016 8.40 AM
TO
7.30 PM
THREE TIME
TESTING
0 6.06.2016 8.40 AM
TO
7.30 PM
0 7.06.2016 8.55 AM
TO
9.0 PM
0 8.06.2016 8.35 AM
TO
6.50 PM
0 9.06.2016 8.40 AM
TO
6.0 PM
11.06.2016 8.35 AM
TO
6.45 PM
FIVE TIME
TESTING
TOTAL VALVE
REPAIR VALVE
&
TESTING
REPAIR
14.06.2016 8.40 AM
TO
6.50 PM
15.06.2016 8.40 AM
TO
6.50 PM
16.06.2016 8.35 AM
TO
7.0 PM
18.06.2016 8.40 AM
TO
8.0 PM
REPAIRING
REPAIRING
19.O6.2016 8.35 AM
TO
7.30 PM
NOTE
20.05.2016 8.40 AM
TO
6.45 PM
21.06.2016 8.50 AM
TO
7.15 PM
22.05.2016 8.35 AM
TO
7.O PM
23.06.2016 10 . 00 AM
TO
2.0 PM
25.06.2016 8.40 AM
TO
4.30 PM
26.06.2016 8.30 PM
TO
6.40 PM
27.06.2016 9.05 AM
TO
7.0 PM
DISC OP.TITE
28.06.2016 8.40 AM
TO
6.40 PM
TESTING ONLY
RENDUM
29.06.2016 8.40 AM
TO
6.30 PM
30.06.2016 8.35 AM
TO
6.50 PM
HANDLE NOT
PROPER
0 2.07.2016 8.40 AM
TO
5.30 PM
HANDLE N0T
PROPER
REPAIRING
MR.ANIL
HANDLE N0T
PROPER
REPAIRING
MR.ANIL
TESTING FOR
O.K.MR.ADHIKA
RI.NANA &
RAGHUVEER
0 3.07.2016 8.10 AM
TO
6.30 PM
0 4.07.2016 8.40 AM
TO
6.3O PM
PRASHANT
ORDER O.K
M.D.SIR
0 5.07.2016 8.35 AM
TO
6.30 PM
06.07.2016 8.35 AM
TO
4.30 PM
0 7 07.2016 8.40 AM
TO
6.30 PM
0 9.07.2016 8.40 AM
TO
6.30 PM
HANDLE NOT
PROPER
JEACKETWELD.
10.06.2016 8.45 AM
TO
6.30 PM
REPAIR
11.07.2016 8.45 AM
TO
6.30 PM
14.07.2016 8.45 AM
TO
6.40 PM
16.07.2016 8.45 AM
TO
6.40 PM
HAND WHEEL
NUT FREE
NOT PROPER
17.07.2016 8.40 AM
TO
6.40 PM
HAND WHEEL &
NUT FREE
NOT PROPER
18.07.2016 8.40 AM
TO
6.40 PM
19.07.2016 8.40 AM
TO
6.50 PM
20 .07.2016 8.40 AM
TO
6.50 PM
21.07.2016 8.35 AM
TO
6.45 PM
NOTE.AIR FAIL
TO OPEN
23.07.2016 8.45 AM
TO
7.0 PM
NOTE.PCD
PROBLAM
NOTE.PCD
PROBLAM
24.07.2016 8.40 AM
TO
7.0 PM
25.0 7.2016 9.15 AM
TO
6.0 PM
27.07.2016 8.45 AM
TO
7.O PM
1.30 PM
TO
5.0 PM
TO
7.0 PM
28.07.2016 8.35 AM
TO
7. 0 PM
30.07.2016 8.45 AM
TO
6.50 PM
1.0 M.5.DRUP
1.0 M.5.DRUP
N0T.O.K
31.07.2016 8.40 AM
TO
6.45 PM
REPAIR.
ABHISHECK
GUJRAT TO
V.T.I.
01.08.2016 9.05.AM
TO
6.20 PM
02.08.2016 8.50 AM
TO
5.30 PM
03.08.2016 8.40 AM
TO
6.40 PM
HAND WHEEL
OPEN.CLOSE
TITE
QTY.01N0 LEACK
1.MT.4T05 DROP
ORDER.MR.
ADHIKARI.NANA
04.08.2016 8.40 AM
TO
6.35 PM
06.08.2016 8.40 AM
TO
6.50 PM
0 7.08.2016 8.40 AM
TO
5.50 PM
08.08.2016 8.40 AM
TO
6.35 PM
FULL DAY
TESTING FOR
BUTTER FLY VAL
MR.ADHIKARI
MR.ANIL
MR.PRASHANT
MR.ALOCK
09.08.2016 8.45 AM
TO
6.35 PM
10.08.2016 9.05 AM
TO
6.50 PM
THREE TIME
TESTING
11.08.2016 8.45 AM
TO
6.45 PM
16.08.2016 8.50 AM
TO
7.50 PM
17.08.2016 8.40 AM
TO
8.15 PM
FULL DAY REPAIR
MR.ADHIKARI
MR.ANIL
18.02.2016 8.40 AM
TO
4.10 PM
REJECKT
20.08.2016 8.35 AM
TO
6.40 PM
21.08.2016 8.35 AM
TO
6.40 PM
22.08..2016 8.45 AM
TO
6.40 PM
FRIST SIDE
SECEND SIDE
23.08.2016 8.45 AM
TO
7.00 PM
FIRST SIDE
SECEND SIDE
24.08.2016 8.50 AM
TO
7.O PM
NOTE.TOTAL
BALLVALVE
HANDLE TITE
SEAT PTFE CUT
NOTE.TOTAL
DRAIN PLUG
NOTE AVILABL
25.08.2016 8.40 AM
TO
5.0 PM
27.08.2016 9.10 AM
TO
6.45 PM
28.08.2016 8.35 AM
TO
6.30 PM
TEST
TEST
NOT TEST
NOT TEST
29.08.2016 8.50 AM
TO
6.45 PM
FRIST SIDE
SECEND SIDE
30.8.2016 8.40 AM
TO
7.15 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
31.08.2016 8.50 AM
TO
6.45 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
01.09.2016 8.45 AM
TO
6.50 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
0 3 .09.2016 8.45 AM
TO
7.0 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
04.09.2016 8.45 AM
TO
6.45 PM
FRIST SIDE
SECEND SIDE
06.09.2016 8.35 AM
TO
6.45 PM
FRIST SIDE
SECEND SIDE
07.09.2016 8.35 AM
TO
6.40 PM
FRIST SIDE
SECEND SIDE
0 8.09.2016 8.40 AM
TO
6.40 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
FUONDRY
SE
FRIST SIDE
SECEND SIDE
10.09.2016 8.40 AM
TO
6.45 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
11.09.2016 9.15 AM
TO
6.35 PM
FRIST SIDE
SECEND SIDE
12.09.2016 8.40 AM
TO
7.30 PM
FRIST SIDE
FRIST SIDE
SECEND SIDE
13.09.2016 8.35 AM
TO
8.15 PM
FRIST SIDE
SECEND SIDE
14.09.2016 8.45 AM
TO
7.30 PM
FRIST SIDE
SECEND SIDE
15.09.2016 8.40 AM
TO
4.0 PM
FRIST SIDE
SECEND SIDE
16.09.2016 10.0AM
T0
5.0 PM
17.09.2016 8.45 AM
TO
6.45 PM
18.9.2016 8.00 AM
TO
8.30 PM
RAGHUVEER
&
MR.SURAJ Q.C
19.09.2016 8.55 AM
TO
7.15 PM
20.09.2016 8.45 AM
TO
6.45 PM
21.09.2016 9.30 AM
TO
7.15 PM
REPAIR
RAGHUVEER
22.09.2016 8.45 AM
TO
7.50 PM
TESTING.REPAIR
MR.ANIL &
RAGHUVEER
24.09.2016 8.40 AM
TO
7.20 PM
QTY.03 N0
1.0 MINUT
6.0 DROP LEACK
REPAIR VALVE
QTY.0 2 N0
REJECT VALVE
O.K
25.09.2016 8.45 AM
TO
7.25 PM
REPLESHMENT
26.09.2016 8.50 AM
TO
8.0 PM
FRIST SIDE
27.09.2016 8.50 AM
TO
9.30 PM
FRIST SIDE
SECEND SIDE
FRIST SIDE
SECEND SIDE
28.09.2016 8.30 AM
TO
4.30 PM
29.09.2016 8.45 AM
TO
930 AM
01.10.2016 8.50 AM
NOTE> TO
FULL DAY 7.45 PM
REPAIR ORDER.M.D.SIR
D.P.C.VALVE "
DASH P0T "
VALVE ORDER.M.D.SIR
MR.ADHIKARI "
PRASHANT
02.10.2016 8.50 AM
TO
8.15 PM
REPAIRING
MR.ANIL
FITTER
& TESTING
03.10.2016 8.50 AM
TO
7.30 PM
04.10.2016 8.40 AM
TO
7.45 PM
DINTECH
REPAIR
MR.DASHRAT
05.10.2016 8.40 AM
TO
7.30 PM
DINTECH VALVE
REPAIR
FRISTSIDE
SECEND SIDE
FRISTSIDE
SECEND SIDE
06.10.2016 8.40 AM
TO
7.30 PM
FRIST SIDE
SECEND SIDE
0 8.10.2016 8.40 AM
TO
6.50 PM
0 9.10.2016 8.40 AM
TO
6.45 PM
REPAIR MR.ANIL FITTER
DISC.CF8
DISC.D.I
10.10.2016 8.55 AM
TO
6.40 PM
12.10.2016 8.40 AM
TO
7.20 PM
FRIST SIDE
SECEND SIDE
13.10.2016 8.40 AM
TO
6.45 PM
15.10.2016 8.45 AM
TO
6.50 PM
16.10.2016 8.45 AM
TO
6.50 PM
NOTE> GEAR
BOX PROBLAMB
NOTWORKING
PROPER
17..10.2016 8.45 AM
TO
6.45 PM
18.10.2016 8.40 AM
TO
7.0 PM
19.10.2016 8.45 AM
TO
6.50 PM
FRIST SIDE
SECEND SIDE
I.B.R.
20.10.2016 8.45 AM
TO
7.20 PM
NOTE.QTY.0 1 N0
BONNET.CASTI
NG.LEACK
REPAIR
FRIST SIDE
SECEND SIDE
ORDER.M.D.SIR
MR.ANIL FITTER
REPAIR SEAT
O.K
MR.ANIL FITTER
REPAR SEAT
O.K
22.10.2016 8.45 AM
TO
7.20 PM
23.10.2016 8.40 AM
TO
7.0 PM
24.10.2016 8.45 AM
TO
7.30 PM
8.0 PM TO.11 PM
RAGHUVEER
25.10.2016 8.45 PM
TO
7.30 PM
NIGHT.SHIFT
RAGHUVEER
"
"
"
"
"
25.10.2016 8.45 AM
TO
7.30 PM
26.10.2016 8.45 AM
TO
9.30 PM
27.10.2016 8.45 AM
TO
5.30 PM
29.10.2016 8.45 AM
TO
6.30 PM
30.10.2016
31.10.2016
01.11.2016
02.11.2016 8.30 AM
TO
6.30 PM
03.11.2016 TO
17.11.2016 8.35 AM
TO
8.30 PM
F TO F
NOT PROPER
NOTE.BACK
SEAT LEACK
19.11.2016 8.30 AM
TO
7.30 PM
NOTE.TOTAL
VALVE BACK
SEAT LEACK
20.11.2016 8.35 AM
TO
7.30 PM
FIRST SIDE
SECEND SIDE
NOTE.WEDGE
CASTING LEACK
REPAIR
QTY.01 NO
21.11.2016 8.35 AM
TO
10.0 PM
{OFF SET }
FABRICATION
BODY
REPAIR MR.ANIL
FITTER
22.11.2016 8.40 AM
TO
7.0 PM
23.11.2016 8.30 AM
TO
7.20 PM
24.11.2016 8.35 AM
TO
7.O PM
26.11.2016 8.35 AM
TO
7.0 PM
27.11.2016 8.35 AM
TO
7.0 PM
28.11.2016 8.35 AM
TO
7.0 PM
29.11.2016 10.30 AM
TO
7.30 PM
30.11.2016 8.35 AM
TO
7.0 PM
01.12.2016 10.30 AM
TO
8.0 PM
0 3.12.2016 8.50 AM
TO
7.0 PM
04.12.2016 8.35 AM
TO
6.40 PM
0 5.12.2016 8.45 AM
TO
7.25 PM
06.12.2016 10.30 AM
TO
5.00 PM
07.12.2016 8.40 AM
TO
7.10 PM
0 8.12.12.2016 TO
24.12.2016 8.45 AM
25.12.2016 8.45 AM
26.12.2016 8.45 AM
TO
7.30 PM
27.12.2016 8.35 AM
TO
7.0 PM
28.12.2016 8.40 AM
TO
7.30 PM
N0TE.PCD
PROBLAM
"
"
29.12.2016 8.35 AM
TO
7. 10 PM
31.12.2016 8.35 AM
TO
7.O PM
01.01.2017 9. 10 AM
TO
7. 20 PM
02.01.2016 8.35 AM
TO
7.30 PM
0 3.01.2017 8.30 AM
TO
8.20 PM
TESTING
RAGHUVEER
04.01.2017 8.35 AM
TO
7.15 PM
TESTING
RAGHUVEER
O.K ORDER
M.D. SIR
TIME.6.50 PM
05.01.2017 8.30 AM
TO
2.O PM
TESTING
RAGHUVEER
2.15 PM
TO
7. O PM
07.01.2017 8.30 AM
TO
7.30 PM
0 8.01.2017 8.35 AM
TO
7.20 PM
09.01.2017 8.35 AM
T0
7.30 PM
10.01.2017 8.35 AM
TO
7.30 PM
11.01.2017 8.30 AM
TO
7.30 PM
12.01.2017 8.30 PM
TO
8.15 PM
14.01.2017 8.30 AM
TO
7.735 PM
TESTING
RAGHUVEER
15.01.2016 8.30 AM
TO
7.30 PM
TESTING
RAGHUVEER
16.01.2017 11.00 AM
TO
5.00 PM
17.01.2017 8.45 AM
TO
8.0 PM
RAGHUVEER
TESTING
18.01.2017 8.30 AM
TO
8.45 PM
TESTING
RAGHUVEER
19.01.2017 8.30 AM
TO
7.30 PM
TESTING
RAGHUVEER
20.01.2017 10.0 AM
TO
5.15 PM
21.01.2017 8.30 AM
TO
7.10 PM
TESTING
RAGHUVEER
OXYGEN
SERVICE
22.01.2017 8.35 AM
TO
7.25 PM
TESTING
RAGHUVEER
23.01.2017 9.00 AM
TO
1.30 PM
TESTING
RAGHUVEER
1.O PM
TO
5.30 PM
24.01.2017 8.25 AM
TO
8.20 PM
TESTING
RAGHUVEER
25.01.2017 8.30 AM
TO
7.45 PM
TESTING
RAGHUVEER
28.01.2017 8.40 AM
TO
8.0 PM
29.01.2017 8.30 AM
TO
8.0 PM
TESTING
RAGHUVEER
30.01.2017 8.30 AM
TO
8.0 PM
31.01.2017 8.30 AM
TO
8.0 PM
01.02.2017 8.20 AM
TO
8.10 PM
NOTE.DISC OPEN
CLOSSE PROBLA
TESTING
RAGHUVEER
02.02.2017 8.30 AM
TO
8.0 PM
TESTING
RAGHUVEER
03.02.2017 8.20 AM
TO
7.0 PM
0 4.02.2017 8.20 AM
TO
8.0 PM
0 5 .02.2017 8.30 AM
TO
8.0 PM
06.02.2017 8.30 AM
TO
7.O PM
07.02.2017 10.0 AM
T0
5.0 PM
08.02.2017 8.30 AM
TO
7.30 PM
09.02.2017 10.0 AM
TO
5.0 PM
11.02,2017 8.50 AM
TO
7.0 PM
12.02.2017 8.50 AM
TO
7.15 PM
13.02.2017 8.50 AM
TO
7.0 PM
14.02.2017 8.50 AM
TO
7.0 PM
15.02.2017 8.50 AM
TO
7.15 PM
NOTE.DISC
OPEN PROBLAM
RUBBER CUTT
FRONT SIDE
18.02.2017 8.50 AM
TO
7.10 PM
19.02.2017 8.50 AM
TO
8.0 PM
20.02.2017 8.50 AM
TO
7.30 PM
21.02.2017 8.45 AM
TO
8.0 PM
RAGHUVEER
TESTING
22.02.2017 8.50 AM
TO
8.0 PM
23.02.2017 10.0 AM
TO
5.30 PM
24.02.2017 8.50 AM
TO
7.O PM
25.03.2017 8.50 AM
TO
8.0 PM
27.01.2017 8.50 AM
TO
7.30 PM
28.03.2017 8.50 AM
TO
8.0 PM
TESTING
RAGHUVEER
01.03.2017 8.50 AM
TO
8.00 PM
02.03.2017 8.50 AM
TO
8.00 PM
04.03.2017 8.50 AM
TO
7.30 PM
05.03.2017 8.50 AM
TO
7.30 PM
06.03.2017 8.50 AM
TO
12.30 PM
TO
5.0 PM
07.0.3.2017 8.50 AM
TO
8.0 PM
8.03.2017 8.50 AM
TO
8.0 PM
09.03.2017 8.50 AM
TO
7.30 PM
11.03.2017 8.50 AM
TO
7.30 PM
12.03.2017 8.50 AM
TO
8.0 PM
13.03.2017 8.50 AM
TO
7.30 PM
14.03.2017 8.50AM
TO
8.0 PM
15.03.2017 8.50 AM
TO
9.O AM
16.03.2017 8.30 AM
TO
10.0 PM
18.03.2017 8.30 AM
TO
9.15 PM
CASTING LEACK
REPAIR
19.03.2017 8.30 AM
TO
7.30 PM
20.03.2017 8.30 AM
TO
8.0 PM
21.03.2017 8.30 AM
TO
8.00 PM
RENDUM TEST
"
"
"
"
"
"
22.03.2017 8.30 AM
TO
8.0 PM
RENDUM TEST
"
"
"
"
"
"
"
23.03.2017 8.30 AM
TO
11.30 AM
TO
5.O PM
25.03.2017 8.25 AM
TO
7.30 PM
26.03.2017 8.25 AM
TO
7.15 PM
27.03.2017 8.25 AM
TO
7.30 PM
28.01.2017 8.25 AM
TO
8.0 PM
29.03.2017 8.20 AM
TO
8.O PM
30.03.2017 8.20 AM
TO
8.0 PM
NOT TEST
"
"
"
"
"
"
"
"
"
"
"
"
31.03.2017 8.20 AM
TO
8.0PM
01.04.2017 8.30 AM
TO
7.0 PM
LEVER OP.
03.04.2017 8.20 AM
TO
7.0 PM
04.04.2017 8.45 AM
TO
7.15 PM
05.04.2017 10.30 AM
TO
5.00 PM
06.04.2017 8.25 AM
TO
8.10 PM
07.24.2017 8.50 AM
TO
7.55 PM
08.04.2017 8.30 AM
TO
5.15 PM
10.04.2017 8.40 AM
TO
8.0 PM
PCD PROBLAM
11.03.2017 8.45 AM
TO
8.0 PM
REPAIR
N.K. INDUST.
12.04.2017 8.45 AM
TO
7.30 PM
13.04.2017 8.45 AM
T0
7.30 PM
14.04.2017 8.25 AM
TO
7.0 PM
15.04.2017 8.25 AM
TO
7.30 PM
17.04.2017 8.50 AM
TO
7.50 PM
18.04.2017 8.50 AM
TO
8.30 PM
19.04.2017 9.0 PM
TO
9.15 PM
20.04.2017 10.0 AM
TO
5.0 PM
21.04.2017 8.20 AM
TO
7.O PM
22.04.2017 8.25 AM
TO
7.O PM
24.04.2017 8.25 AM
TO
7.30 PM
25.04.2017 8.20 AM
TO
7.30 PM
26.04.2017 8.50 AM
TO
6.50 PM
27.04.2017 8.25 AM
TO
6.55 PM
28.04.2017 8.35 AM
TO
7.0 PM
29.04.2017 8.50 AM
TO
8.0 PM
02.05.2017 8.50 AM
TO
7.30 PM
03.05.2017 8.30 AM
TO
8.30 PM
04.05.2017 10 .0 AM
TO
4.0 PM
05.05.2017 8.30 AM
TO
7.30 PM
06.05.2017 8.20 AM
TO
7.30 PM
08.05.2016 8.20 AM
TO
7.30 PM
09.05.2017 8.55 AM
TO
7.30 PM
10.05.2017 8.45 AM
TO
9.10 PM
11.O5.2017 8.55 AM
TO
10.0 PM
12.05.2017 8.45 AM
TO
7.0 PM
13.05.2017 8.35 AM
TO
7.10 PM
15.05.2017 9.15 AM
TO
7.10 PM
16.05.2017 8.35 AM
TO
7.10 PM
17.05.2017 9.15 AM
TO
7.0 PM
18.05.2017 8.50 AM
TO
7.45 PM
19.05.2017 8.50 AM
TO
7.30 PM
20.05.2017 8.45 AM
TO
6.50 PM
22.05.2017 9.10 AM
TO
7.10 PM
23.05.2017 8.30 AM
TO
7.10 PM
24.05.2017 8.20 AM
TO
7.15 PM
25.05.2017 8.30 AM
TO
DAILY WORK REPORT
WORK
ACTIVITY
ORDER
WCB CASTING GATE VALVE SIZE 150MM X 150#
BODY 09 N0
BONNET 06 N0
WCB CASTING GATE VALVE SIZE 2OO MMX 15O#
BODY 14 NO
BONNET O6NO
C I W|T BUTTER FLY VALVE {GEAR BOX OP}
SIZE 35OMM X PN1O O2NO
SIZE 4OOMM X PN1O O2NO
GRN CLEARING
GRN CLEARING
WCB W|T BUTTER FLY VALVE [PNUMATIC DOUBLE ACT.CYL.]
SIZE 45O MM X PN 16 O 3 NO
SIZE > 9OO MM XPN 1O O 1NO
WCB W\T BUTTER FLY VALVE
SIZE > 5OMM X PN 1O 1ONO
CF3M W\T D.P.C. VALVE CASTING
SIZE .5O MM X 15O # BODY O 2 NO
SIZE . 5O MM X 15O # DISC O4 NO
WCB BUTTERR FLY VALVE CASTING
SIZE.5OO MM X PN 16 BODY O 1NO
WCB GLOBE VALVE CASTING
SIZE . 4OO X 15O# O 2 NO
BODY O 2 NO
BONNET
POSTER FITTING
G.M. S/C GATE VALVE {HAND WHEELOP} W/O 3O3
SIZE.15 MM X 150#
HYDROSEAT O.K 05N0
WCB F/E SWING CHECK VALVE W/O 273
SIZE.50 MM X 150#
HYDROSEAT O.K 0 1 N0
SIZE.25MMX150# 0 1N0
HYDROSEAT O.K
F304 S/C NEEDLE VALVE W/0 397
SIZE.15 MM X 150#
HYDROSEAT O.K 10 N0
WCB F/E GATEVALVE{HAND WHEEL OP} W/O 303
SIZE.15O MM X 150#
HYDROSEAT O.K O 1N0
W/O 273 VALVE S.R.NO PUNCHING
COPERKHARNE OFFICE
T0 I.B.R. OFFICE BANDRA
DATE.04.02.2016
T0
DATE.21.02.2016
I.B.R. OFFICE
FACTORY
WCB W/T BUTTER FLY VALVE {PNEUMATIC DOUBLE ACTING CY} W/O.169
SIZE.150 MM X PN.10
HYDRO SEAT O.K
SIZE.200 MM X PN.10
HYDRO SEAT O.K 0 5N0
SIZE.250 MM X PN.10
HYDRO SEAT O.K
SIZE.65 MM X PN.10
HYDRO SEAT O.K
WCB W/T BUTTER FLY VALVE {GEAR BOX OP}
SIZE.200 MM X PN.10
HYDRO SEAT O.K
SIZE.150 MM X PN.10
HYDRO SEAT O.K
M.S.FABRICATION F/E JECKET BALLVALVE W/O.249
SIZE.20 MM X 150 #
BODY CASTING LEACK & JOINT LEACK 0 4 N0
HYDRO SEAT LEACK
SIZE.20 MM X 300 #
BODY CASTING LEACK & JOINT LEACK 0 4 N0
HYDROSEAT LEACK
SIZE.100 MM X 300 #
BODY CASTING LEACK & JOINT LEACK 0 6 N0
HYDRO SEAT LEACK & HANDLE PLAY
SIZE.100 MM X 150 #
HYDRO SEAT O.K 0 1 N0
HYDRO SEAT LEACK &HANDLE PLAY & TOP JOINT LEACK 0 5 N0
WCB W/T BUTTER FLY VALVE {PNEUMATIC DOUBLE ACTING CY} W/O.169
SIZE.150 MM X PN.10
HYDRO SEAT O.K
SIZE.200 MM X PN.10
HYDRO SEAT O.K
SIZE.250 MM X PN.10
HYDRO SEAT O.K
SIZE.65 MM X PN.10
HYDRO SEAT O.K 0 2 N0
WCB W/T BUTTER FLY VALVE {GEAR BOX OP }
SIZE.150 MM X PN.10
HYDRO SEAT O.K 0 2 N0
SIZE.200 MM X PN.10
HYDRO SEAT O.K 0 4 N0
G.R.N.CLEARING 12 NO
FACTORY TO I.B.R.OFFICE BANDRA
HOLE
FRIDAY
I.B.R F22 GLOBE VALVE {BODY & BONNET WELDING}HAND WH} W/O.471
SIZE.25 MM X 2500 # 36 N0
INSPECTI0N 0 1 N0
I.B.R.A105 B/W GLOBE VALVE{BODY & BONNET WELDING 36 N0
SIZE.25 MM X 2500 #
INSPECTI0N 0 1 N0
SIZE.40 MM X 2500 # 18 N0
INSPECTI0N 0 1 N0
I.B.R. B/W GATE VALVE CASTING W/O.453
SIZE.300 MM X 600 # BODY.BONNET.WEDGE 11.SET
CF8 W/T BUTTER FLY VALVE {PNEUMATIC SINGLE ACTING CYL.} W/O.509
SIZE.150 MM X PN.10 0 6 N0
HYDRO SEAT TEST LEACK
GLAND & BOTTOM TEST O.K
C.I.W/T BUTTER FLY VALVE {LEVER OP } W/O.437
SIZE.50 MM X PN.10 10 N0
HYDRO SEAT TEST O.K. 0 5 N0
HYDRO SEAT LEACK 0 2 N0
GLAND LEACK 0 2 N0
BODY BRECKIZ 0 1 N0
WCB 2PCF/E BALLVALVE {LEVER OP } W/O.62
SIZE.50 MM X 150 # 20 N0
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
WCB W/T BUTTER FLY VALVE {PNEUMATIC SINGLE ACTING CYL} W/O.016
SIZE.500 MM X PN.10 0 2 N0
HYDRO SEAT TEST O.K
SIZE.400 MM X PN.10 0 1 N0
HYDRO SEAT TEST O.K
SIZE.300 MM X PN.10 O 1 N0
HYDRO SEAT TEST O.K
A105 S/W {I.B.R. }GLOBE VALVE { HAND WHEEL OP } W/O.447
SIZE.25 MM X 2500 # 15 N0
HYDRO BACK SEAT TEST O.K
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
WCB F/E GATE VALVE {HAND WHEEL OP } W/O.337
SIZE.100 MM X 150 # 0 4 N0
HYDRO BACK SEAT TEST O.K
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
SIZE.100 MM X 150 # W/O.317
HYDRO BACK SEAT TEST 10 N0
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
SIZE.100 MM X 150 # W/O.18
HYDRO BACK SEAT TEST 0 2 N0
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
WCB W/T BUTTER FLY VALVE {GEAR BOX OP } W/O.200
SIZE.250 MM X PN.10 0 1 N0
HYDRO SEAT TEST O.K
SIZE.200 MM X PN.10 0 1 N0
HYDRO SEAT TEST O.K
WCB F/E BUTTER FLY VALVE {PNEUMATIC DOUBLE ACTING CYL. W/O.222
SIZE.1000 MM X PN.10 0 1 N0
HYDRO BODY TEST
HYDRO SEAT TEST
WCB 2PC F/E BALLVALVE {LEVER OP } SEAT.M.TO.M W/O.249
SIZE.50 MM X 150 # 0 2 N0
HYDRO BODY TEST 0 1 N0
HYDRO SEAT TEST O.K
AIR SEAT TEST > LEACK LEACK
HYDRO SEAT TEST > LEACK 0 1 N0
WCB F/E JEACKET BALLVALVE {LEVER OP } W/O.249
SIZE.100 MM X 300 # 0 6 N0
HYDRO JEACKET TEST
HYDRO BODY TEST
HYDRO SEAT TEST
AIR SEAT TEST
SIZE.100 MM X 150 # 0 6 N0
HYDRO JEACKET TEST
HYDRO BODY TEST
HYDRO SEAT TEST
AIR SEAT TEST
TESTING MACHINE REPAIRING
WCB F/E BUTTER FLY VALVE {PNEUMATIC SINGLE ACTING CYL.} W/O.244
OFF SET DISC { BODY FABRICATION M.S. } 0 2 N0
NOTE. Air fail to open disc O.K
SIZE.200 MM X150 # 02 N0
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
WCB F/E DUAL PLATE CHECK VALVE W/O.244
SIZE.200 MM X150 # 0 2 N0
HYDRO SEAT TEST O.K
WCB W/T BUTTER FLY VALVE CASTING W/O.222
SIZE.800 MM X PN.16 .BODY & DISC 0 1 SET
GO TO PANVEL
DIWALI
"
"
16.11.2016 LEVE
I.B.R.OFFICE BANDRA
WC6 DRAWING .65MM X 2500# 0 1 N0
FROME 3C 12" X 600# 0 1 N0
WCB DRAWING.20".5" 3/4 " GTV &21/2 " SCV 0 5 N0
23.12.2016 L
TO 8.15 PM W/O.145
TO 7.30 PM W/O.145
C.I. F/E BUTTER FLY VALVE {GEAR BOX } WITH LIMIT SWITCH W/O.292
SIZE.800 MM X PN.10 0 4 N0
HYDRO SEAT TEST O.K
I.B.R.B/W GLOBE VALVE {HANDWHEEL OP } W/O.
SIZE.65MM X 2500 # 0 1 N0
HYDRO BODY TEST . 200 KG OK
A105 F/E GLOBE VALVE {HAND WHEEL OP } W/O.298
SIZE.25 MM X 150 # 10 N0
HYDRO .BODY .BACK SEAT . SEAT .AIR SEAT TEST O.K
A.P.I.
A.P.I.
WCB 2PC F/E BALLVALVE {PNEUMATIC DOUBLE ACTING } W/O.295
SIZE.25 MM X 150 # 32 N0
HYDRO SEST TEST O.K 20 N0
HYDRO SEAT LEACK 0 2 N0
GLAND LEACK 0 4 N0
D.I. F/E BUTTER FLY VALVE {GEAR BOX OP } W/O.295
SIZE.800 MM X PN.10 0 1 N0
HYDRO SEAT TEST .06.KG O.K O.K
WCB 2PC F/E BALLVALVE {PNEUMATIC DOUBLE ACTING } W/O.97
SIZE.25 MM X 150 # 32 N0
INSPECTIN O.K 0 2 N0
SIZE.40 MM X 150 # 0 4 N0
INSPECTIN O.K 0 1 N0
SIZE.80 MM X 150 # 0 3 N0
INSPECTIN O.K 0 1 N0
SIZE.100 MM X 150 # 0 5 N0
INSPECTIN O.K 0 1 N0
WCB W/T BUTTER FLY VALVE {LEVER OP } W/O.97
SIZE.65 MM X PN.10 0 5 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.100 MM X PN.10 10 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.50 MM X PN.10 25 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.40 MM X PN.10 25 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.32 MM X PN.10 20 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
WCB LUG TYPE KNIF GATE VALVE {HAND WHEEL OP } W/O.97
SIZE.80 MM X PN.10 0 8 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.100 MM X PN.10 08 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.200 MM X PN.10 0 3 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
SIZE.350 MM X PN.10 0 5 N0
HYDRO SEAT TEST .06.KG O.K 0 1 N0
I.B.R. OFFICE BANDRA
NSIC
C.I. F/E BUTTER FLY VALVE {PNEUMATIC D0UDLE ACTING CYL.} W/O.293
SIZE.250 MM X PN.10 10 N0
TESTING O.K 0 9 N0
SEAT LEACK 0 1 N0
WCB F/E SWING CHECK VALVE W/O.501
SIZE.50 MM X 150 # 0 3 N0
TESTING O.K O.K
WCB F/E BUTTER FLY VALVE {GEAR BOX OP } W/O.248
SIZE.200 MM X 150 # 0 6 N0
HYDRO SEAT TEST . 12 K.G O.K O.K
WCB 3WAY BALLVALVE F/E { GEAR BOX OP } REYNOLD
SIZE.150 MM X 300 # 0 1 N0
BODY & SIDE PC JOINT LEACK .30 K.G. LEACK
HYDRO SEAT O.K
WCB 3PC F/E BALLVALVE {GEAR BOX OP } W/O.19
SIZE.100 MM X 300 # 0 8 N0
HYDRO SEAT TEST O.K 0 3 N0
WCB F/E GATE VALVE {HAND WHEEL OP } W/O.30
SIZE.80 MM X 150 # 0 5 N0
SIZE.100 MM X 150 # 0 5 N0
SIZE.150 MM X 150 # 0 6 N0
CF8M 3PC S/C BSP {F } BALLVALVE {LEVER OP } W/O.03
SIZE.25 MM X 800 # 51 N0
SIZE.20 MM X 800 # 36 N0
WCB W/T BUTTER FLY VALVE {PNEUMATIC DOUBLE ACTING } W/O.469
SIZE.200 MM X 150 # 0 4 N0
REMARKS
CASTING DIAMENTION
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
CASTING DIAMENTION
"
"
"
"
"
"
"
CASTING DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
CASTING DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
STORE
I.B.R.OFFICE BANDRA
CHALLAN.58O DATE.14.12.2O15
GRAVITY CAST PVT.LTD
CASTING DIAMENTION
"
"
"
"s
CHALLAN.45O DATE.16.12.2O15 DATAR ENTERPRISE
TESRING
TESTING
TESTING
TESTING
TESTING
TESTING
O.K
O.K
O.K
O.K
O.K
INSPECTION
O.K
O.K
O.K
TESTING
O.K
O.K
O.K
SEAT LEACK
S.D.TRADING CO. CHALLAN . 18O8 DATE . 19.12.2O15
DIAMENTION
"
TESTING AREA
O.K
O.K
TESTING
O.K
TESTING
O.K
O.K HYDRO SEAT LEACK O2NO
VALVE INDUDTRIESE
CHALLAN.O384 DATE.24.12.2O15
DIMENTION
"
"
"
"
"
"
NUPRO ENGINEERING CHALLAN.1O4R DATE.14.12.2O15
DIMENTION
TESTING
O.K
O.K
DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
STORE
MACHINE SHOP
DIAMENTION
TESTING
O.K.
S.D.TRADING.CO. CHALLAN.1612.DATE.28.12.2O15
DIAMENTION
"
"
MACHINE SHOP DIAMENTION
MACHINE SHOP DIAMENTION
BODY MACHINE SHOP DIAMENTION
"
W/O . 365 MACHINE SHOP DIAMENTION
"
MACHINE SHOP DIAMENTION
{ TECHANISYS} DISPACH
TESTING
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
J.S.W.STEEL.LTD DOLVI { 2O14.15}
TESTING
"
"
"
"
"
"
"
"
"
BHEL {INSPECTION}
TESTING
"
"
"
"
"
GERMAN TECHNO CAST CHALLAN.O72 DATE.O4.O1.2O16
DIAMENTION
"
"
"
STORE
TESTING
"
"
"
"
"
"
"
STORE
GRINDING
"
PENTING
PENTING
TESTING
"
"
"
"
"
BHEL
TESTING
"
"
"
DINTECH VALVE PVT . LTD. CHALLAN.O323 DATE.O6.O1.2O16
DIAMENTION
"
"
"
"
"
"
"
"
"
S.K.A.ENGINEERING WORKS CHALLAN.5O DATE.O7.O1.2O16
DIAMENTION
"
"
TESTING
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
N.K. INDUSTRIES ENGINEERS & FABRICATORS CHALLAN.0592 DATE.09.01.2016
DIAMENTION
"
"
"
"
"
"
WEDGE OPPIN & CLOSSE CHECK
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING&DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
W/0.410 L & T {IBR } INSPECTION
"
TESTING
HANDLE PLY
HANDLE PLY
TESTING
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
BARC INSPECTION
"
"
TESTIG
"
ONE SIDE
ONE SIDE
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & S.R.N0.PUNCHINH
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & S.R.N0.PUNCHING
"
"
TESTING
"
NOT TESTING
0 .K. AIR SEAT.7.0 KG
0.K. HYDRO SEAT. 38.KG
0.K. AIR SEAT. 7.0 KG
BODY & SIDE PC JOINT LEACK .38 KG
INSPECTION
"
"
TESTIN & DIAMENTION
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION {I.B.R.}
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
KALYAN TO BANDRA
"
"
DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
NOT ASSAMBLE
"
"
TESTING
NOT ASSAMBLE
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
NOT ASSAMBLE
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
STORE
F.91.G.B.V. FORME THREE.C.CLEARING
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
NOT TESTING
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
NOT TESTING
"
"
"
"
"
"
"
TESTING
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
TESTING
"
NOT TESTING
"
"
"
TESTING
"
"
"
TESTING & DIAMENTION
"
"
"
"
NOT TESTING
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & TESTING
"
"
"
"
"
"
"
"
TESTING
"
O.K
O.K
0.K
LEACK
LEACK
O.K
LEACK
LEACK
"
"
"
"
"
"
"
OXYGIN SERVICE.DEGRECING
"
TESTING MACHIN REPAIRING
S.R NO.PUNCHING
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
NOT TESTING &ASSAMBLE NOT
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
'
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
S.R.N0.PUNCHING
TESTING
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
S.R.N0 PUNCHING
"
DIAMENTION & TESTING
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
I.B.R. INSPECTION
"
TESTING
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
I.B.R. INSPECTION
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
I.B.R.OFFICE ANDRA
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
PUNCHING
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
INSPECTION.HOLD
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
STORE
CLEENING
INSPECTION
"
"
"
"
SRNO.PUNCHING & GRINDING
"
TESTING & DIAMENTION
"
"
"
"
INSPECTION
"
"
"
"
"
"
"
"
"
"
"
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION {TATA }
DIAMENTION & TESTING CHECK
"
"
"
"
"
"
"
"
"
"
"
"
INPECTON & TESTING & DIAMENTION & PENUMATIC DOUBLE ACTING CYLENDER OPEN & CLOSSE
"
"
"
"
"
"
"
"
"
"
"
METTING
TESTING &DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION
"
TESTING MACHINE STOP
INSPECTION
"
"
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
TESTING DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
TESTING & DIAMENTION
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
I.B.R.OFFICE
INSPECTOIN
O.K
O.K
TESTING
"
"
"
"
"
TESTING DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
BHEL> INSOECTION
DIAMENTION
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION {HINDUSTANSHIPYARD }
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
'
"
"
"
'
"
"
"
"
"
"
"
"
"
TESTING
"
"
"
"
DIWALI
"
"
S.R.NO.HT.NO PUNCHING
"
"
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
I.B.R.OFFICE BANDRA
"
"
"
I.B.R.INSPECTION
"
"
INSPECTION
"
"
"
"
"
"
"
"
DIAMENTION REP0RT
"
"
"
"
I.B.R.OFFICE BANDRA
READY
READY
INSPECTION .CASTING & HYDRO TEST O.K
"
HOLD
READY
"
"
"
I.B.R.OFFICE BANDRA
O.K
HOLD
HOLD
M0THER DEATH
INSPECTION
PUNCHING & GRANGING
DIAMENTION REPORT
INSPECTION {TPI }
HYDRO TEST.BODY & SEAT & DIAMENTION
"
"
"
"
"
"
PUNCHING
PUNCHING
GRINDING & SR.N0.HT.N0 PUNCHING
I.B.R.INSPECTION
INSPECTION O.K
I.B.R.INSPECTION
O.K
"
"
A.P.I.
I.B.R.OFFICE BANDRA
"
"
"
"
DIAMENTION & TESTING REPROT
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION REPORT
"
"
"
"
"
"
"
"
"
TESTING & DIMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
WITH DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPCTION
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTION
"
INSPECTION
"
"
"
"
"
"
"
TESTING
"
"
"
"
"
"
"
"
"
"
"
"
"
I.B.R.OFFICE BANDRA
"
"
"
"
OFFICE {KOPERKHAIRANE }
DIAMENTION REPORT
"
"
"
"
"
"
"
DIAMENTION TESTING REPOT
DISC.GRINDING {CF8 } PUNCHING.CF8M & HT.N0.S.R.N0.
"
DIAMENTION &TESTING REPORT
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
S.R.N0.& HT.N0 PUNCHING
INSPECTION {VISAKHAPATNAM STEEL PLANT }
TESTING & DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & TESTING REPORT
"
"
"
"
"
GEAR BOX PROBLAM & DISC CLOSSE PROBLAM
TWO TIME TESTING
"
INSPECTION { RELANCE }
DIAMENTION
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
DIAMENTION & TESTING REPORT
"
"
"
"
"
"
"
"
"
"
"
"
"
"
INSPECTON {TPI }
TESTING & DIAMENTIOM
"
"
"
"
"
"
DIAMENTION & TESTING REPORT
"
"
"
"
"
"
"
"
"
"
DIAMENTION REPORT
"
"
"
"
S.R.N0 , MOC . HT N0. PUNCHING
S.R.N0.PUNCHING
I.B.R.OFFICE BANDRA
"
"
"
DIAMENTION REPORT
GRINDIN S.R.NO.& HT.NO PUNCHING
"
"
DIAMENTION REPORT
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
BHEL { INSPECTION }
"
"
"
"
DIAMENTION & TESTING REPORT
"
"
"
"
"
"
"
"
DIAMENTION & TESTING REPORT
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
S.R.N0 PUNCHING
TESTING REPORT
"
"
"
"
"
"
"
"
BHEL {INPECTION }
"
"
"
"
LEVER OP.
03.04.2017 8.20 AM
TO
7.0 PM
04.04.2017 8.45 AM
TO
7.15 PM
05.04.2017 10.30 AM
TO
5.00 PM
06.04.2017 8.25 AM
TO
8.10 PM
07.24.2017 8.50 AM
TO
7.55 PM
08.04.2017 8.30 AM
TO
5.15 PM
WCB GATE VALVE F/E {HAND WHEEL OP } W/O.444
SIZE.300 MM X 150# 0 2 N0
TESING INSPECTION 0 1 N0
WCB GATE VALVE F/E {HAND WHEEL OP } W/O.379
SIZE.250 MM X 150 # 01 N0
TESING INSPECTION 0 1 N0
SIZE.100 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
SIZE.80 MM X 150 # 0 3 N0
TESING INSPECTION 0 1 N0
WCB SWING CHECK VALVE W/O 379
SIZE.100 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
WCB 2PC F/E BALLVALVE {GEAR BOX OP } W/O.379
SIZE.250 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
SIZE.200 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
SIZE. 100 MM X 150 # 0 5 N0
TESING INSPECTION 01 N0
SIZE.125 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
WCB F/E GLOBE VALVE {HAND WHEEL OP } W/O.379
SIZE .250 MM X 150 # 0 1 N0
TESING INSPECTION 0 1 N0
CF8 S/C BSP {F } 3PC BALLVALVE {LEVER OP } W/0.379
SIZE.15 MM X 150 # 15 N0
TESING INSPECTION 0 2 N0
SIZE.25 MM X 150 # 0 4 N0
TESING INSPECTION 0 1 N0
WCB W/T BUTTER FLY VALVE {GEAR BOX OP } W/O.180
SIZE.450MM X PN.10 0 1 N0
TESTING O.K
WCB L/T BUTTER FLY VALVE {GEAR BOX OP } W/O.412
SIZE.300 MM X 150# 0 7 N0
TESTING O.K
WCB W/T DUAL PLATE CHECK VALVE W/0.430
SIZE.80 MM X 150 # 16 N0
TESTING O.K
WCB DUAL PLATE CHECK VALVE W/O.430
SIZE.80 MM X 150 # 23 N0
TESTING O.K
C.I.W/T BUTTER FLY VALVE {PNEUMATIC DOUBLE ACTING CY} W/0.423
SIZE.80 MM X PN.10 0 2 N0
TESTING O.K
SIZE.50 MM X PN.10 0 3 N0
TESTING LEACK
WCB F/E GATE VALVE {GEAR BOX OP } W/O.489
SIZE.450 MM X 150 # 0 1 N0
HYDRO BACK SEAT TEST O.K
HYDRO BODY TEST O.K
HYDRO SEAT TEST O.K
AIR SEAT TEST O.K
CF8 S/C BSP {F } 3PC BALLVALVE {LEVER OP } W/O.379
SIZE.15MM X 300 # 12 N0
TESTING O.K
SIZE.25 MM X 300 # 0 3 N0
TESTING O.K
WCB F/E SWING CHECK VALVE W/O.325
SIZE.150 MMX 150 # 0 2 N0
WCB W/T DUAL PLATE CHECK VALVE W/O.412
SIZE.700 MM X 150 # 0 2 N0
WCB L/T BUTTER FLY VALVE {GEAR BOX OP } W/O.412
SIZE.400 MM X 150 # 0 8 N0
SIZE.500 MM X 150 # 0 6 N0
I.B.R.WCB S.R.VALVE CASTING SIZE.16"X20"X150# 01 SET
WCB F/E GTV SIZE.16 "X 300# DRAWING DIAMENTION CHENGE 0 1 N0
I.B.R. OFFICE DRAWING REJECT
I.B.R.OFFICE BANDRA
"
"
"
"