You are on page 1of 7

DISEO DE ESTRIBO DE CONCRETO ARMADO

ESPECIFICACIONES DEL PUENTE

Altura de Glibo Libre (Hl) = 5.00 m Ancho del Puente = 17.25 m


Longitud del Puente = 20.00 m Separacin entre vigas (S) = 2.00 m

DATOS Y DIMENSIONAMIENTO DEL ESTRIBO

Hp = 2.28 m
Ep = 0.40 m Ep

Ece = 0.50 m Ece


Hce = 1.58 m
Hvc = 0.70 m
Hvar vc = 0.40 m Hce

Es = 0.35 m Hp

Ei = 0.70 m Hvc
Es
Lp = 1.80 m
Lt = 2.90 m
Hvar vc
D= 0.70 m
L= 5.40 m
Ht
Hf = 1.50 m Hl

Ht = 8.08 m
= 0.00
c = 2,400.00 Kg/m
s = 1,900.00 Kg/m
= 30.00
adm = 2.50 Kg/cm Lp
Lt
F'c = 250.00 Kg/cm Hf
Fy = 4,200.00 Kg/cm
Ei D
q= 1,500.00 Kg/m
Ka = 0.33
L
Kp = 3.00
h' = 0.79
Coeficiente de friccin del suelo = 0.50
Longitud equivalente al relleno de tierra armada = 4.60 m

CLCULO DE FUERZAS PROVENIENTES DE LA SUPERESTRUCTURA QUE SE TRANSMITEN A LA INFRAESTRUCTURA


A TRAVS DEL APOYO FIJO

CARGA MUERTA PROVENIENTE DEL TABLERO (D)

Altura de viga (hv) = 1.40 m Nro. De vigas = 9.00 vigas


Wpp viga = 815.00 Kg/m e asf = 0.05 m
Espesor losa (e) = 0.18 m asf = 2,300.00 Kg/m
Ancho de defensa lateral = 0.51 m Ancho efect. de Asf = 16.23 m

W concreto = 864.00 W defesas laterales e Isla = 430.22


W separadores = 120.00 W asfalto = 207.38

Carga Muerta (D) = 12,183.03 Kg/m

CARGA VIVA PROVENIENTE DEL TABLERO (L)

FD = 0.60 FT = 1.00
FMTC = 1.20 FI = 1.26

P= 13,087.41 Kg Carga Viva (L) = 12,625.26 Kg/m


DETERMINACIN DE LAS FUERZAS ACTUANTES EN EL ESTRIBO

1.- CARGA MUERTA


1.1. CARGAS MUERTAS DE LA INFRAESTRUCTURA

FUERZAS ESTABILIZADORAS FUERZA (Kg/m) X (m) MOMENTO (Kg-m) Y (m) MOMENTO (Kg-m)

Pared Rectangular (P1) 4,620.00 1.98 9,124.50 3.45 15,939.00


Pared Triangulo (P2) 2,142.00 2.27 4,855.20 2.40 5,140.80
Triangulo Variable V.C. (P3) 264.00 2.33 616.00 6.07 1,601.60
Viga Corona (P4) 648.00 2.25 1,458.00 6.35 4,114.80
Parapeto (P5) 1,516.80 2.50 3,792.00 7.29 11,057.47
Relleno Pared Triangulo (P6) 1,695.75 2.38 4,041.54 4.10 6,952.58
Relleno V.C. Tringulo (P7) 209.00 2.52 525.98 5.93 1,240.07
Relleno Rect. Parapeto (P8) 1,938.00 2.60 5,038.80 3.25 6,298.50
Relleno Rectngulo (P9) 37,859.40 4.05 153,330.57 4.39 166,202.77
Base del Estribo (P10) 9,072.00 2.70 24,494.40 0.35 3,175.20
59,964.95 207,276.99 221,722.78

1.2. CARGA MUERTA DE LA SUPERESTRUCTURA (D)

D= 12,183.03 Kg/m b= 2.05 m M= 24,975.21 Kg-m/m

2.- CARGA VIVA (L)

L= 12,625.26 Kg/m b= 2.05 m M= 25,881.79 Kg-m/m

3.- EMPUJE DE TIERRAS (E) (Tomando en cuenta el efecto debido a la sobrecarga por carga viva)

E= 24,714.03 Kg/m b= 2.91 m MA = 72,003.65 Kg-m/m

4.- FLOTACIN (B)

Nivel Frettico = 0.00 m

B= 0.00 Kg/m b= 0.00 m MA = 0.00 Kg-m/m

5.- VIENTO

5.1. VIENTO SOBRE LA SUPERESTRUCTURA QUE SE TRANSMITE A LA INFRAESTRUCTURA (W)

Presin Longitudinal = 50.00 Kg/m W= 153.62 Kg/m


Altura del Brocal = 1.07 m b= 7.83 m
Altura Expuesta = 2.65 m MA = 1,202.10 Kg-m/m
rea Expuesta = 53.00 m

5.2. VIENTO SOBRE LA CARGA VIVA (Wl)

Presin Longitudinal = 50.00 Kg/m Wl = 57.97 Kg/m


Posicin de la Fuerza = 1.83 m b= 9.91 m
MA = 574.49 Kg-m/m

6.- FUERZA LONGITUDINAL (LF) (Debida al frenado de los vehculos)

Nro. De Carriles = 4.00

LF = 315.52 Kg/m b= 9.91 m MA = 3,126.80 Kg-m/m


7.- FUERZA SSMICA (EQ)

Coeficiente Ssmico = 0.10

7.1. FUERZA SSMICA SOBRE LA INFRAESTRUCTURA (EQI)

EQI = 5,996.50 Kg/m b= 3.70 m MA = 22,172.28 Kg-m/m

7.2. FUERZA SSMICA SOBRE LA SUPERESTRUCTURA (EQS)

C.G. respecto a la base de la viga = 0.82 m

EQS = 2,436.61 Kg/m b= 7.32 m MA = 17,823.77 Kg-m/m

CLCULO DE LA ESTABILIDAD DEL ESTRIBO

1ERA. HIPTESIS. ESTRIBO SOLO

1.1.- GRUPO I = D+L+CF+E+SF+B Esfuerzo = 100.00 %

a) Esfuerzos sobre el terreno

Pos. de la resultante (a) = 2.26 m adm = 25,000.00 Kg/m

1 = 16,584.46 Kg/m CUMPLE


2 = 5,624.78 Kg/m CUMPLE

b) Factor de Seguridad al Volcamiento

F.S.V. = 2.88 CUMPLE

c) Factor de Seguridad al Deslizamiento

F.S.D. = 1.47 < 1.5 REQUIERE DIENTE

2DA. HIPTESIS. ESTRIBO CARGADO

2.1.- GRUPO I = D+L+CF+E+SF+B Esfuerzo = 100.00 %

a) Esfuerzos sobre el terreno

Pos. de la resultante (a) = 2.20 m adm = 25,000.00 Kg/m

1 = 24,496.57 Kg/m CUMPLE


2 = 6,900.93 Kg/m CUMPLE

b) Factor de Seguridad al Volcamiento

F.S.V. = 3.59 CUMPLE

c) Factor de Seguridad al Deslizamiento

F.S.D. = 1.97 CUMPLE


2.2.- GRUPO II = D+E+B+SF+W Esfuerzo = 125.00 %

a) Esfuerzos sobre el terreno

Pos. de la resultante (a) = 2.20 m adm = 31,250.00 Kg/m

1 = 20,717.34 Kg/m CUMPLE


2 = 6,004.13 Kg/m CUMPLE

b) Factor de Seguridad al Volcamiento

F.S.V. = 3.17 CUMPLE

c) Factor de Seguridad al Deslizamiento

F.S.D. = 1.71 CUMPLE

2.3.- GRUPO III = D+L+CF+E+B+SF+0,3W+WL+LF Esfuerzo = 125.00 %

a) Esfuerzos sobre el terreno

Pos. de la resultante (a) = 2.15 m adm = 31,250.00 Kg/m

1 = 25,332.36 Kg/m CUMPLE


2 = 6,065.14 Kg/m CUMPLE

b) Factor de Seguridad al Volcamiento

F.S.V. = 3.42 CUMPLE

c) Factor de Seguridad al Deslizamiento

F.S.D. = 1.95 CUMPLE

2.4.- GRUPO VII = D+E+B+SF+EQ Esfuerzo = 133.00 %

a) Esfuerzos sobre el terreno

Pos. de la resultante (a) = 1.67 m adm = 33,250.00 Kg/m

1 = 28,699.63 Kg/m CUMPLE


2 = -1,978.16 Kg/m CUMPLE

b) Factor de Seguridad al Volcamiento

F.S.V. = 2.07 CUMPLE

c) Factor de Seguridad al Deslizamiento

F.S.D. = 1.28 < 1.5 REQUIERE DIENTE


DISEO DE LAS ARMADURAS

RECUBRIMIENTO AL CENTRO DE LAS BARRAS:

PARED 0.075 m
PIE 0.075 m
TALN 0.075 m

1.- DISEO DE LA PARED

MOMENTO As.
d As Asmin 1,33*As Astemp As def. Dimetro Nro. de Sep. entre
PUNTO FLEXIONANTE q Colocado
(m) (cm/m) (cm/m) (cm/m) (cm/m) (cm/m) de Barra Barras Barras (cm)
(Kg-m) (cm)
1.58 1,664.71 0.23 0.014487 1.96 7.57 2.61 5.44 5.44 1 3/8 1 100.00 #11 @ 100
2.16 3,568.25 0.27 0.022585 3.59 8.89 4.78 6.15 6.15 1 3/8 1 100.00 #11 @ 100
2.74 6,477.22 0.31 0.031203 5.69 10.22 7.59 6.87 7.59 1 3/8 1 100.00 #11 @ 100
3.32 10,589.34 0.35 0.040178 8.28 11.55 11.04 7.58 11.04 1 3/8 2 50.00 #11 @ 50
3.90 16,102.32 0.39 0.049425 11.36 12.87 15.15 8.30 12.87 1 3/8 2 50.00 #11 @ 50
4.48 23,213.87 0.43 0.058898 14.93 14.20 19.91 9.02 14.93 1 3/8 2 50.00 #11 @ 50
5.06 32,121.71 0.47 0.068569 19.01 15.53 25.35 9.73 19.01 1 3/8 2 50.00 #11 @ 50
5.64 43,023.54 0.51 0.078423 23.60 16.85 31.47 10.45 23.60 1 3/8 3 33.00 #11 @ 33
6.22 56,117.09 0.55 0.088450 28.71 18.18 38.29 11.17 28.71 1 3/8 3 33.00 #11 @ 33
6.80 71,600.07 0.59 0.098648 34.36 19.51 45.82 11.88 34.36 1 3/8 4 25.00 #11 @ 25
7.38 89,670.19 0.63 0.109016 40.56 20.83 54.08 12.60 40.56 1 3/8 5 20.00 #11 @ 20
Acero de Reparticin Horizontal en ambas caras = 9.45 3/4 4 25.00 # 6 @ 25
CHEQUEO DE CORTE Acero Vertical en la cara anterior = 6.00 5/8 4 25.00 # 5 @ 25
Vu = 33,499.30 Kg
CUMPLE
Vn = 44,518.94 Kg
Acero Colocado = # 11 @ 40 x 7.8m Y # 11 @ 40 x 5.87m
Acero vertical en la cara anterior = # 5 @ 25 x 7.83m
Acero de reparticin horizontal = # 6 @ 25 x 17.1m

2.- DISEO DEL PARAPETO

MOMENTO As.
d As Asmin 1,33*As Astemp As def. Dimetro Nro. de Sep. entre
PUNTO FLEXIONANTE q Colocado
(m) (cm/m) (cm/m) (cm/m) (cm/m) (cm/m) de Barra Barras Barras (cm)
(Kg-m) (cm)
1.58 1,664.71 0.33 0.007034 1.36 10.83 1.81 7.20 7.20 5/8 4 25.00 # 5 @ 25
Acero de Reparticin Horizontal en ambas caras = 7.20 5/8 4 25.00 # 5 @ 25
CHEQUEO DE CORTE Acero Vertical en la cara anterior = 4.80 1/2 4 25.00 # 4 @ 25
Vu = 2,528.84 Kg
CUMPLE
Vn = 23,149.85 Kg
Acero Colocado = # 5 @ 25 x 2.59m
Acero vertical en la cara anterior = # 4 @ 25 x 1.81m
Acero de reparticin horizontal = # 5 @ 25 x 17.1m

3.- DISEO DEL PIE, Esfuerzos que se generan en el suelo sobre el cual se apoya el estribo
(Se disea en base a la Hiptesis II. Estribo Cargado, Grupo I)

Posicin de la Resultante (a) = 2.20 m


Longitud Tercio Central = 1.80 m

CLCULO DE PRESIONES 1 = 2.45 Kg/cm


2 = 0.69 Kg/cm

PRESIN EN EL PIE EN LA CARA DEL MURO = 1.86 Kg/cm


PRESIN EN EL PIE A UNA DIST. d DE LA CARA DEL MURO = 2.07 Kg/cm
MOMENTO As.
d As Asmin 1,33*As Astemp As def. Dimetro Nro. de Sep. entre
PUNTO FLEXIONANTE q Colocado
(m) (cm/m) (cm/m) (cm/m) (cm/m) (cm/m) de Barra Barras Barras (cm)
(Kg-m) (cm)
1.80 54,073.00 0.63 0.063927 23.78 20.83 31.71 12.60 23.78 1 5 20.00 # 8 @ 20
Acero de Reparticin Horizontal en ambas caras = 12.60 7/8 4 25.00 # 7 @ 25
CHEQUEO DE CORTE
Vu = 39,296.19 Kg
CUMPLE
Vn = 44,518.94 Kg
Acero Colocado = # 8 @ 20 x 6.87m
Acero de reparticin por temperatura = # 7 @ 25 x 17.1m

4.- DISEO DEL TALN, Esfuerzos que se generan en el suelo sobre el cual se apoya el estribo
(Se disea en base a la Hiptesis I. Estribo Solo)

Posicin de la Resultante (a) = 2.26 m


Longitud Tercio Central = 1.80 m

CLCULO DE PRESIONES
1 = 1.66 Kg/cm
2 = 0.56 Kg/cm

PRESIN EN EL TALN EN LA CARA DEL MURO = 1.15 Kg/cm


PRESIN EN EL PIE A UNA DIST. d DE LA CARA DEL MURO = 1.02 Kg/cm

MOMENTO As.
d As Asmin 1,33*As Astemp As def. Dimetro Nro. de Sep. entre
PUNTO FLEXIONANTE q Colocado
(m) (cm/m) (cm/m) (cm/m) (cm/m) (cm/m) de Barra Barras Barras (cm)
(Kg-m) (cm)
2.90 54,599.75 0.63 0.064575 24.02 20.83 32.03 12.60 24.02 1 5 20.00 # 8 @ 20
Acero de Reparticin Horizontal en ambas caras = 12.60 7/8 4 25.00 # 7 @ 25
CHEQUEO DE CORTE
Vu = 28,277.64 Kg
CUMPLE
Vn = 44,518.94 Kg
Acero Colocado = # 8 @ 20 x 6.87m
Acero de reparticin por temperatura = # 7 @ 25 x 17.1m

5.- DISEO DEL DIENTE, Presiones Pasivas que se generan sobre el diente REQUIERE DIENTE
(se disea para el caso en el que el Factor de desplazamiento sea menor)

F.S.D. = 1.28 HIPTESIS II, GRUPO VII

1 = 2.87 Kg/cm
2 = -0.20 Kg/cm

PRESIN EN LA CARA DEL MURO = 1.85 Kg/cm

Para un F.S.D. = 1.5, h= 1.91 m


Hs = 0.50 m
Ed = 0.50 m

PRESIN PASIVA SOBRE EL DIENTE EN LA CARA DE LA BASE = 0.40 Kg/cm


PRESIN PASIVA EN LA PARTE INFERIOR DEL DIENTE = 0.68 Kg/cm

MOMENTO As.
d As Asmin 1,33*As Astemp As def. Dimetro Nro. de Sep. entre
PUNTO FLEXIONANTE q Colocado
(m) (cm/m) (cm/m) (cm/m) (cm/m) (cm/m) de Barra Barras Barras (cm)
(Kg-m) (cm)
1,178.00 0.43 0.002904 0.7345 14.17 0.9794 9.00 9.00 3/4 4 25.00 # 6 @ 25

CHEQUEO DE CORTE
Vu = 4,332.00 Kg
CUMPLE
Vn = 30,272.88 Kg
CANTIDADES DE MATERIALES

Volumen de Concreto de la base = 69.52 m

Volumen de Concreto de pared = 66.06 m

Volumen de Relleno = 425.19 m

Relleno equiv. con Tierra Armada = 641.15 m

Encofrado = 267.31 m

LONGITUD TOTAL DEL REFUERZO EN ML


DE CANT. LONG.
3/8 1/2 5/8 3/4 7/8 1 1 3/8
PARED BARRA BARRA (m)
Acero Colocado = 1 3/8 43.00 7.80 335.40
1 3/8 43.00 5.87 252.41
As vertical en la cara ant. = 5/8 70.00 7.83 548.10
As de reparticin horiz. = 3/4 50.00 17.10 855.00
PARAPETO
Acero Colocado = 5/8 70.00 2.59 181.30
As vertical en la cara ant. = 1/2 70.00 1.81 546.00
As de reparticin horiz. = 5/8 16.00 17.10 273.60
PIE
Acero Colocado = 1 87.00 6.87 597.69
As repart. Por Temperat. = 7/8 8.00 17.10 136.80
TALN
Acero Colocado = 1 87.00 6.87 597.69
As de repart. por temperat. = 7/8 13.00 17.10 222.30
BASE
Acero inferior de la base = 7/8 22.00 17.10 376.20
DIENTE
Acero de reparticin horiz. = 3/4 3.00 17.10 51.30
LONGITUD EN METROS LINEALES POR DIAMETRO 0.00 546.00 1,003.00 906.30 735.30 1,195.38 587.81
PESO EN KILOGRAMOS (ML) 0.559 0.994 1.554 2.237 3.045 3.978 7.907
TOTAL PESO EN KILOGRAMOS POR METRO LINEAL 0.00 542.72 1,558.66 2,027.39 2,238.99 4,755.22 4,647.81

Cantidad de Acero de #3 = 0.00 Kg


Cantidad de Acero de #4 #7 = 6,367.77 Kg
Cantidad de Acero de #8 #11 = 9,403.04 Kg