You are on page 1of 100

Aurecon in Africa

Company Profile The global leadership team has representation


AURECON IN AFRICA across AME and APAC.
Aurecon is a leading, vibrant, global group
created by the recent fusion of three world- Industries
class companies, Africon, Connell Wagner and
Aurecon operates in all major industries,
Ninham Shand. Our new group has a
including:
combined 210-year history; a staff complement
Advisory and Management Consulting
of 6 300; and an office network extending
Buildings and Property
across 28 countries worldwide.
Community Infrastructure
Aurecon provides multi-disciplinary Defence
professional services on a broad range of Education and Training
infrastructure projects across diverse Energy
industries, with clients and projects in 69 Environment
countries. The group is committed to securing Health
an enduring sustainable future and embraces Integrated Communications Technology
diversity. Industrial
International Development Assistance
The group is principally owned by Aurecon Local Government
executives throughout the global business a Mining and Metals
group of skilled professionals committed to Oil and Gas
building their own technical expertise, and to Telecommunication
the ongoing development of their teams. They Transportation
are heavily involved in managing and delivering Water
project outcomes for clients, with a strong focus
on economic viability and constructability, Our expertise
utilising practical, sustainable and innovative
solutions. With our stability, geographic reach, depth of
knowledge and experience, Aurecon is able to
Aurecon provides a broad range of multi- effectively and efficiently manage a clients
disciplinary professional technical services projects. Aurecon is attuned to client and
across diverse industries. stakeholder needs and expectations. We are
committed to deliver exemplary results in all the
Vision projects undertaken, and to exceed those
needs and expectations.
Aurecons vision is: Leading. Vibrant. Global.
Mission At every stage of a project, our services are
Aurecons mission is to foster human designed to assist clients to transform their
development by: deploying deep-rooted visions into reality. Aurecon delivers:
professional technical skills; and teaming with Technical excellence
our clients for positive outcomes. Skilled and experienced teams of
professionals
Our global reach Access to innovative design, thought
leadership and technical expertise
To suit the vast geographical reach of Aurecon
A practical approach to problem solving
operations, the newly created group provides
A sound understanding of project
professional technical services on a broad
economics
range of integrated infrastructure projects to
clients across two key zones: Effective communications and reporting
Africa and the Middle East (AME); and
Asia Pacific (APAC).
Industry recognition and ISO 14001 standards. The group is
AURECON IN AFRICA upgrading certification to incorporate the latest
Aurecons commitment to service excellence, revision of the standard, ISO 9001:2008, with
innovation and thought leadership has been PriceWaterhouseCoopers acting as the
acknowledged by top business and industry certifying authority. This upgrade is scheduled
associations. The company is recognised for its for completion in July 2009.
contributions and achievements with major
awards in all service areas including: Sustainability
Modern technology
Climate change is recognised as one of the
Innovative thinking greatest challenges facing governments,
Thought leadership industries and the public.
Practical and cost-effective solutions
Service excellence In response to the call for decisive action to
Aurecons Heritage lessen the impact of climate change on the
environment, business leaders are increasingly
Companies putting strategies in place to measure and
Africon was South Africas largest, privately manage their greenhouse gas (GHG)
owned infrastructure consultancy with an emissions, with the aim of using this knowledge
established network of 32 offices extending to reduce their organisations carbon footprint.
across South Africa, the rest of Africa and the
Middle East. We recognise that sustainability is about
encouraging social, economic and
Connell Wagner was one of Asia Pacifics environmental equity amongst present
largest and most experienced multi-disciplinary populations whilst cultivating a liveable world
consulting companies. The company was for our future generations.
privately owned and had a 75-year history, a
staff complement of more than 4 100 and a Aurecon is committed to adopting sustainability
network of offices spanning Australasia, South- principles in all aspects of our business and
East Asia, China, India and the Middle East. client services.

Ninham Shand was one of South Africas As an active member of the Green Building
leading, privately owned companies of Council of Australia, New Zealand and South
consulting engineers and environmental Africa, Aurecon understands the importance of
scientists with a proud history spanning more delivering every project sustainably. We pride
than 75 years. ourselves in our sustainable design solutions,
many of which are recognised by major
Quality Management industry awards.
Aurecon's operations management system is Skills Development
flexible, simple and adaptable to all projects,
large and small. The adoption of a common Aurecons most valuable asset is knowledge
system across all our offices ensures a this emanates from our skilled and talented
consistent approach throughout the company. pool of professionals. The company is
This system applies to all Aurecon activities committed to providing all employees access to
from concept, feasibility and planning phases, structured career development opportunities,
through to the design and construction phases through internal and external training, online
of a project, as well as ancillary services learning, on-the-job development and
including advisory, survey and project knowledge workshops.
management.
Aurecon supports staff through further
Third party certifiers have endorsed our education and training by means of an
systems according to international ISO 9001 education assistance scheme. The companys
AURECON IN AFRICA learning and development strategy facilitates a With a strong commitment to our clients,
proactive approach, empowering staff to we respond quickly to their requests for
manage their own career paths. Aurecons specialist advice on concepts,
popular Mentorship programme is an effective independent peer reviews or design
way for our young professionals to gain verification.
knowledge and develop valuable skills Our sound understanding and knowledge
enriching their work experience and careers. of critical factors including geographic,
cultural, climatic, environmental, statutory
Why Choose Aurecon? and legal requirements, in global markets,
Clients have access to our global resource gives clients peace of mind as they enter
pool. This allows for highly effective and new frontiers.
efficient allocation and mobilisation of Our priority is to build and nurture strong
resources. and collaborative relationships with our
clients to gain a clear understanding of
Clients benefit from our global delivery
their business and project objectives.
capability, 24 hours a day, 7 days a week.
We share with clients the value of our
groups extensive project experience and
thought leadership providing innovative,
cost-effective and proven solutions.

Aurecon involvement in Africa


SOUTH AFRICA PROJECTS Engineering design and supervision structural design of 80% of the main building,
for the Peter Mokaba Stadium, all structural steel bridges, balconies and roofs
Polokwane and all the facade engineering. The total value
of the project is approximately R1.3 billion and
The new Peter Mokaba stadium in Polokwane, the completion date is March 2009.
Limpopo Province, has 45 000 permanent
seats. The current construction value is R860 Pinnacle Point Beach and Golf
million and construction will be completed by Resort, Mossel Bay
end June 2009. Aurecon is responsible for all Set on the edge of the Indian Ocean, Pinnacle
the engineering services, including civil, Point Beach and Golf Resort is situated at the
structural, geotechnical, traffic, electrical, and gateway to the Garden Route of South Africa. It
electronic, HVAC as well as fire and wet consists of four hundred hectares of prime
services on this project. land, of which one hundred hectares comprise
the nature reserve. The resort is home to
indigenous wildlife, birdlife and 264 varieties of
fynbos. Pinnacle Point consists of an 18-hole
championship golf course incorporating three
separate residential components - 120 golf
lodges, 114 golf villas and 406 freehold erven.
The development also consists of a 50-room
hotel, casino and a wellness centre.

Department of Foreign Affairs


Building Public-Private Partnership,
Pretoria
The construction of the Department of Foreign
Affairs building in Soutpansberg Road in
Pretoria has been awarded to a Design and
Construct Consortium with Concor as the main All developments are sensitively integrated with
contractor. Aurecon, together with Iliso the surrounding nature reserve. The golf
Consulting and LMA, were responsible for the course includes dramatic cliffside holes and
civil and structural design of these new facilities was designed by renowned golf architect Peter
which consist of a new office building and large Matcovitch, who describes this course as "the
conference centre of approximately 140 000 most dramatic golf course site I've ever
square metres, a new guest house also in encountered anywhere in the world!"
Soutpansberg Road (3 600 square metres) and
the upgrading and expansion of the Foreign Aurecon was appointed as principal civil,
Affairs existing guest house in Waterkloof structural and electrical engineers for the entire
Heights. development. This included the drafting of the
tender documentation and doing contract
administration for the golf course. Aurecon was
also responsible for the design of a 3,7M
wastewater treatment works. The civil services
contracts, as well as the golf course, club
house and main entrance facility were
completed in 2006. The water treatment works
were completed in October 2005.

Iliso is responsible for the bulk earthworks and


all on-site services including roads and
stormwater. Aurecon is responsible for the
SOUTH AFRICA PROJECTS Northgate Celebration mixed-use steel roof with clear internal spans of 40m.
development, Johannesburg Wide racking aisles and a 12,5m racking height
are being used with FM2 floor tolerances as
Aurecon was appointed to do the preliminary per concrete society TR 34. Freezer room
and detailed designs for the new Celebration areas, chilled areas, peri-ambient and ambient
mixed-use development in Johannesburg. The storage areas are being provided as well as a
Celebration site is bordered by Northumberland tray-wash area. External aprons are a
Avenue to the east, Aureole Avenue to the combination of concrete surface beds and
north, Valley Road to the west and Olienhout interlocking pavers.
Avenue to the south. The development will be
constructed in five zones as follows: Preparation of a national transport
School master plan for South Africa, 2005-
Village centre comprising retail, 2050
commercial and residential zones (similar
The primary objective of this project was the
to Melrose Arch)
development and formulation of a framework
Residential (freehold and possible
National Transport Master Plan (NTMP) that
sectional title)
will enable decision-making by the National
Residential/commercial buildings Department of Transport (NDoT) with respect
Retail above the existing Sasol parking lot to the relevant multi-modal and integrated
The project started construction in 2007 and transport infrastructure and services planning.
will be phased, depending on demand, to 2010. South Africa's nine provinces are each
responsible for its own transport infrastructure
and services planning. The respective
municipal, provincial and national spheres are
all subjected to, and hampered by, significant
problem areas and constraints. The need was
identified for an overall framework to address
all problem areas and constraints, while at the
same time providing guidance with respect to
how transport infrastructure and services
Aurecon was responsible for the design of all
should be planned, in accordance with
civil engineering and structural services. This
available and changing land-use, and decision-
included electrical bulk services, wet services
making with regard to transport infrastructure
and facade engineering. The value of the
and services, within the available national
services is worth R322 500 000.
legislative framework.
Woolworths Distribution Centre,
Gauteng The purpose of the NTMP was ultimately two-
fold: This NTMP served as the required
This new 87 000m Gauteng Distribution
mechanism through which the NDoT provided
Centre for Woolworths will serve the entire
a national framework in terms of which
country outside the Western and Eastern Cape.
transportation systems planning,
Aurecon is the structural, civil, geotechnical
implementation, maintenance, operations,
and transportation engineers for the project.
investments and monitoring decisions were to
be made. The NTMP also served as an action
plan that provided the NDoT with a time frame
that indicated the actions required for
addressing transportation systems planning,
implementation, maintenance, operations,
investments and monitoring decisions, and also
A major earthworks contract is needed to indicated the time frame across which these
create a level platform of 1km long. The main actions had to take place. Aurecon provided:
building has concrete columns and a structural
SOUTH AFRICA PROJECTS Data collection and synthesising of
information
Status quo overview
Transport planning
Transport economics
Socio-economics
Macro-economics
Transport modelling
Traffic and travel demand forecasting The first part of the project, ie the extension to
Scenario development the north and onto the apron, was completed
Statistical analysis successfully within time and budget despite the
Spatial and land-use planning changing nature of the client requirements. A
Financing, policy and investment large portion of the works included a retail
Institutional restructuring component with changing commercial tenant
requirements that had to be accommodated up
Environmental planning
to a very late stage. The planning of the
Transport policy and legislation
internal operations during the refurbishment of
Extensions and upgrading of the the landside and airside facilities proved to be a
international terminals at OR Tambo challenging task but was carried out
International Airport, South Africa successfully. Aurecon was responsible for the
structural support work for the baggage
The growth in international traffic required that handling system in the double basement, the
the international terminals of OR Tambo atrium roof lights, all the faade steelwork, and
International Airport be upgraded. The project the wet services within the central terminal
started in 1996 with the upgrading and building. Additionally, Aurecon was also
extension by some 75m to the north of the responsible for the HVAC design up to the
existing terminal building. This entailed the tender stage. High priority was given
construction of a basement, arrivals and throughout to keep the airport a neat and safe
departure levels, mezzanine levels and roof environment in order for the public not to
offices as well as the addition of three holding experience it as a construction site.
lounge nodes that extended some 40m onto
the airside apron. During the full duration of the Independent Engineer for the N4
construction works, the terminal was kept Platinum Toll Highway
operational and all tenants had to be
Aurecon was appointed to act as Independent
accommodated. A baggage sorter was installed
Engineer on the Platinum Toll Highway, which
as well as 102 check-in desks with three new
includes the portion of the N1 between Pretoria
baggage carousels in the arrivals hall.
and Bela-Bela, as well as the N4 between
Pretoria and Skilpadhek on the border with
Botswana.

This project was later extended to the south by


demolishing the old existing domestic terminal
building and replacing it with a new central
terminal building some 225m long by 70m wide
with a double basement for baggage handling Aurecons duties included coordinating the
and six floor levels above. tender process, advising on a preferred bidder,
SOUTH AFRICA PROJECTS auditing preliminary and detailed designs, Three new bridges and fourteen major culverts
including various engineering disciplines, were being constructed. The largest consisted
environmental aspects and socio-economic of four 21m spans with voided decks over the
development, reviewing construction control, Kruis River and 20m high. The bridge over
including review of an Incident Management the Yellowwood tree is 26m long and 4m high
System (IMS), Management Information and was constructed with pre-cast beams. Nine
System (MIS), quality assurance, toll systems, of the culverts were constructed in situ of which
operation and maintenance, financial auditing three are combination access / drainage
and legal issues. Services included: culverts. The initial design of this project started
Reviewing preliminary and detailed in September 1998 and ended in August 1999.
designs In 2005 and 2006 designs were refined and the
Reviewing environmental aspects documentation and tender process took place,
Socio-economic development while construction started in January 2007.
Reviewing construction quality control,
Gautrain Rapid Rail Link, Gauteng
including review and audit of an Incident
Management System (IMS), Management The Gautrain Rapid Rail Link is a state-of-the-
Information system (MIS) and quality art rapid rail network planned in Gauteng. The
assurance rail connection comprises of two links, namely
Toll systems operation and maintenance a link between Tshwane (Pretoria) and
Financial auditing Johannesburg and a link between OR Tambo
Reviewing legal issues International Airport and Sandton. Aurecon, in
consortium with Halcrow Holdings Limited, a
Upgrading of 14km of National Road UK-based infrastructure consultancy with
N2 Section 9 from Tsitsikamma to extensive experience in segmental
Witelsbos construction, was appointed in May 2006 by
the Bombela Civil Joint Venture for detailed
Aurecon won the prestigious Mail & Guardian
design package 6A of the Gautrain Rapid Rail
Greening the Future Merit Award in 2008 for
Link.
this project, a 14km section of a strategic and
scenic national road through South Africa's
garden route and the last section of the N2 to
be upgraded to toll road standards. A 4km
section passes through indigenous forest, with
associated environmental challenges. The
design called for vertical reinforced earth walls
at the high fills and a retaining system at the
deep cuts to minimise the impact of the road on
the forest. A massive Yellowwood tree became
the environmental signature of the project and
a 20m span bridge is being constructed to
Major design items include viaducts, retaining
protect its roots and drainage patterns.
structures, earthworks, geotechnical designs,
overpasses, parking areas, utilities, electrical
and mechanical items, and landscaping.

Eradication of the bucket sanitation


system for the Department of
Provincial and Local Government
A budget of R1.2 billion has been allocated for
bucket sanitation system eradication under the
municipal infrastructure grant (MIG)
programme that is coordinated by the
SOUTH AFRICA PROJECTS Department of Provincial and Local client had a need to conduct a feasibility study
Government (DPLG). A further R400 million to determine the best option for transferring
has been made available in the 2007/08 water from the Crocodile River to the growth
financial year for bucket eradication projects. hot spots around Lephalale, 130km to the
north. The objective of this feasibility study was
thus to determine the optimum solution for the
timely water supply of the required quantities of
water to the various proposed developments of
the coalfields in the Lephalale area. The
purpose of the technical module was to perform
the technical analysis associated with this
project and to formulate clear
recommendations on how to achieve the
The Department of Water Affairs (DWAF) is the
above.
sector department responsible for water and
sanitation, while DPLG is the sector
department responsible for oversight of local
government. Municipalities are responsible for
delivering services including provision of
sanitation and are tasked with delivering
sanitation in place of the bucket system. Many
of the municipalities, however, are experiencing
serious capacity constraints and other systemic
blockages to delivering sanitation services. The
DWAF together with DPLG and the 56 Based on the existing water supply
municipalities involved have determined the infrastructure within the Mokolo River
current backlogs within the affected catchment, the current available water and
municipalities, the status of delivery and the water use is in balance. Hence no spare
constraints to delivery. The constraints have capacity exists to sustain the anticipated future
resulted in a slower rate of progress towards economic development of the area. The
meeting the stated goals than anticipated. development of, inter alia, new power stations
is of high strategic importance with tight time
The intention of this project is to deploy experts frames. The timely completion of this water
in the field of water and sanitation to provide augmentation project is therefore not
hands-on technical assistance to facilitate the negotiable.
eradication of the bucket sanitation systems as
stipulated in the government's agenda. This is Aurecon's role in the project included the
in line with the DPLG's mandate of giving project management and coordination of the
support to municipalities in an effort to improve team; large diameter pipeline design;
and strengthen their service delivery. It is geotechnical investigations; confirmation of
envisaged that the benefits to accrue from this user water requirements; risk assessment and
project will eventually ensure seamless the drafting of a mitigating plan; considering
provision of services in a sustainable and international obligations in terms of
accelerated manner. international water courses and reporting.
Other firms are responsible for the design of
Mokolo Crocodile River (west) water dams, weir and pump stations, topographical
augmentation project: technical surveys and the management of river
module abstraction.
The Mokolo Crocodile River (west) water
augmentation scheme will provide water to
strategic users in the Lephalale area, such as
Sasol, Eskom and various coal mines. The
SOUTH AFRICA PROJECTS Design and construction downstream of the dam, two pump stations
supervision for Berg River Dam and with capacities of 6 and 4m3/s respectively and
supplement scheme including gated two steel pipelines of 1 500mm diameter with a
total length of 12.4km. The abstraction works
outlet works, spillway, river
includes a series of sediment traps that can be
abstraction works, pump stations
hydraulically flushed to replenish deposited
and pipelines sand, gravel and boulders to downstream river
The Berg Water Project will augment the water reaches.
supply of the Western Cape region and
specifically that of the City of Cape Town. The
Vaal River Eastern Sub-system
brief involved a dam type selection study, in Augmentation Project (VRESAP)
which clay core rockfill, composite RCC The Vaal River Eastern Sub-system
gravity/clay core rockfill and concrete faced Augmentation Project is an emergency water
rockfill dams were evaluated. transfer scheme. Water is abstracted from the
Vaal Dam and pumped to the Knoppiesfontein
division structure over a distance of 115km.
From the division structure the water gravitates
to the Bosjesspruit and Trichardsfontein Dams
near Secunda. The primary bulk consumers
served by the project are Eskom and Sasol.

The outlet works comprised a dual wet and dry


well multi-level intake tower 63m high with a
5.5m diameter concrete outlet conduit. One of
the features of the outlet works will be their
ability to mimic the periodic natural floods that
are necessary to mitigate the impact on the
ecology and geomorphology in and around the The project has a design capacity of 5,40 m3/s
river. It is possible to cater for a flood up to and essentially comprises the following:
200m3/s, which will be released through the
outlet works over a similar period to the natural An abstraction works in the Vaal Dam and
occurring floods. The releases will take place a low lift pump station, equipped with six
through multi-level selector gates, an isolating pumps (4 duty, 2 standby) of 700kW. The
gate (hydraulically operated bonneted slide flow of 5,40 m3/s is transferred through a
gate) and a flow control gate (hydraulically total head of 29m to a balancing dam and
operated radial gate). desilting works upstream of a high lift
pump station.
The spillway comprises a 40m long side A high lift pump station, equipped with four
channel with splitters and an aeration gallery, a sets of two pumps per set (3 duty, 1
discharge chute and deflector bucket and an standby). The two pumps comprise
18m deep unlined plunge pool. The maximum 1.3MW and 7MW. The pump station
discharge capacity is 740m3/s. The plunge pool transfers the flow of 5,40 m3/s through a
will also be used as energy dissipater for the static head of 160m and a total head of
flood releases from the outlet works. Model 350m to the Knoppiesfontein division
studies were undertaken of both the spillway structure.
and the outlet works. A single 1900mm diameter rising main
over a distance of 115km. The rising main
The supplement scheme comprises an comprises a combination of stiffened and
abstraction works on the Berg River 10km plain steel pipe of grades X42 and X52
SOUTH AFRICA PROJECTS steel and with wall thicknesses between 9 Environmental Management Act, as well as the
and 20mm. The pipeline is epoxy lined provisions of the generation licenses issued to
with a bitumen fibreglass wrapping. the licensees by the Regulator.
A 10M surge tank to control dynamic
transients, a concrete division structure at The framework was developed in close
Knoppiesfontein, cathodic protection of consultation with both the licensees and
the pipeline, a number of road and rail NERSA, and was submitted to NERSAs
crossings and various pipeline electricity sub-committee for approval in August
appurtenances. 2008.

Development of a compliance The second phase involved the technical and


monitoring framework and business assessments and site visits to
conducting technical audits of measure compliance against the compliance
licensed electricity generators in monitoring framework. A series of workshops
South Africa, 2008 were held with the generator licensees to
review the business processes across the six
Aurecon, in association with EirGrid PLC,
dimensions of the CMF. Site visits to 12 power
Shanahan Engineering and Enzani
stations were undertaken to verify the
Technologies, was appointed by the National
processes and confirm compliance.
Energy Regulator of South Africa (NERSA) to
undertake the development of a compliance
Once all the stations were audited, all
monitoring framework and conduct technical
information gathered by the assessments and
audits of licensed electricity generators in
site visits were compiled into a report for
South Africa. The development of the
submission to the National Energy Regulator.
compliance monitoring framework (CMF) is
Aurecon was tasked with asset and project
envisaged as a tool to be used by NERSA in
management, technical audits and the transfer
future assessments of power stations to
of skills and training.
measure levels of compliance with the Grid
Code and other statutory documents. The CMF
is also designed to bring to light any areas of
focus which may need to be included in the
current Grid Code, or clauses in the Grid Code
which may be redundant. In addition, the CMF
makes provision for future legislation to be
included. The technical audits, utilising the
CMF, will provide the Energy Regulator with a
broad overview of the current status of selected
power stations in terms of their compliance
across various dimensions, which would greatly
assist NERSA in assessing current capacity,
maintenance and refurbishment needs and
planning for the short, medium and long-term.
The project was divided into three phases:
inception, analysis and reporting.

The first phase dealt with the development of


a compliance monitoring framework which can
be used to measure a licensed generators
compliance to various legislative and statutory
documents, including the Grid Code, the
Transmission Code, the National Occupational
Health and Safety Act and National
AFRICA PROJECTS Mmamabula energy project, of the largest and most modern malls in West
Botswana Africa.

The village of Mmamabula is located some Aurecon was appointed as structural and civil
135km north-east of Gabarone on the A1 engineers for the project and responsibilities
national road. The Mmamabula Coal Fields lie included the design for mass earthworks,
roughly east-west between the Mmamabula external bulk services and all access roads and
village and the international border with South parking areas.
Africa. The coal fields are an extension of the
Waterberg coal field in South Africa and are The mall accommodates two South African
host to Kumba's Grootegeluk 16Mtpa coal mine retailers, Shoprite Checkers and Game. It was
and Eskom's 4 000MW Matimba Power designed by architects Bentel Associates
Station. International (BAI) and the developers were
South African based. CDC Capital Partners, in
Between August and October 2006, Aurecon association with local Ghanaian partner, Inter
conducted the bankable feasibility study and City Hotels.
geotechnical investigation for the proposed
coal-fired power plant. The client is now in the The mall, with 19 700m lettable area,
process of establishing a power plant and coal accommodates retail, food and service outlets
mine, with both the mine and the power plant to ranging in size between 60m and 800m
be constructed on an engineering, procurement (excluding the anchors) and a 800 space car
and construction (EPC) basis. The purpose of park. The designs incorporated traditional
the project is to define the scope of all internal mall circulation with several interesting
infrastructure in support of the EPC works and vistas onto the dynamic food court, open
obtain contracts for the construction of these skylights and modern flush plastered ceiling
works. Subsequent to the design reviews and tiled floors. State-of-the-art air
having been completed, Aurecon was conditioning, fire protection systems and
appointed to carry out some limited design security ensures that this centre is world-class.
work in order to finalise the contract A best practice approach has been utilised in
documentation. all aspects of the design. Although the bulk of
the technical documentation was done in South
The work comprised the upgrading and Africa by consultants, the client insisted that
construction of roads, a railway line and airfield, each consultant has a Joint Venture partner in
the design and construction of a new Ghana who was responsible for on-site
residential village including 1 079 new housing conditions.
units and a clinic, guest house and offices, the
installation of water supply services including
the commissioning of boreholes, water
treatment works, reservoirs and pipe work and
the construction of a waste dump and fencing.
Services for the project entailed programme
management, technical reviews, contract
documentation and design services.

Accra Mall, Ghana Challenges on the project were massive.


Spearheading the new retail trend in the Whenever possible, the architects have tried to
Ghanaian capital, Accra, is the construction of utilise local building materials, technology and
the new 20 000m Accra Mall, the countrys first suppliers, but the bulk of materials had to be
modern shopping centre. The mall, which imported from afar as Egypt, Italy and South
opened its doors in April 2007, is Ghanas Africa. Finding qualified and experienced
largest construction project to date and is one contractors also took some effort. Another
challenge was the fact that the mall is located
AFRICA PROJECTS in a seismic area and as such engineers have water pipes and a clear water pump station as
had to ensure that the detailed design part of the water reticulation network.
encompassed all earthquake zone
requirements. Maintenance is an important Toyota Benfica 3S Showroom and
concern and all mechanical and electrical Viana Logistics Centre, Angola
installations were designed to be as energy With the rapid economic growth Angola has
and maintenance efficient as possible. experienced during the last few years, the
wealth of its citizens has also increased.
Nova Vida development, Angola
Toyota experienced an increase in its car sales
The project, valued at approximately $80 and in order to cater for this increase in
million, involved the design and construction of demand, Toyota decided to expand its
1 600 flats (mostly four-storey buildings with business in Angola. The first two projects
four 3-bedroom flats per floor), 500 3-bedroom involved a new car showroom and workshop (in
houses as well as total infrastructure, and 300 Luanda-Sul) and a logistical centre (in Viana)
4-bedroom houses for the Ministry of Public where new imported cars are received,
Works, Angola. Group Five Housing and prepared and dispatched to the showrooms.
Projects completed the design and construction This facility also has a spare parts warehouse.
of the buildings, using their Goldflex 800
Precast Housing System. Both projects involved the development of a
master plan and the determination of the
design requirements. Once the master plans
have been finalised and approved, the concept
design stage commenced. The client followed
the design process carefully to ensure that
these facilities would not only comply with their
expectations, but also to the international
requirements of the mother company in Japan.
Drawings and descriptive reports were
prepared and submitted for building licenses at
the local authority. The detailed design stage
followed the concept design stage. The
projects were then put out on tender.

Benfica 3S Showroom: This facility consists of


a showroom (sales of new cars), spare parts
and service (workshop) section. Much
emphasis was placed on the display of new
Aurecon's role entailed the provision of a vehicles and attention to customer needs.
contract management and construction Ample parking space was also provided for
monitoring service to the Ministry, and to customer cars. The facility is also designed to
supply resident engineers. Aurecon was also handle different types of rubbish for recycling.
responsible for doing the design review, as well Wash water is also recycled for re-use. The
as some design work including a reservoir, total building floor area is 12934 m2.
water tower and landscaping and infrastructure
designs for Group Five. This included roads Viana Logistics Centre: This facility receives all
and stormwater, water, sanitation, and new imported cars for sale in Angola. The
electricity. The water and sanitation design facility consists of two parts, viz. Pre-delivery
services entailed designing approximately inspection (PDI) and spare parts warehouse.
30km of sewers, a 2.1M treatment works, a The PDI section has a 750 vehicle parking
sewage pump station, approximately 22km of area, administration offices, ablutions, canteen
and locker rooms, PDI stalls and utility
buildings. The spare parts warehouse is
AFRICA PROJECTS 5000m2 large with a 500m2 office area on a
mezzanine level. The whole facility is located The project comprised the establishment of
on a 40 000m2 stand. mine infrastructure, including coal processing
facilities, maintenance facilities, administration
Aurecon was responsible for the project facilities, conveyors, bulk water and electrical
management and engineering design, while an supply, new access roads, water treatment and
external architect firm was sub-contracted for rail loading facilities. Aurecons involvement
the architectural design. consisted of the development of a new
conceptual design for the mine to improve on
Feasibility study update and bidding and optimise the current layout, followed by
document preparation for the 225kV detailed design of the mine infrastructure
interconnection transmission lines components. The project was done in
between Ghana and Burkino Faso association with numerous sub-consultants in
This project included updating of the feasibility terms of rail design, bulk water and waste
study, the elaboration of a preliminary project at disposal, architects and materials handling, but
the level of the feasibility, the preparation of Aurecon was responsible for the project
tender documents for the supply and laying of management, conceptual and detailed design
transmission lines and related substations, in and geotechnical investigations. The value of
the framework of the 225kV interconnection services was R70 590 000.
between Bolgatanga and Ouagadougou. Income Generating Public Works
Programme: Technical Assistance to
Aurecon is responsible for the primary plant
the Programme Management Unit,
portions of the two substations on either side of
the 225kV interconnector transmission line.
Malawi
The overall objective of the Income Generating
Services provided by Aurecon included Public Works Programme (IGPWP) is to
updating the client's substation technical contribute to the Malawi Government's
requirements by means of workshops with the objective of poverty reduction in line with the
client and corresponding utilities. Services also Malawi Growth and Development Strategy
entailed conducting preliminary project studies, (MGDS). The project purpose is to enhance the
compiling a conceptual design proposal report socio-economic situation of the rural/peri-urban
of the substation layouts, and assisting the poor and to assist them to promote sustainable
client with tender adjudication. livelihoods. This will be achieved through
improving accessibility, infrastructure and
Moatize Coal Project, Tete Province, promotion of productive activities by creating
Mozambique, 2008 linkages to other economic activities. IGPWP is
Some of the worlds richest coal deposits are using labour intensive approaches to
located at Moatize in the Tete Province of implement interventions in roads, forestry and
Mozambique. Vale mining company holds the irrigation. The following thematic or
concession to exploit this resource over the crosscutting issues are also being addressed:
next few decades. The current project was for HIV and AIDS, gender, environment and
the establishment of the first phase of the mine institutional development. The programme is
with anticipated production volumes of 12 also enhancing the capacities of the District
million tons of coal per year, both for coking Assemblies (DA) in management of public
and thermal coal. works projects.

The project entailed a major investment in the The implementation of interventions under the
region, and also required the upgrading of IGPWP builds on the lessons and
other infrastructure in the area such as rail and achievements of the predecessor programmes,
port facilities at Beira, which will have broader the GoM/EU PWP and the Multi Annual Food
benefits for the region. Security Programme (MAFSP), both managed
AFRICA PROJECTS by Aurecon, which used a similar approach. In infrastructure and remain within a fixed budget.
addition, people affected by and infected with The value of services is R52 560 000.
HIV and AIDS are also benefiting from the The total length of the road is 120km and the
interventions to be implemented through their three sections of road include:
guardians participating in this programme. A
major emphasis of the IGPWP is to provide a Ucua to Pangu Aluquem - 45.2km
link between income generation and productive Mobile to Quibaxe to Bula Atuma 57.0km
activities within the communities through Quibaxe to Pango Aluquem 41.7km
practical and sustainable approaches.
Aurecon mainly provides programme, project KOV de-watering project,
and contractual management and technical Democratic Republic of Congo
assistance while the associated partner, The project involved the design of a dewatering
Cardno-Agrisystems, provides financial and desilting system to dewater and desilt the
management assistance. KOV pit, procurement of all the equipment and
Feasibility studies, design, services, supervision of the installation of the
equipment and the final testing and
preparation of tender documents,
commissioning up to handover to the client.
adjudication of tenders and
The system consisted of floating pump stations
construction supervision of the on the water and a set of booster pumps that
Matala - Menongue Road (350km), carries a concentration of 5% silt in water to a
Angola decanting dam where the silt is settled out of
The contract involves the reconstruction of the the water and the clean water decanted into the
existing 150km road between Matala and nearby river. The project also involved the
Kuvango, and the construction of a new road of design of a clean borehole water management
200km between Kuvango and Menongue. The system, the procurement of all the equipment
surfaced road is 8 metres wide and will consist and services, the supervision of the installation
of 150mm sub-base, 150mm stone base of all the equipment and the final testing and
course and a double seal surface treatment. As commissioning.
part of this assignment, 28 bridges will be
rehabilitated or reconstructed. The total length
of this road is 350km. The estimated
completion date of the project is 2009 and the
value of services is R96 250 000.

Detailed design, preparation of


tender documents, adjudication of
tenders and construction
supervision for the upgrading of KOV pit is a copper and cobalt open pit mine in
Ucua - Pangu Aluquem Road the Kolwezi in the DRC which has been out of
(45.2km), Mobile - Qiubaxe - Mula operation for over 10 years but with one of the
Atuma Road (57km) and Quibaxe - richest and highest grades of copper
Pango Alquem Road (41.7km), concentrate. DCP has decided to reopen and
Angola continue to operate the mine. By bringing this
mine back into operation, the local community
This contract involves the design, supervision will benefit directly with the provision of
and contract administration to upgrade three permanent employment and indirectly with all
sections of low standard gravel roads to 7m the other commodities that a vibrant economy
wide bitumen surface, all weather roads. The will bring.
road transverse swamp areas as well as
mountainous terrain and innovative designs The full scope of works included the
were implemented to optimise existing refurbishment of all the bulk material handling
AFRICA PROJECTS equipment which consisted of conveyor belts, Feasibility studies, environmental
hauling trucks, a stacker with tripper car and impact assessment (EIA), social
crushing equipment. A new concentrator was impact assessment (SIA), detailed
also being built to handle the ore that will be
design and preparation of tender
mined. The rest of the infrastructure like roads
documents for the phased
and railway lines were also refurbished as well
as the electrical power supply. Aurecon was
rehabilitation of about 7 000km of
appointed as the consulting engineers to carry rural roads, Sudan
out the design, procure the equipment, More than four decades of conflict in Sudan led
supervise the installation and test and to widespread human suffering and massive
commission both the dewatering and desilting displacement of people. Of particular
system as well as the management of the significance is the lack of transport
borehole water. The value of the services infrastructure development, the depletion of
provided is R140 000 000. skilled manpower and the disappearance of
formal governmental structures. With the return
Supervision of the bridge across the
of peace, various government structures are
Cunene River at Xangongo, Angola being established along with the creation of
The bridge across the Cunene River at new public institutions, which are now
Xangongo is founded on 110 800mm diameter beginning to develop their capacity and
piles between 25 and 40 metres deep. The introducing policies, plans, programmes and
deck consists of prefabricated steel decks related systems, together with procedures for
(fabricated in China and shipped to Angola), the management of the transport sector.
that are launched across 18 columns. The final This project is part of the Sudan Emergency
roadway consists of a total of 1,384km precast Transport and Infrastructure Development
concrete slabs (panels). The total length of the Plan. The overall objectives of the assignment
bridge is 880m and the total width is 11.64m are to identify, verify and establish the existing
with 1.5m wide sidewalks. rural roads network in Southern Sudan, and
prepare a programme to improve access and
ensure the maintenance of about 7 000km of
prioritised rural feeder roads linking critical
communities and social service centres,
production areas and markets.
The exercise will also serve to complete critical
links to the rest of the trunk and secondary
network, reduce isolation and promote social
integration and resumption of economic
Aurecon was responsible for: activity.

Detailed pavement and materials Aurecon, the lead consultant, supported by


investigations BKS as sub-consultant, will be responsible for
Engineering surveys the rehabilitation / re-establishment of the
Feasibility studies entire rural network over a period of five years.
Rehabilitation pavement designs The proposed road improvements are expected
Bridge condition assessments to cover about 7 000km of priority rural roads
Geometric design spread over Southern Sudan, which includes
Preparation of tender documents about 3 000km in the Upper Nile, Jonglei,
Adjudication of tenders Eastern and Central Equatoria states. The
Construction supervision upgrading of the roads also comprise
approximately 1 000km in Western Equatoria,
together with about 3 000km in Northern and
Western Bar el-Ghazal, Warrap, Unity and
Lake states.
AFRICA PROJECTS Electrical engineering
HVAC services
Wet services
Fire Services and Gas supply

The offered services will include road inventory


and mapping, a road condition survey, and
environmental and social impacts
assessments. Additionally, scope and cost of
improvement works will be provided, together
with prioritisation of roads for rehabilitation. A
development plan and cost estimates, and
improvement packages for conventional or
labour-based works will be prepared.
Moreover, tender documents, a strategy and
implementation plan for national programme,
and maintenance manuals and tender
documents should also be arranged.
BKS will be responsible for about a third of the
work. Through implementation of study
recommendations, the government will be able
to develop and promote the use of labour-
based road works methods in road
construction, especially rural roads.
Recommendations will provide the basis for
government to seek development assistance
from various donors and financing from private
developers. The project is due for completion in
August 2009 and is worth R 22 200 000.

Blue Ocean Park Resort, Mauritius


Aurecon was appointed to complete the full
complement of engineering services design for
this new development in Balaclava Bay by
Mirage Leisure & Development on the north-
western shore of Mauritius. The resort
comprised a 193 key, five-star leisure
development with sixteen three-storey room
blocks, two large pools, a private spa and kids
club complemented with restaurant and
conference facilities. The total built area is
about 12 500m on a site of some 67 000m
located in Balaclava Bay on the north-western
shore of Mauritius.
Aurecons services included the following:
Structural design
Civil services design
Multi-disciplinary services and
projects
BUILDINGS Aurecon, since its inception over half a century ADDED VALUE
ago, has been a major player in the building
industry. Building and industrial projects, and The Aurecon Industrial Projects teams first
later building services, have been the priority is to ensure project viability. For this
cornerstones upon which the growth and reason, every effort is made to deliver on time
prosperity of the firm has been built. We and within budget, while constantly enforcing
render the following services with regard to quality standards of the highest order. The
buildings: managing, planning, designing and engineering solutions offered are not only
construction monitoring of various building economically sound, but are devised
facilities. Substantial investments have been particularly with long-term durability and ease
made by the firm in the development of its of execution in mind.
building professionals, technical and quality
systems, and service standards. Aurecons
AREAS OF SPECIALISATION
objective is to provide a commercially- Office developments
orientated and innovative service to all our
Full project range from speculative office
clients in the building industry.
park developments and office blocks
through to high-rise corporate
The consultant of choice for discerning
headquarters
clients across the globe.
All structural materials - reinforced and
Committed to service excellence, the Aurecon pre-stressed concrete, composite
Building Projects team is often the consultant of structural steel and concrete systems,
choice for discerning clients across the globe. structural steel work, timber and
Not only does the team have the experience aluminium, as well as load-bearing
and know-how to ensure the success of masonry.
projects, but they are also capable of
responding to contingencies timeously and
effectively.

The teams past successes encompass


Retail developments
structural designs and specifications for an
array of projects ranging from high-rise Leading-edge technology and innovative
corporate headquarters and major retail design solutions have earned the Aurecon
centres through to hospitals and golfing Building Projects team a place amongst
estates. Considerable attention is paid to the front-runners in this competitive field.
putting innovative, cost-effective systems in
place, while adherence to the highest norms
and standards is strictly enforced.
BUILDINGS Leisure developments SPECIALISED SUPPORT
Recent developments include hotels, SERVICES
resorts, casinos, theatres and golf estates.
Restoration and maintenance
Respected by developers across the
board for cost-effective designs and the Provides high-performance, cost-effective
ability to meet the demands of fast-track design solutions to suit all types of building
construction programmes. fabric and envelopes.

Industrial Developments Structural dynamics


The full scope of the projects in A comprehensive knowledge base of design
Manufacturing, Storage or Process criteria for various applications and conditions
engineering is provided. ensures expert advice on vibration limits
Warehouses, Factories, Industrial Plants Fully capable of conducting seismic evaluations
and facilities for the food industry have on concrete and steel structures, minimising
been designed and constructed with strict vibration under operating conditions and
adherence to the highest standards analysing load impact on structures.
utilising both materials and technology to
the clients best advantage. Protective structures
Hardened or security structures capable of
Airport Facilities
protecting both people and goods from the full
Includes such diverse projects as effects of weapons and/or intruders are
hangars, airside corridors and loading designed with the aid of advanced structural
bridges, through to terminal buildings. design software.
Health Facilities RELATED SERVICES
Includes clinics, health centres, rural and In-house professionals further complement the
urban hospitals, as well as nursing Aurecon Building Projects team by offering
colleges. specialist services in the following:
Educational facilities Civil Engineering:
The Civil Engineering experts
Includes schools, colleges, universities specialise in the design of Water
and hostels. Supply and Purification Systems,
pumping stations, pipelines and
Facade Engineering
reservoirs. This division also has
Provided this service on a number of expertise in the following areas:
landmark buildings and projects, Drainage and Flood alleviation
employing a wide range of cladding Canals and waterways
systems in South Africa and abroad. Harbour and Coastal engineering
Designs are based on the most Irrigation Systems
economical solution possible under the Traffic studies and Transportation
specified design loads, with strict planning
adherence to codified guidance and best
Geotechnical investigations
practice procedures.
Roads, parking and stormwater designs
Parkades Building and site wet services design
Fire safety design
Includes parking layout, control systems,
Environmental impact assessments
conversion of existing buildings into car
parks and planning of public transport Facilities maintenance management
loading facilities Land Information and GIS systems
Quantity Surveying
BUILDINGS REACHING NEW HEIGHTS architectural design team. Our lighting
specialists have an extensive knowledge of
Aurecon appreciates the complexities often
associated with tall building engineering and lighting products, their functions, limitations and
clients financial objectives. As an international, cost structures, and bring considerable value to
multi-disciplinary engineering consultancy, the building functions and appearance of
Aurecon has a breadth and depth of external spaces.
experience and expertise from which it can
draw to meet demanding programmes and Aurecon can provide advice on:
overcome severe site constraints. Fitting selection
Lamp selection
STRUCTURAL ENGINEERING Colour rendering
The structural engineering of tall buildings Direct versus indirect lighting
requires extensive experience and expertise in Concealing of luminaires
occupancy comfort, wind engineering, wind Use of colour
testing and sway performance particularly Active lighting and lighting control
when the height and slenderness of a building Budget costs
increases.

A thorough knowledge and understanding of


efficient floor systems and cost-effective
basement solutions is also necessary if the
right solution is to be found early. Through
specialist wind engineering and dynamic
analysis Aurecon is able to avoid the
unnecessary use of dampers, excessive shear
walls, the addition of extra mass and
strengthening in the core.

Specialist skills include:


Dynamic analysis and performance
assessment
Seismic analysis and design
Briefing for and interpretation of wind
tunnel testing
Wind load analysis and design
Structural steelwork
Composite structure
Concrete structure
Floor superstructure analysis and design
Column axial shortening analysis
Foundation analysis and design
Temporary and permanent site retention

AN UNDERSTANDING OF
LIGHTING DESIGN
Lighting is an integral part of any space. It is
light that brings architecture to life. Aurecon
provides imaginative and creative lighting
solutions working in conjunction with the
BUILDING SERVICES The Building Services Engineering section of Fire Engineering
Aurecon offers a complete service from
inception to operation in conjunction with a Rational fire design and protection
wide range of related skills available in the measures
other Aurecon divisions. The services provided Automatic fire extinguishing installations,
are diverse and range from conceptual including automatic sprinklers, foam and
planning and feasibility studies to design, gas extinguishing systems
documentation, implementation and inspection Conventional fire protection installations,
of building services related to all types of including fire hydrants, fire hose reels and
commercial, industrial and residential buildings. hand-held fire extinguishers
Fire and smoke detection, alarm
Aurecon is in touch with the latest development notification and evacuation systems
and technology utilised in the building services Smoke control installations
field. Through regional offices in Africa, the Fire signage design, including emergency
Middle East, Europe and South East Asia, evacuation signage and signage for fire
Aurecon is able to undertake any project, protection equipment
irrespective of geographic location or Booster pump and water storage
magnitude. The Building Services Engineering installations for fire protection applications
section provides a wide range of services by
utilising their expertise gained over a period of
Protection and Security
more than thirty years in this field. The core Perimeter protection
fields of these services are: Access control
CCTV surveillance and recording
Wet Services and Drainage
Access control
Water supply, treatment and storage
systems Other fields of specialisation
Hot and cold water distribution systems UPS systems; static and rotary
Pump systems for domestic water, Diesel driven standby power systems
sewage, subsoil and fire protection Specialised lightning and surge protection
applications Gas distribution systems
Domestic hot water generating plants Medical gas systems
utilising a wide range of energy sources Compressed air generation and
Steam generation and distribution distribution systems
systems Kitchen and laundry equipment
Sanitary drainage and disposal systems Lifts and escalators
Rainwater and stormwater drainage Statutory and safety audits
systems including certified designer for Upgrading and restoration of existing
the Pluvia technology building services
Subsoil drainage systems Technical Investigations
Electronic Services Facilities management
Compilation of maintenance contracts with
Voice and data networks service level agreements
Building management systems Energy efficiency audits
Audio and music systems Hot water and steam plants feasibility
Boardroom and multimedia installations studies - evaluating alternative energy
Heating, Ventilation and Air sources.
Conditioning
Central heating, ventilation and air
conditioning systems
MUNICIPAL SERVICES Aurecon has been involved for over 50 years in environment. In particular, the following
the planning, design and construction services are provided:
supervision for the complete municipal and Strategic Master planning on municipal,
infrastructure services of major residential provincial and national level.
townships, commercial developments, leisure Feasibility studies
developments, golf and lifestyle estates and Assistance and Engineering Support
sports complexes. The firm assisted various towards township and development rights
clients with projects - from inception, planning, establishment
negotiations, approval up to completion and Negotiations and liaison with local
maintenance. In addition to the normal authorities
infrastructure engineering aspects, Aurecon Database generated cost studies
also provides extensive project management Arrangements and interpretation of
budget reporting and cost reconciliation topographical surveys
services. Aurecon provides the full range of Establishment of services agreements
support services including the processing of
Water resource planning
satellite imagery, geotechnical investigations
and analyses, topographical surveying, traffic DEVELOPMENT SERVICES
impact studies, assessment and analyses,
structural, electrical and mechanical design, Investigations and Studies
economic and financial analyses and feasibility Geotechnical an geohydrological
studies. investigations and reports
Environmental Impact Assessments and
Management Plans
Transport planning, Traffic studies and
Reports
Certification of flood lines
Municipal Infrastructure Services reports

Engineering design for:


Mass earthworks
Project development from inception to Bulk water supply, water treatment and
operation, irrespective of scope or nature, storage (including dams and reservoirs)
consists of the following phases: Sewage treatment facilities and effluent
Assessment of demand and requirement control
from client Solid waste disposal facilities
Concept Sewer drainage and sewer reticulation
Feasibility study Gas reticulation systems
Planning Water supply and reticulation
Design Stormwater drainage systems and
Construction reticulation networks
Operation Roads, access routes, intersections,
Maintenance parking areas and all traffic network
aspects
PRE-DEVELOPMENT Electrical supply and reticulation systems
SERVICES Pumps and pump stations
Irrigation systems
Aurecon provides extensive support towards
township establishment and conceptual Security and Electronic/Data networks
planning of new developments. Our planning Civil and building structures
skills span the full spectrum of the municipal Sports fields and recreation areas
Public transport facilities
MUNICIPAL SERVICES Project Management and related
services
Quality control
Construction supervision and site
inspections
Design reviews and approval of designs
and drawings with local authorities
Provision of Contract and Tender
documentation
Contract administration, implementation
and management
Financial auditing and Budget reporting
Coordination of external link services
installation

POST-DEVELOPMENT
SERVICES:
Operations and Maintenance
Management of facilities
Provision of Operation manuals
Completion reports and reconciliation
ROADS Aurecon is able to provide expert professional Aurecon has gained extensive project
services in road design and design review to experience in road widening and upgrading in
any client. Aurecon has been intimately varying traffic and environmental conditions,
involved in the road sector planning and design and the firm possesses the required blend of
sphere since its establishment in 1951. The skills needed to address the unique challenges
companys experience ranges from the posed by this type of design and construction
emergency opening of roads in rural work. It is the companys experience, that for
Mozambique to the upgrading of a fully this type of work, the method and particular
operational, self-funding, multi-lane highway in specification are unique and an integral part of
Malaysia. the design process.

Over the years, the company has received To this end, Aurecon has developed tried and
numerous awards for the design of roads, such tested methods and particular specifications
as National Route 2 (toll road) near Plettenberg that are compatible with the unique
Bay in South Africa, the Northern Access Road requirements of road widening and upgrading
to Katse Dam in Lesotho, and the rehabilitation work.
of the war damaged multi-arch Pungue Bridge
in Mozambique. It has been involved in the In addition, this type of work requires a blend of
successful completion of major road design geotechnical and pavement engineering
projects, both in Africa, south of the Sahara knowledge and expertise in order to achieve
(including Ethiopia), as well as in the Middle harmony between the old and existing
East and Southeast Asia. pavement structure. Aurecon has gained
extensive experience in this aspect of
ROAD DESIGN pavement design, having undertaken various
projects on difficult ground, such as:
Aurecon has designed and supervised more
than 12 000km of roads in South Africa alone. road widening and upgrading on soft and
The company has experience in working with swamp ground (marine clays, slimes,
survey subcontractors and has the most up-to- peat)
date road design software to ensure optimal road widening on expansive soils
horizontal and vertical alignment within the road widening and vertical realignment at
standards set for the road being designed. the transition between rigid structures (ie
bridge abutments and culverts) and
Aurecons experience in designing the various embankments on soft ground
standards of road enables it to tailor its designs road widening and upgrading in steep
to match exactly the needs of each situation. mountainous terrain
In addition to geometric design, Aurecon Services
conduct materials surveys and deliver Road needs studies
comprehensive bridge designs in line with Operational and safety assessment of
current and appropriate specifications. roads
Pavement evaluation and rehabilitation
Aurecons extensive design experience also design
places it in a unique position to undertake
New pavement design
Design Reviews in order to prevent problems
Feasibility studies, route location and
and claims on-site and to optimise or add value
basic planning
to designs by other consultants. Aurecon
Road planning, design and construction
recently did the Design Review and update of
supervision
the existing design for the road between
Special investigations such as the effects
Lubango and Ondjiva, Angola (design of
of vehicle overloading on pavements and
375km of road, and design of bridge over
the visibility of road traffic signs
Kunene River).
ROADS Feasibility studies, site location and Cold in situ recycling of granular crushed
detailed design of traffic control / stone bases using cement stabilisation or
weighbridge centres bitumen/cement stabilisation
Cold in situ recycling of asphalt base
ROAD REHABILITATION coarse materials using rejuvenators and
polymer modifiers, or rejuvenators and
DESIGN cement
Aurecon uses a holistic approach to pavement Hot in situ recycling of asphalt layers
structural evaluation (remaining life) and using rejuvenators and polymer modifiers
rehabilitation design. This approach is often
termed multi-criteria or multi-component Other innovative materials employed by
analysis. It involves assessing each structural Aurecon in road rehabilitation projects include:
layer (component) of the pavement in order to foamed bitumen emulsions
evaluate its remaining structural life. The
stone mastic asphalt surfacing
design life of the pavement is then based on
large aggregate asphalt base course
the weakest component. An analogy being that
polymer and rubber modified crack
a chain is only as strong as its weakest link.
absorbing layers and seal coats

The use of large aggregate asphalt bases is a


fairly recent innovation and is used in heavy-
duty pavements where high shear strength is
required in the asphaltic layers.

BRIDGE DESIGN
Aurecons bridge design team has for more
The required pavement evaluation and design than 50 years been responsible for all related
data collection is staged in order to minimise structures. The structures include major
cost without sacrificing reliability. This is highway interchanges as well as hydrological
achieved by collecting the least expensive data and hydraulic investigations, retaining walls,
first to identify preliminary uniform behavioural canals, low-cost drainage structures, a diversity
sections. These are refined as the higher level of: road-over-road, road-over-rail, rail-over-
of detail (more expensive) information is road, bridges and river- and dam crossings.
gathered in other to define the engineering Aurecon provides the full services including
properties and parameters for each uniform feasibility studies, basic planning, detailed
section identified. The uniform sections are design, documentation and supervision.
used for evaluating remaining structural
capacity and rehabilitation design.

Aurecon is experienced in assessing the


remaining structural capacity of a pavement
structure from deflection data, DCP, and
laboratory tests, and remains in the forefront of
technological innovation through its
participation in research projects and
international conferences. Aurecon has
experience in the following in situ recycling
Services
methods for road rehabilitation:
Cold in situ recycling of problematic General Bridge Engineering
natural gravels such as weathered granite Bridge Management Systems
and sands using cement and\or bitumen Bridge Hydraulics and Hydrology
emulsion stabilisation
ROADS TUNNEL DESIGN

Aurecon provides the full range of engineering


services for investigation, design and
construction monitoring. We have been
responsible for engineering many tunnels using
a variety of techniques and machinery
including;

Immersed tube
Driven
Cut and cover
Jacked
AIRPORTS Aurecon's airport involvement spans 30 years
and encompasses all services related to airport
planning and design. Our personnel are well
acquainted with the requirements of the
International Civil Aviation Organisation
(ICAO), the Federal Aviation Authority (FAA)
and the International Air Travel Association
(IATA). We have successfully executed a
diverse range of projects including
comprehensive airports as well as individual
facilities such as runways, taxiways and
aprons, passenger and cargo terminals, aircraft
hangars, landside road systems and multi- Experience
storey car parking facilities. We can assist
The planning and design of the upgrading
clients through all the phases of infrastructure
of Livingstone Airport
development from conceptual development,
The planning, design, tender and
through feasibility study, master planning and
construction supervision of Lanseria
detailed design, to construction supervision and
International Airport
commissioning.
The planning, design, tender and
construction supervision of Kruger
Mpumalanga International Airport
New Cargo Centre at Entebbe
International Airport, Uganda
Upgrading of passenger terminal facilities
at OR Tambo International Airport, South
Africa
Freight apron extensions at OR Tambo
International Airport, South Africa
Master planning for OR Tambo
International Airport
Services
Master plan for Windhoek International
Techno/economic/financial feasibility Airport, and Eros Aerodrome, Namibia
studies Rehabilitation of runway at Cape Town
Environmental impact assessment International Airport, South Africa
Airport master planning and facility Development and construction supervision
planning of parallel runway and taxiway system at
Airport design (all facilities and all design OR Thambo International Airport, South
disciplines) Africa
Bidding process Upgrading of Ilha da Sol Airport, Cape
Construction supervision Verde Islands
Commissioning Rural airfield development, Lesotho
Project management Design and construction supervision of
Pavement engineering two major air force bases, South Africa
Airport operations and operational Development and construction supervision
services of several regional airports in Southern
Support facilities and hangars Africa
Airport ground lighting New international terminal and multi-
storey car park at OR Tambo International
Airport
water quality, weather and climate are
Aurecons strategic partner for coastal, ocean
HARBOURS and environmental engineering services is
assembled and analysed where required.
Numerical Modelling: Wave hindcasting,
Prestedge Retief, Dresner Wijnberg (PRDW). refraction and diffraction analyses,
The firm practise exclusively in the specialist simulation of wave penetration into
areas of port, coastal and environmental harbours, surge resonance, determination
engineering. The firm is based in Cape Town, of wave forces on structures, effluence
South Africa, from where it operates both dispersion studies, water quality analysis,
nationally and internationally. The partners and simulation of coastal sediment movements
senior personnel have devoted their and spatial analyses by means of
professional careers to the pursuit of Geographic Information Systems.
excellence in the field of maritime civil Physical Modelling: Laboratory model
engineering and are recognised internationally simulations of wave and tide conditions in
harbours and estuaries, stability of
as specialists in this field, reflected in the
breakwater armour units, wave interaction
number of awards received over the years.
with structures, wave-induced currents
and navigation and moorage studies.
Surveys: Topographical hydrograph and
geotechnical surveys as well as diving
inspections are undertaken by defining the
work required, appointing appropriate
contractors supervising the work and
interpreting the results.
Project Administration: Contract
documentation, project cost estimates,
tender evaluation and adjudication,
contract administration, project cost
control, quality control and supervision of
construction.
Project Monitoring: Monitoring completed
The following services are provided: projects to evaluate performance and
Design of Coastal, Marine and Harbour generate data for future developments.
Works: Determination of environmental Installation Engineering: Planning and
loadings. Evaluation of alternative design of temporary works for marine
structure types. Selection of construction structures and pipelines.
methods and materials, taking account of
environmental and service loads.
Construction costs analysis. Detailed
design, preparation of drawings and
construction specifications.
Feasibility Studies and Project
Development: Analysis of financial and
technical feasibility of development
projects
Environmental Impact Evaluations:
Integrated environmental management
studies, environmental audits, conflict
resolution and environmental
management advice
Data capture and analysis: Data on wave
conditions, coastal sediments, currents,
HARBOURS These services find application in the following:
Harbours and cargo terminals
Offshore structures
Marinas and small craft facilities
Coast rehabilitation and protection
Bench improvements
Groynes
Management of dunes and beaches
Dredging
Regional Planning
Construction planning
Ocean energy utilisation
Sea Water intakes
Long sea outfalls
Tidal swimming pools
Quarry walls and wharfs
Jetties
Promenades
Flood and floating mooring jetties
Slipways and boat ramps
Breakwaters
Offshore single point moorings
Revetments and bulkheads
Beach mining
Underwater observation platforms
Upgrading and repairing coastal structures
Sand bypassing schemes at harbours and
river mouths
ELECTRICAL AND MECHANICAL Since 1982, Aurecon has been providing a Load studies and project design
wide range of professional services in power Rural electrification planning, design and
system engineering, industrial process construction management
engineering, building electrical and electronic Off-grid electricity solutions.
services, and energy sector advisory and
Network normalisation
management services to its clients in the
energy, mining, industrial and property sectors. Data collection and auditing (consumer
Aurecon's Energy and Industrial Consulting and network)
Asset assessment, valuation and life cycle
Services team comprises engineers,
planning
technicians, economists, financial analysts and
Energy loss management, including
support staff with extensive experience in these
system analysis (power flow, voltage drop,
sectors. fault level, protection coordination and
harmonic analysis studies), and statistical
metering
Rehabilitation planning and
implementation
Network maintenance planning.

POWER SYSTEM
ENGINEERING
Revenue management
Aurecon provides solutions across the
Assessment, design and supervision of
complete life cycle of electricity networks
installation of:
from conceptual design through to
maintenance management. Vending systems
Automatic metering systems
The Power System Engineering team provides Remote metering systems.
services in:

Master planning
Network auditing
Load flow analysis, fault level studies and
protection studies
Network analysis and network
development studies
Load forecasting
Geographic mapping of networks and
network diagrams. Power system design and
Electrification construction management
Income and affordability surveys and Transmission lines
community liaison Substations
ELECTRICAL AND MECHANICAL Medium and low voltage distribution Mechanical engineering services
systems to urban and rural areas.
Heating, ventilation and air conditioning
Lighting systems systems
Pipe and pump systems
Design and construction management of:
Hydraulic systems
Freeway and road lighting
Specialised material handling systems
Area lighting
Chemical dosing systems
Sports field lighting.
Hoisting equipment
Airfield navigational systems Maintenance engineering
Corrosion protection systems.
Design, specification and supervision of
installation of: Instrumentation and control services
Airfield lighting systems
Design and implementation of process
Airfield navigational aids
instrumentation and control systems in
Meteorological equipment hazardous and non-hazardous
environments.
Communication equipment.
Electrical engineering services
INDUSTRIAL PROCESS
Industrial and process plants
ENGINEERING
Power factor correction
Aurecon provides the full spectrum of industrial Special power supplies and Uninterrupted
process engineering solutions, including Power Supply (UPS) systems
professional electrical, control, and mechanical Lightning and surge protection.
engineering services for industrial, electricity
generation, and process plant projects. Our Supervisory, Control and Data
clients range from the industrial, petrochemical Acquisition (SCADA) systems and
and mining sectors to private sector clients in telemetry services
water and wastewater fields. Design and implementation of local
process SCADA systems
Design and implementation of SCADA
systems from distributed sites by means
of telemetry
Design and implementation of stand-alone
telemetry systems for long distance
system control.

Power generation services


Assessment of existing diesel-driven
Service spectrum:
station performance
Conceptual design Generation planning and expansion
Feasibility studies planning
Detailed engineering design Design of diesel-driven power station and
Project management auxiliaries
Commissioning Renewable and non-grid solutions.
Handover
Performance testing BUILDING ELECTRICAL AND
Evaluation of existing plant process ELECTRONIC SERVICES
performance
The Building Electrical and Electronic Services
Site testing.
team provides electrical and electronic
ELECTRICAL AND MECHANICAL solutions in support of building and residential ENERGY SECTOR ADVISORY
estate design and management. Service lines
include: AND MANAGEMENT SERVICES
Electrical Installations for Buildings The Energy Sector Advisory and Management
Services (ESAMS) team provides consulting
Electrical installation
services and transaction advice to and on
Lifts and escalators
behalf of national policy makers, private sector
Indoor lighting and control systems investors and utilities as well as international
Area and security lighting financial institutions. Services are offered at
Standby power supplies the market, enterprise and project levels
Earthing and lightning protection related to investment, management and
institutional restructuring in the energy sector
with the aim of delivering sustainable life cycle
solutions.

Sector Reform, Policy Advice and


Market Restructuring
Sector restructuring
Privatisation and introduction of Private
Sector Participation (PSP)
Electronic Installations for Buildings Electricity utility restructuring

Data and voice networks Electricity Enterprise Development


Background music and white noise and Management
systems New enterprise development
Access control, and time and attendance Existing enterprise improvement
systems
Surge protection systems Investment Consulting and
Security systems; fire detection and CCTV Transaction Advice
surveillance
For electricity businesses and projects,
Infrastructure Installations including IPPs:
Pre-feasibility and feasibility studies
Fibre optic cable networks
Business case development
Cable television signal distribution
Financial due diligence and modelling,
Perimeter fence systems
incorporating project finance principles
Video surveillance
Legal due diligence
Voice over IP systems
Transaction advice

Sustainable Energy Business Case


Development
Renewables solar, wind, hydropower
Energy efficiency
The Clean Development Mechanism
(CDM)

Energy Sector Research


African electricity utilities
African energy/electricity sector issues
Global trend contextualisation
ELECTRICAL AND MECHANICAL SPECIALISED SERVICES thermal technologies. We provide services for
photovoltaic cells that are grid connected or
In the varied field of electrical engineering, the part of remote area power supply systems. For
Electrical and Mechanical Division offers the solar thermal, our expertise covers all aspects
following services: of the systems for converting solar energy into
Monitoring, data acquisition and analyses electricity.
of electrical systems and mechanical
process parameters such as power Wind energy
consumption, temperatures, flow Aurecon provides technical, environmental and
velocities, pressures, humidity and mass strategic services to the development phase of
Energy conservation and energy efficiency wind energy projects as they are progressed to
research consenting and implementation.
Systems master planning
Implementation of quality assurance Every wind project starts with site selection and
management systems and auditing in assessment of suitability taking into
accordance with ISO 9000 standards consideration issues such as the wind
Operating and maintenance management resource, proximity to the electrical grid,
services environmental impact and public acceptance.
Project management of multi-disciplinary
projects Our services include:
Regional wind assessments
Installing and operating wind monitoring
Renewable energy masts
Preparing a wind resource assessment
Bioenergy (including the use of special modelling
As the need to develop a clean fuel supply with tools where appropriate)
a plentiful, renewable resource evolves, new Project feasibility considering initial energy
challenges arise in producing energy that yield prediction, grid access, outline
requires innovative solutions and specialist project costs and revenue projections
expertise. Many skills are needed to Preliminary assessment of site
successfully execute bioenergy projects and geotechnical and access conditions
Preliminary environmental impact
Aurecon provides a wide range of consultancy assessment and likelihood of gaining
services for the development of renewable consent
energy resources including biofuels, biomass, Project formulation, including selection of
wind, solar and hydro. With a proven track turbine layout, access routes and grid
record and wide industry experience in connection point
renewable energy, we have the skills to take
your projects from concept to commercial
operation.

Other renewable energy


Hydro
Our hydro capability covers all phases of the
project cycle from water resource assessment
to plant commissioning including civil, electrical
and mechanical design of facilities.
Solar energy
Solar energy is typically converted into
electricity using photovoltaic cells or solar
RAILWAYS Aurecon has a proud history in the provision of Drainage designs including hydrological
expert professional services in the many and hydraulic studies, subsurface
aspects of transportation. The services we drainage designs, surface drainage
offer cater for the various modes of transport, ie designs, and track prism drainage
road, air and rail. Since transportation is a designs.
complex field that is interlinked with many Design of Station and Marshalling Yards
including substations
others, we make use of a highly qualified and
Compilation of works contracts.
experienced team of engineers, regional
Supervision of construction.
economists, legal experts and other associated
staff, to provide services in a variety of
functional areas. MAINTENANCE, UPGRADING
AND PERFORMANCE
IMPROVEMENT
Aurecon offers a unique service line in railroad
maintenance, upgrading and performance
improvement of existing tracks. The first step
to implementing a rail maintenance
management system is by performing a proper
rail asset inventory and condition assessment
of all rail assets. Maintenance are then planned
PLANNING AND COST and focussed and life cycle costing is
MODELLING calculated. A proper rail maintenance
management system can potentially provide
Route planning inclusive of cadastral, land the following benefits:
and engineering surveys.
Economic comparative studies Follow a preventative maintenance mode
investigating rail to other transportation rather than a corrective one.
systems. Prevents crisis management, derailments
Optimising Train Operations. and delays in production.
Infrastructure and System Design. Target maintenance operations and
Risk Assessments and Safety Audits. resources only to areas where they are
Feasibility studies. needed.
Basic planning layout designs Identify areas of repeated repair and apply
cost reducing long-term solutions to them.
DESIGN AND CONSTRUCTION Increase asset life without spending
In the design and construction of new railway additional capital.
tracks, we offer the following services:
Geometric and layout design. UNDERGROUND RAILWAY
Mechanical, electrification and signalling
systems. ENGINEERING - MINES
Granular layer thickness design (ballast, Aurecon recently expanded its railway service
subballast and prepared subgrade underground, providing the following
thickness requirements). specialised services for the Mining Industry:
Earthworks design and specifications.
Track transition designs for bridges, Advice on the compilation of the
tunnels and special trackwork. Mandatory Code of Practice for
Development of ballast/subballast Underground Railbound Transport
specifications. Equipment (due Feb 2004)
RAILWAYS Training - Underground Railway Information and Land Solutions.
Workshops Structural engineering.
Asset Inventory, Condition Assessment
and Life Cycle Costing
Risk Assessments and Safety Audits
Planning and Cost Modelling
Quality Management (ISO 9001 and
ISO/IEC 17025 Certified)
Track Geometry Measurements
Rail Maintenance Management Systems

INVESTIGATION TECHNIQUES
Investigation techniques of existing tracks to
determine the root cause of tracks performing
poorly include:
Track geometry survey
Measure and interpret track deflection,
stiffness, and modulus.
Identify ballast and subgrade condition
using ground penetrating radar.
Assess track functional condition using
track geometry measurements.
Determine causes of ballast fouling at
specific sites.
Determine substructure properties,
drainage conditions and root cause of
problems using cross trenching.
Conduct laboratory tests for ballast,
subballast and subgrade properties.

RELATED ENGINEERING
STUDIES
Hydrological and hydraulic investigations.
Geotechnical and material investigations.
Bridge design.
Environmental management.
Health and Safety.
INDUSTRIAL The design of facilities for industry forms an the construction of super-flat floors to the most
integral part of the activities of Aurecons stringent international standards.
Commercial Development Sector. Aurecon
provides expertise with the planning, design,
specifications, cost estimates, documentation
and tendering, construction monitoring and
project management of industrial projects. The
firm is actively involved in the provision of
building services and aims at providing an
innovative commercially orientated service to
appropriate norms. Aurecons policy is to
provide excellent service to clients through
teamwork and professionalism. Clients are FACTORIES
provided with a comprehensive service to meet
their requirements. Aurecon provides expertise in the planning,
design, specifications, cost estimation,
documentation and tendering, construction
monitoring, and project management of factory
projects. Structural engineers work hand in
hand with process engineers and materials
handling experts. This ensures that any special
requirements such as strict tolerance durability,
ease of maintenance and operational
requirements are incorporated into all the
designs where required.
Expertise gained by acting as principal agent FOOD INDUSTRY
on various projects, complemented by an
industrial architectural service, streamlines the Aurecon's experience in the food industry
planning, design and supervision of industrial covers the meat industry, grain milling and
projects. This specialised knowledge ensures storage, wineries, fisheries, beverages, dairy
economical construction solutions that are products, convenience foods, and canned
tailor-made to client requirements. Many years foodstuffs. Multi-disciplinary teams that
of experience in undertaking a variety of understand food hygiene and processing are
industrial projects makes Aurecon ideally suited used to ensure the creation of facilities that
to serve the manufacturing, storage and satisfy the demanding needs of clients and
process industries. Aurecon's highly qualified maximise their long-term financial investment.
and experienced professionals apply
appropriate materials and technology to create
value for our clients, from economical
commercial developments through to
innovative, durable, process-driven facilities.

WAREHOUSES
Aurecon has extensive experience in the
storage and distribution facilities required in the
milling, printing and retail industries. Aurecon
also specialises in the design of cold storage INDUSTRIAL PLANTS
facilities and high-density storage facilities with Aurecon's expertise with regard to industrial
very narrow aisles (VNA warehouses). plants includes project management, civil and
Aurecon has designed, specified and overseen structural design, specialist structural analysis,
quantity surveying, geotechnical investigation,
INDUSTRIAL foundation engineering, and contract experience to assist architects and other
administration. engineering disciplines with the placing and
detailing of services and accesses, as these
INDUSTRIAL elements influence the degree of protection
PARKS/DEALERSHIPS required. If services are not given careful
attention, then access could sometimes be
A diverse and interesting range of commercial gained through these services or the protective
projects have been completed. These include structure can be penetrated.
commercial industrial parks, where large
numbers of economically designed light and DYNAMIC ANALYSIS OF
medium industrial units are grouped together.
STRUCTURES AND MACHINE
Line workshops in built-up areas for the motor
industry eg the "motorcity" concept, are FOUNDATIONS
frequently designed and constructed by
Aurecon has performed dynamic analysis on a
Aurecons structural engineers. Other projects
wide range of structures. This includes the
include motor dealerships consisting mainly of
determination of natural frequencies and mode
workshops, spares stores and covered and
shapes as well as time-integration of a
open parking. As with all commercial projects,
structure subjected to time-related forces or
innovative and economical designs are applied
earth movements. The analysis of the structure
including, "stressed skin" technology and
in the frequency range is done by means of
modular systems.
Fourier transformations, and determines the
effects of the dynamic interaction between the
earth and the structure. The dynamic response
of a structure or component may be predicted
quite accurately if the necessary information is
available. An important component of a
structural dynamic evaluation is the need to
verify the predicted response against the
design criteria, applicable standards or specific
requirements of the user. Aurecon has the
experience to compile the necessary
PROTECTIVE STRUCTURES information for an analysis and to evaluate the
results. Typical analyses include the design of
Protective structures, also called hardened or various bases for vibrating machinery, seismic
security structures, are structures offering evaluation of concrete structures, design and
protection to people, goods and other buildings evaluation of buildings to minimise vibration
against the effects of weapons and intruders. caused by operating machines, analysis of
Common buildings and structures have a low structures subject to impact loadings and
resistance against the high intensity effects of platforms supporting dynamic equipment.
artillery and vandals, and it is essential that
special attention be given to these effects when
designing a protective structure. The design of
protective assistance to a client in evaluating
the degree of protection needed. The client is
also informed of the extent of damage and
losses that can be expected. Aurecon also has
technical literature and various other sources of
information on aspects such as weapons and
their effects, types of intrusions, special
construction materials, structural systems and
the use of advanced structural analysis
software. Furthermore, Aurecon has the
WATER The water cycle is a complex system that has models to deliver cost-effective solutions to
been strained by the growing demand imposed clients.
on it by the progress of society. The
sustainable management of our water We understand the marketplaces increased
resources is an increasingly important demand for the provision of high standards of
challenge for engineers and scientists, and quality and customer service to all water
arguably requires greater focus from the industry stakeholders. This includes local, state
scientific community than any other natural and federal government and authorities and
resource. private sector clients. We appreciate the need
for the provision of integrated, multi-disciplinary
The water cycle consists of six stages solutions that encompass the full range of
evaporation, condensation, precipitation, issues that impact on business operations.
surface runoff, infiltration and transpiration Aurecon has in-depth knowledge of the water
during which water is constantly being cycled sector which includes industry standards,
between the atmosphere, ocean and land. systems and practices as well as business
Aurecon understands all aspects of the water operations.
cycle and is thus able to offersa complete
range of engineering and scientific services to We offer a complete range of
help clients optimise the sustainable services in:
management of their water resources.
Water Resource Analysis
Aurecon offers a comprehensive range of Surface Water Hydrology
services in both water and sanitation. This Geo-Hydrology
includes surface and groundwater Sedimentation Studies
management, infrastructure provision and Water Quality
water and sewage utility services. We provide
clients with professional input for all project
Water Resources Planning &
phases - from inception to completion in Management
order to assist them in meeting the challenges Planning and Management
they face. Groundwater Development

Most communities in poor countries suffer from


Dams
poor water and sanitation service levels. This Yield-Reliability Analysis
can be attributed to a myriad of reasons, be it Embankment Design
lacking infrastructure, organisational Spillway Design
constraints, or community based issues. Flood Hydrology Design
Aurecon has actively addressed the needs of Dam Safety Assessment
such communities and has developed skills Dam Infrastructure
that cover the technical, social and institutional
Water Services Planning &
aspects of providing water and sanitation
Management
services.
Planning and Management
Our expertise Water Storage and Distribution
The Water and Environment Group is a well- Sewer Reticulation
established and integral part of Aurecons Water Demand and Water Loss
Management
business. We offer extensive project
management, planning, design expertise and Pumps & Pipelines
turnkey capabilities for projects of any size. Our
Hydraulics
expert team strives to combine innovative
Irrigation
thinking with constructive project delivery
Pump Design
Pipeline Design
WATER Water & Wastewater Treatment
Process Analysis and Design
Detailed Design
Performance Assessment of Existing
Works
On-site Sanitation
Desalination
Stormwater & Flood Control
Runoff Assessment
Management and Planning
Canals, Culverts and Stormwater Sewers
River Hydraulics
Coastal Engineering
Marina Design
Coastal Hydraulics
Inlet, Outlet and Protection Works Design
Construction Management
Construction Procurement
Contract Administration and Management
Solid Waste Management
Planning
Design
Management & Legal
Institutional and Support Services
Information Systems
Legal Services in Water
Asset Management
Condition and Performance Assessments
Useful Life Determination
Prioritisation of Maintenance and
Refurbishment Requirements
Estimation of Replacement and Current
Values
Asset Management Plan
Foundation investigations for all types of
Today, Aurecon is a prominent member of the
GEOTECHNICAL geotechnical, hydrogeological and
buildings and structures
Dam site investigations
environmental fraternities. Aurecon's
Foundation design for all building and
Geotechnical and Environmental Services team
structure types for normal and problem
provides comprehensive support and services soil conditions
on a variety of civil engineering and Design of lateral soil support systems and
development projects. The team is also able to slope stability analysis
provide an independent, one-stop service to Expert opinion with regard to the impact of
external clients that require the expertise of this geological and geotechnical aspects on
specialised and experienced group of the design and construction elements of
professionals. These professionals base their engineering projects
involvement on the premise that value must be
added in the process and, to this end, state-of-
the-art methodologies and innovative
techniques and ideas are brought to bear on
the project in hand.

The geohydrological-related services provided


by Aurecon's Geotechnical and Environmental
team vary from the siting of boreholes and
The geotechnical services provided by aquifer assessments, to defining the extent and
Aurecon include all the geological and soil severity of groundwater pollution. Fields of
engineering input required for infrastructure specialisation include:
planning and development projects, to ensure
Aquifer definition and yield potential
that the design of structures is compatible with
determination
the geological conditions of the sites.
Borehole site selection, construction and
testing
Fields of specialisation include:
Hydrogeotechnical and tracer studies to
Engineering geological mapping for
detect sources and extent of groundwater
regional and township planning
pollution
Soil and geological mapping for road and
Radio and isotope chemistry of surface
the railway route location, industrial
and groundwater.
developments and the location of
construction materials
We have undertaken many investigations to
Soil profiling, core logging and
assess foundation conditions for new and
quantification of properties of natural
existing structures. Foundation systems
materials and groundwater conditions
appropriate to the soil conditions encountered
Assessment of problem soil conditions are designed to ensure the integrity of new
and hazard mapping
GEOTECHNICAL structures and compatibility with existing
structures. Design sometimes has to take into
account heavy vibrating machinery loads and
the effect of seismic events. For instance, the
finite element package PLAXIS has frequently
been used over the past four years to conduct
numerical analyses of founding problems.

Lateral stability of excavations and slope


stability investigations frequently form part of
basement designs for large buildings. Soil
nails or anchors are commonly required to
improve the stability of deep vertical basement
excavations, such as the deep vault
excavations for the Reserve Bank
headquarters in Pretoria and the new ABSA
building in Johannesburg, South Africa.
ENVIRONMENTAL Aurecon Environmental Services is an Landscape Design and Planning
environmental business consultancy practice.
The professional staff complement comprises a ENVIRONMENTAL IMPACT
network of various expertise in the various MANAGEMENT
fields of integrated environmental management
AES keeps abreast of current legislative
and planning. The expertise within the requirements and approvals for sustainable
organisation ensures that it is equipped to development accord with government policies
comply with the current environmental and legislation. Service fields include:
legislation as a minimum, but strives for Environmental Impact Assessments
environmental best practice in all projects. (EIAs) for development applications.
Environmental Management Plans (EMP)
to mitigate project implementations during
design, planning, construction,
rehabilitation and operational phases.
Environmental Management Programme
Reports (EMPR) for mining classified
activities, including borrow pits.
Peer review of EIAs, EMPs and EMPRs.
Visual and aesthetic impact assessment
of proposed development.
INTEGRATED Baseline assessments to determine
environmental status quo.
ENVIRONMENTAL SOLUTION
Public Participation Process.
This has enabled Aurecon: Environmental
Services to select through its partnering and ENVIRONMENTAL
associations the best available expertise for the MANAGEMENT FRAMEWORKS
business opportunity available in South Africa.
(EMFs)
Internal networking within the organisation has A Geographic Information System (GIS) based
established a large, competent and well- management and decision support system
experienced consultancy to address very integrating spatial planning, decision-making,
specific environmental issues and solutions. environmental planning and environmental
This unconventional corporate structure allows impact management into a coherent integrated
the firm to snag non-traditional projects. whole.
FIELDS OF SPECIALISATION ENVIRONMENTAL AND
The Environmental Services Group has gained ECOLOGICAL DEVELOPMENT
extensive knowledge and experience during
PLANNING
the past few years in a suite of environmental
consulting fields. This is due to direct An ecologically based assessment in
involvement in a variety of projects. These determining the inherent environmental
fields include: sensitivity of a development site, ensuring an
optimal environmental development fit.
Environmental Impact Assessments Land and spatial environmental
Environmental Management Frameworks development planning.
(EMFs) Rehabilitation planning and design.
Environmental and Ecological Planning Lifestyle Estate Development Planning
Environmental Auditing and Monitoring Natural Resource Management.
Local Authority Environmental Policy Ecotourism planning.
Development
ENVIRONMENTAL ENVIRONMENTAL AUDITING
AND MONITORING
Auditing of environmental management
systems
Monitoring of the implementation of
environmental management plans in
construction and operational phases of
development.

LOCAL AUTHORITY
ENVIRONMENTAL POLICY
DEVELOPMENT
Establishment of frameworks to facilitate
development of environmental authorising
competency at local level.
Establishing an enabling framework for
local authority EIA reviews.
Legislative review.
Environmental strategies and sectoral
plans for IDP processes.

LANDSCAPE DESIGN AND


PLANNING
Landscape design and planning to enhance
natural features of the site and its surroundings
for the optimum utilisation of open spaces
within the project context.
Conceptual Design frameworks
Landscape Master / Development
Planning
Sketch Plans and Planting Plans
Bills of Quantities and detailed cost
estimates
Detailed design and working drawings
Production of tender documentation
HEALTH AND SAFETY The Occupational Health and Safety Act (No 85 deviations but also recommendations for
of 1993) of South Africa, as well as the relevant implementation.
regulations contain provisions directing
employers to maintain a safe workplace and to Ensuring the sustainability of an
minimise the exposure of employees and the Occupational Health and Safety
programme
public to workplace hazards. Failing to comply
The success and sustainability of any
with these duties is a criminal offence. In the
Occupational Health and Safety programme
event of an accident, it will be expected from
depends on the level of motivation and
employers to indicate whether the harm could commitment to the programme by management
have been foreseen or predicted, if yes, did the and staff. Aurecon specialises in intervention
employer take reasonable steps to prevent the actions to ensure that the Occupational Health
accident. and Safety programme is maintained and
sustained. These actions include the following:
The supply, installation and
maintenance of an Occupational Health
and Safety Programme
An Occupational Health and Safety
training needs analysis
Prioritisation of training needs
Implementation of training programmes
Investigations into reportable incidents
The compilation of comprehensive
incident occurrence profiles.

The recent published Construction Regulation,


2003, placed an additional responsibility on
employers and / or clients in South Africa to
ensure that all work is carried out and plants
maintained in terms of specific Health and
Safety Specifications. Implementation Services
Aurecon, with its 18 offices throughout South A complete OHS Implementation
Africa, is ideally placed to assist management Programme comprising of the following:
in fulfilling their responsibilities and duties in Section 16.2 appointments
terms of the Occupational Health and Safety Health and Safety Representative
Act and the relevant regulations by: Appointments
Health and Safety Committees
Conducting Occupational Health and Incident Investigation
Safety Baseline- and Legal Compliance Supervision of Machinery
Audits Appointments
These audits provide management with First Aid
information on the Occupational Health and Fire fighting
Safety status of the workplace. The audit Training
entails a systems audit as well a physical walk- Any other appointment as required
through audit. The final report is structured in Conducting Occupational Health and
such a way that it reflects not only the Safety Training
HEALTH AND SAFETY In terms of Occupational Health and Safety, Heat/Cold
people do not intentionally break the law. It is
rather ignorance of what is required or a lack of In offering these services, Aurecon strives to
knowledge/capacity concerning the law, which maintain a close relationship with its clients in
results in unlawful actions. For this reason, order to identify their specific shortcomings in
Aurecon presents the following training courses terms of the Act and provide measures of
to educate people concerning legal aspects corrective actions to ensure minimum
related to Occupational Health and Safety: compliance to the Act.
Legal liability for top management
Legal liability for supervisors Aurecons success in this regard is based on its
Legal liability for the workforce strategy of providing a product to the client
Health and safety representatives whereby compliance to legislation is not only
Incident/accident investigation provided, but also sustained over a long
Health and safety in the workplace period of time.
Safety through the empowerment of
people CLIENTS
Aurecon has rendered OHS services to the
Aurecon (previously trading as Africon) is an following clients:
accredited training organisation with the
Services SETA and delegates will receive a Department of Correctional Services
certificate as proof of the knowledge gained East Rand Water (ERWAT)
during the course for all of the above courses. Pick n Pay Northern Region
Pick n Pay Gauteng
Negotiations with the Compensation Pick n Pay Western Cape
Commissioner
McCarthy Motor Holdings (KwaZulu-Natal)
Aurecon has the expertise to negotiate and to
McCarthy Motor Holdings (Gauteng)
interact successfully, on behalf of companies,
YUM! Restaurants International
with the Compensation Commissioner in terms
Vuka Project Management Services
of:
Government Employees Pension Fund
Annual assessment
Historical performance ISCOR
Specific tariff applicable Sishen South Mine
Cost of claims in relation to Kumba Resources
Assessment Dutton Plastics Engineering
Refunds in terms of payments Agrichicks
already made Spitz
Nashua Mobile
Approved Inspection Authority Services
Aurecon is also registered as an Approved
Inspection Authority with the South African
Department of Labour and can therefore carry
out monitoring of the following environmental
stress factors:
Noise
Dust
Radiation
Hazardous Chemical Substances
(Includes asbestos, lead, gases,
vapours and fumes)
Vibration
Illumination
MINING Aurecon recently made the strategic decision to
expand its involvement in the mining industry
and broaden its service offering to also include
mining design services, beneficiation (in
collaboration with external partners), turnkey
and Engineering, Procurement and
Construction Management (EPCM) projects, as
well as project and construction management.
Aurecon undertakes projects based upon
internationally recognised guidelines and, as
such, is an ISO 9001 accredited service
provider. With extensive experience gained
throughout Africa and beyond, combined with
newly acquired mining expertise, Aurecon is
ideally positioned to be a major player in the
mining industry.

Aurecon has executed various mining related


projects and assignments in South Africa,
Botswana, Namibia, Zambia, Mozambique and
Mali. Our experience was gained in various
mining operations, such as:

Platinum Diamond
Coal Copper
Iron Uranium
Gold Manganese
Zinc

Aurecons project experience in the mining


sector includes the following engineering fields:
Transportation engineering Building services
Geotechnical services Municipal services
Electrical engineering Mechanical engineering
Quality management Water and sanitation engineering
Structural engineering Environmental services
Civil design and engineering Technical assistance
Project management Laboratory services
Quantity surveying Feasibility studies
Operation and management
MINING SERVICES Project services

1. Mining Engineering
4. Additional Services
Pre-feasibility studies
Mill lining and associated wear products
Feasibility studies and the preparation of
consulting
bankable documents
Housing estates and infrastructure
Financial evaluations and modelling
maintenance management
Geotechnical investigations
2. Infrastructure Design Demand Side Management (DSM) services
as a registered Electricity Services
Surface
Company (ESCO) with Eskom
Road and rail transportation
Disaster management
Utilities related to electrical power
reticulation, compressed air plant as well HIV/Aids awareness programmes
as water supply and treatment Occupational health and safety services
Plants and support systems related to Mechanical engineering services
ventilation and refrigeration plants, backfill Electrical engineering services
plants, material handling and logistics Surveying services
Buildings Quantity surveying
Housing and town infrastructure Environmental management
Recreational facilities Legal services
Beneficiation
Bulk materials handling (conveyors, MINING CLIENTS
tipplers, load out stations, live bottom Sasol Mining
silos) Goldfields
Anglo American
De Beers
Underground
Debswana
Station (level) Namdeb
Rock pass systems, bulkheads, tips, silos Impala Platinum
and bunkers Kumba Resources
Inter-level rock handling and control Bateman
Materials handling facilities (conveyors) Ingwe
Iscor
Pumping installations Eskom
Underground mine water handling, Rssing Uranium
treatment and disposal Hartebeesfontein Gold Mine
Loading stations Western Areas Gold Mining Co Ltd
Transport logistics
Mine services (electrical, water,
compressed air and lighting) 5. Minerals and metals
Hydro transport pumping of solids Engineering resources and services
Workshops
Communication systems Aurecon provides the following services:
Instrumentation engineering
Hazard and risk assessment
3. Project Delivery Hydraulics
Project evaluation Survey and GIS
Turnkey and EPCM contracts Planning
Project, Engineering and Construction Fire engineering
Management Procurement
Commissioning Construction management
MINING 6. Mechanical engineering Industrial steel framed buildings
Conveyor support structures
Aurecon can provide a complete mechanical
Crane runway structures
engineering consultancy in areas of plant
Bulk solid containers
layout, materials and fluid handling and storage
Structural condition audits
for all industries.
Concrete repairs/remediation
We are experienced in:
Bulk materials handling and storage 8. Electrical and instrumentation
Conveying systems engineering
Emission controls
Fume extraction and dust control Services include:
Special purpose machinery and Infrastructure design
production facilities Substations
Pump systems (including difficult to Switchboard design
pump substances such as must and Plant electrical reticulation
wet marc) Industrial lighting systems
Industrial refrigeration and steam Electrical safety system design
heating Hazard and risk assessment
Process cooling and heating Process control design
Industrial ventilation and air
conditioning 9. Bulk materials handling
Clean rooms
CIP systems Aurecon has extensive expertise in the
Storage and handling of dangerous planning, design and construction management
goods of bulk materials handling projects, including
seaboard import and export terminals and
Drive systems
associated port and marine works facilities.
Process services/utilities
Safety systems
Marine
Port operations
Structures and dredging
Shipping and ocean freight
Vessel selection and design
Tug and barge operations
Planning

Port
Terminal operations
Train unloading
7. Civil and structural engineering Stockyard operations
Simulation
Aurecon can provide complete civil and
structural engineering services in road and rail Yard machines
infrastructure, factory building structural design,
plant structural support, and material storage Rail
facility design. Route selection
Bulk freight operations
We are experienced in: Container freight operations
Concrete foundations Alignment and civil design
Heavy duty pavements Signalling and communications
MINING Road Design and specification of primary
Route selection and design support utilising rib support, bolting,
Civil engineering and construction shotcrete, secondary linings and
Haul road operations and truck selection segmental linings
Construction planning and advice
Handling Instrumentation planning and
Mobile equipment operations and implementation
selection Contract documentation and tender
assessment
Overland Contract administration, site supervision
Conveyors and inspection
Slurry pipelines Computer modelling using finite elements,
Ropeways finite difference or distinct element
modelling
Systems
Simulation Engineering for the tunnelling environment
Capacity and strategic planning often presents challenges that are not normally
Optimisation studies encountered in more commonly practised
fields. In successfully dealing with these
Business challenges, Aurecon calls upon the vast
Competition policy experience of its specialist staff to provide
Rail, marine and road operating costs clients with cost effective solutions. Having
Economic, financial and market analysis such a wealth of experience in the company
also provides an excellent breeding ground for
Transport economics
younger, less experienced engineers to
Due diligence
develop their talents.
Tunnels
Aurecon can provide a full range of appropriate
services in all stages of project implementation
including:
A depth of in-house staff resources that
is unsurpassed in its experience in the
broad range of disciplines required for
underground projects
A history of innovative, cost effective and
practical solutions to underground
problems as Aurecon has been
responsible for initiatives that have
introduced new tunnelling technology
Extensive project experience on privately
developed infrastructure projects and a
firm commitment to making a project a
winner.

Aurecon has a range of specialist skills in


tunnelling including:
Feasibility studies and preliminary design
reports
Design and specification of tunnels using
tunnel boring machine, roadheader, drill
and blast methods and microtunnelling
BUILDING PROJECTS Engineering design and supervision Newtown Landscaping Architects from
for the Peter Mokaba Stadium, South Johannesburg, in Joint Venture with Bagale,
Africa completes the professional team responsible
for conducting this important project for the
Aurecon, in a Joint Venture with Prism/KC Polokwane Municipality. The current
Maiwashe/Newtown, was appointed for the construction value is R860 million and
design, documentation and construction construction will be completed by end of June
supervision of the Peter Mokaba Stadium in 2009.
Polokwane for the 2010 Soccer World Cup.
RMB properties office complex in
The initial brief called for the upgrading and Fairlands, Gauteng
adaptation of the existing Peter Mokaba New corporate head offices for Wesbank and
Stadium in Polokwane with a total of 7 500 FNB Home Loans in Fairlands, Johannesburg.
permanent seats. The new stadium has 45 000 Aurecon's scope of services included
permanent seats. structural, civil, geotechnical, facade, fire and
wet services engineering for this 140 000m
prestigious office development.

The development comprised two basement


parking levels (80 000m) forming a podium for
two separate office blocks and a shared
facilities building. Each office block, one each
for Wesbank (25 000m) and FNB Home Loans
Prism Architects, a local architectural firm in (16 000m), comprise three floors of open plan
Polokwane, are the architects of record for this office space with entrance and central triple
prestigious project. They are assisted by AFL volume atrium spaces. Each tenant is housed
Architects from Manchester in the United in their own office block with dedicated main
Kingdom, who will bring their international entrances. Each office block has access to the
experience on stadiums to the table. common shared facility placed centrally
between the two offices, which houses a multi-
Aurecon is responsible for all the engineering purpose area, staff canteen, retail stores,
disciplines, ie civil, structural, geotechnical, display areas and landscaped recreational
traffic, electrical, and electronic, HVAC as well areas. Externally, provision is made for parking,
as fire and wet services on this project. The a gate house and a utilities area.
services of SKM Anthony Hunt, a multi-
disciplinary consulting engineering firm
specialising in stadium design, has been
secured to bring its international experience in
stadium design to the team. Aurecons team is
led by Stoffel Mentz and the local coordination
in Polokwane is done by Hannes Claassens,
the regional manager for Limpopo.

The Quantity Surveyors on the project are KC


Maiwashe and Associates in a Joint Venture The office block features a facade most notable
with KDM, both local quantity surveying firms for the unusual elliptically shaped 'pods'
from Polokwane. The leading principals of the designed to display signage. Horizontal and
Joint Venture that are responsible for the vertical sunscreens are among the other design
finances of the project are Kathu Maiwashe elements to create a striking landmark.
and Faisal Ghood.
BUILDING PROJECTS A total of 120 000m of suspended slab and 60 staff parking within the constraints of the
000m of concrete was used in the existing site. An adjoining site was sub-
development. divided, rezoned and consolidated with the
existing site during 1999 - 2000.
Aurecon, in partnership with Iliso Consulting,
received a commendation in the category The final approved scheme consisted of the
'Projects with a Value Greater than R5 million', following:
for the Fairlands Office Complex project at the An 850 bay, 10 storey purpose-designed
annual CESA/Glenrand MIB Engineering parking structure, accommodated within a
Excellence Awards in August 2008. 25m height restriction zone.
14 000m of additional office space
Conceptual design, detailed design, constructed over the existing podium
preparation of construction documentation and structure.
construction monitoring for the following Conference and Banqueting facilities over
services: the existing Annexe accommodating 500
Structural design people.
Civil design
Wet services design RMB Merchant Place
Fire design This project comprised four free-standing office
Geotechnical design buildings and a multi-storey parkade. The
Facade design office building structures have been arranged in
such a way as to be serviced and secured by a
SA Reserve Bank head office common basement utilised for parking and
extensions allowing traffic-free pedestrian movement on
The South African Reserve Bank building is the the ground level. The four office buildings,
tallest building in the capital city, Tshwane. The varying between 5 and 22 storeys, amount to
building tower extends to 150m above street 30 000m, 4 500m, 9 500m and 18 000m of
level, whilst the basement reaches 25m below gross building area respectively. Basement
ground. The building was originally completed parking under these buildings amounts to 1 300
in 1988, with Aurecon as civil and structural bays. The nine-level multi-storey parkade (36
engineers. The original design made provision 000m) houses an additional 1 400 parking
for future vertical extensions over the podium bays, and is utilised solely for office parking.
and Annexe structures, which were
implemented in the Extension Project. Aurecon
was again appointed as civil and structural
engineers for this R180 million expansion.

The structural design of the buildings was


based on a principle of concrete frames over a
multi-level basement. The highly economical
structural floors consist of 220mm and 250mm
partially prestressed solid slabs on a column
grid of 8,4m x 8,4m governed by parking
The most difficult aspect of the new project was considerations in the basement.
to accommodate the provision of new covered
BUILDING PROJECTS MTN Innovation Centre - Phase 2 Structural Engineering
Civil Engineering
The recently completed Phase 2 component of
Geotechnical Engineering
the MTN Innovation Centre in Fairland,
Johannesburg, further enhances this high- Wet Services
technology development which will eventually Fire Design
consolidate the operations of South African Bahrain Financial Harbour, United
cellular operator, Mobile Telephone Networks
Arab Emirates
(MTN), onto a single site.
The building concept is that of a robust and In November 2002, Aurecon was appointed by
flexible building capable of accommodating Ahmed Abubaker Janahi Architects in the
future changes and churn, representing the Kingdom of Bahrain as Consulting Engineers
ever-changing dynamics of the end-user. The for the Feasibility and Urban Planning Study of
building is also designed with energy efficiency the proposed Bahrain Financial Harbour. This
in mind and is formally part of the green development was of unprecedented scale as a
building challenge, a worldwide collaboration financial investment project in the Kingdom of
project of the CSIR. Bahrain and one for which a wide range of
design resources and multi-disciplinary skills
were required.

Aurecons involvement in the project to date


incorporated a financial viability and urban
planning feasibility study including a desk
study, field investigations and first order cost
estimate report for the development. Aurecons
feasibility study focussed on context, area and
site planning, and brought together numerous
disciplines including urban planning,
architectural design and quantity surveying as
well as a full range of engineering skills.

Completed in a record period of just 18 months,


this fast-track project valued at some R350
million presented both the professional team
and contractor with various challenges, among
which the following:
Ensuring vibration-free piling for the
foundations to the superstructure
Completing the concrete structure within
eight months as this was critical to
ensuring overall project success
Handing over various portions of the
buildings to the end-user in a phased
manner to allow fit-out and occupation Aurecon secured further appointments on this
Completing the majority of the external project for the conceptual planning, preliminary
work in the rainy season design and feasibility stage and also for tender
Accommodating extensions to the scope documentation for the Twin Towers and
of work as the project proceeded. Financial Mall. The tender documentation was
completed and is based on detailed design and
Services provided: construct basis. Aurecon was responsible for
BUILDING PROJECTS the Structural, MEPD, Fire and Solid Waste association with local Ghanaian partner, Inter
documentation; while the Joint Venture City Hotels.
Partners executed the Mechanical and
Electrical work. The mall, with 19 700m lettable area,
Aurecon was subsequently contracted to accommodates retail, food and service outlets
provide design and supervision services for the ranging in size between 60m and 800m
external civil infrastructure, roads and bridges (excluding the anchors) and a 800 space car
of the entire BFH precinct. The estimated park. The designs incorporated traditional
construction value of this work was US$ 350 internal mall circulation with several interesting
million. vistas onto the dynamic food court, open
skylights and modern flush plastered ceiling
PriceWaterhouseCoopers Tshwane and tiled floors. State-of-the-art air
Office, South Africa conditioning, fire protection systems and
Aurecon was responsible for the bulk security ensures that this centre is world-class.
earthworks, civil engineering services A best practice approach has been utilised in
(including the slip lane design from Atterbury all aspects of the design. Although the bulk of
road for traffic access to the building), structural the technical documentation was done in South
engineering, stormwater design and bulk Africa by consultants, the client insisted that
services to the building as well as rational fire each consultant has a Joint Venture partner in
design. Ghana who was responsible for on-site
conditions.
This 11000m four storey office block was
designed to commercial office standards, using
reinforced concrete trough slabs for the office
block and solid post-tensioned un-waterproofed
parking decks. The building sits on a ventilated
semi-basement for parking. The structure is
founded conventionally on pad footings. All
paving on ground was designed with paving
block, including the basement parking area.
Challenges on the project were massive.
Accra Mall, Ghana Whenever possible, the architects have tried to
utilise local building materials, technology and
Spearheading the new retail trend in the
suppliers, but the bulk of materials had to be
Ghanaian capital, Accra, is the construction of
imported from afar as Egypt, Italy and South
the new 20 000m Accra Mall, the countrys first
Africa. Finding qualified and experienced
modern shopping centre. The mall, which
contractors also took some effort. Another
opened its doors in April 2007, is Ghanas
challenge was the fact that the mall is located
largest construction project to date and is one
in a seismic area and as such engineers have
of the largest and most modern malls in West
had to ensure that the detailed design
Africa.
encompassed all earthquake zone
requirements. Maintenance is an important
Aurecon was appointed as structural and civil
concern and all mechanical and electrical
engineers for the project and responsibilities
installations were designed to be as energy
included the design for mass earthworks,
and maintenance efficient as possible.
external bulk services and all access roads and
parking areas. Blue Ocean Park Resort, Mauritius
Aurecon was appointed to complete the full
The mall accommodates two South African
complement of engineering services design for
retailers, Shoprite Checkers and Game. It was
this new development in Balaclava Bay by
designed by architects Bentel Associates
Mirage Leisure & Development on the north-
International (BAI) and the developers were
western shore of Mauritius. The resort
South African based. CDC Capital Partners, in
BUILDING PROJECTS comprised a 193 key, five-star leisure deluxe apartments, townhouses and
development with sixteen three-storey room penthouses, directly linked to the five-star
blocks, two large pools, a private spa and kids Fairmont Palm Hotel and Resort. The
club complemented with restaurant and apartment units contain 1, 2, 3, 4, or 5
conference facilities. The total built area is bedrooms from 1 508 to 11 638 square feet.
about 12 500m on a site of some 67 000m Residents have access to an extensive range
located in Balaclava Bay on the north-western of services provided by the hotel, including a
shore of Mauritius. beach and health club, private beach,
Aurecons services included the following: swimming pool, children's playground,
Structural design restaurants and cafes, housekeeping and
Civil services design maintenance, maid and childcare services, as
Electrical engineering well as the nearby boutiques and restaurants of
HVAC services The Palm Golden Mile. The Fairmont Palm
Wet services Residence has North and South Wing
Fire Services and Gas supply apartment buildings and was developed by IFA
Hotels & Resorts.

Aurecon was appointed to do the fire safety


and systems design and construction
supervision for these services at both the
Fairmont Palm Residence and Hotel. Work on
the Hotel also included wet building services
design, stormwater reticulation design and
construction supervision of these services.

Projects on Palm Jumeirah, Dubai


Palm Jumeirah or The Palm, Jumeirah is an
artificial island constructed in Dubai by
Nakheel. The island is in the shape of a palm
tree. It consists of a trunk, a crown with 17
fronds, and a surrounding crescent island that
forms breakwater of 11km long. The Palm
extends 6.5km into the Persian Gulf. The island
was created by pouring sand fill onto the 10.5 Golden Mile apartment residences,
metre-deep seabed using bottom-dump Dubai
dredgers. More than 100 million cubic metres
The Golden Mile is a mixed-use Retail,
of sand and rock have been used to create
Restaurant and Residential Development
60km of beaches. Rocks weighing a total of 7
(covering 60 000m and including 860
million tons have been brought in from 16
apartments) located on the Western portion of
quarries. Calcareous sand, cemented into
the Trunk of the Palm Jumeirah. The Gold Mile
sandstone, was used for the reclamation.
Residences contain 10 waterfront buildings
with approximately 780 freehold apartments
Aurecon was involved in three projects on the
from one bedroom to penthouses and town
Palm Jumeirah, namely the Fairmont Palm
homes. It is a Joint Venture between Al
Residence, The Golden Mile Apartment
Nakheel and IFA Hotels & Resorts. Aurecon
Residences and the Fairmont Hotel.
was appointed to do the fire safety and
Fairmont Palm Residence, Palm systems design as well as the construction
Jumeirah, Dubai supervision for these services.

The Fairmont Palm Residence is located on the


trunk of the Palm Jumeirah, and contains 558
BUILDING PROJECTS Chris Hani Baragwaneth Hospital: University of South Africa, Pretoria
transactional advisor for the The first phase of this campus was started in
upgrading feasibility study and the early seventies. Aurecon has been the
possible PPP structural engineers for all the buildings but
CHBH has been described as the second one, as well as the civil engineers for most of
biggest hospital in the world. However, the the roads and parking areas. Buildings
hospital is in serious need of upgrading. This designed include: Academic I and II,
project entailed an investigation into the various Administration I and II, Library, Computer
options for meeting the clients needs, a Centre, Printing Facility and various Parking
detailed feasibility of the recommended option Structures. Of special note is the extensive
and, if proven feasible, the procurement of a use of coloured face concrete and pre-cast
new or refurbished facility through a PPP concrete facade panels.
(Public-Private Partnership).

The Transaction Advisor was required to


conduct a feasibility study and potential
procurement of the Chris Hani Baragwanath
Hospital through a Public-Private Partnership
(PPP) for the client in accordance with South
Africas National Treasurys PPP guidelines.
The Project was divided into three distinct
phases.
Phase 1 consisted of a Needs Analysis (a
thorough analysis of the clients needs for Crown Casino, Melbourne, Australia
this hospital) and a Solutions Option
This outstanding building features a 40-storey,
Analysis (an analysis of the various
five-star hotel positioned above two basement
options that will address the needs).
car parks and a podium structure incorporating
Phase 2 required a Project Due Diligence,
the casino itself. Due to the nature of the
Value Assessment and Procurement Plan
ground and presence of ground water, an
for the comprehensive Feasibility Study,
undrained approach to the basement design
which had to be prepared for submission
was taken allowing the natural ground water to
to National Treasury for Treasury
return to its original level around the basement
Authorisation I (TA I) in terms of the PPP
walls post construction. The project also
regulations issued under the Public
featured the first battered excavation in
Finance Management Act. This required a
Melbournes notorious Coode Island silt and
demonstration that the proposed PPP
development of a hybrid concrete/steel podium
arrangement would be affordable to
floor structure in Australia.
Government and that value for money, in
terms of the proposed risk allocations,
This project has won numerous awards from
was indicated.
the Property Council of Australia; the Property
Subject to receipt of TA I, the Transaction
Association of Consulting Engineers; and the
Advisor was required to assist in the
Institution of Engineers in Australia.
procurement of the PPP partner, Phase 3,
through a possible bidder pre-qualification Eureka Tower, Melbourne, Australia
process and the preparation of a Strategic
Once complete, this 90-storey tower will be the
Implementation Plan, draft Request for
tallest residential building in the southern
Proposals, an Evaluation System and a
hemisphere. Situated on the prestigious south
draft Contract, which were to be submitted
bank of the Yarra River, the structure requires
to National Treasury for Treasury
piles of up to 50 m in length to support the
Authorisation II (TA IIA).
tower through the soft, compressible silts
BUILDING PROJECTS typical to the site. The tower will also use the
inherent damping capacity of the large water
tanks at the top of the building to minimise
accelerations and residents perceptions of
movement.

Bridgewater Place, Leeds, United


Kingdom
Once complete, Bridgewater Place will
comprise a mixed commercial office and
residential development. A former car park site,
the new development will include 21,000 m2
office space, 158 apartments and 1,500 m2
retail and leisure accommodation. The
structural design comprises slender, flat slab,
post-tensioned floor plates supported on
reinforced concrete columns and cores.
Various residential towns, South Aurecon's role entailed the provision of a
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
Africa contract management and construction
monitoring service to the Ministry, and to
For the past 20 years, Aurecon was supply resident engineers. Aurecon was also
continuously involved in the planning, design responsible for doing the design review, as well
and construction supervision of the complete as some design work including a reservoir,
municipal and infrastructure services of seven water tower and landscaping and infrastructure
major residential townships in South Africa, as designs for Group Five. This included roads
well as various new residential developments in and stormwater, water, sanitation, and
the Middle East. Aurecon was involved in, and electricity. The water and sanitation design
assisted various clients from the inception services entailed designing approximately
stage, with planning, negotiations, agreements,
30km of sewers, a 2.1M treatment works, a
approval up to end of retention and
sewage pump station, approximately 22km of
maintenance, with release of guarantees. In
water pipes and a clear water pump station as
addition to the normal infrastructure
part of the water reticulation network.
engineering aspects, Aurecon also provided
extensive project management budget Viana Housing development, Angola
reporting and cost reconciliation services.
A housing development was being constructed
Aurecon continues to consult on residential
on this property. The development was taking
development projects and has developed this
place in stages and currently the development
field of business into a key service line.
comprises approximately 2 750 developed
Nova Vida development, Angola stands. It is proposed that a further
approximate 5 000 housing units will be
The project, valued at approximately $80
developed in the adjoining areas.
million, involved the design and construction of
1 600 flats (mostly four-storey buildings with
The aim of the project was to upgrade the level
four 3-bedroom flats per floor), 500 3-bedroom
of service available to the existing 2 750 stands
houses as well as total infrastructure, and 300
in Viana and where new services were installed
4-bedroom houses for the Ministry of Public
to include provision for future expansion or
Works, Angola. Group Five Housing and
allow for the planning for such expansions to
Projects completed the design and construction
be effected. Aurecon was appointed for the
of the buildings, using their Goldflex 800
civil engineering design and contract
Precast Housing System.
documentation of the following services:
Upgrading of the stormwater drainage and
control system
Protection against and prevention of
erosion
Extensions to the water supply system to
cater for the proposed high-rise residential
complexes
Provision of a sewer drainage system to
collect the overflow emanating from the
existing septic tanks
Upgrading and surfacing of main and
secondary roads in the area
Upgrading of existing water reticulation
Upgrading of existing electrical reticulation
Jakkalsfontein Coastal Resort,
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
Yzerfontein, Western Cape, South
Africa
This coastal resort on the West Coast consists
of 150 residential units concentrated in nodes
behind the primary coastal dunes. The rest of
the original farm is managed as a nature
reserve with horse trails and other features.
Aurecon was responsible for all civil and
structural aspects of the project. Great care
was taken to limit the impact of construction A number of innovative design solutions were
work on the flora and fauna. The project was implemented in order to optimise on the
awarded the 1993 EPPIC National Premium services design. Instead of compromising on
Award for Integrated Environmental safety standards in order to reduce service
Management. costs, the design team identified the key
service components and decided to ensure the
integrity of these. To realise savings in other
areas, a critical assessment of new
technologies was made and an innovative
approach to design was adopted whereby the
internal service delivery within blocks and at
collector street level were treated separately.
By accommodating functions such as fire
fighting and waste collection from the collector
streets, the services within residential blocks
could be scaled down, thereby saving costs
Delft Leiden housing project without having to reduce safety standards.
The Delft Leiden housing project was the Management of wind blown sand is one of the
largest housing project ever to be undertaken biggest challenges facing a designer in the
by the City of Cape Town on a turnkey project Cape Flats. This was achieved through various
basis. The project involved the development of measures such as hardening of the road
6 320 low cost housing units in Delft on the verges, placement of housing units close to the
Cape Flats. road edge and reducing the number of
catchpits, thereby limiting sand entering the
Aurecons involvement in the project included stormwater system. This was only possible
the design and site supervision for the site because of the design teams extensive
services as part of a consortium with another practical experience over many years regarding
engineering firm. Our work included 50% of stormwater management for conditions typical
the road, stormwater and sewer design and full to this area.
water reticulation. Full services to the value of
R30 million were installed in only seven The project received the Western Capes
months. Institute of Housing Project of the Year,
Developer of the Year and Best Local Authority
of the Year Awards while the City of Cape
Towns Mr Herman Steyn was awarded both
the Provincial and National Award as Housing
Person of the Year for his involvement in the
project.
Gardener Ross Golf and Country was designed with a serious commitment to
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
Estate, Tshwane, South Africa preservation of indigenous fauna and flora, with
limited memberships available to non-owners.
Aurecon was appointed as infrastructure The Golf Academy and Training Centre offer a
consultants for this prestigious US$55 million comprehensive range of lessons and clinics to
Gardener Ross Golf & Country Estate. suit all ages and golfing standards.
Situated in the Tshwane metropolitan area, this
development boasts the only Ernie Els- The contemporary chic architectural theme
signature golf course in Gauteng, as well as blends classic lines and themes with modern
one of the best club houses, a wellness centre, material and finishes. The 122 Gentleman
a convenience retail development and a large Bushveld Stands, an average of 8 723m in
number of exclusive residential dwellings. size, offer a feeling of privacy and of being in
the bush, whereas the avid golfers will
appreciate the intimate views of lush fairways
and greens offered by these 401 stands with an
average of 1 025m in size. The picturesque
village green with affordable units offers
residents a real sense of community with the
179 units (with an average size of 747m),
situated close to the Estate's Shops, Business
Centre, Chapel and Olive and Macadamia
orchards.
Work on the development commenced in
August 2004 and, going forward, will certainly Val de Vie Winelands Lifestyle
be a big boost for the local economy by Estate, South Africa
contributing to job creation in the Gauteng
region. Phase 1 of the development was This prestigious exclusive resort is situated on
completed in October 2005, while phases 2 the banks of the Berg River between Paarl and
and 3 were completed end of October 2006. Franschhoek in the Western Cape Province of
South Africa. It is surrounded by the
As part of the construction implementation Simonsberg and Drakenstein Mountains and
programme, Aurecon also conducted a CETA bordered by vineyards and orchards.
registered pilot programme encompassing
social training and HIV/AIDS education.

Euphoria Golf and Country Lifestyle


Estate, Naboomspruit, South Africa
The Euphoria Golf Estate is strategically
located 140km north of the economic hub of
Gauteng in the Waterberg region of Limpopo
Province, easily accessible from the N1
highway between Pretoria and Polokwane.
The malaria-free Waterberg region has been
Aurecon was appointed as principal civil,
identified as a major tourism attraction and
structural and electrical engineers. Aurecon
prized for its alluring combination of rolling hills,
also acted as the Health and Safety agent and
graceful valleys and grassland plains covered
was responsible for all contract management,
with pristine bushveld.
administration and site supervision duties for
this development.
Annika Sorenstam, number one female golfer
for the past five years, is the name behind this
The development includes two world-class polo
first lady's-signature golf course in South
fields, polo pavilion, stables, gym, wine cellar,
Africa. The 18-hole Championship Golf Course
luxury guesthouse, conference centre,
residential stands, equestrian centre and sports Aurecon was also responsible for full-time site
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
facilities. The project was completed by June inspection services. The value of the civil and
2007. electrical infrastructure work was approximately
US$4,5 million.
Erinvale Country Estate and Golf
Club: Somerset West, Western Cape, Paradyskloof Golf Estate,
South Africa Stellenbosch - Golf Estate, South
Erinvale Country Estate, where the 1996 World
Africa
Cup Golf tournament was played, consists of This proposed golf estate abuts the
an 18 hole golf course (designed by Gary Stellenbosch Mountains and surrounds the
Player), a clubhouse, a maintenance centre, Vriesenhof Wine Estate. Aurecon was part of
326 general residential stands, 100 group the team of developer and consultants who
housing stands and a hotel. made a successful bid to the Stellenbosch
Municipality to develop this prime piece of land
Aurecon was involved in the conceptual into a prestige golf estate. The development
planning, rezoning applications, traffic impact includes a 250 bed hotel, 18-hole
studies, geotechnical and geohydrological championship golf course and 500 residential
investigations, detailed design of roads, all civil opportunities. Aurecon acted as civil, structural
and electrical services, remedial work to and electrical consulting engineers for this
existing dams, sewage, irrigation and water project.
pump stations, stormwater drainage channels,
structural design of the clubhouse, electrical Fancourt Golf Estate Phase 1,
reticulation and full-time site inspections. George, Western Cape, South Africa
Fancourt Golf Estate consisted initially of a 27-
Erinvale has already established itself as a hole golf course (designed by Gary Player),
leading golf estate in South Africa. Aurecon clubhouse, maintenance centre, an initial 170
was also the civil and structural engineers for private lodges, a condominium with 18 units as
the Erinvale Lodge, a hotel on the site. This well as future residential stands. Aurecon was
comprised, inter alia, the renovation of existing the consulting engineer responsible for the
historical buildings and the construction of a planning, design and supervision of the civil
number of additional structures, parking areas and structural services at the estate.
and site services. Aurecons involvement included:
conceptual planning
Leopard Creek Country Club,
rezoning applications
Malelane, Mpumalanga, South Africa
overall site layouts for cost estimates
This project consists of an 18-hole golf course, traffic impact studies
clubhouse, sport facilities, maintenance centre negotiations with local authorities
and 250 residential stands adjoining the Kruger regarding future bulk service supply
National Park. Construction of this project was connections
completed in 1996. Aurecons involvement development of long-term strategies with
covers the full spectrum of civil, electrical, the local authorities regarding future
electronic, and structural engineering design access to the development, future water
and also includes the geotechnical supply and future sewage connections
investigations. geotechnical investigations
detailed design of roads, civil services,
parking areas, some dams on the golf
course, irrigation and sewage pump
stations, water channels and remedial
work to existing dams
structural design of the clubhouse, the Aurecon was involved in the restoration work,
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
residential units, golf cart bridges, low and was responsible for the design of the
water bridge and pipe bridges structural and external civil components of the
preliminary design of the proposed Health project.
and Leisure Centre
Pearl Valley Country Estate and
Gold Resort, South Africa
This prestigious upmarket resort is situated on
the banks of the Berg River between Paarl and
Franschhoek in the Western Cape Province of
South Africa. It is surrounded by the
Simonsberg and Drakenstein Mountains and
bordered by vineyards and orchards. Aurecon
was appointed as principal civil and structural
Pecanwood Estate, engineers for all the work including drafting of
Hartebeespoortdam, South Africa the tender documentation and doing contract
administration for the golf course. The
Aurecon was appointed for the design of the
development includes an 18-hole Jack Nicklaus
stormwater system of the whole estate. The
Signature golf course, luxury hotel, conference
development is situated on the banks of the
centre, resort lodges, residential erven,
Hartebeespoortdam. The Jack Niklaus
equestrian centre, sports facilities, waste water
signature golf course was excavated mostly
treatment works and reservoirs.
below the natural ground level to improve the
aesthetics and to create fill material for the
residential platforms adjacent to the dam.

Aurecon was responsible for the integration of


the stormwater for both the golf course and The golf course turf is irrigated by a state-of-
residential areas by using the lower lying golf the-art irrigation system utilising three variable
course as retention areas to ensure an frequency drive pumps and a pressure
economical design and at the same time to maintenance or jockey pump controlled by
prevent the residential areas from flooding. means of pressure switches and magnetic flow
Grande Roche Hotel, Paarl, South meters. The water, which is abstracted from
Africa the Berg River system, gravitates through a
series of lakes into the irrigation lake. A central
This luxury hotel comprises 29 double bedroom control computer and satellite field controllers
suites, restaurants, a conference centre and are programmed to open valves as required.
recreational facilities. An open air stage and Records can be drawn and settings and
amphitheatre are attached to the conference sequencing changed from the central
building. computer.
Some units were newly built but the majority of
the hotel complex is accommodated in the Aurecon provided the following other services:
historic farmstead buildings, which were fully All civil infrastructure design work which
restored. The hotel opened in 1992 and is now include bulk earthworks for the golf course
a declared national monument. and housing platforms, feature lakes,
roads, stormwater, sewer, water, potable
water reservoir, wastewater treatment wastewater treatment works. The civil services
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
works and a regional sewage pumping contracts, as well as the golf course, club
station house and main entrance facility were
All structural designs completed in 2006. The water treatment works
Contract administration for all civil and were completed in October 2005.
structural work, including the golf course
construction

Pinnacle Point Beach and Golf


Resort, Mossel Bay, South Africa
Set on the edge of the Indian Ocean, Pinnacle
Point Beach and Golf Resort is situated at the
gateway to the Garden Route of South Africa. It
consists of four hundred hectares of prime
land, of which one hundred hectares comprise
the nature reserve. The resort is home to
Blue Valley Golf and Country Estate
indigenous wildlife, birdlife and 264 varieties of and Samrand Interchange, Gauteng,
fynbos. Pinnacle Point consists of an 18-hole South Africa
championship golf course incorporating three This US$17 million plus, high-security
separate residential components - 120 golf residential development is located on the
lodges, 114 golf villas and 406 freehold erven. southern boundary of the Centurion municipal
area, just off the N1 Highway between Midrand
and Pretoria, South Africa. Set in highveld
grassland with the Rietspruit River running
through the property, the estate consists of an
18-hole Gary Player-designed championship
golf course, a clubhouse, some 800 residential
stands, a number of higher-density residential
All developments are sensitively integrated with cluster stands and an office park comprising
the surrounding nature reserve. The golf some 38 stands. The total infrastructure
course includes dramatic cliffside holes and project amounted to a value of approximately
was designed by renowned golf architect Peter US$7.5 million. The innovative use of road
Matcovitch, who describes this course as "the layouts, stormwater channel systems and
most dramatic golf course site I've ever street furniture contributes to the establishment
encountered anywhere in the world!" of the tranquil environment, with maximum use
being made of the Rietspruit River, which runs
The development also consists of a 40-room through the property.
hotel, casino and a wellness centre with 120
golf lodges in Cape Cod style, and 114 The development includes a total of six dams
superbly designed golf villas. and two wetlands which were created with
Aurecon was appointed as principal civil, minimal disturbance to the natural ecology and
structural and electrical engineers for the entire flood lines. The dams have a storage capacity
development. This included the drafting of the of some 120 000m, and were designed so as
tender documentation and doing contract not to disrupt the natural flow of the river.
administration for the golf course. The Already, bird life and other small animal
appointment included the civil and structural species are starting to re-establish in the newly
engineering design for the golf course and created habitat.
clubhouse, 406 residential erven, 96 Fynbos
Village Lodges, 130 Golf Villas and hotel, a Aurecon was also responsible for the new
Casino and 120 Casino Lodges. Aurecon was interchange which had to be provided on the
also responsible for the design of a 3,7M N1 freeway. The layout combined a diamond
interchange around the existing Shell Water supply, storage, pumping,
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
Commercial City. Both the six-lane freeway reticulation, possibly desalination
and the Service Station had to be 100% Sewage reticulation, pumping, treatment,
operational during and after construction. disposal of sludge
Samrand Avenue crosses the Highway at a low Irrigation with TSE, storage, pumping,
point. reticulation, fire hydrant network
Solid waste collection, disposal
Due to visibility requirements of the Ultra City methodology
Complex, Samrand Avenue had to cross under Electricity transmission, substations,
the freeway, resulting in complex drainage distribution
problems, which had to be solved during the Transportation planning
design. Unique jacked bridge structures were Communication, IT data systems, SCADA,
designed for the highway and the accesses to other ULV and fibre optic systems
the premises.
District cooling feasibility study, system
Master planning for Palm Deira, network
Dubai Services coordination, main service
culverts
The Palm Deira is the largest of the three Palm
Islands (Palm Jumeirah, Palm Jebel Ali and Golf City Development, Dubailand,
Palm Deira). It is located on the Deira coastal Dubai, UAE
area of the emirate of Dubai, in the United Arab
Dubailand is an innovative, awe-inspiring
Emirates (UAE). The unique man-made palm-
development that represents an integral part of
shaped island consists of a trunk, a crown with
Dubais bold vision to become the tourism,
41 fronds, and a surrounding crescent island
leisure and entertainment capital of the region.
that forms a water-breaker.
This development will comprises over 200
individual projects, one of which is Golf City.
Golf City is a unique, 500 hectares, golf course
and resort community development in
Dubailand.

Madinat Jumeirah Resort, Dubai,


UAE
The internationally acclaimed Madinat
Jumeirah Resort in Dubai is Aurecons most
recently completed example of a large-scale
The Palm Deira covers 14km (8.7 miles) in building services project in the Gulf. Aurecon
length and 8.5km (5.3 miles) in width and has was involved in planning, design and
an area of 80km (861 million square feet). It construction supervision of:
consists of residential property, marinas, building wet services including water
shopping malls, sports facilities and clubs. The storage, treatment, pumping and site
residential area is located on the fronds and reticulation
contains 8 000 two-storey town houses in three
passive and active fire protection systems
distinct styles - Premier Villas, Grand Villas and
civil infrastructure and civil structures
Vista Town Homes.
gas storage and reticulation
Aurecon was responsible for the master
road works
planning of:
water canals and bridges
Roads, highways, bridges, tunnels,
interchanges, street lighting marine works and studies in collaboration
with a specialist coastal engineering
Bulk earthworks, final levels, stormwater
consultancy
system
Seerah Lands planned population of 200 000
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
would comprise facilities to accommodate 100
000 short-term visitors or pilgrims. Unique
transportation requirements (moving 100 000
people between Seerah Land and the Holy
Mosque five times a day) led to multi-modal,
high capacity solutions.

This AED 1.6 billion flagship development was


opened in phases during 2003 and 2004 and is
operated by Jumeirah International. The Al Bundoquiya Island Development
development managers were Mirage Mille near Jeddah, Kingdom of Saudi
Leisure & Development, acting on behalf of the Arabia
client, His Highness General Sheikh
Mohammed Bin Rashid, Crown Prince of Aurecon recently completed the conceptual
Dubai. design phase for a 21 million square metre,
mixed-use development along the Red Sea
Burj Dubai Old Town Residential: coast, near Jeddah. Aurecons involvement
Business Hotels, Dubai, UAE covered all technical disciplines, including
marine, traffic and environmental studies, bulk
The Old Town Residential development is part
services provision and internal service
of the Burj Dubai precinct, which includes the
reticulations and roads. Cost modelling and
planned tallest building in the world. The
feasibility studies were also being undertaken
residential development includes two hotels, an
by Aurecon.
eight storey, four star, 200 key, 24 000m hotel
with a retail component and a six storey three
star 186 key, 18 000m hotel. Aurecon was
appointed for the Fire and Life Safety and Wet,
Gas and Fire Systems.

Master planning of a proposed new


township development: traffic and
infrastructure, Medina, Kingdom of
Saudi Arabia Al Khor Beach Park and Bin Ghanim
Aurecon was appointed for the pre-feasibility Island Development, Qatar
master planning of transportation and With the opening up of Qatar to foreigners over
infrastructure services for Seerah Land, a the last five years and with the discovery of the
proposed township development in Medina, large gas fields, the Emir of Qatar and his
Kingdom of Saudi Arabia. Medina is the second government will be looking at developments for
holiest city of Islam, after Mecca (Makkah). Like the influx of foreign workers and also tourism.
Mecca, the city of Medina only permits Muslims One such development is the Al Khor Beach
to enter. Both cities' numerous mosques are Park and Bin Ghanim Island Development, 30
the destination for large numbers of Muslims on minutes drive from Doha and approximately 12
their annual pilgrimage. Hundreds of thousands to 15km from the gas fields.
of Muslims come to Medina annually to worship
at these mosques in a unified celebration.
This is 2 000 acres (just under 1 000 hectares) degenerated pockets of land along the coastal
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
of prime property next to a lagoon on the East road that runs parallel to the Atlantic Ocean in
coast flowing into the Gulf. The development a south westerly direction. The proposed total
consisted of 10 districts with two golf courses gross leasable area of development is more
one in district 3 and one in district 6. Aurecon than two million square metres.
was approached to do a full services report for
this development, which included traffic Aurecon was tasked with providing the marine,
studies, road layouts, bulk water supply, water traffic, roads and infrastructure engineering
storage, irrigation, stormwater drainages, input to the urban planners in order to ensure
sewage disposal, gas supply reticulation, that the proposed development is protected
electricity supply and recommendations for air from the ocean, that proper access is provided
conditioning such as district cooling. and that the development is well serviced by all
engineering services. The appointment
Lemnos Womens World included initial studies and investigations into
Development, Dubailand, Dubai marine erosion factors in order to establish safe
Dubailand is a new inland urban node within setback lines and edge protection measures,
the metropolitan area of Dubai. Lemnos traffic analysis through data gathering, road
Womens World is situated on a 153 000m site network surveys and traffic modelling,
within the Dubailand precinct and includes a preliminary road geometry designs and bulk
200 bedroom hotel, 200 seat conference centre infrastructure demand calculations and existing
and banqueting facilities, 20 000m retail, clinic bulk infrastructure capacity assessments.
/ hospital 7 500m, and a health spa 5 000m.
Engineering Services for Saadiyat
(Total construction area 88 850m). This
facility is envisaged for the private use of
Beach Resort, Saadiyat Island, Abu
women in accordance with the Moslem belief. Dhabi
The client, TDIC, has identified a unique
opportunity to develop a world-class resort on
the North Beach site of Saadiyat Island. The
development has been benchmarked to the St
Regis Hotel Monarch Beach in California
USA.

Aurecon has done a preliminary services report


for the development and should be appointed
as the infrastructural, civil and structural
engineers upon approval of the project.

Master planning and cost estimates The project broadly consists of the following
for the Rabat Saphira Corniche components: A hotel complex with 400 keys,
development, Morocco food and beverage facilities, a spa, beach club,
beach facing restaurant, banqueting facilities,
Aurecon was appointed as Northpoints sub-
conferencing facilities and other five-star
consultants on the Rabat Saphira Corniche
entertainment facilities. There are serviced
Development Master planning project. The
apartments (220 keys) and related public
developer and client is the Dubai-based
circulation between the various components.
company Emaar, represented by their
There are 30 upmarket luxury villas on-site with
Moroccan branch. The development essentially
an additional 75 villas on an adjacent site.
entails the urban master planning of the entire
11km of Rabats south-western coastline. The
area currently consists of 300ha of open and
Kelvin Grove Urban Village, open space areas. The value of services was
ESTATES PROJECTS
TOWNSHIPS AND DEVELOPMENT
Brisbane, Australia A$1 billion and the project was completed in
2008.
Kelvin Grove is Australias first masterplanned,
mixed-use development, integrating education,
residential, business, cultural and leisure
activities in an inner-city environment.

A joint venture between the Queensland


Government Department of Housing and
Queensland University of Technology, the
Village is an integrated community, using the
natural environment and sustainable resources.

As Principal Consultant, Aurecon was


responsible for advancing the masterplan
through to a local plan and producing the
design and documentation for the site.

In conjunction with the Department of Housing


and Brisbane City Council, the plan
endeavoured to create a mixed use/residential
precinct for retail, commercial, university
functions and accommodation with projects like
QUTs Creative Industry (a facility for students
research and training for start-up organisations
as well as for public attendance); merge social
with recreation, study with work and play; and
ultimately be open to a wide sector of the
community, including students, young
professionals, families and retirees. The project
was completed during 2003 and has won
various awards from the Association of
Consulting Engineers, Australia.

Darwin City Waterfront Stage 1


Marine & Community Infrastructure,
Darwin, Australia
The Darwin City Waterfront project is a
proposed development of the Kitchener Bay
area at the end of the Darwin CBD peninsula. It
is being delivered as a private-public-
partnership project by the Northern Territory
Government. The Waterfront project will
include the Darwin Convention & Exhibition
Centre, complementary hospitality, retail and
tourism facilities, residential developments,
commercial developments and community
infrastructure including a major water/pool
feature, marine infrastructure including a sea
wall and full waterfront access for public and
Contract Administration and Site
Municipal infrastructure for Coega
INDUSTRIAL PROJECTS Monitoring
Industrial Zone 1, South Africa SMME Work packages and Job Creation
The Coega Industrial Development Zone (IDZ) Risk Assessments and ISO 9002 Quality
is South Africas premier location for new Management System
industrial investments. Located within the
Nelson Mandela Metropolitan Municipality, the Bahrain Financial Harbour municipal
initiative is a multi-billion dollar industrial services, Bahrain
development complex covering 28 000 acres The Bahrain Financial Harbour is a financial
(11 000 hectares) and includes a deepwater sector-driven office development with a large
port. The project aims to position South Africa residential component and with conveniently
as a platform for global exports by attracting located retail and restaurant areas. It is located
foreign and local investments in manufacturing on reclaimed land along King Faisal Highway in
industries. Manama, opposite and within walking distance
of the city centre. Manama is the capital city of
the Kingdom of Bahrain Island, located in the
South Eastern corner of the Arabian Gulf.

Aurecon was appointed for the master


planning, detailed design, preparation of tender
documents as well as construction supervision
for the municipal services infrastructure for the
whole development. The infrastructure detailed
design comprised:
Four bridge structures of which the
longest is 120m
An irrigation network including pump
station and reservoir
A water distribution network
The Aurecon/Izizwe/Nzuza Joint Venture was An electrical distribution network including
appointed as Engineer for the feasibility, design substations
and contract administration of municipal A road network
services for industrial erven of Zone 1 (Port A stormwater drainage system
Cluster) in the IDZ. A sewerage drainage system including
wastewater treatment works and pump
Zone 1 comprised 440ha of land and the stations.
services lengths (roads, water) are some 33km
distance each. Phase 1 comprised the initial
bulk infrastructure with Stormwater detention
ponds, Sewer pump stations, Main access
roads, Traffic circles, Electrical substations and
Water main network.
Noi Bai export processing zone,
Aurecon provided the following services:
Vietnam
Feasibility Investigation, Preliminary
Design and Phasing Aurecon was appointed to assist the Noi Bai
Detailed Design and Construction Development Corporation in developing an
Drawings export processing zone at the Noi Bai
Tender documentation and Adjudication International Airport near Han Noi in Vietnam.
based on a Preferential Procurement Aurecon was involved in the project from the
Policy stage where liaison with local authorities
INDUSTRIAL PROJECTS regarding a service and operating agreement Geotechnical investigations
took place, through to the detailed design of Construction supervision
civil, structural, electrical and mechanical
engineering works. The project also entailed Ha Tikoe industrial estate, Lesotho
bulk earthworks and all network facilities, Aurecon was appointed by the Lesotho
including roads, stormwater, domestic water, National Development Corporation (LNDC) to
sewerage, electricity, telecommunications, fire provide predevelopment services for a portion
protection and internal computer of land of approximately 80ha, adjacent to the
communication. The zone consists inter alia of Maseru bypass road. Aurecon was responsible
a 100ha industrial security zone, customer and for developing this land into 91 serviced
administration facilities, security container yard, industrial plots of various sizes. The
shuttle service, sewage treatment plant and appointment included the drafting of a
electrical substation and support facilities such subdivision layout, Environmental Impact
as shops, garages and access roads. The site Assessment, as well as the design of roads
is located in an area previously covered with (approximately 5.5km), stormwater drainage,
rice paddies and the ground consists of 2700kl water reservoir, water and sewer mains,
extremely clayey silt that necessitates water and sewer reticulation,
extensive geotechnical engineering designs for telecommunications and bulk electricity supply.
each aspect of the project.
Services provided:
Preliminary Report Stage
Feasibility Study
Engineering Design Study
Tender Stage
Construction Study
Completion Study
Post-construction Study

Mohales Hoek industrial estate


infrastructure
Shell field logistics bases
Aurecon was appointed to assist the Lesotho
Aurecon was appointed by Murray & Roberts
National Development Corporation in providing
and Prodeco for the detailed design of all
Infrastructure to its newly built industrial factory
architectural, structural, MEP and municipal
shells. Aurecons involvement came about as
and civil infrastructure for three fully self-
a rescue effort whereby a previous consultant
sufficient logistic centres for Shell in Nigeria.
had been terminated. This meant that the
Each centre consists of a three-storey
project had to be fast-tracked in order to meet
accommodation building and security building,
the original completion date. The first stage
double-storey office and single-storey
involved the review of the completed designs
recreation building, workshop and generator
and tender drawings, leading to re-design of
buildings as well as its own water purification
most of the works. The works included
plant, wastewater treatment works and power
surfaced access roads within the estate, an all
generation plant. Detailed specifications for
weather gravel road along the outside
subcontract works were provided as part of the
perimeter of the estate with a reinforced
scope of service.
concrete mini bridge; a dedicated water supply
Services provided:
pipeline for the estate and internal reticulation;
Structural engineering
domestic and industrial sewer pipelines and
Civil engineering improvement of stormwater infrastructure.
Municipal services design The project is located north of Mohales Hoek
HVAC services about 2km outside the CBD.
Electrical services
INDUSTRIAL PROJECTS Several additional works were requested by the Century Business Park and Gateway
client as the project progressed and thus the Industrial Park, Gauteng, SA
completion date was revised.
Services provided: Aurecon was appointed as consulting
Review of design infrastructure engineers for the development of
Detailed re-design Gateway Industrial Park and Century Business
Specifications Park adjacent to the N1 freeway between
Construction supervision Johannesburg and Pretoria, consisting of 95
industrial stands and 12 business stands.
Samrand mixed development site,
Gauteng, South Africa
Aurecon was appointed by the Malaysian
developer Samrand to assist in the planning,
design and construction supervision of a 700ha
mixed development in Centurion, South Africa.
The site is situated north of the premises of the
Development Bank of South Africa, alongside
the N1 highway. Apart from all geotechnical
investigations and design of conventional
municipal services, Aurecon also carried out The complete spectrum of engineering services
extensive traffic surveys and traffic engineering was provided, including the planning, design
studies. and installation supervision of external link
services, project management, as well as
financial auditing and reporting. A large portion
of the township is underlain with dolomitic
ground conditions and extensive geotechnical
investigations were done to provide the
optimum civil designs.

The final development comprised the following: The development included the design and
Light industrial and commercial facilities construction supervision of an off-ramp from
(258ha) the N1 freeway, one of the busiest highways in
Office and commercial facilities (19ha) Africa, currently transporting approximately 19
Small-scale light industrial and 000 vehicles a day.
commercial facilities (39ha)
Residential golf estate (188ha) The external services provision included:
Exhibition centre (40ha) A complete traffic impact study for the
Service station (5ha) region and off-ramp
Community centre (4ha) Bulk water Supply
Retail (14ha) Outfall Sewer System
Hotel (2ha) Electrical substation dedicated for the
Flagship building (1ha) development
Open space (70ha) Stormwater master plan for the region
Environmental impact assessment
Also included in the project was the Comprehensive geotechnical report for
construction of a new interchange from the N1 the complete development area
freeway. Aurecon was also appointed for, inter
alia, the detailed design and construction Aurecon provided the following services:
supervision of the new interchange. Planning and feasibility study
Engineering design
INDUSTRIAL PROJECTS Installation supervision of external link of valve, equipment and instrumentation
services schedules.
Project management The pipeline and all associated equipment
Financial auditing have been designed in accordance to the
Reporting relevant and applicable Sasol, SABS, ASME,
Construction supervision API and other International specifications.

The basic engineering design of the Description of services provided:


860km Mozambique to Secunda Project Management
natural gas pipeline for Sasol Process Design
Aurecon, in association with Worley, was Mechanical Design
appointed for the basic engineering design and Electrical Design
preparation of line pipe procurement and Drafting Services
construction RFQ documentation for the HAZOP Facilitation
Mozambique to Secunda Natural Gas Pipeline Documentation Services
Project.
The Project further included the managing of The basic engineering design of the
third-party Contracts including the Demining, Secunda in-plant piping from the
EIA, Route Survey and Servitude negotiation pressure protection station (PPS) up
and ROW in ROM. to unit 42 as part of the Mozambique
The approximate length of the pipeline is to Secunda natural gas pipeline
860km (340km in RSA and 520km in project for Sasol
Mozambique). The pipeline will be a 26
(600mm) diameter continuous welded line with Aurecon, in association with Worley, was
a design pressure rating of ANSI 900 (MAOP of appointed for the basic engineering design for
12,6 Mpag). the Secunda In-Plant Pipeline from the
The project included the compiling of P&IDs, Pressure Protection Station (PPS), situated in
Route alignment drawings, GA drawings, Site the secondary area, up to Unit 42, situated in
Layout Plans, various Reports, Design and the primary area of the Sasol factory at
Control Philosophies and also a HAZOP study Secunda, South Africa, as part of the
and Report. Mozambique to Secunda Natural Gas Project.
The In-Plant piping comprised of approximately
4km of ANSI 300, 600mm-diameter continuous
welded pipe which conveys the gas from the
PPS to Unit 42 with two take-off points inside
the factory along the route and a connection to
the factory flare.

The project included the compiling of P&IDs


and Isometric pipe route drawings.
The project further included the sizing of the
pipe, the material selection and specification of
the In-Plant pipes. The In-Plant piping has
been designed in accordance to the relevant
and applicable SASOL, National and
International specifications.

Description of Services Provided:


The project further included the sizing of the
Mechanical Design
pipeline and all the associated valves and
Drafting Services
equipment, the material selections, technical
Documentation Services
specifications, data sheets and the compilation
INDUSTRIAL PROJECTS ALBA coke calcining plant: Bahrain, certain Pachuca walkways and conveyor gantry
Persian Gulf structures to the Buffelsfontein Gold Mine. The
purposes of the report was to re-evaluate the
Aurecon was involved in the construction of a condition of certain structures in the above
green coke calcining facility and a seawater areas by means of visual inspection with a view
desalination plant in Bahrain (year 2000). The to identifying those elements that, according to
plant is situated on reclaimed land on the island our opinion and experience, needed remedial
of Sitra, near Bahrains main island, and is work to eliminate the risk of collapse, and to
designed to produce 450 000 tons of calcined extend the safe service life of the elements and
coke a year. Green coke refers to the solid the structures they form part of.
substance that remains once coal gas and coal
tar have been extracted from coal. The green
coke is then heated to remove all water and
impurities, leaving an end product, white coke
or graphite, which is used as a catalyst in the
manufacture of aluminium. The waste heat
generated by this process will be used to
produce desalinated seawater at a rate of
43M a day, for export to the Bahrain public
water network.

Aurecon has also been involved in the project, Woolworths Distribution Centre:
designing some extremely challenging Cape Town, South Africa
structures, among which, a group of cantilever
This 28 000m facility serves as the Regional
retaining walls tapering to a height of 23m for
Distribution Centre for Woolworths, a major
the Green Coke Storage Building. Aurecon
South African retailer. Aurecon provided
has also been involved in the detailed design of
structural and civil engineering input for the
the Potable Water Tank Foundation. In
complex.
redesigning the aforementioned, Aurecon
effected a saving through value engineering.
The buildings are conventional steel structures
The group was subsequently appointed to
with freezer rooms, chilled areas, peri-ambient
assist with the detailed design of the
rack storage areas, clothing stores and tray-
desalination plant foundations and the
wash areas. The office portion is a
seawater outfall, and the redesign of the four
conventional reinforced concrete structure.
calcined coke silos. A numerical analysis of a
The floors vary from epoxy treated areas for
limited part of the building structure was
food preparation to conventional power floated
performed using the finite element programme
concrete, with and without surface hardeners.
Pafec. The dynamic analysis calculated the
Racking aisles are wide-bay with rack heights
natural frequencies and mode shapes, and the
limited to 10m.
steady state response was calculated using a
range of forcing frequencies. Woolworths Distribution Centre:
Hartebeestfontein Gold Mine: No. 2 Gauteng, South Africa
shaft gold, acid and south plants as This new 87 000m Gauteng Distribution
well as portions of Buffelsfontein Centre for Woolworths will serve the entire
plant for Durban Roodepoort Deep, country outside the Western and Eastern Cape.
Limited (Woolworths is a major South African retailer
focussed predominantly on food and textiles.)
Structural evaluation report of numerous Aurecon is the structural, civil, geotechnical
structures to the No. 2 Shaft, Gold, Acid and and transportation engineers for the project. A
South Plant at the Hartebeestfontein Gold major earthworks contract is needed to create
Mine. The report includes an overview of a level platform 1,0km long. The main building
INDUSTRIAL PROJECTS has concrete columns and a structural steel projects. Aurecon was appointed to design the
roof with clear internal spans of 40m. Wide structures with a dimension of approximately
racking aisles and a 12,5m racking height are 35 x 26m and a height of 25m. The design
being used with FM2 floor tolerances as per included all structural steelwork components of
Concrete Society TR 34. Freezer room areas, the predominantly steel framed structure. The
chilled areas, peri-ambient and ambient design included support trestles, supporting
storage areas are being provided as well as a ducting towards and away from the buildings,
tray-wash area. External aprons are a the supporting structure for a 600t silo, and an
combination of concrete surface beds and approximately 55m high stack.
interlocking pavers.

Nasionale Pers printing facility,


Johannesburg, South Africa
Scope of Work: Structural Engineering design Atlantis Witzands, hospital and
and supervision, external works. Melkbos pump stations, Cape Town,
South Africa
The Printing Press facility features a Paper
Store, Press Hall, Mail Room and office area. Services performed for the Atlantis Witzands
External steel portal members were required in and Hospital Pump Stations consisted of
the Press Hall to achieve the headroom dynamic and static analyses of pump and
requirements within the height restraints of the motor bases. Analyses of the pump and motor
site. The Press Hall features 40t and 5t footings were completed for the pump-motor
overhead cranes. Paper delivery and dispatch combinations envisaged by the client. These
takes place under 10m and 8m cantilever combinations for the Atlantis Witzands Pump
canopies. The Printing Press is installed on a Station are as follows:
reinforced concrete press table structure WL-200-6 pump and FDI-3710 motor (575
constructed to high tolerance requirements. A kW)
WL-200-4 pump and FDI-3709 motor (410
dynamic analysis was performed on the 45m
kW)
long press table.
The results of analyses were evaluated against
vibration standards to obtain acceptable
service levels. Large horizontal pipe forces
played an important role in the sizing of the
elements. For the Melkbos Pump Station, a
transformer plinth for two 1MVA transformers,
and a pump and motor footing for a 300kW 4-
pole motor with a KSB Omega 300-435A pump
Alusaf Hillside and Bayside gas were designed. Similar dynamic and static
treatment centres, Richards Bay, analyses, as for the Atlantis Witzands project,
South Africa were performed for the pump and motor
footings. Other design work included a 12m
Scope of work: high steel radio mast inclusive of concrete
Structural Engineering design and base.
supervision.

Gas treatment centres formed part of the works


for the Alusaf Hillside and Bayside smelter
INDUSTRIAL PROJECTS Iscor, Richards Bay smelter feed 150mm thick reinforced concrete roof dome,
conveyor, South Africa rising 5,28m, supports a 14t internal stacking
conveyor and a 30t external feeder conveyor. A
A structural steel design for the conveyor 4m wide x 3m high access door was provided
support structure was previously performed by for emergency loading operations. A 3,3 x 3,3m
other consultants but the client had since reclaiming tunnel was positioned in the centre
changed certain design parameters and of the storage facility. One of the design
requested an audit on the static and dynamic parameters was an asymmetric loading on the
design. Spans of the conveyor gantries varied wall. Due to this loading condition and the
from 18 to 35m, and the evaluation included a density of the material, a 3D finite element
21m high take-up tower and trestles. A static analysis was carried out to determine wall
load check was performed, which confirmed stresses and deflections.
that the design was acceptable. A dynamic
analysis (using the software PROKON) was Izone Business Park, Rolleston, New
also carried out to evaluate the dynamic effect Zealand
of the conveyor belt. Natural frequencies
The Izone business development is an initiative
calculated ranged from 2.2Hz to 8.4Hz for
of the Selwyn District Council to provide an
different span configurations.
employment centre in the district, in close
Foschini carton store, Cape Town, proximity to the fastest-growing residential area
South Africa in the district (Rolleston).

The 2 400m warehouse has an internal clear Aurecon was initially engaged to assist with the
height of 15m beneath the trusses with no rezoning of the rural site purchased by Selwyn
internal support columns. Four 2.5m girders District Council to enable the business park to
spanning 35m were used to support the become a reality. Following the successful
secondary arched trusses, which have a span rezoning of the property Aurecon was engaged
of 9m. The aisles were constructed to super to gain all necessary consents to enable the
flat standards with levels along the wheel site to be developed.
tracks measured to an accuracy of 0.1mm.
The racking is 15m high. These have included various subdivision, land
use and discharge consents. We completed all
survey and design tasks to enable
development blocks to be created. Throughout
the project Aurecon has carried out the project
management of the zoning and land
development components of the project. The
Selwyn District Councils foresight has been
rewarded with a high take-up rate of property
within the development which in turn is
generating local employment opportunities for
Ilmenite storage and reclaiming residents.
facility, Empangeni, KwaZulu-Natal,
South Africa
Aurecon was subcontracted by Eskom
Materials handling to design a structure to store
27 000t dry ilmenite. Ilmenite is a heavy metal
with a density of 3ton/m, that is used as a
base ingredient to give materials a white
colour. The structure proposed was a
prestressed cylindrical concrete wall with a
diameter of 34,5m and wall height of 17m. The
AIRPORT PROJECTS Extensions and upgrading of the the landside and airside facilities proved to be a
international terminals at OR Tambo challenging task but was carried out
International Airport, South Africa successfully. Aurecon was responsible for the
structural support work for the baggage
The growth in international traffic required that handling system in the double basement, the
the International Terminals of OR Tambo atrium roof lights, all the faade steelwork, and
International Airport be upgraded. The project the wet services within the central terminal
started in 1996 with the upgrading and building. Additionally, Aurecon was also
extension by some 75m to the north of the responsible for the HVAC design up to the
existing terminal building. This entailed the tender stage. High priority was given
construction of a basement, arrivals and throughout to keep the airport a neat and safe
departure levels, mezzanine levels and roof environment in order for the public not to
offices as well as the addition of three holding experience it as a construction site.
lounge nodes that extended some 40m onto
the airside apron. During the full duration of Kruger Mpumalanga International
the construction works, the terminal was kept Airport, South Africa
operational and all tenants had to be Construction of the airport started in May 2001
accommodated. A baggage sorter was and was completed in July 2002. The airport is
installed as well as 102 check-in desks with located in mountainous terrain and massive
three new baggage carousels in the arrivals earthworks have been undertaken. Fill heights
hall. of 22m and cuts of 17m in height characterised
the airport upon completion. The facilities
provided at the airport included a CFR station,
terminal building, general aviation area, hotel
and vehicle parking area. The airport has a
concrete apron that can accommodate three
wide-bodied aircraft; while water and sewerage
treatment is to be done on-site. Aurecon will
also be responsible for construction supervision
This project was later extended to the south by in terms of provision of three full-time resident
demolishing the old existing domestic terminal engineers and a complete engineering
building and replacing it with a new central materials laboratory located on-site.
terminal building some 225m long by 70m wide
with a double basement for baggage handling
and six floor levels above.

Services:
Planning of all airport infrastructure
The first part of the project, ie the extension to Value engineering exercises for private
the north and onto the apron, was completed developer to ensure optimum design
successfully within time and budget despite the Pavement design
changing nature of the client requirements. A
Airside infrastructure geometric design
large portion of the works included a retail
Access road and parking area design
component with changing commercial tenant
Bulk services design
requirements that had to be accommodated up
Geotechnical design for earthworks
to a very late stage. The planning of the
internal operations during the refurbishment of Terminal building services design
AIRPORT PROJECTS Preliminary design and feasibility A structural column grid of 8,5m x 7,5m was
study for a cargo centre at Entebbe chosen as a result of arker and was recessed
International Airport, Uganda 750mm into the parking bay to provide a more
comfortable turning circle.
Aurecon, in association with SAA Cargo and
PA Kagimu & Partners, was appointed to A 220mm thick post-tensioned flat slab, with
conduct a preliminary design and feasibility tapered circular column heads on internal
study for the new cargo centre at Entebbe columns only, was chosen for the typical
International Airport, Uganda. After cargo parking suspended floors due to the following
volumes had been forecasted, facility advantages:
requirements were established, both in terms of cost-efficient
size and number. The preliminary design earlier removal of support work ie fast-
consisted of the planning and design of the track construction
following elements: thinner slab depths.
Cargo Apron and Taxiways
Dry Cargo Building (for perishables as As there was a severe shortage of parking, the
well as dry goods) first floor slab was designed as a prop-free
Truck offloading area, vehicle parking slab. In this way, once the support work was
area and roads removed, parking could be immediately made
Freight forwarder buildings available, with construction work proceeding
Cold Storage Facilities above on the upper floors without the need for
backpropping.
Architectural elevations were produced and
engineering designs were carried out in
Vertical vehicle circulation was provided in the
sufficient detail to warrant accurate cost
form of two circular ramps, comprising an
estimates. Additionally, a pavement
internal circular concrete drum, outer circular
investigation was done to ensure correct
columns and a post-tensioned flat slab. Each
positioning of the facility. An economic and
of the ramps provided dedicated ingress and
financial appraisal was performed in parallel to
egress at each floor level. In order to prevent
the design to reveal the viability of the
excessive shortening of the concrete due to
proposed centre. The mentioned appraisal
shrinkage and prestressing, the building was
ensured cost-effective designs and where
split into twelve panels. Maximum panel size
necessary, recommendations regarding
was limited to 45m x 34m. The joint detail
phasing were done.
between panels consisted of a butt joint in the
OR Tambo International Airport slab, with the faces bitumen coated to act as a
multi-storey parkade, South Africa bond breaker, and a steel cover plate welded to
cast-in angles. In order to prevent water
The parkade comprised five parking levels with ingress into the joint, the joints were slightly
each level having a footprint of approximately raised and all steelwork was galvanised for
200,0m x 135,5m. The total construction area corrosion protection. A lightweight structural
was approximately 135 000m and comprised steel roof was provided over the entire parking
of the following: garage comprising of angle and circular trusses
surface bed spanning between 8,5m and 25,5m. Profile of
four suspended floors the roofs was curved with use being made of
lightweight structural steel roof stainless cable stays to provide both structural
support and attractive features to the roof.
The total number of parking bays provided is
approximately 4 100. A parking module of
17,0m was adopted with the typical parking bay
being 5,0m long by 2,5m wide and the
driveway width being 7,0m wide.
AIRPORT PROJECTS New terminal building, parking and two hangars to accommodate the same
facilities and apron extensions for aircraft type.
Lanseria International Airport, South
Walk-through service tunnels between existing
Africa
and new hangars as well as under floor ducts
Since being allocated international status, the at the new hangars were also provided. A
scope for growth at Lanseria Airport has wash bay was equipped with an oil separator
increased dramatically. In order to and the facility also included a new office block
accommodate the projected increase in and employees parking area with the carports
passengers and larger aircraft movements, the and shade nets. A new spare parts store also
airport has embarked on a process of formed part of the extension.
upgrading and expansion. This project entailed
the development of an on grade parking area,
relocation of a large number of existing
services, development of a new 9 500m
terminal building, demolition of the existing
terminal building and the rehabilitation and
extension of the existing concrete apron.
Aurecon was also appointed to provide certain
airport planning input such as the preparation
of the terminal layout in terms of passenger
and baggage handling, as well as the
preparation of the overall apron scheme
surrounding the new terminal building. The
terminal building consists of a 1 800m
basement accommodating the baggage All construction work was done whilst the main
handling facility, plant rooms and various store facility was fully operational.
rooms. The remainder of the building (7
700m) accommodates the terminal activities, Design for the new domestic
offices, airline lounges and retail areas. terminal building for the Sydney
Aurecon was also responsible for the Domestic Airport, Sydney, New
construction supervision of all related works. South Wales
The new domestic terminal building for Qantas
at Sydneys Mascot Airport involved many
engineering challenges. The building provides
ten aircraft gates, separate departures and
arrival hall, a new Qantas Club facility seating
over 750 and an international passenger
transfer lounge. Innovative engineering
solutions and careful staging have produced a
highly successful facility constructed with
minimal disruption to passenger services.
Design of extension of the SAFAIR Aurecon designed an innovative foundation
freighter facility at OR Tambo system, including the use of high-level pad
International Airport footings in the sands and clays and short
Aurecon was appointed to provide structural length piles in other areas. The buildings take
and civil engineering services for the extension into account expected large settlements
of an existing facility used for the maintenance caused by the very poor ground conditions. A
of a fleet of C130 (Hercules) aircraft. The feature of the work is the use of advanced
extension made provision for a concrete aircraft engineering techniques to create ultra-long
parking apron for five DC8 type aircraft stands span post-tensioned concrete structures,
allowing large column free areas within the
AIRPORT PROJECTS terminal. The spans range in length to 21
metres, a rarity in building design. A steel
structure featuring innovation in engineering
and detailing creates a dramatic departures
hall which is not only very aesthetic but highly
economical when compared to conventionally
engineered structures. The client was Qantas
Airways Limited.

Design, management and


construction supervision for
Melbourne Airport, Melbourne,
Victoria
In preparation for the A380 runway, Aurecon
was commissioned to undertake the planning,
design and documentation, project
management and construction supervision for
the 16/34 runway lighting upgrade works
associated with the runway widening. The
airport lighting upgrade and replacement
works consisted of: relocation of the runway
edge lighting from the existing positions to new
positions at the edge of the new pavement;
upgrading of the runway centreline and edge
lighting to provide high-intensity lighting
information for both runway approaches;
construction of two concrete beams (full
runway width) for the installation of the new
and upgraded high-intensity runway threshold
and runway end lighting; and upgrading of the
taxiway centreline lighting at the
taxiway/runway intersections to comply with
the new international airport lighting standards.
Additionally, the airport lighting upgrade
comprised provision of additional taxiway
centreline lights to enable the complete
taxiway lighting system to be upgraded to
comply with the operational requirements of
Category III operations; relocation and
alignment of the taxiway information and
guidance signs to conform with current runway
clearance standards; construction of a new pit
and duct system for the airport lighting
primary/secondary cables and isolating
transformers; and replacement of the existing
aged cables and transformers and installation
of new equipment into the new pit and duct
system. The project was completed on time
and within budget and won an Association of
Consulting Engineers Australia's award.
ROAD PROJECTS Lagos infrastructure project - toll surfacing. Drainage culverts were widened or
road development - feasibility, pre- replaced and one bridge was widened. The
feasibility studies and detailed other bridge on the route was destroyed and
required complete reconstruction.
design (57km), Nigeria
The Lagos Infrastructure Project consists of a The heavy traffic in the area and the very poor
number of new and existing roads that have to condition of the existing pavement necessitated
be developed and operated as tolled facilities. the re-working of the existing base; a selected
The phenomenal growth in vehicle ownership layer and a new base and sub-base layer was
and the deterioration of the existing roads are imported.
leading to tremendous congestion and delays,
which can be successfully alleviated by a tolled London Road - Canning Road to
system. The capital investment will exceed Louis Both Avenue Phase 2, South
US$ 350 million and accurate feasibility Africa
studies, traffic projections, willingness to pay, The existing road of 2km is to be upgraded to a
information and accurate cost estimates were divided four-lane, dual carriageway urban
required. arterial. Aurecon did the detailed design,
contract documentation and the tender
The project entailed two phases, a feasibility process. The supervision was being done by
study phase and detailed design phase. The Aurecon. Construction commenced in 2004.
feasibility study phase comprised the
compilation of technical and financial reports The accommodation of traffic during
that had to be audited by the project tenders in construction received special attention since
order to determine or substantiate the viability the road is a major link to Alexandra.
of the project. The detailed design phase
entailed the detailed design of a toll road Contract for the consultancy
network and the provision of all relevant services for supervision of the
services up to the tender stage of the project rehabilitation works of 34.7km of
process. road between Lusaka and Chirundu
Rehabilitation of 62km of Kawempe - (escarpment section), Zambia
Luwero Road, Uganda The project is approximately 34,7km in length,
The project consisted of the reseal and and consists of the widening of the existing
rehabilitation of 60km of existing surfaced road road formation to allow for a cross-section
between Kawempe and Luwero, just North of geometry of 2 x 3,5m lanes and 2 x 2m
Kampala. surfaced shoulders. Auxiliary / climbing lanes
will be constructed where required, and in the
Interventions will mainly consist of rehabilitation sections of high cut or fill, the shoulder width
of failed road sections; periodic maintenance will be reduced. The reconstructed road will be
(reseal with single bituminous surface surfaced using asphalt concrete. Bridges on
treatment or overlay with asphalt concrete); the project section will be reconstructed by
shoulder rehabilitation; reinstatement and lining replacing the entire structure or the deck only
of side drains; restoration of road markings and where vertical alignment remains unaltered.
furniture; as well as preparatory works of Construction of the interim four-lane
pothole and base repairs. urban freeway on National Route 17
Detailed design a supervision of the Section 1 between Rosettenville and
rehabilitation of the Cala-Humbo the Elands Interchanges
Road (22km), Angola The Mooi Street link into the city centre of
The existing 21km road was upgraded to a 9m Johannesburg (the Commercial gateway into
wide surfaced road from the original 6m wide Africa) was also constructed under this
Contract, as well as two new toll plazas and
ROAD PROJECTS extensions to an existing toll plaza. A major Information system (MIS) and Quality
challenge was a 1 million m cutting through an Assurance
existing mine dump adjacent to the ecologically Toll systems operation and maintenance
sensitive Wemmer pan area with associated Financial auditing
stability and geotechnical problems. The total Reviewing legal issues
length of the freeway was 8km, but the
project also included distribution and dual BOT Project for the upgrading and
carriageway cross roads of 12km, as well as maintenance of the National Route 3
ramps. The total equivalent single carriageway from Heidelberg to Villiers
was 60km. This was the initial part of a major project to
Independent Engineer for the N4 extend, upgrade and maintain the dual
Platinum Toll Highway, South Africa, carriageway National Route 3 (N3), which is an
important route between Gauteng and
2000
KwaZulu-Natal. The initial three-year
Aurecon was appointed to act as Independent construction period requires substantial
Engineer on the Platinum Toll Highway, which rehabilitation and construction work to improve
includes the portion of the N1 between Pretoria the quality and safety of the route. Work during
and Bela-Bela, as well as the N4 between this period entailed:
Pretoria and Skilpadhek on the border with Dualling the undivided section of the road
Botswana. from Heidelberg to Villiers
Upgrading the parallel provincial road
Constructing three new toll plazas
Rehabilitating various sections of the road
Services:
Preliminary and detailed design
Traffic studies
Toll strategy
Documentation
Rehabilitation
As Independent Engineer, the duties of the
Detailed design and construction of
Aurecon included coordinating the tender
Nelson Mandela Drive, South Africa
process, advising on a preferred bidder,
auditing preliminary and detailed designs, Nelson Mandela Drive provides a north-south
including various engineering disciplines, access through the centre of the Pretoria CBD.
environmental aspects and socio-economic The road, which consists of a 3,6km four-
development, reviewing construction control, lane dual carriageway and 2,5km of linked
including review of an Incident Management roads forms part of Pretoria's major road
System (IMS), Management Information network.
System (MIS), Quality Assurance, Toll The design had to provide for phased
systems, Operation and Maintenance, construction in order to allow for normal traffic
Financial auditing and legal issues. Services flow during the construction stages. Three
included: major road-over-river and one road-over-road-
Reviewing preliminary and detailed and-river bridge was included. Aurecon was
designs also responsible for the construction
Reviewing environmental aspects supervision services of this project. Services
Socio-economic development included:
Reviewing construction quality control, Traffic counts and predictions
including review and audit of an Incident Geometric design
Management System (IMS), Management Pavement design
Structural design
Contract documentation
ROAD PROJECTS Environmental issues and mitigation by the RTA had crossed over the Eastern
Tender evaluation and recommendations Distributor and exited into the western end of
the Kings Cross Tunnel. Despite being 30m
Gateway Bridge, Brisbane, deeper and 300m longer, the alternative was
Queensland successful as it eliminated the challenge of
This bridge crosses the Brisbane River with a mixing several hundred metres of cut-and-
260 metre prestressed concrete balanced cover construction with the heavily trafficked
cantilever box girder main span which at the William Street. Also, by incorporating larger
time of construction was a world record for this radii and tunnel widening on curves, the line of
type of construction. The total length of the sight and stopping distances were improved
bridge is 1.6 kilometres including ten approach thus permitting the design speed to generally
spans on the northern side and five on the increase from 70kph to 80kph.
southern side of the river. The bridge contains
60,000 cubic metres of concrete. Extensive road design on the surface was
required for the complete re-configuration of
The Gateway Bridge won numerous the streetscapes between property boundaries
engineering awards for design excellence in at Druitt St, Harbour St, Sir John Young
Australia and overseas from professional Cresent, Bayswater Rd and William St/Park St.
institutes such as the Institution of Engineers While the impact of portals was often the
Australia, Association of Consulting Engineers fundamental cause of change, the opportunity
Australia, the Concrete Institute of Australia, presented by the removal of traffic and
the Illuminating Engineers Society of Australia prospect of starting with a new canvass
and the Institute of Structural Engineers (United allowed the application of a high standard of
Kingdom). urban design and landscaping finish.

South East Busway and Transit


Lanes, Brisbane, Queensland
Aurecon assisted Queensland Transport to
develop a more viable transport system for the
south-eastern suburbs of Brisbane with a
Busway between Brisbanes Central Business
District ad Springwood, and Transit Lanes
between Mt Gravatt and the Logan Motorway.

Aurecon provided Queensland Transport with


diverse services for several sections of
Brisbanes South East Busway. These included
environmental and consultation services,
preliminary design, detailed design and design
review.
Cross City Tunnel, Sydney New South Wales
This unique project consists of dual tunnels
running east-west beneath Sydneys CBD with
connecting tunnels to the Eastern Distributor
and other surface roads.

Aurecon undertook the winning tender design


with an adopted alignment that was a
successful alternative that passes under the
Eastern Distributor tunnel and exits east of
Kings Cross. The original alignment proposed
RAILWAY PROJECTS Gautrain Rapid Rail Link, South Reconstruction of the tracks next to
Africa platforms 1 and 4 with a ballastless track
system.
The Gautrain Rapid Rail Link is a state-of-the-
Perway drainage including surface and
art rapid rail network planned in Gauteng. The
subsurface
rail connection comprises of two links, namely
Pipe Jacking under existing lines
a link between Tshwane (Pretoria) and
Reconstruction of existing parking facilities
Johannesburg and a link between OR Tambo
International Airport and Sandton. Aurecon, in Construction of new ablution block
consortium with Halcrow Holdings Limited, a
UK-based infrastructure consultancy with
extensive experience in segmental
construction, was appointed in May 2006 by
the Bombela Civil Joint Venture for detailed
design package 6A of the Gautrain Rapid Rail
Link.

Basic engineering design for the rail


transportation of coal from Moatize
to Nacala Port, Mozambique
Rio Doce's, Mozambique, embarked on a Basic
Major design items include viaducts, retaining Engineering Design or Bankability Feasibility
structures, earthworks, geotechnical designs, Study (BFS) for the Rail Transportation of Coal
overpasses, parking areas, utilities, electrical from Moatize coal field in the Tete Province
and mechanical items, and landscaping through Malawi to the Nacala Port. The study
was performed to transport 12 million tons of
Design and supervision of the coal per year. The total length of the Nacala
drainage remedial works and route is 980km with 185km of new track from
compaction grouting at the the Moatize Mine to Lirangwe where the new
Centurion Railway Station, South line joins the existing line in Malawi. The
Africa existing lines, both in Malawi and Mozambique,
are in a fairly poor condition carrying only a few
The Centurion Station is situated in the
hundred thousand tons of traffic per year and
Lyttleton area, underlain by Dolomites, and part
major upgrading design was required. A
of the Metros mainline to Johannesburg.
financial analysis was performed to evaluate
Sinkhole development occurred along a 3km
the CAPEX and OPEX. The design scope
section of the mainline in the Centurion Station
included:
area during the rainy season of 2003. The
Route investigations study and trackwork
dolomite ground conditions and the risk of
sinkhole development in this area was reduced Railway bridges and culverts
by a compaction grouting, drainage and track Two tunnels of approximately 1km
improvement contract to control surface water Signalling and telecommunications
infiltration in the area of the site. Major design Rail wagons
items included: Traction power simulations
Train operations simulations
Compaction grouting within the track Buildings, machinery and equipment
footprint totalling 162 boreholes and 1 848 End point terminals and maintenance
cubic meters of grout material placed depots
RAILWAY PROJECTS Organisational Model for Human Cost Control
Resources Contract Administration
Project Execution Plan (PEP) Design Audit/Review and Management
Operations Management Plan (OMP) Quality Assurance
Health and Safety Management Plan Typical side platform station
(HSMP) Basic planning of commuter railway
stations on the Pretoria - Mabopane
Railway Line, South Africa
The recent rapid urban development of the
Klip/Kruisfontein area between Soshanguve
and Akasiaboom stations on the Pretoria -
Mabopane Rail Line has resulted in increased
commuter demand for additional stations in this
area. Five additional commuter station sites
Underground track geometry have been identified. The purpose of this
measurements, South Africa project was to conduct the basic planning for
the five new proposed commuter rail stations.
Underground track geometry measurements
The basic planning information included the
were taken at a number of Anglo Platinums
study area, area of influence as well as
mines in the North-west Province area
documenting the methodologies and design
(Amandlebult, Rustenburg and Townlands).
philosophies pursued in estimating the
The purpose of the study was to measure the
commuter rail profiles, station infrastructure,
basic track geometry condition of their
intermodal facility requirements and final
underground railways and to compare the
positions of all five proposed commuter rail
results to the current SANS 0339:2000
stations. The basic planning phase also
standards.
captured the interaction of the station with its
The Track Quality Measurement (TQM)
environs and attempted to integrate the station
machine was used for the measurements. The
with the surrounding urban fabric.
measurements were analysed and workplaces
were identified for the maintenance crew. Djibouti - Ethiopia railway line -
minimum rail safety work
Light rail transit (system II), Kuala
Lumpur Design and tender document preparation for
relaying of 114km track, sleepers and ballast
The Government of Malaysia awarded a Build-
including strengthening of 49 existing bridges.
Operate-Transfer (BOT) concession for a 29km
New tracks will replace 100 year old 20kg/m
light rail transit network traversing the city of
rails and steel sleepers, and will consist of
Kuala Lumpur, consisting of 24 stations. A
40kg/m rails and concrete sleepers on 1075
small portion of the route was to be constructed
m/km ballast. The eroded existing
at grade, 22km was to be elevated (pre-cast
embankment will be widened and a sub-ballast
segmental construction) and 4km underground
layer added. 49 steel bridges will be
(bored tunnels, as well as cut-and-cover
strengthened or replaced to increase the safe
sections). The project was implemented in two
load capacity from 14 ton to 17 ton. Services
sections, with a total construction cost of about
provided included:
US$ 800 million. Aurecon's client, Pengurusan
Detailed design of railway and bridge
LRT Sdn Bhd, was appointed by the
rehabilitation
concession holder to be project manager for
Materials design for formation upgrading
both sections. Aurecon seconded 13
Tender documents, quantities and cost
expatriate staff members to the project
estimates
management team. Other expatriates were
provided by Bechtel. Services included: Tender process and evaluation
Construction Supervision
WATER PROJECTS Olifantsvlei wastewater treatment KwaMashu wastewater treatment
works, Johannesburg, South Africa works, Durban, South Africa
This 100 M/d extension as well as extensive The KwaMashu Wastewater Treatment Works,
refurbishment of existing treatment units was at with a capacity of treating 70 M/d, had to be
its time the largest single wastewater treatment extended. As a result of the investigations and
contract in South Africa. Aurecon was the lead process analysis performed by Aurecon, the
consultant and responsible for all aspects of additionally required 15 M/d treatment
the project utilising sub-consultants for capacity could be provided by removing the
architecture and landscaping only. bottlenecks in the existing works. This resulted
The processes utilised for this project have in saving costs of approximately USD 5,5
been developed jointly with the client based on million. The works entailed improvements to
extensive research and development, the units the inlet works, which had to be extended to
have already been commissioned and it can be accept the additional flow. The major gain in
stated that the effluent standards exceed those treatment capacity was achieved by improving
predicted. In general, the effluent Standards the efficiency of the secondary settling tanks,
are COD - less than 75 mg/l, suspended solids which allowed the system to be operated at
- less than 20 mg/l, nitrate - less than 5 mg/l, higher sludge concentrations, and thus a higher
and phosphates - less than 1 mg/l. biological load. The works is presently under
construction, but it has to remain in operation at
all times. This requires detailed planning and
strict project control.

Zeekoegat water care works,


Pretoria, South Africa
Planning, civil and structural design, electrical
Athlone wastewater treatment and mechanical design, project documentation
facility - Cape Town, South Africa and the construction supervision for this
Aurecon is one of three consultants appointed nutrient removal activated sludge wastewater
by the Cape Metropolitan Council to refurbish treatment facility was done by Aurecon. The
and extend its Athlone Wastewater Treatment Zeekoegat wastewater treatment works has a
Works. This ongoing project is currently one of treatment capacity of 30 M/d and treated
the largest wastewater treatment projects in effluent must comply with the Special Standard
South Africa. It involves the total refurbishing for Discharge, a requirement set by the
of an ageing facility and its extension to enable Department of Water Affairs and Forestry as a
it to treat a 120 M/d at a higher standard which result of the location of the facility close to a
includes nutrient removal (phosphate and nature reserve. This location of the facility also
nitrate removal). In South Africa, the current required architectural and landscaping design
tendency is increasingly for enhanced effluent to create an aesthetically acceptable
standards forcing this country to be known as a appearance for the facility. The facility has
leader regarding process design for achieving been designed with the requirement for an
enhanced sewage effluent standards. extension in mind. This future extension will
WATER PROJECTS double the capacity of the existing works, which Mayflower water treatment works,
was completed in 1988. Empuluzi, South Africa
Aurecon was responsible for the total design of
this water treatment facility. It treats 8,6 M/d
by means of slow sand filtration with partial pre-
treatment of the raw water. The pre-treatment
includes dosing of a coagulant, flocculation in a
baffled channel flocculator and sedimentation
in a reinforced concrete pre-sedimentation
tank. The slow sand filters, of which four were
constructed, were earth embankment
structures, as this allowed for a considerable
saving on construction cost compared to
Gammams wastewater treatment reinforced concrete, and sufficient space was
works, Windhoek, Namibia available to make this an option. The facility
Aurecon was appointed to extend the has consistently produced potable water of a
Gammams Wastewater Treatment Works near high quality, and is scheduled for a complete
Windhoek in Namibia. Aurecon provided all refurbishment in the near future. Aurecon has
consultancy services for this project, including been appointed to provide the consultancy
process design, civil and structural design, services for this refurbishment.
electrical, mechanical and instrumentation
design, project documentation, construction
supervision and contract management. The
works was extended to increase the treatment
capacity from 17 M/d to 30 M/d, and the
design had to provide for the fact that the
existing works had to remain in operation
during the construction of the extension.
The treatment facility uses a nutrient removal
activated sludge process, and the design
provided for the construction of a primary
Eerstehoek water treatment works,
sedimentation tank, extension of the existing Elukwatini, South Africa
biological reactor, and construction of three The complete process, civil, mechanical and
secondary sedimentation tanks, several pump electrical design for this water treatment facility
stations, various ancillary buildings, as well as was done by Aurecon. The facility is a
access roads and pipelines. Construction conventional rapid gravity sand filtration plant
started in 1992 and the work was completed at which employs chemical (coagulant) dosing,
the end of 1993. flocculation, sedimentation, filtration and
disinfection to treat a flow of 8,6 M/d. It has
been in operation since 1986 and has
consistently produced treated water of a high
quality for domestic purposes. The works is to
be extended during 1999 to allow treatment of
an additional 4,3 M/d. During 1998, Aurecon
prepared the complete civil, structural,
mechanical and electrical design for this
extension to the facility, which included the
addition of two baffled channel flocculators, two
sedimentation tanks and two rapid gravity sand
filters. The extension also required the
construction of a pump station and pipeline to
WATER PROJECTS provide raw water from an alternative source. appears that there is a shortage in the
The pump station and pipeline were order of 25 m/sec.
constructed during 1998. Investigate the most suitable draw-off
point from Lake El Assad and do a
Khayelitsha cental pump station and preliminary design for the draw-off, pump
rising main, South Africa station, water purification works and
A large part of the town of Khayelitsha was transfer infrastructure from the purification
designed to drain into this system. This works to the combination basin.
catchment will ultimately carry a population of Once the most suitable option has been
250 000. The system consists of a drywell identified, the consultant is to prepare
pump station with four pumps that can deliver detailed designs for the take-off structures
650 l/s in total, and a rising/gravity system of and the water purification works. The
800mm diameter pipeline which runs over 5km client will do the detailed design of the
towards a treatment works. Installation was other pump stations and the pipeline in-
quite difficult due to deep sections (up to 8m) house and the consultant must do an
and very high groundwater conditions. This expert review on the hydraulic, cathodic
required specific attention to dewatering and protection and water hammer designs for
shoring of excavations. these pipes. The project is to be executed
in two phases with 2020 as the first phase
and 2040 as the second phase.
Aurecon's role is to assist the international
practice from Egypt with the conception
planning of the total project, to provide
expert advice concerning the take-off
structure and to do specialist reviews on
all the designs prepared by AAW.

Olifansvlei Effluent pump station,


Drawing water from lake at Al Furat
South Africa
River to the City of Damascus, Syria
The appointment called for the detailed design
Aurecon has been appointed together with an
and preparation of complete construction
international practice in Egypt on a multi-million
drawings and documentation for a pump station
dollar project to provide water to Damascus
and rising main which pumps treated sewage
from Lake Assad on the Euphrates River to
effluent from the Olifantsvlei Wastewater
Damascus. The project involved the
Treatment Works to maturation dams over a
investigation of a suitable draw-off pump
distance of approximately 2km. The pump
station from the El Assad Lake on the Eufrates
station has been designed to ultimately pump 8
River. From this draw-off point, water is
cubic metre per second and will consist of 4
pumped to a new water purification works
centrifugal pumps. Aurecon was responsible for
situated close to the lake. Here the water is
the project management, hydraulic design,
purified and then pumped through a series of
structural and civil design, geotechnical
high lift pump stations along a route that is
investigation, as well as the design and
approximately 250 - 300km long to a suitable
specification of all the mechanical/electrical
mixing basin close to Damascus. The water is
equipment required.
then mixed with water emanating from the
coastal regions as well as other sources
currently feeding Damascus.

The role of the consultants was to:


Determine the water demand up to the
year 2040 for Damascus. At this stage it
WATER PROJECTS Aurecon was also appointed to do the site Durbanville north bulk water supply,
supervision of the contracts under this project Cape Town, South Africa
and to implement Aurecon's site management
system based on SABS/ISO 9000. Aurecon was appointed by the City of Cape
Town for the Durbanville North Bulk Water
The main components of the project were: Supply. Aurecon is responsible for the
pump station sump and inlet configuration construction of a 15M reservoir, 800kW pump
pump station building station and approximately 7km of rising and
two centrifugal pumps, each with a gravity mains. The water will be pumped from
capacity of 2 cubic metre per second the Spes Bona pump station to the Spes Bona
equipped with variable speed drives, Reservoir. As the Bulk Water Transfer System
1000mm diameter electrically actuated is being expanded in stages, this scheme will
flow control valves supply different suction heads to the Spes
Bona pump station during its operation. Due to
isolating and non return valves
this, the Spes Bona pump station will make use
pressure vessel for water hammer
of Variable Frequency Converter (VFC) to
protection
control the speed of the pump motors. This
1400mm diameter by 2km long mild steel
enables the Spes Bona pump station to
pipeline, which is Fusion Bonded Epoxy
operate at the different duty points as required
coated and lined, installed partially below
by the system.
and partially above ground level, suitably
protected by a cathodic corrosion
protection system
electrical requirements
forced ventilation
mechanical hoisting and conveyance
equipment

Olifantsvlei inlet screw pump


station, Johannesburg, South Africa The Spes Bona pump station will also be
operated in a continuous pumping operation,
The appointment called for the mechanical where the VFCs simulate the demand
design, preparation of mechanical flow withdrawn from the Spes Bona reservoir,
diagrams and drawings, as well as the providing a constant supply head to the
documentation for an Archimedes type screw distribution system. This reduces the pumps
pump station for the pumping of raw sewage to power consumption due to less starting of the
the Olifantsvlei Wastewater Treatment Works. pump drives. When complete, this supply
scheme will supply the distribution network of
The main components of the project were: the Northern Tygerberg Area.
Mechanical coarse screens for pump
protection Monwabisi central pump station and
Screening washing, drying and removal rising main, Cape Town, South
equipment Africa
Two pump lift stations, each pump lift
A Southern Section of Cape Town along the
comprising three screws, each screw has
False Bay Coast was designed to drain into this
a capacity of 1.75 cubic meter per second
system. The system consists of a drywell
over a vertical lift of 6.5m
pump station with four pumps that can deliver
Isolating channel sluice gates 500 l/s, in total, and a rising/gravity system of
Forced ventilation 600/700 mm diameter pipeline which runs over
Motor control centre and electrical power 4km towards a treatment works. The pipe
supply section consisted of special epoxy-coated fibre-
cement pipes.
WATER PROJECTS Design and construction Vaal River Eastern Sub-system
supervision for Berg River Dam and Augmentation Project (VRESAP)
supplement scheme including gated The Vaal River Eastern Sub-system
outlet works, spillway, river Augmentation Project is an emergency water
abstraction works, pump stations transfer scheme. Water is abstracted from the
and pipelines Vaal Dam and pumped to the Knoppiesfontein
The Berg Water Project will augment the water division structure over a distance of 115km.
supply of the Western Cape region and From the division structure the water gravitates
specifically that of the City of Cape Town. The to the Bosjesspruit and Trichardsfontein Dams
brief involved a dam type selection study, in near Secunda. The primary bulk consumers
which clay core rockfill, composite RCC served by the project are Eskom and Sasol.
gravity/clay core rockfill and concrete faced
rockfill dams were evaluated.

The outlet works comprised a dual wet and dry


well multi-level intake tower 63m high with a
5.5m diameter concrete outlet conduit. One of
the features of the outlet works will be their
ability to mimic the periodic natural floods that
are necessary to mitigate the impact on the
ecology and geomorphology in and around the
river. It is possible to cater for a flood up to
200m3/s, which will be released through the
outlet works over a similar period to the natural
occurring floods. The releases will take place
through multi-level selector gates, an isolating
gate (hydraulically operated bonneted slide
gate) and a flow control gate (hydraulically
operated radial gate).

The spillway comprises a 40m long side


channel with splitters and an aeration gallery, a
discharge chute and deflector bucket and an
18m deep unlined plunge pool. The maximum
discharge capacity is 740m3/s. The plunge
pool will also be used as energy dissipater for
the flood releases from the outlet works. Model
studies were undertaken of both the spillway
and the outlet works.

The supplement scheme comprises an


abstraction works on the Berg River 10km
downstream of the dam, two pump stations
with capacities of 6 and 4m3/s respectively and
two steel pipelines of 1 500mm diameter with a
total length of 12.4km. The abstraction works
includes a series of sediment traps that can be
hydraulically flushed to replenish deposited
sand, gravel and boulders to downstream river
reaches.
deliver the effluent from the wastewater
Moatize coal project, Tete Province,
MINING PROJECTS treatment plant to Union Mine for use in
Mozambique industrial processes.
Some of the worlds richest coal deposits are
located at Moatize in the Tete Province of Aurecon provided planning, preliminary design,
Mozambique. Vale holds the concession to project management, GIS, CAD, client and
exploit this resource over the next few other parties liaison, geotechnical
decades. The current project is for the investigation, environmental impact
establishment of the first phase of the mine assessment, topographical surveys,
with anticipated production volume of 12 million institutional analyses, risk mitigation, cost
tons of coal per year, both for coking and estimation, financial/economic analyses
thermal coal. including cost recovery and funding options.

Infrastructural and structural


The project entails a major investment in the
region, and will also require the upgrading of
engineering services for the Run-Of-
other infrastructure in the area such as rail and Mine (ROM) extensions to Catoca
port facilities at Beira, which will have broader Diamond Mine, South Africa
benefits for the region. Bulk Earthworks, Access Roads, Layerworks
and Structural Engineering services for the
The project comprises the establishment of ROM (Run-Of-Mine) extensions to the existing
mine infrastructure including coal processing Catoca diamond mine in Angola. Engineering
facilities, maintenance facilities, administration services rendered by Aurecon mainly consist of
facilities, conveyors, bulk water and electrical the following:
supply, new access roads, water treatment and Geotechnical investigation and report
rail loading facilities. Aurecons involvement at Layout and setting out of main
this stage consists of the development of a new components
conceptual design for the mine to improve on Coordinate with other planners, viz. Krupp
and optimise the current layout, followed by Materials Handling (Conveyors),
detailed design of the mine infrastructure Reinforced Earth (Crusher Tip Wall),
components. The project is done in Crusher designer
association with numerous sub-consultants in
terms of rail design, bulk water and waste Design and detail for construction:
disposal, architects and materials handling, but Ground profile for Overland Conveyor
Aurecon is responsible for the project
system
management, conceptual and detailed design
Ground Profile for the Sacrificial Conveyor
and geotechnical investigations.
Ground Profile for the Ramp Conveyor
Northam wastewater treatment Access Road to the Crusher Tip
works feasibility study Crusher Tip
Armco tunnel bridge structure
Anglo Platinum is planning expansions at
Crusher slab (RC) and supporting layer
mines in the area of Northam/Thabazimbi. It
works
was found that the town of Northam has no
additional wastewater treatment capacity for Container slabs
new residents that would be associated with Magnet structure slabs and supporting
the expansions at the mines. Anglo Platinum is layer works
also in need of additional water for industrial Stormwater drainage
processes at the Union Mine. Anglo Platinum Overland conveyor sleepers and pipe
appointed Aurecon to conduct a feasibility supports
study to investigate the construction of a new
wastewater treatment process plant at
Northam, as well as a pump line that would
MINING PROJECTS Bulk earthworks, roads, bulk water compare the results to the current SANS
supply and Civil Engineering 0339:2000 standards.
services for the new Khumani Iron Outsourcing of non-core
Ore Mine (BKM Project) at Sishen maintenance activities of
Main components of Aurecon's scope of work: infrastructure in Oranjemund and
Bulk earthworks and layer works for the Associated Mines for Namdeb,
Crusher tip Namibia
o Workshop platform
o Overland conveyor Since the signing of an outsourcing agreement
o Stacker and reclaimer in November 2001, the diamond mining
prisms at the ROM and company Namdeb has been able to turn its full
Product Load-out and attention to its core business whilst Aurecon
Plant. Namibia and Southern African Contracting
Bulk water supply and booster pump Services (SACS) maintain the basic
station infrastructure in Oranjemund. Namdeb is a
Access roads Joint Venture between the Government of the
Municipal Services Republic of Namibia and the De Beers Mining
Stormwater attenuation dams Corporation. Oranjemund is the operational
headquarters of the Joint Ventures' mining
Underground rail consultancy activities in Namibia.
services for Lonmin Platinum, South
Africa In keeping with its policy to concentrate on core
A pilot case study was conducted at Lonmin's business activities, Namdeb decided to
Eastern Plats, Western Plats and Karee mine outsource various maintenance services in
to measure the basic track geometry condition Oranjemund to the SACS/Aurecon Joint
of some of their underground railways and to Venture. In keeping with its policy to
compare the results to the current SANS concentrate on core business activities,
0339:2000 standards. Namdeb decided to outsource the following
non-core maintenance services in Oranjemund
Geometry measurements in the underground and the related mining areas:
mining environment are currently limited to Town Electricity Maintenance:
survey points on the rail and ad hoc gauge Maintenance of the low voltage electrical
measurements. In SANS 0339:2000, various distribution network and service
maximum permissible deviations from the track connections, streetlights and maintenance
design values are listed. Track geometry of refrigeration installations
measurements help to ensure that the following Town Mechanical Maintenance: General
is achieved: maintenance and repair of mechanical
The safe geometry tolerances of the track and associate equipment. This includes
classifications are met (defined in SANS the total water and sewerage systems,
0339:2000) and therefore reduce the risk plumbing, drainage installations and boiler
of derailments. making functions.
Identify workplaces for the maintenance Town Building Maintenance: General
crew. maintenance and repairs to the buildings
Allows for cost-effective maintenance of and structures of Namdeb, including
the track since areas that do not require houses, private enterprise buildings, sport
geometrical alteration are not worked in. clubs and company buildings
Town Road Maintenance: Maintenance of
A pilot case study was conducted at Lonmin's the tar and gravel roads, demarcation of
Eastern Plats, Western Plats and Karee mine roads, erecting and maintenance of safety
to measure the basic track geometry condition barriers and road signs in the Namdeb
of some of their underground railways and to area.
MINING PROJECTS The Joint Venture of Southern African Design of ventilation ducting piling
Contracting Services and Aurecon Namibia at Middelbult and Bosjesspruit
was awarded this contract in September 2001. Mines, South Africa
The initial contract is for a five-year period and
includes the maintenance of the following Aurecons Structural Engineers designed the
infrastructure: the water reticulation network, ventilation ducting piling for the Middelbult and
sewage conveyance and purification, the low- Bosjesspruit Mines.
voltage electrical distribution network, road The project entailed new ventilation ducts and
network and buildings (eg houses, sports clubs the relocation of existing equipment including
and company buildings). parts of existing ducts for both the Bosjesspruit
and Middelbult ventilation shafts in Secunda.
Design of a new access to De Hoop The shape of the 7m diameter ventilation duct,
mine and the upgrading of the consisting of stiffened 6mm plating, was
existing access to Mapoch Mine on determined by the ventilation consultant.
road P169/1 between Stoffberg and Aurecon performed structural design of the
Steelpoort, South Africa plating and other duct elements, including
concrete bases and plinths. The design also
Aurecon was appointed for the detailed design, incorporated existing duct sections from
and to obtain provincial approval for a new existing mine ventilation shafts that are no
access road to the De Hoop Mine of road longer in use. The structural design included
P169/1 (55,75km) and the upgrading of the shaft collars to support shaft drilling equipment,
existing access to the Mapoch Mine Refinery as well as the concrete bases supporting fans
(27,42km). and electrical motors. Dynamic and static
Services provided: analyses were conducted on the equipment
Geometric design foundations using in-house developed
Pavement design software.
Road sign design Aurecons professional services included the
Drainage design verification of the steel beams and shaft collar
Dewatering for Western Areas Gold system as part of the contract.
Mining at Gemsboksfontein, South Sasol industrial effluent treatment
Africa works, South Africa
Western Areas Gold Mining Co Ltd set about Aurecon was appointed to improve the flow
dewatering the Gemsboksfontein dolomitic through the water recovery units at Sasols
ground water compartment in May 1986. petrochemical complex at Secunda. The
Immediately, prior to the start of dewatering, problem was identified as a bottleneck in the
Aurecon was responsible for pre-stabilisation of flow through the water recovery units as a
a 1,8km section of road where the risk of result of certain shortcomings in the water
sinkholes and subsidence as a result of treatment plants used to treat wastewater for
dewatering was considered unacceptable. This reuse in the petrochemical processes.
remains to date probably the largest successful The project included the improvement of the
compaction grouting exercise in the world. operation of five activated sludge treatment
A monitoring system for ground movement and plants. This involved the refurbishment of two
water table drawdown was developed which is sedimentation tanks in order to improve their
used to study and report on the effects of sedimentation efficiency, installation of
dewatering on infrastructure and land. In equipment for the automation of sludge
addition to the factual reporting to interested recirculation and withdrawal. Also required was
and affected third parties on the progress and the improvement of the hydraulic flow splitting
effects of dewatering, Aurecon continues to structure which divides the flow between the
assist the mine with contingency measures five plants. The conversion of existing sludge
where ground movements occur. thickening tanks to sedimentation tanks was
MINING PROJECTS done and the electrical reticulation system was Aurecon was appointed to design the
upgraded. The Supervisory Control and Data structures with dimension approximately 35 x
Acquisitioning (SCADA) System was improved. 26m and a height of 25m.
Flow measuring instruments and equipment for The design included all structural steelwork
the accurate measurement of dissolved oxygen components of the predominantly steel framed
levels was also installed as part of the project. structure. The design included support trestles
Construction was completed in 1995. supporting ducting towards and away from the
buildings, the supporting structure for a 600t
Hazardous waste pond for Atomic silo, and an approximately 55m high stack.
Energy Corporation, South Africa
Orapa Mine remedial work tertiary
Aurecon was appointed by the Atomic Energy
Corporation to design an evaporation pond for
crushing plant, Botswana
the treatment of hazardous waste at its Aurecon was appointed by Gaia to assist with
premises in Pelindaba near Pretoria. the structural rehabilitation work on the tertiary
The pond, with a surface area of 9000m and a crusher at Orapa Mine.
volume of approximately 15 000m, contains Aurecon was involved with the design of the
hazardous liquids with high sulphate and temporary support system whilst work was
fluoride content. carried out on the repairs to the columns,
beams and corbels. Supervision was carried
The greatest challenge of this project lay in the out on the fabrication and installation of the
design of a lining for the pond, as the lining temporary support system.
serves a number of functions. It must be Services included structural support system
chemically resistant against the corrosive design and remedial work supervision.
contents of the pond, while also protecting the
surrounding soil against pollution through New sewage treatment works at
leakage. This necessitated a capability to Orapa Mine, Botswana
detect leakages. A compound lining consisting Aurecon was appointed by Debswana Diamond
of multiple layers was designed. The primary Company for the design and construction of a
layer consists of a chemically inert geo- new 3,5M/day capacity activated sludge
synthetic liner with a white signal layer on top sewage treatment works to replace the existing
of a low permeability geo-synthetic clay liner. facility made redundant by expansion of open
Underneath this layer is a leak-detection layer cast mining operations. The design provided
consisting of geo-synthetic netting against the for primary settling, screening and de-gritting,
bottom and sides of the pond. This layer is biological treatment, secondary sedimentation
connected to manholes which allow monitoring and disinfection. Waste sludge is discharged
of possible leakage through the primary layer. into two sludge lagoons where it is allowed to
The leak-detection layer is isolated from the settle and the supernatant water used for
surrounding soil by means of a secondary geo- irrigation. The works also has an emergency
synthetic liner. The primary liner with its white storage dam to which excessive flow can be
signal layer and the geo-synthetic clay liner diverted for later gradual inclusion in the
were used for the first time in South Africa on influent for treatment.
this project.

Structural engineering design and The services included the process and
hydraulic design, topographical and
supervision for Alusaf Hillside and
geotechnical investigations, structural and civil
Bayside gas treatment centres, design, mechanical and electrical services
South Africa design, tender documentation, construction
Gas treatment centres formed part of the works supervision and commissioning of the facility.
for the Alusaf Hillside and Bayside smelter
projects.
MINING PROJECTS Hartebeesfontein Gold Mine: No 2 Preliminary design and budget cost
Shaft gold, acid and south plants as estimate for modifications to the
well as portions of Buffelsfontein UG2 plant high grade secondary
Plant for Durban Roodepoort Deep milling circuit, South Africa
Limited, South Africa Aurecons Energy and Industrial Consulting
Aurecon concluded the structural evaluation Services Sector was appointed by Impala
report of numerous structures to the No. 2 Platinum for the preliminary design and cost
Shaft, Gold, Acid and South Plant at the estimate to implement UG2 Batching Plant
Hartebeestfontein Gold Mine as well as an modifications in order to accommodate higher
overview of certain Pachuca walkways and input product flow without volumetric changes
conveyor gantry structures to the Buffelsfontein to the existing batch weighing tanks.
Gold Mine. Increased volume of concentrate from the UG2
Processing Plant rendered the existing UG2
The purposes of the report was to re-evaluate Batching Plant incapable of completely
the condition of certain structures in the above batching the concentrate. This increased
areas by means of visual inspection with a view volume was handled by adding additional
to identifying those elements that, according to feeder lines from the UG2 Processing Plant.
our opinion and experience, needed remedial Magflow flow meters were added to each of the
works to eliminate the risk of collapse, and to feeder lines and a Coriolis Mass Flow meter
extend the safe service life of the elements and (free issued by Impala Platinum) on one of the
the structures they form part of. feeder lines in order to have accurate on-line
volumetric flow, density and mass flow being
Rehabilitation of R7 conveyor measured and compared to the measurements
system at Impala Platinum Mine, obtained from the batch weighing system. This
South Africa ensured that accurate records and weights of
The R7 conveying system and associated silos concentrate could be obtained to balance the
form an integral part of Impala Platinum's flow of material through the process plant.
mineral processes milling and flotation circuit. The successful completion of the assignment
Aurecon was appointed to rehabilitate the 30 was the result of an integrated system design
year old conveyor. The project required the approach that was driven by the process
implementation of the following activities: requirements, resulting in a coordinated
Carry out a design review of the existing process, including all support services. This
conveyor structure design process enabled the E&I Division to fully
understand the clients needs. The compilation
Prescribe remedial measures to ensure
of a Mechanical Flow Diagram (MFD) and the
that the structure meets design loading
subsequent HAZOP analysis by all design,
requirements based on the design review
operating and maintenance role players
Carry out an on-site assessment of the
assisted the E&I Division to understand and
general condition of the structural
address the clients needs to his satisfaction.
steelwork
Prescribe remedial measures for the Smelter feed conveyor, Richards
replacement and / or repair of badly Bay, South Africa
corroded and abraded elements
A structural steel design for the conveyor
Project management and site supervision
support structure was previously performed by
of the construction phase
other consultants but the client had since
Enhancement: Concrete structures
changed certain design parameters and
Mechanical Services
requested an audit on the static and dynamic
Contract Documentation design.
Quantity Surveying
Operations and Maintenance.
MINING PROJECTS Spans of the conveyor gantries varied from 18
to 35m, and the evaluation included a 21m high
take-up tower and trestles.

Dalrymple Bay Coal Terminal,


Mackay, Queensland
Aurecon engineered the Dalrymple Bay Coal
Terminal in 1980, and has since substantially
engineered all offshore works. At 54.5 Mtpa, it
is amongst the largest coal terminals in the
world.

Aurecon was appointed Project Manager for


the EPCM of the seventh expansion phase of
the Dalrymple Bay Coal Terminal (DBCT 7X).
The expansion will increase the capacity of the
terminal by 50 per cent taking it above 85
Mtpa. The scope is almost a duplication of all
work accomplished at the terminal over the last
six expansion phases (since 1984). Under the
terms of 7X, Aurecon will accomplish that same
scope within four years. The two main phases
of work include: (1) a new inloading system,
new bunds and yard machines; and (2) a new
outloading system, another bund/yard machine,
third outloading conveyor and a fourth berth.
The project was completed during 2008.

Caroona Underground Coal Mine,


Surface Facilities, Quirindi, New
South Wales
The proposed coal mine surface facilities (Mine
Industrial Area) and associated underground
coal mine is a proposed greenfield mine
development located in the Gunnedah Coal
Basin.

The proposed capacity, once determined, could


be in the range of 10 to 25 Mtpa. The facilities
include the complete coal handling system
between the drift conveyor from the
underground mine through to the train load out
facility, including ROM, raw and product coal
stacking and reclaiming, coal preparation plant,
all buildings, rail loop and spur, roadwork's,
utilities (bulk power and water) and services.
The project is due for completion in 2010.
ENERGY PROJECTS POWER SYSTEMS Complete load flow and fault level analysis with
single contingency studies (Windhoek
ENGINEERING Municipality, Namibia).
Master planning/studies Master plan for 11kV network at
Onwgediva. Master plan incorporating
Indicative rural master plan. Compilation
existing overhead network in the town (Ministry
of an indicative master plan for a network to
of Regional Local Government and Housing,
supply a total of 500 000 rural consumers
Namibia).
(Ministry of Energy and Mineral Development,
Uganda).
Upgrade of rural electrification master Substations
plan. Obtaining detailed field data to update 60/15 kV, 40 MVA outdoor step down
Nampowers existing master plan and
substation at Nova Vida housing
transferring all to a readily accessible GIS-
development in Luanda. (Minapu,
based system. (Nampower, Namibia).
Angola)
Master plan for the City of Windhoek.
Auditing the existing networks, undertaking Contract management and supervision
load flow and fault level analysis of the existing for the electricity supply to key
networks. 20-year load projections. Compiling a customers in the Rustenburg area, RSA
complete master plan report. (Windhoek (Various).
Municipality, Namibia). Contract administration and supervision on the
Master plan for the transmission and following substations:
distribution system. Auditing the existing UG2 substation :
networks, undertaking system and fault 2 x 88kV feeder bays
Shaft 15 substation :
analysis of the existing networks. 20-year load
3 x 88kV feeder bays
projections. Compiling of complete master plan
Wildeplats :
report. (State Fuel and Power Corporation, 1 x 88kV feeder bay
Zanzibar). Wonderkop :
Report on rehabilitation requirements of 1 x 88kV feeder bay
the 220kV, 110kV, 30kV, 20kV and 6,6kV Millennium 100MVA 88/33/6.6 kV
networks in the Republic of Congo. distribution substation and power lines
(Investec, Congo, Brazzaville). (Eskom Distribution, Northern Region, South
Master plan for the 66kV and 11kV Africa).
networks in Walvis Bay. System analysis, Extension of the existing CCT 88/33kV
load projections for 20 years. Proposals for distribution substation (Eskom
upgrading and extension. Supply option study Distribution, Northern Region, South Africa).
and compilation of comprehensive master plan New Impala 120MVA 88/6.6 kV
report (Walvis Bay Town Council, Namibia). distribution substation and power lines
Master plan for the 66kV and 11kV (Eskom Distribution, Northern Region, South
networks for the City of Pietersburg. Africa).
System analysis, load projections for 20 years. 132 / 11 kV, 20 MVA transformer circuit
Proposals for upgrading and extension. Supply at Mtoni substation (State Fuel & Power
option study and compilation of comprehensive Corporation, Zanzibar).
master plan report. (Pietersburg/Polokwane Upgrading of the 66/11kV substations
Transitional Local Council, South Africa).
and 11kV distribution substations for
Rehabilitation of the 11 kV distribution
the implementation of a SCADA/EMS
and LV reticulation in rural areas. (Town
system for the Electricity Distribution System
Council of Potgietersrus, South Africa).
for the City of Pietersburg.
Master plan for the future 11kV network (Pietersburg/Polokwane Transitional Local
for the southern areas of Windhoek. Council, South Africa).
ENERGY PROJECTS 110/20kV, 20MVA Outdoor Step down Atteridgeville X7 Electricity for all
Substation at Noi Bai (Noi Bai Development project (Pretoria City Council, South Africa).
Corporation, Vietnam) Electrification of Mafefe, Gemini and
Fertilis using single wire earth return
Distribution networks technology and labour intensive
methods. (Eskom Distribution, Northern
25 km 60 kV power line to Nova Vida Region, South Africa).
housing development in Luanda. South Africa 400kV interconnector high
(Minapu, Angola).
voltage transmission lines. Project
Restructuring of the electricity management for the Namibian portion of
distribution industry (EDI). Consolidation transmission line construction. The new line
of 400+ electricity distributors in South Africa spans from the Aries substation in South Africa
into 5 or 6 consolidated regional distributors. via Keetmanshoop to the new Aries substation
Aurecon played a key role in ring fencing of near Windhoek. Construction of the line was
regional distributors infrastructure and setting completed four months ahead of schedule
up handover arrangements. (Department of (Nampower, Namibia)
Minerals and Energy, South Africa). Libya 220kV transmission line
Normalisation of medium and low construction management. Project
voltage networks in Ekangala (Eskom, includes a 175km coastal line 105km inland
South Africa, 2001). line through the Sahara desert and three
Pre-feasibility study, feasibility study 220/66/33kV Gas Insulated Switch gear (GIS)
and detailed engineering design for the step down substations. (General Electricity
strengthening of the 66kV and 11kV Company of Libya).
networks at Walvis Bay (Walvis Bay Town
Council, Namibia).
15km Long 22kV power line to Lebowa INDUSTRIAL PROCESS
Granite. (Department of Works, South
Africa).
ENGINEERING
25km Long 22kV power line to Ga- Mechanical Engineering
Saleka. (Department of Works, South Africa). Delta apron fuel line repair. Design and
10km Long 33kV power line to contract supervision for the replacement of an
Mahwelereng. (Department of Works, South existing 860m long 400mm diameter steel fuel
Africa). pipeline with a new line. (ACSA, Johannesburg
International Airport, South Africa).
Electrification/Medium and Low Mechanical upgrade and extension of
Voltage Reticulation the Tsojana water purification works.
The Design and Documentation for new rapid
Rural Electrification using new gravity sand filters, blowers and back wash
electrification technology. Electrification of pumps. (Chris Hani District Municipality, South
28 000 rural stands in Adi Keih, Dekemhare, Africa, Queenstown)
Barentu and Keren districts in Eritrea (Eritrea Surge analyses of the Petronet refined
Electricity Authority, Eritrea). products pipeline. Set up of surge modelling
Electrification of approximately 80 000 and analysis software, surge model compilation
stands for Eskom in various towns and calibration. Recommendations regarding
(Eskom, South Africa). the integrity of the pipeline and the operating
Electrification of 12 500 stands in procedures were made. (Petronet, South
various towns around Rustenburg Africa).
(Rustenburg District Council, South Africa). Beira sewage investigation and
feasibility study. Site investigation and
ENERGY PROJECTS status quo report of the sewage pump stations Soutpan bulk water supply scheme
including recommendations relating to the upgrade. Responsibilities included the
refurbishment and upgrading of the sewage design, documentation, contract administration
pumping system. (Mozambique). and site supervision of Motor Control Centres
Upgrade of the southern Nsikazi for the raw water, main clear water and booster
regional water scheme, Design, clear water pump stations. (Masilonyana
documentation, construction supervision and Municipality, Free State, South Africa).
commissioning of the mechanical work required Mozambique to Secunda natural gas
for a new 1.5MW clear water pump and the pipeline. Basic engineering design related to
new 160kW raw water pumps. (Mbombela control of the Mozambique to Secunda natural
Local Municipality on behalf of the Department gas pipeline in conjunction with Worley Ltd. of
of Water Affairs and Forestry, Nelspruit, South Australia. (Sasol, South Africa - Mozambique).
Africa). Electrification of water pumps. Design of
Modifications to the Petronet multi- energy supply to water pumps. (Ministry of
products pipeline. Design, specification and Water, Construction, Energy, Lands and
supervision to upgrade the receiving depot Environment, Zanzibar).
manifold for transferring AVTUR from the
coastal refineries to OR Tambo International
Airport. (Petronet, Gauteng, South Africa). Control and Supervisory Control and
Upgrade of the AVTUR pump line from Data Acquisition (SCADA) Systems
Coalbrook to OR Tambo International Upgrade of the control and monitoring
Airport. Design, specification and supervision equipment at Mantsole traffic control
to upgrade the AVTUR Pump Line from centre. Responsibilities included the design,
Coalbrook to OR Tambo International Airport, specification, supervision and contract
including pump selection and manifold piper administration of control and monitoring
work. Electrical and control installation. equipment installations, including
(Petronet, South Africa, Gauteng). instrumentation, PLCs (Programmable Logic
Botswana Ash (Pty) Ltd. Proposal and Controllers), heavy vehicle Weigh-In-Motion
concept design for a dust control and spillage equipment and SCADA (Supervisory Control
recovery system. (Botswana Ash, Botswana). and Data Acquisition) system. (SANRAL,
Gauteng, South Africa).
Electrical Engineering Installations Soutpan bulk water supply scheme
upgrade. Responsibilities were the design,
Impala Platinum Merensky concentrator documentation, contract administration and site
water circuit modifications supervision of instrumentation, PLCs
Responsibilities included the preliminary (Programmable Logic Controllers) and Radio
design, cost estimate and compiling of a report Telemetry between the raw water, main clear
for the UG2 Merensky concentrator water water and booster clear water pump stations
circuit modifications, including the electrical, and clear water reservoirs and water treatment
instrumentation and mechanical installations. works. (Masilonyana Municipality, Free State,
(Impala Platinum Mines, North West Province, South Africa).
South Africa) Implementation of control and
Impala Platinum UG2 high grade plant monitoring equipment for Heidelberg
secondary milling circuit modifications. traffic control centre. Responsibilities were
Responsibilities were the preliminary design, the design, specification, supervision and
cost estimate and compiling of a report for the contract administration of control and
UG2 high-grade plant secondary milling circuit monitoring equipment installations, including
modifications, including the electrical, instrumentation, PLCs (Programmable Logic
instrumentation and mechanical installations. Controllers), heavy vehicle Weigh-In-Motion
(Impala Platinum Mines, North West Province, equipment and SCADA (Supervisory Control
South Africa)
ENERGY PROJECTS and Data Acquisition) system. (SANRAL, IPPs Sudan, preliminary designs of electrical
Gauteng, South Africa). and control systems for the diesel prime
Implementation of control and movers, outdoor electrical substations and fuel
monitoring equipment for systems, suitable fuel selection and
Potchefstroom traffic control centre. conversions of diesel prime movers.
Responsibilities were the design, specification, Installations vary from 5 - 40MW. (GESCO;
supervision and contract administration of Burkina Faso, Chad, Guinea Bissau, Sierra
control and monitoring equipment installations, Leone, Sudan, Zanzibar).
including instrumentation, PLCs Advisory services to Eskom enterprises
(Programmable Logic Controllers), heavy to establish a Joint Venture with the
vehicle Weigh-In-Motion equipment and National Water and Electricity Company
SCADA (Supervisory Control and Data of The Gambia. Assessment of fast-track
Acquisition) system. (Department of Roads, generation and other generation requirements.
Transport & Public Works, North West (NAWEC, The Gambia).
Province, South Africa).
Serule weighbridge and traffic control
centre. Responsibilities were the design,
tender documentation, contract management
BUILDING ELECTRICAL &
and supervision of the instrumentation for a ELECTRONIC SYSTEMS
heavy vehicle weighbridge. (Serule, Botswana). IEC security projects. Compilation of
Inchope and Caia weighbridge and original security and safety policy documents
traffic control centre. Responsibilities were for the Independent Electoral Commission
the design, tender documentation, contract (IEC) in 1999, followed by development of the
management and supervision of the heavy policy document into operational procedures
vehicle weighbridge instrumentation, non-grid and system specifications. Aurecon then
Energy Generation (Solar Power) for general successfully designed and supervised the
electrical building power and a borehole pump installation of fifteen electronic security
and a diesel standby power generator. installations for the Commission, and currently
(Mozambique). acts as technical consultant on all security and
Sasol Carbo-Tar, coke calcining plant. standby power related projects for the IEC.
Basic engineering design for a coke calcining (IEC, South Africa).
plant including electrical, control and City of Cape Town CCTV strategy
instrumentation and SCADA system. (Sasol master plan. Aurecon was appointed to
Carbo-Tar, South Africa). compile a strategy master plan in preparation
SCADA system for the Pietersburg to the 2010 Soccer World Cup. The strategy
electrical system. The project included the must support the metros vision to become a
upgrading and modification of 11kV and 66kV sustainable, accessible, safe and caring city.
switchgear to make all required signals (City of Cape Town, 2004)
available to the SCADA via the Radio Kruger Mpumalanga International
Telemetry System. Responsible for the design, Airport. Aurecon was appointment for the
documentation and contract related services to complete spectrum of electricity and electronic
implement the SCADA/EMS incorporating a engineering services for this modern airport.
Radio and Telemetry System. The electronic services included protection
(Pietersburg/Polokwane Local Council, South systems as well as voice and data networks.
Africa). (ABB, South Africa,
Midstream Estate: electronic services.
Power Generation Installation of the full complement of security
services for this 1 500 stand estate. The
Feasibility studies for independent access control system is based on fingerprint
power producers (IPPs) in Africa. Site biometric readers with facial image recording,
assessments to establish suitable sites for new
ENERGY PROJECTS supported by licence plate image capture. Independent electoral commission.
Each stand is provided with telephony, high Deployed a large number of covert and
speed internet and satellite TV via a single surveillance CCTV cameras at the Head Office,
cable connection. (Bondev Developers, South Election House, IEC's head office, and at
Africa). provincial electoral offices (ten in total).
South African embassy and diplomatic Analogue and hard disk recording and storage
village for Kinshasa. Aurecon was facilities (IEC, South Africa)
responsible for the complete spectrum of Leopard Creek Golf Estate
electrical and electronic design. The main (underground electrical and electronic
supply had to be reinforced with generator and infrastructure).
UPS power supplies. Fire detection, access Luxury 300-stand golf estate bordering the
control and intercommunication systems were Kruger Park, South Africa. Aurecon designed
required. The project also comprised and supervised the installation of the complete
sophisticated electronic security, including underground electrical and electronic
CCTV surveillance with digital recording. A infrastructure project including 10 km of fibre
cable TV signal distribution network was optic cable, interactive cable TV, access
required for the diplomatic village. Extensive control, remote plant monitoring, intrusion and
surge and overvoltage protection measures fire detection with remote monitoring (Private
had to be designed to protect sensitive user Client, South Africa).
equipment. (South African Department of
Public Works, South Africa). Sustainable biofuels from Algae,
Kentron perimeter protection. Design Wellington, New Zealand
and supervision of installation of specially- New Zealand Trade and Enterprise wished to
selected perimeter cameras with sophisticated determine the potential opportunity for New
movement detection head-end equipment. Zealand around sustainable production of
Lighting is provided by means of infrared biofuels for transport applications.
illuminators outside the visible spectrum.
(Denel, South Africa). Aurecon was assigned to undertake and
Johannesburg City inner core manage a scoping study to identify and assess
surveillance. Aurecon was the technical technologies to manufacture biofuels from
consultant on this project involving CCTV algae in corporation with the Cawthron Institute
surveillance cameras and a sophisticated and the New Zealand Institute of Economic
surveillance control and recording facility. Research. The project was completed during
(Business Against Crime, South Africa) 2008.
Grandwest Casino: access routes CCTV Detailed Design and Contract
surveillance. Aurecon was appointed to Administration for Hydro Power
deploy closed-circuit television (CCTV) Generation Options on the As River in
surveillance to monitor and protect main Free State Province, South Africa
access routes. (Business Against Crime, South
Bethlehem Hydro appointed Aurecon to
Africa)
undertake the detailed design and project
Traffic law enforcement study. The
management duties for two mini hydro stations,
technical study comprised all engineering and
one on the farm Merino along the As River and
system design aspects (Botswana Department
the other attached to the Sol Plaatje Dam, near
of works, Botswana)
the town of Bethlehem in Eastern Free State
Tygerberg ITS with CCTV technology. Province of South Africa. Water from the
Preparation of a proposal for integrated traffic
Lesotho Highlands Water Project flows in the
management (ITS) on main highways to Cape
As River, providing a constant flow of
Town. Technology for monitoring, response
approximately 24 cubic metres per second
and law enforcement is based on CCTV(City of
within the river. The head at the Merino Site is
Cape Town, South Africa)
approximately 14m while that at Sol Plaatje is
ENERGY PROJECTS approximately 10m. The installed capacity of approach, and a stylised 360 degree camera
the turbines is respectively 2.5MW and 3.2 pan
MW. Extensive post-production editing took place,
which included titles, transitions and colour-
The layout of the power station for the Sol correction. The final deliverable was packaged
Plaatje Dam differed significantly from that into a DVD-formatted disc and used to brief key
conceptualised at Feasibility Study stage, staff within Queensland Transport, including
achieving increased efficiency and generation the Minister for Transport.
output. Project completion was during 2008
and the value of services was US $420,000.
Wembley Stadium, London, UK
Aurecon has designed the entire engineering
for the world famous Wembley Stadium. The
proposed stadium will seat 90,000 and features
a unique retractable roof, offering an
unprecedented facility as the new English
national stadium.

This project is one of the most exciting in which


Aurecon has ever been involved. The iconic
roof form we have developed includes an arch
spanning some 300 m long and 140 m high
and demonstrates our capability in world class
lighting of stadia.

Technical challenges such as pitch illumination,


lighting the Great Arch and the creation of
intimacy around the five-star restaurants each
required innovative lighting solutions.

Queensland Transport Regional Bus


Shelters
Queensland
Queensland Transport commissioned Aurecon
to produce a number of visualisations
highlighting different transport standard
compliant bus shelters in a virtual environment.

The key features of this visualisation included:


The modelling of three unique transport
standard compliant bus shelters
The creation of a virtual environment, complete
with traffic, road furniture, foliage and
pedestrians
The production of an animated movie file,
where the bus arrives at the shelter, which was
created from a variety of angles including a
pedestrian approach on foot, a bus drivers

You might also like