Bill of Quantities
VOLUME III
Bill No. 4
B01 - Oncology Building
Issue 1
dated 27th. August2014
This BOQ is Measured based on CD package issued on 5th Jan 2014 and updated foundation design
issued on 28th April 2014
VOLUME III
Bill No. 4
B01 - Oncology Building
Issue 1
Index
Commencing on
Page
A Piles head trimming to the cut off level with removal of debris to the
areas approved by authorities. Item Item Pro-rata Item 5/3/(Add-3)/A 51,153.30 -
0
Piles head treatment by using treatment material approved by the
Engineer 0
0
B To pile heads, 1200mm diameter No 0 No
0
C Ditto but micro piles. No 0 No
0
C.1 To pile heads, 800mm diameter 0.00 198 No 198 No Pro-rata Item 5/3/1(Add-3)/C 415.00
0
D Steel bend inside pile caps and cleaning by using approved materials
against rust. Item Item Pro-rata Item 5/3/1(Add-3)/D 38,542.68
0
PILE 0
0
To Collection SR. 0
A
150mm thick blinding bed below pile cap footings, combine
footings, raft foundation and tie beams etc. laid in two layers
80mm and 70mm with water proofing membrane in between
(waterproofing membrane measured elsewhere).
5,560 3,697 m -1,863 m Item 4/3/1(Add-3)/A 435 (810,405.00)
0
B 100mm thick blinding bed below isolated 973 3,564 m 2,591 m Item 4/3/1(Add-3)/B 427
0
C 50mm thick blinding bed below the tie beams. 5,700 45 m -5,655 m Item 4/3/1(Add-3)/C 406 (2,295,930.00)
0
Raft foundation 300 mm thick including trench concrete (refer to Pro-rata Items 3/3/2(Add-3)/F &
A 657 m 657 m 1,291
4/3/2(Add-3)Item A). 5/3/2(Add-3)/D
0
B Ditto but, 400mm thick m 0 m
0
C Ditto but, 500mm thick (refer to 4/3/2(Add-3) Item A). 1,214 m 1,214 m Item 5/3/2(Add-3)/d 1,429
0
D Ditto but, 600mm thick (refer to 4/3/2(Add-3) Item A). 561 m 561 m Item 4/3/2(Add-3)/A 1,344
0
E Ditto but, 1000mm thick 110 126 m 16 m Item 4/3/2(Add-3)/B 1,067
0
Pro-rata Items 4/3/2(Add-3)/C &
F Ditto but, 1300mm thick(refer to 4/3/2(Add-3) Item C). 303 m 303 m 1,136
4/3/2(Add-3)/D
0
Pro-rata Items 4/3/2(Add-3)/C &
G Ditto but, 1700mm thick (refer to 4/3/2(Add-3) Item C). 456 m 456 m 4/3/2(Add-3)/D 1,088
0
H Strip footing 1000mm thick m 0 m
0
The Following are Omissions from KFSH1 BOQ 0
800 mm thick Raft foundations 3100 m -3,100 m Item 4/3/2(Add-3)/A 1,173 (3,636,300.00)
1400 mm thick Raft foundations 385 m -385 m Item 4/3/2(Add-3)/C 1,124 (432,740.00)
1500 mm thick Raft foundations 310 m -310 m Item 4/3/2(Add-3)/D 1,112 (344,720.00)
A.1 Ditto but, 800mm thick (refer to 5/3/3 (Add-3) Item A). 40 m 40 m Pro-rata items 3/3/3(Add-3)A & B 1,058
B.1 Ditto but, 1300mm thick (refer to 5/3/3 (Add-3) Item B). 80 m 80 m Pro-rata items 3/3/3(Add-3)A & B 1,443
C.1 Ditto but, 1500mm thick (refer to 5/3/3 (Add-3) Item B). 362 m 362 m Pro-rata items 3/3/3(Add-3)B & C 1,597
To Collection SR. 0
A
500mm thick retaining wall from foundation to ground floor. 450 1,288
1,090 m 640 m Item 4/3/2(Add-3) /L
0
B
400mm thick retaining wall from foundation to ground floor. 1,290
105 m 105 m Item 3/3/4(Add-3) /B
0
C
350mm thick retaining wall from foundation to ground floor.
m 0 m
0
D 250mm thick retaining wall from foundation to ground floor (Refer
to 6/3/2 (Add-3) Item G). 135 m 135 m Pr Items 4/3/2(Add-3)/L& 4/3/2(Add-3)/A 1,645
0
D.1 200mm thick retaining wall from foundation to ground floor (Refer
to 6/3/2 (Add-3) Item G). 200 m 200 m Pr Items 4/3/2(Add-3)/L& 4/3/2(Add-3)/A 1,717
0
E
100mm thick retaining wall from foundation to ground floor.
m 0 m
0
2500 mm thick retaining walls 180 m -180 m Item 4/3/2(Add-3)/G 949 (170,820.00)
0 -
1400 mm thick retaining walls 150 m -150 m Item 4/3/2(Add-3)/H 1,026 (153,900.00)
-
900 mm thick retaining walls 320 m -320 m Item 4/3/2(Add-3)/J 1,098 (351,360.00)
-
800 mm thick retaining walls 470 m -470 m Item 4/3/2(Add-3)/K 1,237 (581,390.00)
-
500 mm thick retaining walls for tunnel 100 m -100 m Item 4/3/2(Add-3)/M 1,288 (128,800.00)
0 0
300 mm thick retaining wall 25 m -25 m Item 4/3/3(Add-3)/A 1,214 (30,350.00)
0
1600mm thick core wall from foundation to grade slab (refer to
B 50 m 50 m Pr Items 4/3/2(Add-3)/H&J 1,495.80
5/3/4 (Add-3) Item G).
0
1800mm thick core wall from foundation to grade slab (refer to
C 40 m 40 m Pr Items 4/3/2(Add-3)/H&J 1,452.60
5/3/4 (Add-3) Item G).
0
2200mm thick core wall from foundation to grade slab (refer to
D 65 m 65 m Pr Items 4/3/2(Add-3)/H&J 1,366.20
5/3/4 (Add-3) Item G).
0
E 600mm thick shear wall from foundation to grade slab. m 0 m
0
F 500mm thick shear wall from foundation to grade slab. 30 m 30 m Item 3/3/3/5(Add-3)/B 1,744
0
G 450mm thick shear wall from foundation to grade slab. m 0 m
0
H 400mm thick shear wall from foundation to grade slab. 4 m 4 m Item 3/3/5(Add-3)/D 1,972
0
800mm thick Shear wall from foundation to grade slab (Refer to
J 20 m 20 m Pr Items 4/3/3(Add-3)/H&J 1,283
5/3/5 (Add-3) Item A)
0
K Columns from foundation to grade slab. 70 490 m 420 m Items 4/3/4(Add-3)/A 2,679
0
L Ditto but attached to retaining walls 50 80 m 30 m Items 4/3/4(Add-3)/B 1,967
0
E 350mm thick suspended solid slab m 0 m
0
F 340mm thick suspended solid slab m 0 m
0
G 320mm thick suspended solid slab m 0 m
0
H 300mm thick suspended solid slab 1450 260 m -1190 m Item 4/3/5(Add-3)/C 1,244 -1,480,360.00
0
Project No. JE-1257
KFSH & RC Volume III 4/3/23
B01 - Oncology Bldg.
BILL No. 4
DIVISION 3
CONCRETE
KFSH 1 NORTH
BOQ CAMPUS Add / Omit BOQ Ref. / Rate Analysis Total Omissions
Unit Rate
BOQ
Item Description Qty Qty Unit Qty Unit Amount Amount
SR SR
J 280mm thick suspended solid slab 1,810 m 1810 m Item 3/3/6(Add-3)/D 1,264
0
K 260mm thick suspended solid slab m 0 m
0
L 250mm thick suspended solid slab 3,670 m 3670 m Item 3/3/6(Add-3)/F 1,353
G 400mm thick suspended solid slab 340 m 340 m Item 5/3/6(Add-3)/A 1,172.00
0
H
1230mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item A). 1,092.00
175 m 175 m Pr Item 4/3/5(Add-3)/A
0
J
1480mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item A). 1,315.08
110 m 110 m Pr Item 4/3/5(Add-3)/A
0
K
1930mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item A). 1,714.94
225 m 225 m Pr Item 4/3/5(Add-3)/A
0
L
2330mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item A). 2,070.37
180 m 180 m Pr Item 4/3/5(Add-3)/A
0
M 700mm thick Cap column m 0
0
Project No. JE-1257
KFSH & RC Volume III 4/3/25
B01 - Oncology Bldg.
BILL No. 4
DIVISION 3
CONCRETE
KFSH 1 NORTH
BOQ CAMPUS Add / Omit BOQ Ref. / Rate Analysis Total Omissions
Unit Rate
BOQ
Item Description Qty Qty Unit Qty Unit Amount Amount
SR SR
N 550mm thick Cap column m 0
To Collection SR. 0
A 500mm thick cap column 265 65 m -200 m Item 4/3/5(Add-3)/G 1,457.00 -291,400.00
0
B 450mm thick cap column 12 m -12 m Item 4/3/5(Add-3)/H 1,607.00 -19,284.00
0
C 400mm thick cap column 47 m -47 m Item 4/3/5(Add-3)/J 1,324.00 -62,228.00
0 0.00
D 350mm thick cap column 480 m -480 m Item 4/3/5(Add-3)/L 1,563.00 -750,240.00
0 0.00
E 320mm thick cap column m m
J 460mm thick cap column 120 m 120 m Pr Items 4/3/5(Add-3)/G & 5/3/5(Add-3)H 1,507.20
0
K
480mm thick cap column(Refer to 4/3/5 (Add-3) Item H). 110 m 110 m Pr Items 4/3/5(Add-3)/G & 5/3/5(Add-3)H 1,482.60
0
L Suspended beams 950 1,385 m 435 m Item 4/3/5(Add-3)/M 1,434.00
0
M Corbel 20 1 m -19 m Item 4/3/5(Add-3)/N 1,434.00 -27,246.00
A Columns from grade slab to above. 1,260 1,825 m 565 m Item 4/3/6(Add-3)/A 1,573
-
B 800mm thick Shear wall from grade slab to above (Refer to 5/3/7
(Add-3) Item F). 120 m 120 m Pr Items 4/3/6(Add-3)J & K 1,643
-
C 600mm thick core wall from grade slab to above. m - m
-
D 550mm thick core wall from grade slab to above. m - m
-
E 500mm thick core wall from grade slab to above. 730 m 730 m Item 3/3/7(Add-3)D 1,701
-
F 400mm thick core wall from grade slab to above. 30 2,105 m 2,075 m Item 4/3/6(Add-3)C 1,326
-
G 300mm thick core wall from grade slab to above. 55 m (55) m Item 4/3/6(Add-3)E 1,744 (95,920)
-
H 150mm thick core wall from grade slab to above. m - m
-
J Ditto, but 1350mm thick (refer to 4/3/6 (Add-3) Item C). 855 m 855 m
-
K Ditto, but 1600mm thick (refer to 4/3/6 (Add-3) Item C). 200 m 200 m
-
L Ditto, but 1800mm thick (refer to 4/3/6 (Add-3) Item C). 160 m 160 m
-
M Ditto, but 2200mm thick (refer to 4/3/6 (Add-3) Item C). 280 m 280 m
-
N 600mm thick shear wall from grade slab to above. m - m
-
O 500mm thick shear wall from grade slab to above. 30 m 30 m
350 thick core wall; from grade to above 1,200 m (1,200) m Item 4/3/6(Add-3)/D 1,369 (1,642,800)
2500mm thick shear wall from grade slab to above. 600 m (600) m Item 4/3/6(Add-3)/F 989 (593,400)
1500mm thick shear wall from grade slab to above. 175 m (175) m Item 4/3/6(Add-3)/G 1,076 (188,300)
1400mm thick shear wall from grade slab to above. 1,090 m (1,090) m Item 4/3/6(Add-3)/H 1,782 (1,942,380)
900mm thick shear wall from grade slab to above. 72 m (72) m Item 4/3/6(Add-3)/J 1,630 (117,360)
300mm thick shear wall from grade slab to above. 7 m (7) m Item 4/3/6(Add-3)/K 1,709 (11,963)
To Collection SR. 0
STAIRCASE
A
Stair case; including inclined slab, landing slab, beams, wall & steps
of different thicknesses and sizes at all levels from basement to
service lower roof as shown in the drawings.
185 m
C At 12 th floor. m
D At 13 th floor. m
To Collection SR. 0
EXPANSION JOINTS
Expansion joints including, joint filler, board, cover and sealant etc.,
complete as per drawings, specifications.
E
Allow for 25mm thick Neoprene pads as shown on the drawings,
sections, as required and as per approved shop- drawings.
m
ISOLATION JOINTS
F
Minimum 300mm high x 20mm thick isolating joint with approved
filler and sealant, at slab on grade, as shown in the drawing.
3,230 m
SUNDRIES
G
Allow for lintels as required as per drawings & specifications.
Item
PRECAST CONCRETE
To Collection SR.
SCREEDS
A 50mm thick concrete screed with A252 wire mesh over the 710mm
thick Double " T " slab. m
A.1 50mm thick concrete screed with A252 wire mesh over the Double "
T " slab 105 m
To Collection SR.
COLLECTION
BILL No. 4
DIVISION 3 - CONCRETE
Carried to Summary SR..
Amount
SR
51,153.30
Amount
SR
171,866
Amount
SR
Amount
SR
4,585,873.50
Amount
SR
1,106,327.11
341,704.00
600,160.00
25,168.00
Amount
SR
2,085,793.51
Amount
SR
1,734,806
753,799
17,072
Amount
SR
4,193,651.07
Amount
SR
42,320.00
Refer to rate build-up
116,080.69
Refer to rate build-up
0.00
578,114.00
Refer to rate build-up
0.00
18,414.00
Amount
SR
814,929
Amount
SR
472,080
Amount
SR
690,840
2,767,230.00
Amount
SR
52,320
7,888
1,125,180
59,010
Amount
SR
1,821,434.00
Amount
SR
460,320
463,335
328,800
9,900
Amount
SR
2,287,840
4,965,510
8,515,705
Amount
SR
398,480.00
0.00
191,100.00 Refer to rate build-up
0.00
144,658.80 Refer to rate build-up
0.00
385,861.50 Refer to rate build-up
0.00
372,666.60 Refer to rate build-up
Amount
SR
1,492,767
Amount
SR
1,264,880.00
0.00
61,586.80 Refer to rate build-up
0.00
1,006,720.00 Refer to rate build-up
0.00
0.00
Amount
SR
2,677,137
Amount
SR
888,745
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount
SR
5,079,137
Amount
SR
Amount
SR
Amount
SR
Amount
SR
Amount
SR
Amount
SR
Amount
SR
Amount
SR
Amount
SR
171,865.98
4,585,873.50
2,085,793.51
4,193,651.07
814,928.69
2,767,230.00
1,821,434.00
8,515,705.00
13,475,171.75
398,480.00 -11,879,790.00 25,354,961.75
2,287,840
2,677,136.80
4,965,510
5,079,136.60
6,221,821.75
0.00
0.00
0.00
0.00
Amount
SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
A Piles head trimming to the cut off level with removal of debris to Pro-rata Item
the areas approved by authorities. Item 5/3/1(Add-3)/A 51,153.30 51,153.30 Refer to rate build-up
Pro-rata Item
C.1 To pile heads, 800mm diameter 198 No 5/3/1(Add-3)/C 415.00 82,170.00 See rate build-up
-
D Steel bend inside pile caps and cleaning by using approved Pro-rata Item
materials against rust. Item 5/3/1(Add-3)/D 38,542.68 38,542.68 See rate build-up
-
PILE -
-
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
-
G Micro pile to carry load equals 70 tons with approximate diameter
200mm and approximate lengh= 30m ( contractor to verify the
assumptions ) No -
-
-
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
A 800mm thick diameter Pile (Lenght = 14 m) (Refer to 5/3/1 (Add- Pro-rata Item
3) Item F). 4 No 5/3/1(Add-3)/F 15,451.80 61,807.20 See rate build-up
-
B 800mm thick diameter Pile (Lenght = 26 m) (Refer to 5/3/1 (Add- Pro-rata Item
3) Item F). 5 No 5/3/1(Add-3)/F 28,696.20 143,481.00 See rate build-up
-
C 800mm thick diameter Pile (Lenght = 21 m)(Refer to 5/3/1 (Add- Pro-rata Item
3) Item F). 189 No 5/3/1(Add-3)/F 23,177.70 4,380,585.30 See rate build-up
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
A
150mm thick blinding bed below pile cap footings, combine
footings, raft foundation and tie beams etc. laid in two layers
80mm and 70mm with water proofing membrane in between
(waterproofing membrane measured elsewhere).
3,697 m Item 4/3/1(Add-3)/A 435 1,608,195
0
B
100mm thick blinding bed below isolated 427
3,564 m Item 4/3/1(Add-3)/B 1,521,798
0
C
50mm thick blinding bed below the tie beams. 406
45 m Item 4/3/1(Add-3)/C 18,270
0
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
D.2
Combined Footings. 968
26 m Item 4/3/1(Add-3)/D 25,168
0
D.3 Pro-rata Item 3/3/2
400 mm thick strip Footings (Refer to 4/3/2 (Add-3) Item F). 22 m (Add-3)/G 565.20 12,434 Refer to rate build-up
0
0
0
0
0
0
0
To Collection SR. 4,248,730
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
Pro-rata Items
Raft foundation 300 mm thick including trench concrete (refer to
A 657 m 3/3/2(Add-3)/F & 1,291.00 848,187
4/3/2(Add-3)Item A).
5/3/2(Add-3)/D
0
B Ditto but, 400mm thick m 0
0
C Ditto but, 500mm thick (refer to 4/3/2(Add-3) Item A). 1,214 m Item 5/3/2(Add-3)/D 1,429 1,734,806
0
Pr Items 4/3/2(Add-
D Ditto but, 600mm thick (refer to 4/3/2(Add-3) Item A). 561 m 3)/A& 5/3/2(Add-3)/D 1,343.67 753,798.87
0
E Ditto but, 1000mm thick 126 m Item 4/3/2(Add-3)/B 1,067 134,442
0
Pro-rata Items
F Ditto but, 1300mm thick(refer to 4/3/2(Add-3) Item C). 303 m 4/3/2(Add-3)/C & 1,136
344,094 Refer to rate build-up
4/3/2(Add-3)/D 0
Pro-rata Items
4/3/2(Add-3)/C &
G Ditto but, 1700mm thick (refer to 4/3/2(Add-3) Item C). 456 m 4/3/2(Add-3)/D 1,088 495,693 Refer to rate build-up
0
H Strip footing 1000mm thick m 0
0
0
0
0
0
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
0
0
0
0
0
0
0
0
0
0
To Collection SR. 4,311,021.07
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
Pro-rata items
A.1 Ditto but, 800mm thick (refer to 5/3/3 (Add-3) Item A). 40 m 3/3/3(Add-3)A & B 1,058 42,320.00
0.00
B Ditto but, 1200mm thick m 0.00
0.00
Pro-rata items
B.1 Ditto but, 1300mm thick (refer to 5/3/3 (Add-3) Item B). 80 m 3/3/3(Add-3)A & B 1,443 116,080.69
0.00
C Ditto but, 1400mm thick m 0.00
0.00
Pro-rata items
C.1 Ditto but, 1500mm thick (refer to 5/3/3 (Add-3) Item B). 362 m 3/3/3(Add-3)B & C 1,597 578,114.00
0.00
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
G.1 Ditto but 1000mm high 40 m Item 4/3/1(Add-3)G 1500 60,000.00 Tie beam
0.00
J Grade Beams (Refer to Bill 4, Oncology Building BOQ) m 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
To Collection SR. 814,929
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
Pr Items 4/3/2(Add-
F Trench walls 5 m 3)/L& 4/3/2(Add-3)/A 1,645 8,225 Refer to rate build-up
0
G
Pump room and sump pit walls 1,288 70,840
55 m Item 4/3/2(Add-3) /L
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
1350mm thick core wall from foundation to grade slab (refer to Pr Items 4/3/2(Add-
A 210 m 1,569.90 329,679 Refer to rate build-up
5/3/4 (Add-3) Item G). 3)/H&J
0
1600mm thick core wall from foundation to grade slab (refer to Pr Items 4/3/2(Add-
B 50 m 1,495.80 74,790 Refer to rate build-up
5/3/4 (Add-3) Item G). 3)/H&J
0
1800mm thick core wall from foundation to grade slab (refer to Pr Items 4/3/2(Add-
C 40 m 1,452.60 58,104 Refer to rate build-up
5/3/4 (Add-3) Item G). 3)/H&J
0
2200mm thick core wall from foundation to grade slab (refer to Pr Items 4/3/2(Add-
D 65 m 1,366.20 88,803 Refer to rate build-up
5/3/4 (Add-3) Item G). 3)/H&J
0
E 600mm thick shear wall from foundation to grade slab. m 0
0
F
500mm thick shear wall from foundation to grade slab. Item 3/3/3/5(Add-3)/B 1,744 52,320
30 m
0
G 450mm thick shear wall from foundation to grade slab. m 0
0
H
400mm thick shear wall from foundation to grade slab. Item 3/3/5(Add-3)/D 1,972 7,888
4 m
0
800mm thick Shear wall from foundation to grade slab (Refer Pr Items 4/3/3(Add-
J 20 m 1,283 25,660 Refer to rate build-up
to 5/3/5 (Add-3) Item A) 3)/H&J
0
Project No. JE-1257
KFSH & RC Volume III 4/3/85
B01 - Oncology Bldg.
BILL No. 4
DIVISION 3
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
K
Columns from foundation to grade slab. Items 4/3/4(Add-3)/A 2,679 1,312,710
490 m
0
L
Ditto but attached to retaining walls Items 4/3/4(Add-3)/B 1,967 157,360
80 m
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
B.1 600mm thick Slab on grade (Refer to 4/3/4 (Add-3) Item D). Item 4/3/4(Add-3)/D
395 m &E 1,173 463,335
0
C
Thickened slab 822
465 m Item 4/3/4(Add-3)/F 382,230
0
C.1 250mm thick Pump room slab (Refer to 5/3/5 (Add-3) Item H). Item 4/3/4(Add-3)/D
11 m &E 900 9,900
0
External Steps 0
0
D
Steps
8 m Item 4/3/4(Add-3)/G 771 6,168
0
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
F 340mm thick suspended solid slab m
H
300mm thick suspended solid slab
260 m Item 4/3/5(Add-3)/C 1,244 323,440
0
J
280mm thick suspended solid slab
1,810 m Item 3/3/6(Add-3)/D 1,264 2,287,840
L
250mm thick suspended solid slab
3,670 m Item 3/3/6(Add-3)/F 1,353 4,965,510
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
G
400mm thick suspended solid slab 1,172.00 398,480.00
340 m Item 5/3/6(Add-3)/A
0.00
H 1230mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item Pr Item 4/3/5(Add- 1,092.00 191,100.00 Refer to rate build-up
A). 175 m 3)/A
0.00
J 1480mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item Pr Item 4/3/5(Add- 1,315.08 144,658.80 Refer to rate build-up
A). 110 m 3)/A
0.00
K 1930mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item Pr Item 4/3/5(Add- 1,714.94 385,861.50 Refer to rate build-up
A). 225 m 3)/A
0.00
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
L 2330mm thick suspended solid slab (Refer to 4/3/5 (Add-3) Item Pr Item 4/3/5(Add- 2,070.37 372,666.60 Refer to rate build-up
A). 180 m 3)/A
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
A
500mm thick cap column
65 m Item 4/3/5(Add-3)/G 1,457.00 94,705.00
0.00
B 450mm thick cap column m
F
340mm thick cap column
815 m Item 4/3/5(Add-3)/G 1,552.00 1,264,880.00
0.00
G Pr Items 4/3/5(Add-
360mm thick cap column
40 m 3)/K&L 1,539.67 61,586.80 Refer to rate build-up
0.00
H Pr Items 4/3/5(Add-
440mm thick cap column
650 m 3)/H&J 1,548.80 1,006,720.00 Refer to rate build-up
0.00
Pr Items 4/3/5(Add-
J 460mm thick cap column 120 m 3)/G & 5/3/5(Add-3)H 1,507.20 180,864.00 Refer to rate build-up
0.00
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
K
Pr Items 4/3/5(Add-
480mm thick cap column(Refer to 4/3/5 (Add-3) Item H). 110 m 3)/G & 5/3/5(Add-3)H 1,482.60 163,086.00 Refer to rate build-up
0.00
L
Suspended beams
1,385 m Item 4/3/5(Add-3)/M 1,434.00 1,986,090.00
0.00
M
Corbel
1 m Item 4/3/5(Add-3)/N 1,434.00 1,434.00
0.00
0.00
To Collection SR. 4,759,366
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
A
Columns from grade slab to above. 1,573 2,870,725
1,825 m Item 4/3/6(Add-3)/A
0
B
800mm thick Shear wall from grade slab to above (Refer to 5/3/7 Pr Items 4/3/6(Add- 197,212
(Add-3) Item F). 120 m 3)J & K 1,643 Refer to rate build-up
E
500mm thick core wall from grade slab to above. 1,701 1,241,730
730 m Item 3/3/7(Add-3)D
0
F
400mm thick core wall from grade slab to above. 1,326 2,791,230
2,105 m Item 4/3/6(Add-3)C
0
G 300mm thick core wall from grade slab to above. m
J
Ditto, but 1350mm thick (refer to 4/3/6 (Add-3) Item C). Pr Items 4/3/6(Add-
855 m 3)/G & H 1,252.50 1,070,888
0
K
Ditto, but 1600mm thick (refer to 4/3/6 (Add-3) Item C). Pr Items 4/3/6(Add-
200 m 3)/F & G 1,067.30 213,460
. 0
Project No. JE-1257
KFSH & RC Volume III 4/3/93
B01 - Oncology Bldg.
BILL No. 4
DIVISION 3
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
L
Ditto, but 1800mm thick (refer to 4/3/6 (Add-3) Item C). Pr Items 4/3/6(Add-
160 m 3)/F & G 1,049.90 167,984
0
M
Ditto, but 2200mm thick (refer to 4/3/6 (Add-3) Item C). Pr Items 4/3/6(Add-
280 m 3)/F & G 1,015.10 284,228
Q
400mm thick shear wall from grade slab to above. 1,846.00 9,230
5 m Items 3/3/7(Add-3)/ K
0
0
To Collection SR. 8,895,946
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
To Collection SR. 0
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
STAIRCASE
A Stair case; including inclined slab, landing slab, beams, wall &
steps of different thicknesses and sizes at all levels from
basement to service lower roof as shown in the drawings.
185 m Items 4/3/6(Add-3)/ L 1,356 250,860
C At 12 th floor. m
D At 13 th floor. m
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
EXPANSION JOINTS
C
Ditto but for 50mm thick 11.00 8,690.00
790 m Item 3/3/9(Add-3)/C
E
Allow for 25mm thick Neoprene pads as shown on the drawings,
sections, as required and as per approved shop- drawings.
m
ISOLATION JOINTS
F
Minimum 300mm high x 20mm thick isolating joint with approved
filler and sealant, at slab on grade, as shown in the drawing.
3,230 m Item 4/3/7(Add-3)/G 19 61,370
SUNDRIES
G
Allow for lintels as required as per drawings & specifications.
Item
PRECAST CONCRETE
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
Precast concrete including transportation, lifting, laying in
position, dowels, grouting, filling joints, ranking, etc. complete
as shown in the drawings and specifications
J 5200 4900mm Precast concrete panel (Ref. Drawing No. New Rate - refer to
1257B01-S102H). 1 No rate build up 13,225 13,225
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
SCREEDS
A 50mm thick concrete screed with A252 wire mesh over the 710mm
thick Double " T " slab. m
A.1 50mm thick concrete screed with A252 wire mesh over the Double
" T " slab 105 m Item 4/3/8(Add-3)/A 52 5,460.00
C
35 90,825.00
100mm thick concrete screed to receive carpet 2,595 m Item 4/3/8(Add-3)/C
D
35 404,390.00
100mm thick concrete screed to receive resilient floor 11,554 m Item 4/3/8(Add-3)/D
E
35 159,075.00
100mm thick concrete screed to receive epoxy paint 4,545 m Item 4/3/7(Add-3)/E
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
COLLECTION
NORTH
CAMPUS BOQ Ref. / Rate
Total Additions Comments /Notes
BOQ Analysis
Unit Rate
Item Description Qty Unit Amount Amount
SR SR
BILL No. 4
DIVISION 3 - CONCRETE
Carried to Summary SR.. 44,350,931.05
C.1 400mm thick walls (Item E in page No. 5/4/1(Add-3)) 56 m Item 5/4/1(Add-3)/E 136.00 7,616.00
E 200mm thick walls including parapet 5,968 m Item 4/4/1(Add-3)/E 68.00 405,824.00
G
Composite wall 430 mm thick comprising of 2 skins 200, 200 mm
thick and 30 mm thick cavity with 50 mm thick rigid insulation m
A
Composite wall 460 mm thick comprising of 2 skins 200, 200 mm
thick and 60 mm thick cavity with 50 mm thick rigid insulation 78 m Item 4/4/2(Add-3)/A 116.00 9,048.00 Add-1
B
Composite wall 500 mm thick comprising of 2 skins 200, 150 mm
thick and 150 mm thick cavity with 50 mm thick rigid insulation m
COLLECTION
BILL No. 4
DIVISION 4 - MASONRY
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
EXTERNAL STEPS
A
900mm high floor mounted including intermediate railings
80 m Item 4/5/1/(Add-3)/C 448.00 35,840.00
TRENCH COVER
C Mild steel cover grating, 600mm wide (Item A page No. 3/5/5(Add-
3)) 60 m Item 3/5/5(Add-3)/A 593.00 35,580.00
D Mild steel cover grating, 300mm wide (Item B page No. 3/5/5(Add-
3)) 148 m Item 3/5/5(Add-3)/B 405.00 59,940.00
MANHOLE COVER
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
METAL WORKS
ALUMINUM PANEL
SUNSCREEN
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
SUNSHADE
STEEL COLUMNS
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
A Type TA-5 stainless steel floor transition (Ref. DWG No. I503.3)
420 m Refer to rate build-up 71.35 29,967.00
B 10 mm Stainless steel revel (Ref. DWG No. I505.3). 5,080 m Refer to rate build-up 65.68 333,654.40
C 6 mm Stainless steel revel (Ref. DWG No. I504.4). 842 m Refer to rate build-up 65.68 55,302.56
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
COLLECTION
BILL No. 4
DIVISION 5 - METALS
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTER TOP
Approved vanity counter top with fascia and splash back, provision
for vanity basin etc., including all necessary support, , fixing and all
fixing accessories, all as specified and as shown in the drawings.
B.1 450 mm wide x 700 mm long, Holed for one lavatory (Lavatory #
3) No
B.2 510 mm wide x 700 mm long, Holed for one lavatory (Lavatory #
3) No
B.3 535 mm wide x 700 mm long, Holed for one lavatory (Lavatory #
3) No
B.4 600 mm wide x 800 mm long, Holed for one lavatory (Lavatory #
3) No
B.5 570 mm wide x 980 mm long, Holed for one lavatory semi
-round -shape (Lavatory # 3) No
B.6 600 mm wide x 1105 mm long, Holed for one lavatory (Lavatory
# 3) No
B.7 600 mm wide x 1200 mm long, Holed for one lavatory (Lavatory
# 3) No
B.8 600 mm wide x 1350 mm long, Holed for one lavatory (Lavatory
# 3) No
B.9 600 mm wide x 1495 mm long, Holed for one lavatory (Lavatory
# 3) No
B.10 600 mm wide x 1535 mm long, Holed for one lavatory (Lavatory
# 3) No
To Collection SR.
Project No. JE-1257
Volume III 4/6/126
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 6
WOOD AND PLASTIC
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
B.11 600 mm wide x 1630 mm long, Holed for one lavatory (Lavatory #
3) No
B.12 600 mm wide x 1680 mm long, Holed for one lavatory (Lavatory #
3) No
B.13 600 mm wide x 2440 mm long, Holed for one lavatory (Lavatory #
3) No
B.14 600 mm wide x 2485 mm long, Holed for one lavatory (Lavatory #
3) No
B.15 600 mm wide x 2845 mm long, Holed for one lavatory (Lavatory #
3) No
B.16 600 mm wide x 3080 mm long, Holed for one lavatory (Lavatory #
3) No
B.17 600 mm wide x 3160 mm long, Holed for one lavatory (Lavatory #
3) No
B.18 600 mm wide x 3725 mm long, Holed for one lavatory L-Shape
type (Lavatory # 3) No
B.19 600 mm wide x 3950 mm long, Holed for one lavatory L- Shape
type (Lavatory # 3) No
B.20 450 mm wide x 1300 mm long, Holed for one lavatory (Lavatory #
3) No
B.21 455 mm wide x 510 mm long, Holed for one lavatory (Lavatory #
4) No
B.22 570 mm wide x 980 mm long, Holed for one lavatory (Lavatory #
4) No
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A 610 mm wide 1000 mm long (Item B page No. 3/6/1(Add-3)) 82 No Pr item 3/6//1(Add-3)B 6,074.27
0.00
B Ditto but 1200mm long (Item B page No. 3/6/1(Add-3)) 5 No Pr Item 3/6//1(Add-3)B 7,289.12
0.00
C Ditto but 1400mm long (Item B page No. 3/6/1(Add-3)) 30 No Pr Item 3/6//1(Add-3)B 8,503.98
0.00
D Ditto but 1465mm long (Item B page No. 3/6/1(Add-3)) 1 No Pr Item 3/6//1(Add-3)B 8,898.81
0.00
E Ditto but 1500 mm long (Item B page No. 3/6/1(Add-3)) 2 No Pr Item 3/6//1(Add-3)B 9,111.41
0.00
F Ditto but 1600 mm long (Item B page No. 3/6/1(Add-3)) 11 No Pr Item 3/6//1(Add-3)B 9,718.84
0.00
G Ditto but 1685 mm long (Item B page No. 3/6/1(Add-3)) 1 No Pr Item 3/6//1(Add-3)B 10,235.15
0.00
H Ditto but 1700 mm long (Item B page No. 3/6/1(Add-3)) 7 No Pr Item 3/6//1(Add-3)B 10,326.27
0.00
J Ditto but 1800 mm long (Item B page No. 3/6/1(Add-3)) 10 No Pr Item 3/6//1(Add-3)B 10,933.69
0.00
K Ditto but 2190 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6//3(Add-3)B 7,790.28
0.00
L Ditto but 2400 mm long (Item B page No. 3/6/3(Add-3)) 2 No Pr Item 3/6//3(Add-3)B 8,537.29
0.00
M Ditto but 2450 mm long (Item B page No. 3/6/3(Add-3)) 5 No Pr Item 3/6//3(Add-3)B 8,715.16
0.00
N Ditto but 2590 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6//3(Add-3)B 9,213.16
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A Ditto but 2670 mm long (Item B page No. 3/6/3(Add-3)) 4 No Pr Item 3/6//3(Add-3)B 9,497.74
-
B Ditto but 2700 mm long (Item B page No. 3/6/3(Add-3)) 2 No Pr Item 3/6//3(Add-3)B 9,604.46
-
C Ditto but 2800 mm long (Item B page No. 3/6/3(Add-3)) 2 No Pr Item 3/6//3(Add-3)B 9,960.18
-
D Ditto but 2845 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6//3(Add-3)B 10,120.25
-
E Ditto but 3035 mm long (Item C page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(Add-3)/C 18,435.61
-
F Ditto but 3140 mm long (Item C page No. 3/6/1(Add-3)) 2 No Pr Item 3/6/1(Add-3)/C 19,073.42
-
G Ditto but 3545 mm long (Item C page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(Add-3)/C 21,533.52
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A 610 mm wide 4265 mm long (Item E page No. 3/6/1(Add-3)) 2 No Pr Item 3/6/1(Add-3)/E 25,907.81
0
B Ditto but 4930 mm long (Item F page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(Add-3)/F 29,946.73
-
C Ditto but 6285 mm long (Item K page No. 3/6/2(Add-3)) 2 No Pr Item 3/6/1(Add-3)/K 38,178.41
0
D Ditto but 1870 mm long (L-Shape) 1 No Pr Item 3/6/1(Add-3)/B 11,358.89
0
E Ditto but 2120 mm long 1 No Pr Item 3/6/1(Add-3)/B 12,877.46
-
F Ditto but 3895 mm long (Item D page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(Add-3)/D 23,659.91
-
G Ditto but 4020 mm long (Item E page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(Add-3)/E 24,419.55
-
H Ditto but 6780 mm long (Item K page No. 3/6/2(Add-3)) 1 No Pr Item 3/6/2(Add-3)/K 47,951.42
-
J Ditto but 6855 mm long (Item K page No. 3/6/2(Add-3)) 1 No Pr Item 3/6/2(Add-3)/K 48,481.86
0
K Ditto but 3050 mm long (Semi L-Shape) (Item C page No.
3/6/1(Add-3)) 9 No Pr Item 3/6/1(Add-3)/C 18,526.73
0
L Ditto but 10720 mm long (U-Shape) 2 No Pr Item 4/6/3(Add-3)/G 70,545.15
0
M Ditto but 10360 mm long 4 No Pr Item 4/6/3(Add-3)/L 67058.45
N 740 mm wide 1000 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6/3(Add-3)/B 4,315.30
0.00
O Ditto but 1600 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6/3(Add-3)/B 6,904.48
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A Ditto but 1850 mm long (Item B page No. 3/6/3(Add-3)) 4 No Pr Item 3/6/3(Add-3)/B 7,983.30
-
B Ditto but 2300 mm long (Item B page No. 3/6/3(Add-3)) 2 No Pr Item 3/6/3(Add-3)/B 9,925.19
-
C Ditto but 2435 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6/3(Add-3)/B 10,507.75
-
D Ditto but 2485 mm long (Item B page No. 3/6/3(Add-3)) 1 No Pr Item 3/6/3(Add-3)/B 10,723.52
-
E Ditto but 2500 mm long (Item B page No. 3/6/3(Add-3)) 2 No Pr Item 3/6/3(Add-3)/B 10,788.25
F Ditto but 2525 mm long (Item B page No. 3/6/3(Add-3)) 2 No Item 3/6/3(Add-3)/B 10,896.13
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A
840 mm wide 6350 mm long (Item P page No. 3/6/2(Add-3)) 1 No Pr Item 3/6/2(Add-3)/P 46,656.38
0
B
610/330 mm wide 3110 mm long (Item C page No. 3/6/1(Add-3)) 2 No Pr Item 3/6/1(Add-3)/C 18,891.19
-
C
600/330 mm wide 3110 mm long (Item C page No. 3/6/1(Add-3)) 2 No Pr Item 3/6/1(Add-3)/C 18,581.50
-
D
900 mm wide 7510 mm long (Item H page No. 3/6/2(Add-3)) 2 No Pr Item 3/6/2(Add-3)/H 42,067.17
-
E
900 mm wide 6550 mm long (Item G page No. 3/6/2(Add-3)) 2 No Pr Item 3/6/2(Add-3)/G 36,689.67
-
F
840 mm wide 7310 mm long (Item H page No. 3/6/2(Add-3)) 1 No Pr Item 3/6/2(Add-3)/H 38,217.08
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A
330 mm wide 1650 mm long 4 No Pr Item 3/6/1(Add-3)B 5,422.04
-
B
Ditto but 2450 mm long 8 No Pr Item 3/6/1(Add-3)B 8,050.90
-
C Ditto but 2100 mm long 16 No Pr Item 3/6/1(Add-3)B 6,900.77
-
D Ditto but 2675 mm long 8 No Pr Item 3/6/1(Add-3)B 8,790.27
-
E Ditto but 3330 mm long 2 No Pr Item 3/6/1(Add-3)D 10,942.94
-
F Ditto but 2565 mm long 6 No Pr Item 3/6/1(Add-3)D 8,429.02
-
G Ditto but 3080 mm long 6 No Pr Item 3/6/1(Add-3)D 10,121.40
-
H 900 mm wide 2440 mm long (Item D page No. 3/6/2(Add-3))
1 No Pr Item 3/6/2(Add-3)D 15,793.33
-
J Ditto but 5965 mm long (Item E page No. 3/6/2(Add-3))
1 No Pr Item 3/6/2(Add-3)/E 38,610.50
-
K Ditto but 1845 mm long
4 No Pr Item 3/6/1(Add-3)/B 16,534.97
-
L Ditto but 4980 mm long (Item R page No. 3/6/3(Add-3))
1 No Pr Item 3/6/3(Add-3)/R 21,253.16
-
M 700 mm wide 3540 mm long (Item N page No. 3/6/1(Add-3))
1 No Pr Item 3/6/1(Add-3)/N 22,913.50
-
N 570 mm wide 3500 mm long (Item D page No. 3/6/1(Add-3))
1 No Pr Item 3/6/1(Add-3)/D 19,866.38
-
O 330/450 mm wide 4900 mm long
5 No Pr Item 3/6/1(Add-3)/E 21,957.88
-
P 330/610 mm wide 3550 mm long (Item D page No. 3/6/1(Add-3))
1 No Pr Item 3/6/1(Add-3)/D 21,564.23
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COUNTERS (Cont)
A
610 mm wide 4000 mm long (Item E page No. 3/6/1(Add-3)) 1 No Pr Item 3/6/1(add-3)/E 24,298.06
-
B 660 mm wide 3710 mm long (Semi L-Shape) (Item D page No.
3/6/1(Add-3)) 28 No Pr Item 3/6/1(Add-3)/D 24,383.36
C 600 mm wide 1200 mm long with curved corner 29 No Pr Item 3/6/1(Add-3)/B 7,528.12
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
ACRYLIC PANELS
Supply and install acrylic panels for walls and ceiling accent
including all necessary support, , fixing and all fixing
accessories, all as specified and as shown in the drawings.
MILLWORK
To Collection SR.
NORTH
CAMPUS
BOQ Ref. / Rate Analysis
BOQ
Unit Rate
Item Description Qty Unit Unit
Rate
COLLECTION
BILL No. 4
DIVISION 6 - WOOD AND PLASTIC
Amount
SR..
0
Project No. JE-1257
Volume III 4/6/140
KFSH & RC
B01 - Oncology Bldg.
Total Additions
Amount
SR..
Amount
SR..
7,939.37
0.00
3,819.30
0.00
69,871.06
0.00
131,024.63
0.00
18,098.71
0.00
1,616.30
0.00
3,773.33
0.00
1,054.08
237,196.78
Amount
SR..
Amount
SR..
498,090.14
0.00
36,445.60
0.00
255,119.40
0.00
8,898.81
0.00
18,222.82
0.00
106,907.24
0.00
10,235.15
0.00
72,283.89
109,336.90
7,790.28
17,074.58
43,575.80
9,213.16
0.00
0.00
0.00
0.00
1,193,194
Amount
SR..
37,990.96
-
19,208.92
-
19,920.36
-
10,120.25
-
18,435.61
-
38,146.84
-
21,533.52
165,356
Amount
SR..
51,815.62
0.00
29,946.73
0.00
76,356.82
0.00
11,358.89
0.00
12,877.46
0.00
23,659.91
0.00
24,419.55
0.00
47,951.42
0.00
48,481.86
0.00
166,740.57
0.00
141,090.30
0.00
268,233.80
0.00
4,315.30
0.00
6,904.48
0.00
0.00
914,153
Amount
SR..
31,933.20
-
19,850.38
-
10,507.75
-
10,723.52
-
21,576.50
-
21,792.26
116,384
Amount
SR..
33,658.32
0.00
34,952.86
0.00
48,415.64
0.00
33,690.74
0.00
38,724.49
0.00
44,597.49
0.00
22,622.31
0.00
26,667.51
0.00
96,313.71
0.00
38,901.17
0.00
41,328.45
0.00
75,537.96
0.00
52,591.57
0.00
48,596.12
636,598
Amount
SR..
46,656.38
-
37,782.38
-
37,163.00
-
84,134.34
-
73,379.34
-
38,217.08
317,333
Amount
SR..
21,688.16
-
64,407.20
-
110,412.32
-
70,322.16
-
21,885.88
-
50,574.12
-
60,728.40
-
15,793.33
-
38,610.50
-
66,139.88
-
21,253.16
-
22,913.50
-
19,866.38
-
109,789.40
-
21,564.23
-
18,071.15
734,020
Amount
SR..
24,298.06
-
682,734.08
-
218,315.48
-
71,585.30
-
996,933
Amount
SR..
54,347.95
-
1,582.95
-
37,463.15
-
-
-
-
-
-
-
-
-
-
-
93,394
Amount
SR..
0.00
0.00
237,196.78
0.00
1,193,193.77
165,356.46
914,152.71
116,383.61
636,598.34
317,332.52
734,019.77
996,932.92
93,394.05
5,404,560.93
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
VAPOR BARRIER
WATER PROOFING
C
To the horizontal surfaces, under and top of isolated
footings,strip footings,raft foundations and retaining walls. 6,226 m Item 4/7/1(Add-3)/C 50 311,280
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
A
Type RF1, roofing system (Item A page No. 3/7/2(Add-3)) 10,560 m Item 4/7/2(Add-3)/B 167 1,763,520
0
B Type RF2, fluid applied roof system with white finish to
flat roofs, roofing 280 m Item 4/7/1(Add-3)/E 167 46,760
C
Type RF3, concrete roof pavers or gravel field on fluid
applied roof system (Item C page No. 3/7/2(Add-3)) 130 m Item 3/7/2(Add-3)/C 218 28,366
covering Complete with all fixing accessories. 10,560 m Item 4/7/1(Add-3)/F 128.00 1,351,680
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
A To the vertical upstand of the flat roof. 870 m Item 4/7/2(Add-3)/A 44 38,280
Water Stop
NORTH
CAMPUS BOQ Ref. / Rate Analysis Unit Rate Total Additions
BOQ
COLLECTION
BILL No. 4
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
STEEL DOORS
A
Door Type 03-19.Db.A1F, double leaf, swing type with
hardware set Db-F0.A.SW.15, (45 Minutes fire rated). No
F
Door Type 06-01.DbA2F (M21-003), double leaf, swing type with
hardware set Sn.-F0.A.SW.08, (45 Minutes fire rated). 1 No
To Collection SR.
A
Door Type 06-03.DbA1 (M21-012), double leaf, swing type with
hardware set Db.-F0.A.SW.01, (90 Minutes fire rated). 1 No
C
Door Type 06-07.SnA1F (M11-024), single leaf, swing type with
hardware set Sn.-F0.A.SW.08, (90 Minutes fire rated). 1 No
G
Door Type 10-SnE1FS (M11-034), single leaf, swing type with
hardware set Sn.-F1.E.SW.04, (90 Minutes fire rated). 5 No
L Door Type (M11-001), single leaf, swing type door (45 Minutes
fire rated). 1 No
To Collection SR.
A
Door Type (M11-009), single leaf, swing type door (45 Minutes fire
rated) (same as 06-02.SnA1F Item C page No. 3/8/2(Add-3)) 11 No
B Door Type (M11-017), single leaf, full swing type door (90
Minutes fire rated). 4 No
C Door Type (M11-021), single leaf, swing type door (90 Minutes
fire rated). 15 No
D Door Type (M11-022), single leaf, full swing type door (90
Minutes fire rated). 5 No
E Door Type (M11-023), single leaf, swing type door (90 Minutes
fire rated). 1 No
F Door Type (M11-026), single leaf, swing type door (45 Minutes
fire rated). 1 No
G
Door Type (M11-031), single leaf, swing type door (90 Minutes fire
rated) (same as 10-SnE1F Item A page No. 5/8/2(Add-3)) 8 No
H Door Type (M11-039), single leaf, swing type door (90 Minutes
fire rated). 5 No
J Door Type (M11-040), single leaf, swing type door (90 Minutes
fire rated). 1 No
K Door Type (M11-041), single leaf, swing type door (90 Minutes
fire rated). 1 No
L Door Type (M11-042), single leaf, swing type door (45 Minutes
fire rated). 1 No
To Collection SR.
D Door Type (M21-005), double leaf, swing type door (90 Minutes
fire rated) (same as 06-01.DbA3F Item C page No. 3/8/11(Add-
3)) 8 No
E Door Type (M21-006), double leaf, swing type door (90 Minutes
fire rated). 5 No
F
Door Type (M21-008), double leaf, swing type door (90 Minutes
fire rated) (same as 06-02.DbA2F Item K page No. 3/8/1(Add-3)) 3 No
G Door Type (M21-026), double leaf, swing type door (90 Minutes
fire rated). 1 No
H Door Type (M21-027), double leaf, swing type door (90 Minutes
fire rated). 2 No
J Door Type (M21-028), double leaf, swing type door (45 Minutes
fire rated). 3 No
K Door Type (M21-029), double leaf, swing type door (45 Minutes
fire rated). 1 No
L Door Type (M21-030), double leaf, swing type door (45 Minutes
fire rated). 3 No
M Door Type (M21-031), double leaf, swing type door (45 Minutes
fire rated). 2 No
To Collection SR.
A Door Type (M21-033), double leaf, swing type door (45 Minutes
fire rated). 1 No
B Door Type (M21-034), double leaf, swing type door (45 Minutes
fire rated). 1 No
C Door Type (M21-036), double leaf, swing type door (45 Minutes
fire rated). 1 No
D Door Type (M21-037), double leaf, swing type door (45 Minutes
fire rated). 4 No
To Collection SR.
ALUMINUM DOORS
To Collection SR.
C
Door Type (A/G20-010), double leaf, sliding and swinging type
door (same as 12-03.DbA2 Item J page No. 3/8/6(Add-3)) 7 No
D Door Type (A/G40-001), four leafs, sliding type door with two
fixed leafs 1 No
E Door Type (A/G40-008), four leafs, sliding type door with two
fixed leafs 1 No
F Door Type (A/G40-009), four leafs, sliding type door with two
fixed leafs 2 No
To Collection SR.
GLASS DOORS
To Collection SR.
WOOD DOORS
To Collection SR.
G
Door Type 03-03.SnA1F (W11-012), single leaf, swing type with
hardware set Sn-F0.A.SW.08, (45 Minutes fire rated). 7 No
K
Door Type 03-01.SnA1FP (W11-007), single leaf, swing type with
hardware set Sn-F2.A.SW.01, (45 Minutes fire rated). 1 No
L
Door Type 03-04.SnA1FP (W11-014), single leaf, swing type with
hardware set Sn-F2.A.SW.01, (45 Minutes fire rated). 6 No
To Collection SR.
F
Door Type 03-09.SnA1FS (W11-024), single leaf, swing type with
hardware set Sn-F1.A.SW.02, (45 Minutes fire rated). 1 No
To Collection SR.
E.1 Door Type 07-SnA1R (W12-006), single leaf, swing type with
hardware set Sn-00.A.SW.47 2 No
To Collection SR.
To Collection SR.
To Collection SR.
A
Door Type (W10-005), single leaf, full swing type door. 5 No
C
Door Type (W10-013), single leaf, full swing type door. 1 No
D
Door Type (W10-016), single leaf, full swing type door. 22 No
H Door Type (W10-051), single leaf, swing type door (same as 04-
SnA2 Item K page No. 3/8/14(Add-3)) 30 No
K Door Type (W10-054), single leaf, swing type door (same as 04-
SnA4 Item M page No. 3/8/14(Add-3)) 3 No
N Door Type (W10-063), single leaf, swing type door (same as 06-
09.SnA1 Item A page No. 3/8/16(Add-3)) 2 No
P Door Type (W10-083), single leaf, swing type door (same as 08-
06.SnA2 Item D page No. 3/8/18(Add-3)) 5 No
To Collection SR.
C Door Type (W10-099), single leaf, swing type door (same as 11-
SnE1 Item C page No. 3/8/23(Add-3)) 6 No
F Door Type (W10-107), single leaf, swing type door (same as 12-
01.SnA3 Item C page No. 3/8/24(Add-3)) 83 No
G Door Type (W10-117), single leaf, swing type door (same as 15-
SnA1P Item D page No. 3/8/26(Add-3)) 2 No
H Door Type (W10-118), single leaf, swing type door (same as 15-
SnA1S Item E page No. 3/8/26(Add-3)) 2 No
K Door Type (W11-002), single leaf, swing type door (45 Minutes
fire rated). 2 No
L Door Type (W11-010), single leaf, swing type door (45 Minutes
fire rated). 4 No
M
Door Type (W11-011), single leaf, swing type door (45 Minutes
fire rated) (same as 03-02.SnA1Fs Item G page No. 3/8/11(Add-3)) 1 No
N Door Type (W11-013), single leaf, full swing type door (45
Minutes fire rated). 1 No
P Door Type (W11-032), single leaf, swing type door (90 Minutes
fire rated). 1 No
To Collection SR.
A Door Type (W11-038), single leaf, swing type door (45 Minutes
fire rated). 10 No
B Door Type (W11-039), single leaf, swing type door (90 Minutes
fire rated). 1 No
C Door Type (W11-040), single leaf, swing type door (45 Minutes
fire rated). 5 No
D Door Type (W11-045), single leaf, swing type door (90 Minutes
fire rated & smoke sealed) (same as 04-SnA1FS Item D page No.
3/8/14(Add-3)) 1 No
E Door Type (W11-046), single leaf, swing type door (90 Minutes
fire rated). 1 No
F Door Type (W12-003), single leaf, swing type door (same as 05-
SnA1R Item C page No. 3/8/15(Add-3)) 1 No
G
Door Type (W12-009), single leaf, surface sliding type door. 5 No
H Door Type (W20-035), double leaf, swing type door (same as 11-
DbA4P Item M page No. 6/8/6(Add-3)) 2 No
L
Door Type (W20-044), double leaf, double egree type door (same
as 11-DbE1P Item B page No. 3/8/21(Add-3)) 1 No
M Door Type (W20-045), double leaf, swing type door (same as 11-
DbE1S Item C page No. 3/8/21(Add-3)) 1 No
To Collection SR.
D
Door Type (W20-062), double leaf, full swing type door 3 No
F Door Type (W21-020), double leaf, swing type door (45 Minutes
fire rated). 14 No
G Door Type (W21-035), double leaf, swing type door (90 Minutes
fire rated). 1 No
H Door Type (W21-036), double leaf, swing type door (90 Minutes
fire rated). 1 No
J Door Type (W21-049), double leaf, double egree type door (90
Minutes fire rated). 13 No
K Door Type (W21-050), double leaf, swing type door (45 Minutes
fire rated & smoke sealed) (same as 11-DbE5F Item E page No.
3/8/22(Add-3)) 1 No
To Collection SR.
To Collection SR.
To Collection SR.
To Collection SR.
SKYLIGHT
To Collection SR.
WINDOWS
To Collection SR.
COLLECTION
Porcelain tiles to floor bedded and jointed in cement and sand mortar
including cutting, trims, accessories grouting and pointing and cleaning
on completion; all as specified and as shown on the drawings. 0.00
0.00
C (POR-20, 22) Porcelain floor tiles m 0.00
0.00
C.1 (Por.-1&2) 30 x 30 cm Porcelain floor tiles 537 m 140 75,180.00
0.00
C.2 (Por.-4) 60 x 60 cm Porcelain floor tiles 450 m 372 167,400.00
0.00
C.3 (Por.-3) 45 x 45 cm Porcelain floor tiles (Item E.1 in page No. 3/9/2(Add-
3)) 252 m 140 35,280.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/9/210
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 9
FINISHES
STONE FINISHES
MARBLE
Marble floor tile bedded and jointed in cement and sand mortar
including approved fill materials, grouting and pointing on completion;
all as specified and as shown on the drawings
A Botticino classico m
A.1
ST-5 Crema marfil polished marble floor tiles 30 x 60 cm 1,375 m 474 651,750.00
A.3
ST-7 Silver drop polished marble floor tiles 30 x 60 cm 20 m 474 9,480.00
0.00
A.4 ST-8 Custom pattern marble floor tiles 25 m 521 13,035.00
A.5
combination of stone marble types to level L1 at lobby 450 m 474 213,300.00
A.6
combination of stone marble types to level L1 at reception 95 m 474 45,030.00
0.00
STAIRCASE FINISHES
Marble floor tile bedded and jointed in cement and sand mortar including
approved fill materials, grouting and pointing on completion; all as
specified and as shown on the drawings.
B
To staircase -no.3 landing (From basement to ground floor) m
STONE CLADDING
WOOD PANEL
WOOD CLADDING
Wood veneer wall cladding (flat cut cherry finish), cladded &
jointed with approved fixing system including fixing anchors, pins,
cutting to size etc.; complete set including approved fill materials,
grouting and pointing on completion; all as specified and as per
drawings.
C.1 Partition type PW-29 (Item N page No. 3/9/3(Add-3)) 36 m 753 27,108.00
0.00
C.2 Partition type PW-31 (Item Q page No. 3/9/3(Add-3)) 144 m 712 102,528.00
.
D Partition type PW-34 m 0.00
0.00
E Partition type PW-40 m 0.00
0.00
F Partition type PW-41 m 0.00
0.00
High impact Gypsum board (Abuse resistant interior panel)
including metal framing and fixing accessories, fire rating,
acoustical ratings, complete as shown on the details, General Notes
and as per specifications. 0.00
0.00
G High impact Gypsum board wall m 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/9/224
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 9
FINISHES
C GL-1 Custom pattern on both sides of glass panel 740 m 1,015 751,100.00
0.00
D GL-9 Vitra color glass panel 200 m 1,015 203,000.00
0.00
E GL-18 75% Shade echo-etch glass panel 70 m 1,015 71,050.00
0.00
F GL-26 Light + shadow, shimmer option S glass panel 125 m
1,015 126,875.00
0.00
G GL-27 Clear glass panel 65 m 971 63,115.00
0.00
H GL-28 Botanica dogwood full glass panel 22 m 1,015 22,330.00
0.00
J GL-31 Vitra color - side 1 satin finish, side 2 vitra color glass
panel 200 m 1,015 203,000.00
0.00
K GL-32 AST III / vitra color kids mazeglass panel 18 m 1,015 18,270.00
WALL COVERING
D
Raised access floor at electrical ATS room including all access
hatches as specified and as shown on the drawings. 450 m 520 234,000.00
ARCHITECTURAL SCREEN
D
Ditto but to concrete broom finish at access ramp in first floor m
E
Ditto but to concrete broom finish at access ramp in ground floor m
STAIRCASE FINISHES
D
Ditto but to staircase no.2 landing (From basement to ground floor) m
G
Ditto but to staircase -no.4 landing (From ground to seventh floor) m
EXTERNAL STEPS.
A
Epoxy paint on fair faced concrete for external landing of steps. 561 m 92 51,612.00
COLLECTION
BILL No. 4
DIVISION 9 - FINISHES
FIRE EXTINGUISHERS
A Fire extinguisher type FE-1 (6 kg, multi purpose dry chemical type)
87 No
To Collection SR..
Toilet and Bath accessories with all fixing accessories & fixing
complete as specified and as shown in the drawings and as per
schedule.
B Tissue Holder-2 2 No
C Tissue Holder-3 52 No
E Soap dispenser-2 83 No
F Towel Holder-1 83 No
G Towel Holder-2 83 No
H Towel Holder-3 83 No
J Grab Bar-2 66 No
K Grab Bar-3 No
L Grab Bar-4 No
M Grab Bar-5 72 No
N Shower Curtain-1 78 No
O Shower Curtain-2 No
P Hook-1 72 No
Q Hook-2 11 No
R Shower Seat 89 No
Project No. JE-1257
Volume III 4/10/243
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 10
SPECIALTIES
To Collection SR..
MIRRORS
A Mirror- 1 No
B Mirror- 2 No
C Mirror- 3 No
C.1 2000mm wide x 1535mm high with wood frame matching the
door finish 1 No
METAL LOCKERS
E
Ditto, but 2000 mm long beside STFT RM in ground floor level No
F
Ditto, but 2420 mm long beside STFT RM in ground floor level 1 No
To Collection SR..
BARRIER ARM
Supply and installation barrier arm including with all finishes and
fixing accessories complete as per requirments, as shown in the
drawings and specification
TIRE KILLER
Supply and installation tire killer including with all finishes and
fixing accessories complete as per requirments ,as shown in the
drawings and specification
WALL PROTECTION
D.1
(WP-13 & 15 ) Rigid vinyl wall covering , Velvet finish 340 m
To Collection SR..
SYSTEM FURNITURE
F System furniture m
To Collection SR..
INTERNAL SIGNAGE
Signage Code 1.8 - Leaf sign with No. & text / leaf sign toilet /
H prayer room. No
Signage Code 1.9 - Leaf sign for exam room curtains area (recovery
J base area). No
To Collection SR..
Signage Code 3.2 - Main directory (ground floor lobby area) sign.
D
No
Signage Code 4.2 - Staircase with exite to ground floor info sign.
H
No
Signage Code 4.3 - Elevator sign includes level info (FOH / BOH).
J
No
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 10 - SPECIALTIES
Carried to Summary
Unit Amount
Rate SR..
890.00 77,430.00
-
890.00 28,480.00
Unit Amount
Rate SR..
Unit Amount
Rate SR..
129 19,350.00
-
1295 2,590.00
-
647 33,644.00
-
378 54,054.00
-
189 15,687.00
-
162 13,446.00
-
367 30,461.00
-
183 15,189.00
-
205 13,735.00
-
291 19,206.00
1106 79,632.00
243 18,954.00
102 7,344.00
162 1,782.00
421 37,469.00
Project No. JE-1257
Volume III 4/10/258
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 10
SPECIALTIES
Unit Amount
Rate SR..
Unit Amount
Rate SR..
3,056 3,056
-
2,444 2,444
-
7,521 7,521
-
744 34,968
-
3,075 3,075.00
6,165 6,165.00
Unit Amount
Rate SR..
Unit Amount
Rate SR..
189 248,346.00
189 61,803.00
200 482,800.00
156 53,040.00
237 80,580.00
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
105,910.00
362,543.00
57,229.00
926,569.00
0.00
0.00
0.00
SR.. 1,452,251.00
FURNISHING WORKS
B
Supply, delivery and installation of modular lab system furniture as
per specifications, catalogue and as shown on the drawings.
1 Item
To Collection SR..
ART WORK
Supply and install Art work including all fixing accessories &
fixing complete as specified and as shown in the drawings.
A
Large art work with diagonal dimmension more that 1500mm
1 No
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 12 - FURNISHINGS
RADIATION PROTECTION
C
BMU-5, with outreach length of 3.10m, lifting height 43m,
complete with power slewing and jib head slewing including
fixed Jib arm, fixed pantograph cradle 2.40m length, capacity of
3 No
240kg. / 2 persons, anti collision bar system under the cradle with
soft faade roilers, radio frequency control system and fixed
counterweight system.
BILL No. 4
Amount
SR..
Amount
SR..
A Passenger Elevator (P01, P02, P03 & P04) Electric Traction Type,
with Machine Room.
Capacity: 1,800 Kg.
No. of Stops & Openings: 7 Nos.
Speed: 1.75 m/sec.
Car internal size: 2,100 x 1,800 mm
Car design & doors: Manufacturer standard design / options as
per Client requirement. No
To Collection SR..
SERVICE ELEVATORS
A Service Elevator (S01, S02 & S03) Electric Traction Type, with
Machine Room.
Capacity: 2,250 Kg.
No. of Stops & Openings: 8 Nos.
Speed: 1.75 m/sec.
Car internal size: 2,600 x 1,800 mm
Car design & doors: Double door,Manufacturer standard
design/options as per Client requirement. No
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 14 - CONVEYING SYSTEM
Amount
SR..
Amount
SR..
Amount
SR..
Amount
SR..
Amount
SR..
Supply and install all the fire fighting systems, equipment, sleeves,
openings, blocking seam, sealants, bases (if required) and supports
for pipings, fittings, accessories and controls as required including
builders work in connection with fire fighting system as per NFPA
requirement & Civil Defence complete as required, as shown on
the drawings and as specified.
G 100 mm diameter
H 110 mm diameter 88 m
To Collection SR..
B 65mm diameter
C 80mm diameter 40 m
H 100mm
J 150mm
To Collection SR..
E
25mm test & flushing with drain valve with short length of pipe. 25 No
H 65mm diameter Landing Valve for Stair Case with Valve Cabinet
complete as specified.(Wet - FDV) 15 No
To Collection SR..
B Roof manifold
C Pressure Gauge
E Type FHR (Red Paint Finish) for Parking areas, Service areas &
Mechanical rooms etc.
To Collection SR..
To Collection SR..
Supply and install all the fire fighting systems, equipment, pipings,
fittings, accessories & controls as required for the fire fighting
system as per NFPA requirement & Civil Defence complete as
required, as shown on the drawings and sepecified.
A 150mm diameter 86 m
B 110 mm diameter 39 m
G 65mm diameter Landing Valve for Stair Case with Valve Cabinet
complete as specified. 15 No
To Collection SR..
Supply and install all the Pre Action fire fighting systems, including
Compressor, pipings, fittings, accessories & control panel complete
as required and as per NFPA requirement & Civil Defence complete
as required, as shown on the drawings and as specified.
B 32mm diameter 12 m
E 65mm diameter
Sprinkler
To Collection SR..
B 40mm 1 No
C 50mm 7 No
D 65mm
To Collection SR..
To Collection SR..
To Collection SR..
To Collection SR..
To Collection SR..
COLLECTION
BILL No. 3
DIVISION 22 - PLUMBING
Carried to Summary
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
SR..
PLUMBING SYSTEM
SANITARY FIXTURES
A European Water Closet (Type WC-1), with flush valve, seat and
cover, ablution hose and all accessories complete as required and as
specified. 17 No
B European Water Closet (Type WC-2), with flush valve, seat and
cover, ablution hose and all accessories complete as required and as
specified. 130 No
To Collection SR..
PLUMBING SYSTEM
H.1 Lavatory (Type LAV-7), complete with mixers & all accessories
complete as required and as specified.(Mentioned in Expansion 4 No
Building)
To Collection SR..
PLUMBING SYSTEM
Supply, Test and Install Soil, Waste and Vent Pipe including pipe
markings, sleeves, openings, blocking seams, sealants, bases (if
required) with all necessary fittings, brackets, hangers, supports &
fixing accessories builders work related to Plumbing works complete
as specified and as shown in the drawings.
A 200 mm diameter 15 m
D 80 mm diameter 313 m
Soil and Waste pipes (CAST IRON Epoxy Coated) laid under tiles,
above ceilings, in shafts and in walls, etc. complete as required
E 200 mm diameter 25 m
H 80 mm diameter 653 m
J 50 mm diameter 1295 m
To Collection SR..
PLUMBING SYSTEM
Soil and Waste pipes (Double Wall Containment pipe system for
drainage pipes . PE 100 outer pipe and PE Inner pipe) with leak
detection system, laid above ceilings, in shafts and in walls, etc.
complete as required
2.A 80 mm diameter 10 m
3.A 50 mm diameter 5 m
Vent Pipes (CAST IRON Epoxy Coated) laid under tiles, above
ceilings, in shafts and in walls, etc. complete as required
A 150 mm diameter
B 125 mm diameter
C 100 mm diameter 34 m
D 80 mm diameter 666 m
E 50 mm diameter 2157 m
F 150 mm diameter
G 100 mm diameter 73 m
G.1 50 mm diameter 23 m
To Collection SR..
PLUMBING SYSTEM
Rain Water Pipes (CAST IRON Epoxy Coated) laid under tiles,
above ceilings, in shafts and in walls, etc. complete as required
L 125 mm diameter
M 80 mm diameter 454 m
N 50 mm diameter 10 m
To Collection SR..
PLUMBING SYSTEM
D 100 mm diameter 29 m
To Collection SR..
PLUMBING SYSTEM
ACCESSORIES
To Collection SR..
PLUMBING SYSTEM
ACCESSORIES (Cont)
To Collection SR..
PLUMBING SYSTEM
ACCESSORIES (Cont)
D Combination main roof and over flow drains type with low
silhouette dome and double top set ,(deck plate, RD (1A,1B)(Refer
to item no O page: 5 in Oncology Building)
75 No
E Combination main roof and over flow drains type with low
silhouette dome and double top set ,(deck plate, RD (2A,2B)(Refer
to item no O page: 5 in Oncology Building)
5 No
To Collection SR..
PLUMBING SYSTEM
B Submersible pumps (in sump pit 3), capacity 100 GPM, 36 ft head
approx. grinder type (1 duty & 1 standby).
To Collection SR..
PLUMBING SYSTEM
WATER SUPPLY
Supply, Install and Test Cold and Hot water pipework including pipe
markings, sleeves, openings, blocking seams, sealants and base (if
required) with all necessary fittings, brackets, supports, hangers &
fixings accessories, builders work related to system complete as
specified and as shown in the drawings.
A 160 mm diameter.
Cold water supply pipes (Hard Copper tube) with soldered joints
above false ceilings, walls, in shafts, etc. Including all necessary
fittings and accessories, complete as required, as shown on drawings
and as specified.
B 15 mm diameter. 2,350 m
C 22 mm diameter. 173 m
D 28 mm diameter. 642 m
E 35 mm diameter. 269 m
F 42 mm diameter 528 m
G 54 mm diameter. 677 m
H 67 mm diameter. 129 m
J 76 mm diameter. 153 m
To Collection SR..
PLUMBING SYSTEM
A Allow for the Connection of Cold water supply pipes (Hard Copper
tube) with soldered joints to Oncology Building and Site Loop
Including additional pipe length with all necessary fittings and 1 Item
accessories, complete as required, as shown on drawings and as
specified
Hot water supply and return pipes (Hard Copper tube) with soldered
joints above false ceilings, walls, in shafts, etc. Including all
necessary fittings and accessories, complete as required, as shown on
drawings and as specified.
B 15 mm diameter. 3,570 m
C 22 mm diameter. 1,042 m
D 28 mm diameter. 593 m
E 35 mm diameter. 485 m
F 42 mm diameter 467 m
G 54 mm diameter. 774 m
H 67 mm diameter. 306 m
J 76 mm diameter. 140 m
L Allow for the Connection of Cold water supply pipes (Hard Copper
tube) with soldered joints to Oncology Building and Site Loop
Including additional pipe length with all necessary fittings and
accessories, complete as required, as shown on drawings and as
specified
To Collection SR..
PLUMBING SYSTEM
Hot water supply and return pipes Insulation (12mm thick Euroflex)
Including all necessary fittings and accessories, complete as
required, as shown on drawings and as specified.
A 15 mm diameter. 3,570 m
B 22 mm diameter. 1,042 m
C 28 mm diameter. 593 m
D 35 mm diameter. 485 m
E 42 mm diameter 467 m
F 54 mm diameter. 774 m
Hot water supply and return pipes Insulation (32mm thick Rigid
Fiberglass with Aluminum foil) Including all necessary fittings and
accessories, complete as required, as shown on drawings and as
specified.
G 67 mm diameter. 306 m
H 76 mm diameter. 140 m
J 90 mm diameter.
K 110 mm diameter.
To Collection SR..
PLUMBING SYSTEM
Cold and Hot water pipes accessories Including all necessary fittings,
complete as required, as shown on drawings and as specified.
To Collection SR..
PLUMBING SYSTEM
Accessories (Cont...)
To Collection SR..
PLUMBING SYSTEM
Accessories (Cont...)
To Collection SR..
PLUMBING SYSTEM
Supply, Install and Test Compressed Air pipework for Laboratory and
Health care Facilities including pipe markings, sleeves, openings,
blocking seams, sealants and bases (if required) with all necessary
fittings, brackets, supports, hangers and fixing accessories complete
as required, as shown in the drawings and as specified.
A 12 mm diameter.
B 15 mm diameter. 1,934 m
C 22 mm diameter. 216 m
D 28 mm diameter. 233 m
E 35 mm diameter. 73 m
F 42 mm diameter 69 m
To Collection SR..
PLUMBING SYSTEM
A 12 mm diameter.
B 22 mm diameter.
C 28 mm diameter.
To Collection SR..
PLUMBING SYSTEM
To Collection SR..
PLUMBING SYSTEM
A 15 mm diameter.
B 22 mm diameter. 450 m
C 28 mm diameter. 1,993 m
D 35 mm diameter. 390 m
E 42 mm diameter 59 m
F 67 mm diameter.
To Collection SR..
PLUMBING SYSTEM
A 12 mm diameter.
B 15 mm diameter. 2,562 m
C 22 mm diameter. 352 m
D 28 mm diameter. 63 m
E 35 mm diameter. 33 m
To Collection SR..
PLUMBING SYSTEM
Accessories (Cont.)
To Collection SR..
PLUMBING SYSTEM
Zone Service Unit and Alarm Panel for medical gases including all
necessary fittings, complete as required, as shown on drawings and
as specified.
A AVSU 1 1 No
B AVSU 2 18 No
C AVSU 3 10 No
To Collection SR..
PLUMBING SYSTEM
1 Set
To Collection SR..
J Elevator Pit (7) , 0.6 m x 0.6 m x 0.6 m(Refer to item no. B page: 16
in Oncology Building ) 1 No
To Collection SR..
COLLECTION
Page No. 4/22/1
Page No. 4/22/2
Page No. 4/22/3
Page No. 4/22/4
Page No. 4/22/5
Page No. 4/22/6
Page No. 4/22/7
Page No. 4/22/8
Page No. 4/22/9
Page No. 4/22/10
Page No. 4/22/11
Page No. 4/22/12
Page No. 4/22/13
Page No. 4/22/14
Page No. 4/22/15
Page No. 4/22/16
Page No. 4/22/17
Page No. 4/22/18
Page No. 4/22/19
Page No. 4/22/20
Page No. 4/22/21
Page No. 4/22/22
Page No. 4/22/23
Page No. 4/22/24
Page No. 4/22/25
BILL No. 3
DIVISION 22 - PLUMBING
Carried to Summary
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
SR..
HVAC SYSTEMS
Chilled water pumps, complete with VFD and all accessories, gate
valves, strainer, pressure gauge, reinforced concrete base and
vibration isolator as detailed on drawings with all other related
fittings and accessories complete as required, as shown on the
drawigns and as specified.
A Chilled water pump (Ref. CWP-5.1 & 5.2), 0.93 L/S capacity each,
175 KPA. approx. head, 1.50 KW power, END SUCTION type,
complete with all accessories as required, as shown on the
drawings and as specified.
No
B Chilled water pump (Ref. CWP-13.1 & 13.2), 3.12 L/S capacity
each, 175 KPA. approx. head, 1.50 KW power, END SUCTION
type, complete with all accessories as required, as shown on the
drawings and as specified.
No
To Collection SR..
HVAC SYSTEMS
Supply, Install of Air & dirt separator with pressure regulating valve
assembly, valves, air vent, drain, complete as specified and as shown in
the drawings.Included in the chilled water pipes accessories
EXPANSION TANKS
D ET-01 of Steel Pipes and chilled water fluid type (Mentioned in CUP
Parking Building) 1 No
SIDESTREAM FILTRATION
E SFP-1, with flow 12.5 l/s and max. pressure 100 m (Mentioned in CUP
Parking Building) 1 No
To Collection SR..
HVAC SYSTEMS
To Collection SR..
Chilled water pipes Black Steel Seamless (Schedule 40), complete with
all accessories as specified and as shown in the drawings.
A 25 mm diameter. 96 m
B 40 mm diameter. 53 m
C 50 mm diameter. 37 m
D 65 mm diameter. 28 m
E 75 mm diameter.
F 100 mm diameter. 92 m
G 200 mmdiameter. 36 m
H 250 mm diameter. 75 m
To Collection SR..
HVAC SYSTEMS
Chilled water pipes Insulation (25 mm thick Rigid Fiber glass with
Aluminum Foil, 96 kg/cu.m) and 0.6 mm thick Aluminum Cladding
for exposed pipes and in plant rooms complete with all accessories
as specified and as shown in the drawings.
A 25 mm diameter. 96 m
B 40 mm diameter. 53 m
C 50 mm diameter. 37 m
D 65 mm diameter. 28 m
E 75 mm diameter.
F 100 mm diameter. 92 m
G 200 mmdiameter. 36 m
H 250 mm diameter. 75 m
To Collection SR..
A Energy Recovery unit (Ref. ERU-1), 16,373 L/S at Supply side and
8,917 L/S at Exhaust side each, complete with all accessories as
required, as shown on the drawings and as specified.
B Energy Recovery unit (Ref. ERU-2), 13,066 L/S at Supply side and
7,995 L/S at Exhaust side each, complete with all accessories as
required, as shown on the drawings and as specified.
C Energy Recovery unit (Ref. ERU-3), 10,475 L/S at Supply side and
6,392 L/S at Exhaust side each, complete with all accessories as
required, as shown on the drawings and as specified.
D Energy Recovery unit (ERU-1,2,3), 16,520 L/S Supply air flow and
847 Kw Chilled water cooling coil capacity, complete with all
accessories as required, as shown on the drawings and as specified. 3 No
(Refer to item no A page: 4 in Oncology Building)
INERTIA FILTER
To Collection SR..
HVAC SYSTEMS
Supply, install and test the following modular type air handling
units (ARI rated units & UL listed motors) complete with all
wiring, fittings, return bell mouths, air filters, insulations, Gate
valves, Pressure gauges, Thermometers Butterfly valves, Modulating
valves, Balancing valve , Automatic flow control valve, controls,
thermostat, fixing accessories, reinforced concrete base, vibration
pads, condensate drain pipe, flexible connections and all necessary
accessories complete as specified and as shown in the drawings.
A Ref. AHU-1-1 , total supply air 8972 L/S, total load on coil 54.6
KW.
B Ref. AHU-2-1 , total supply air 9469 L/S, total load on coil 149.4
KW.
C Ref. AHU-3-1 , total supply air 9469 L/S, total load on coil 149.4
KW.
D Ref. AHU-4-1 , total supply air 8826 L/S, total load on coil 117.7
KW.
E Ref. AHU-5-1 , total supply air 10231 L/S, total load on coil 157.4
KW.
F Ref. AHU-1-2 , total supply air 15318 L/S, total load on coil 211.0
KW.
G Ref. AHU-2-2 , total supply air 5923 L/S, total load on coil 89.1
KW.
H Ref. AHU-3-2 , total supply air 5923 L/S, total load on coil 86.1
KW.
J Ref. AHU-4-2 , total supply air 6083 L/S, total load on coil 66.9
KW.
Project No. JE-1257
Volume III 4/23/455
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
HEATING VENTILLATION & AIR CONDITIONIN
K Ref. AHU-5-2 , total supply air 6014 L/S, total load on coil 83.7
KW.
To Collection SR..
HVAC SYSTEMS
A Ref. AHU-GL-1 , total supply air 7403 L/S, total load on coil 119.5
KW.
B Ref. AHU-GL-2 , total supply air 5913 L/S, total load on coil 89.0
KW.
C Ref. AHU-GL-3 , total supply air 5174 L/S, total load on coil 62.9
KW.
D Ref. AHU-B-1 , total supply air 6891 L/S, total load on coil 94.9
KW.
E Ref. AHU-B-2 , total supply air 6991 L/S, total load on coil 99.2
KW.
F Ref. AHU-P-1 , total supply air 6607 L/S, total load on coil 125.5
KW.
G Ref. AHU-P-2 , total supply air 6607 L/S, total load on coil 125.5
KW.
H Ref. AHUZ0.01-I, total supply air 7100 L/S, total load on coil 111
KW.(Refer to item no D page: 5 in Medical Logestic Building) 1 No
J Ref. AHUZ1.01-I, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
K Ref. AHUZ1.01-II, total supply air 7100 L/S, total load on coil 110
KW.(Mentioned in Oncology Building ) 1 No
L Ref. AHUZ1.01-III, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
M Ref. AHUZ1.02-I, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
N Ref. AHUZ1.02-II, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
To Collection SR..
HVAC SYSTEMS
A Ref. AHUZ1.03-I, total supply air 9450 L/S, total load on coil 100
KW.(Mentioned in Oncology Building ) 1 No
B Ref. AHUZ1.03-II, total supply air 9450 L/S, total load on coil 118
KW.(Mentioned in Oncology Building ) 1 No
C Ref. AHUZ1.04-I, total supply air 9450 L/S, total load on coil 124
KW.(Mentioned in Oncology Building ) 1 No
D Ref. AHUZ1.05-I, total supply air 9450 L/S, total load on coil 114
KW.(Mentioned in Oncology Building ) 1 No
E Ref. AHUZ3.01-I, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
F Ref. AHUZ3.01-II, total supply air 9450 L/S, total load on coil 150
KW.(Mentioned in Oncology Building ) 1 No
G Ref. AHUZ4.01-I, total supply air 11800 L/S, total load on coil 184
KW.(Refer to item no E page: 5 in Oncology Building) 1 No
H Ref. AHUZ4.01-II, total supply air 11800 L/S, total load on coil
184 KW.(Refer to item no E page: 5 in Oncology Building) 1 No
J Ref. AHUZ5.01-I, total supply air 11800 L/S, total load on coil 184
KW.(Refer to item no E page: 5 in Oncology Building) 1 No
K Ref. AHUZ5.01-II, total supply air 11800 L/S, total load on coil
184 KW.(Refer to item no E page: 5 in Oncology Building) 1 No
L Ref. AHUZ6.01-I, total supply air 11800 L/S, total load on coil 184
KW.(Refer to item no E page: 5 in Oncology Building) 1 No
M Ref. AHUZ6.01-II, total supply air 11800 L/S, total load on coil
184 KW.(Refer to item no E page: 5 in Oncology Building) 1 No
SOUND ATTENUATORS
To Collection SR..
HVAC SYSTEM
Supply, install and test the following units (ARI rated units and UL
listed motors) complete with all wiring, insulation, valves, flat filter,
flexible connection, plenum box, motorized valves, controls, circuit
breaker, space thermostat, fixing accessories, vibration pads,
condensate drain pipe etc., with all necessary insulation, accessories
complete as specified and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
J Type CRAC-1, total supply air 668 L/S, total load on coil 10.7 KW
8 No
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
Supply, install and test the following VAV units (ARI rated units and
UL listed motors) complete with accessories ( but not limited to) , all
wiring, insulation, valves, flow sensor, factory wired control voltage
transformer, factory mounted electric heating coil, automatic reset
thermal cut-out, pressure diffrential switch, electric switches for staging
etc., with all necessary insulation, accessories complete as specified
and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
Supply, install and test the following VAV units (ARI rated units and
UL listed motors) complete with accessories ( but not limited to) all
wiring, insulation, valves, flow sensor, factory wired control voltage
transformer, factory mounted electric heating coil, automatic reset
thermal cut-out, pressure diffrential switch, electric switches for staging
etc., with all necessary insulation, accessories complete as specified
and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
Supply, install and test the following VAV units (ARI rated units and
UL listed motors) complete with accessories ( but not limited to), all
wiring, insulation, valves, flow sensor, factory wired control voltage
transformer, factory mounted electric heating coil, automatic reset
thermal cut-out, pressure diffrential switch, electric switches for staging
etc., with all necessary insulation, accessories complete as specified
and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
Supply, install and test the following SUPPLY AV units (ARI rated
units and UL listed motors) complete with accessories ( but not
limited to) Controller, all wiring, insulation, valves, flow sensor, factory
wired control voltage transformer, factory mounted electric heating coil,
automatic reset thermal cut-out, pressure differential switch, electric
switches for staging etc., with all necessary insulation, accessories
complete as specified and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
Supply, install and test the following RETURN AVEE units (ARI
rated units and UL listed motors) complete with accessories ( but not
limited to) Controller, all wiring, insulation, valves, flow sensor, factory
wired control voltage transformer, factory mounted electric heating coil,
automatic reset thermal cut-out, pressure differential switch, electric
switches for staging etc., with all necessary insulation, accessories
complete as specified and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
Supply, install and test the following EXHAUST AVE units (ARI
rated units and UL listed motors) complete with accessories ( but not
limited to) Controller, all wiring, insulation, valves, flow sensor,
factory wired control voltage transformer, factory mounted electric
heating coil, automatic reset thermal cut-out, pressure differential
switch, electric switches for staging etc., with all necessary insulation,
accessories complete as specified and as shown in the drawings.
To Collection SR..
HVAC SYSTEM
RETURN FAN'S
Supply, Install and test the following Return Fans type Smoke Rated
Fan Complete with VFD (UL listed / FM approved), including flanges,
support framing, mounting bolts, isolating switches overload
protection, back draft damper and all necessary fixing accessories
and connection complete as required, as shown in the drawings and
as specified.
L
Type Inline,REF AHUGL-1, 6574 L/S,995 Pa static pressure
M
Type Inline,REF AHUGL 2, 5101 L/S,995 Pa static pressure
N
Type Inline, REF AHU GL-3, 3156 L/S,995 Pa static pressure.
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
SOUND ATTENUATORS
Sound attenuator fixed on supply, and return ducts for each AHU, and
ERU to maintain room noise level as required; with all accessories
complete as specified and as shown in the drawings, and Specs.
A Ref. S/A-S-1.1 and S/A-R-1.1, with 8972 L/S air supply (for AHU 1-
1).
B Ref. S/A-S-2.1 and S/A-R-2.1, with 9469 L/S air supply (for AHU 2-
1).
C Ref. S/A-S-3.1 and S/A-R-3.1, with 9469 L/S air supply (for AHU 3-
1).
D Ref. S/A-S-4.1 and S/A-R-4.1, with 6036 L/S air supply (for AHU 4-
1).
E Ref. S/A-S-5.1 and S/A-R-5.1, with 6135 L/S air supply (for AHU 5-
1).
F Ref. S/A-S-1.2 and S/A-R-1.2, with 9211 L/S air supply (for AHU 1-
2).
G Ref. S/A-S-2.2 and S/A-R-2.2, with 5923 L/S air supply (for AHU 2-
2).
H Ref. S/A-S-3.2 and S/A-R-3.2, with 5923 L/S air supply (for AHU 3-
2).
J Ref. S/A-S-4.2 and S/A-R-4.2, with 8774 L/S air supply (for AHU 4-
2).
K Ref. S/A-S-5.2 and S/A-R-5.2, with 5994 L/S air supply (for AHU 5-
2).
To Collection SR..
HVAC SYSTEM
A Ref. S/A-S-GL-1 and S/A-R-GL-1, with 7311 L/S air supply (for AHU
GL-1).
B Ref. S/A-S-GL-2 and S/A-R-GL-2, with 7355 L/S air supply (for AHU
GL-2).
C Ref. S/A-S-GL-3 and S/A-R-GL-3, with 5174 L/S air supply (for AHU
GL-3).
D Ref. S/A-S-B-1 and S/A-R-B-1, with 6939 L/S air supply (for AHU B-
1).
E Ref. S/A-S-B-2 and S/A-R-B-2, with 6992 L/S air supply (for AHU B-
2).
F Ref. S/A-S-P-1 and S/A-R-P-1, with 6607 L/S air supply (for AHU P-
1).
G Ref. S/A-S-P-2 and S/A-R-P-2, with 6607 L/S air supply (for AHU P-
2).
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
To Collection SR..
HVAC SYSTEM
PRESSURIZATION FAN'S
Supply, Install and test the following Pressurization Fans Inline type
Complete with VFD (UL listed / FM approved), including flanges,
support framing, mounting bolts, isolating switches overload
protection, back draft damper and all necessary fixing accessories
and connection complete as required, as shown in the drawings and as
specified.
B.1
Type Inline,SPF-1, 8200 L/S, 250 Pa Total static pressure(Refer to
1 No
item no A page: 13 in Oncology Building)
B.2
Type Inline,SPF-2, 8200 L/S, 250 Pa Total static pressure(Refer to
1 No
item no A page: 13 in Oncology Building)
B.3
Type Inline,SPF-3, 7500 L/S, 250 Pa Total static pressure(Refer to
1 No
item no A page: 13 in Oncology Building)
To Collection SR..
HVAC SYSTEM
A
Type Roof Top, EF-1, 400 L/S, 1000 Pa static pressure(Refer to item
1 No
no D page: 13 in Oncology Building)
B
Type Roof Top, EF-2, 3550 L/S, 1325 Pa static pressure(Refer to item
1 No
no C page: 13 in Oncology Building)
C
Type Roof Top, EF-3, 1400 L/S, 1325 Pa static pressure(Refer to item
1 No
no C page: 13 in Oncology Building)
To Collection SR..
HVAC SYSTEMS
Ductwork
G Internal Acoustic duct lining (Hospital Grade), complete with glue and
fixing pins as required, as shown in the drawings and as specified. 51 m
H Fire rated cladding (2-hours) to smoke exhaust and make-up air duct
works, complete as required, as shown in the drawings and specified. 757 m
To Collection SR..
HVAC SYSTEMS
Air Outlets
D Size, 1.0 m long,5 slots with plenum box (LD5 & LD7)
E.1 Size, 0.9 m long,2 slots with plenum box (LD2C), (Mentioned in
Expansion Building But with 1.0 m / 2 slots) 24 No
E.2 Size, 0.9 m long,3 slots with plenum box (LD3C), (Mentioned in
Expansion Building But with 1.0 m / 3 slots) 12 No
E.3 Size, 0.9 m long,4 slots with plenum box (LD4C), (Mentioned in
Expansion Building But with 1.0 m / 4 slots) 96 No
E.4 Size, 0.9 m long,5 slots with plenum box (LD5C) (Mentioned in
Expansion Building But with 1.0 m / 5 slots) 43 No
To Collection SR..
HVAC SYSTEMS
To Collection SR..
HVAC SYSTEMS
To Collection SR..
HVAC SYSTEMS
To Collection SR..
HVAC SYSTEMS
To Collection SR..
HVAC SYSTEMS
HEPA FILTER
Project No. JE-1257
Volume III 4/23/511
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
HEATING VENTILLATION & AIR CONDITIONIN
To Collection SR..
HVAC SYSTEMS
AUTOMATIC CONTROL
To Collection SR..
C Dedicated General DDC for Fan (Size varies as per IO point list)
5 No
D Dedicated General DDC for Distribution Panel (DP) (Size varies as per
IO point list) 7 No
To Collection SR..
E Dedicated DDC for Lighting Control Panel ( LCP ) (Size varies as per
IO point list) 15 No
F IP Gateway/ Router 12 No
G BMS Work station with 32" LCD Screen and Event printer 2 No
To Collection SR..
COLLECTION
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 23-HEATING VENTILLATION & AIR CONDITIONING
(HVAC)
Carried to Summary
0.00
0.00
Project No. JE-1257
Volume III 4/23/521
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
See Rate Build-up 19930.00 19,930.00
0.00
See Rate Build-up 19930.00 19,930.00
0.00
0.00
0.00
0.00
0.00
See Rate Build-up 98600.00 98,600.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/523
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
See Rate Build-up 519840.00 519,840.00
0.00
To Collection SR.. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
To Collection SR.. 0.00
0.00
0.00
0.00
0.00
80 15,040.00
0.00
Item 06//23//02 86 2,752.00
0.00
Item 04//23//02 91 8,736.00
0.00
Item 04//23//02 136 7,208.00
0.00
Item 04//23//02 182 6,734.00
0.00
Item 04//23//02 237 6,636.00
0.00
0.00
0.00
Item 06//23//02 298 95,360.00
0.00
Item 04//23//02 382 35,144.00
0.00
Item 05//23//06 646 86,564.00
0.00
Item 04//23//02 722 22,382.00
0.00
Item 04//23//02 1019 36,684.00
0.00
Item 04//23//02 1364 102,300.00
0.00
Item 03//23//03 2042 1,143,520.00
Project No. JE-1257
Volume III 4/23/526
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
Item 6//23//03 60 11,280.00
0.00
Item 6//23//03 60 1,920.00
0.00
Item 6//23//03 60 5,760.00
0.00
Item 6//23//03 77 4,081.00
0.00
Item 6//23//03 88 3,256.00
0.00
Item 6//23//03 132 3,696.00
0.00
0.00
0.00
Item 6//23//03 161 51,520.00
0.00
Item 4//23//03 175 16,100.00
0.00
See Rate Build-up 205 27,470.00
0.00
See Rate Build-up 235 7,285.00
0.00
See Rate Build-up 1019 36,684.00
0.00
See Rate Build-up 1364 102,300.00
Project No. JE-1257
Volume III 4/23/528
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/530
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/532
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
Item 4// 23 133621 133,621.00
0.00
Item 4// 23 106436 106,436.00
0.00
Item 4// 23 133621 133,621.00
0.00
Item 4// 23 133621 133,621.00
0.00
Item 4// 23 193735 193,735.00
0.00
Item 4// 23 193735 193,735.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item 03//23 3,516.00 3,516.00
0.00
Item 03//23 3,516.00 3,516.00
0.00
Item 03//23 3,516.00 3,516.00
0.00
Project No. JE-1257
Volume III 4/23/538
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
Project No. JE-1257
Volume III 4/23/540
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/542
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
Item 04 // 23 4573 132,617.00
0.00
Item 04 // 23 4621 438,995.00
0.00
Item 04 // 23 4679 23,395.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item 04 // 23 5615 5,615.00
0.00
Item 04 // 23 8337 41,685.00
0.00
Item 04 // 23 9161 18,322.00
Item 04 // 23 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/544
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
Item 04 // 23 4573 150,909.00
0.00
Item 04 // 23 4621 388,164.00
0.00
Item 04 // 23 4679 322,851.00
0.00
Item 04 // 23 4949 148,470.00
0.00
Item 04 // 23 5022 200,880.00
0.00
Item 04 // 23 5120 40,960.00
0.00
Item 04 // 23 5285 84,560.00
Item 04 // 23 0.00
Item 04 // 23 5615 106,685.00
0.00
Item 04 // 23 12.00
0.00
Item 04 // 23 9161 109,932.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/548
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
Item 04 // 23 2873 91,936.00
0.00
Item 04 // 23 2887 49,079.00
0.00
Item 04 // 23 2887 54,853.00
0.00
Item 04 // 23 2906 31,966.00
0.00
Item 04 // 23 2916 11,664.00
0.00
Item 04 // 23 2916 5,832.00
0.00
Item 04 // 23 2942 20,594.00
0.00
Item 04 // 23 3116 28,044.00
0.00
Item 04 // 23 3281 13,124.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/550
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
5.00
0.00
1.00
0.00
85.00
0.00
5.00
0.00
19.00
0.00
73.00
0.00
14.00
0.00
0.00
0.00
12.00
0.00
Project No. JE-1257
Volume III 4/23/552
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
5.00
0.00
73.00
0.00
52.00
0.00
26.00
0.00
5.00
0.00
8.00
0.00
2.00
0.00
5.00
0.00
1.00
0.00
Project No. JE-1257
Volume III 4/23/554
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
85.00
0.00
1.00
0.00
0.00
0.00
6.00
0.00
1.00
0.00
1.00
0.00
2.00
0.00
6.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/556
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/558
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
Item 03 // 23 26274 26,274.00
0.00
0.00
Item 03 // 23 26274 26,274.00
0.00
To Collection SR.. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/562
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item 04 // 23 6265 12,530.00
0.00
0.00
Item 04 // 23 6265 12,530.00
0.00
Item 04 // 23 6265 12,530.00
0.00
Item 04 // 23 6265 12,530.00
0.00
0.00
Item 04 // 23 6265 12,530.00
0.00
To Collection SR.. 0.00
0.00
Item 03 // 23 9242 18,484.00
0.00
0.00
Item 03 // 23 9242 18,484.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/570
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/572
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
0.00
0.00
0.00
0.00
0.00
Item 03 // 23 24906 99,624.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/574
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
Item 04 // 23 20 3,165,900.00
0.00
Item 04 // 23 20 617,240.00
0.00
Item 04 // 23 9,108.00
0.00
Item 04 // 23 20 119,500.00
0.00
0.00
0.00
Item 04 // 23 41 1,113,970.00
0.00
0.00
51.00
0.00
757.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
To Collection SR.. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item 03 // 23 290 6,960.00
0.00
Item 03 // 23 382 4,584.00
0.00
Item 03 // 23 473 45,408.00
0.00
Item 03 // 23 585 25,155.00
0.00
0.00
0.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/578
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
Item 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
To Collection SR.. 0.00
0.00
0.00
81.00
0.00
3.00
0.00
5.00
0.00
7.00
0.00
0.00
Project No. JE-1257
Volume III 4/23/591
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
1.00
Project No. JE-1257
Volume III 4/23/593
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 23
TILLATION & AIR CONDITIONING (HVAC)
SR.. 31,819,823.00
ELECTRICAL INSTALLATIONS
General Requirements:
Price rates have to include but not limited of supply, install, testing
and commissioning of all items. Also, to includ all builder works,
reinforced concrete pads, openings, sleeves, frames, bases, sealant,
fire barrier materials, supports, Seismic restraints, formworks,
vibration isolators, marking, labels, operational and maintenance
manuals, guarantee and spare parts for all electrical equipments as
stated in the contract documents, coordination with other trades and
connection to all related systems, main feeders & infrastructure
networks including all accessories, as per drawings and
specifications.
ELECTRICAL INSTALLATIONS
POWER INSTALLATION
To Collection SR..
To Collection SR..
F.1 1 set x 1-4/c 35mm FIRE RATED + 1-16mm cu. grd on cable
tray. (Bill.3) 75 m
To Collection SR..
F 1 set x 1-4/c 6mm XLPE / LSF + 1-6mm cu. grd on cable tray.
m
H.2 2 set x 1-4/c 300mm XLPE / LSF + 1-150mm cu. grd on cable
tray. m
H.4 1 set x 1-3.5/c 70mm XLPE / LSF + 1-35mm cu. grd on cable
tray. m
To Collection SR..
H.8 4 sets x 1-4/c 240mm XLPE / LSF + 1-120mm cu. grd on cable
tray. 20 m
BUS BAR
To Collection SR..
To Collection SR..
PANELBOARDS
A Panelboard SWBD-12A-A 1 No
B Panelboard SWBD-12A-B 1 No
C Panelboard SWBD-12B-A 1 No
D Panelboard SWBD-12B-B 1 No
E Panelboard DP-N12A-6 1 No
F Panelboard N12A-2A 1 No
G Panelboard N12A-2B 1 No
H Panelboard N12A-S1A 1 No
J Panelboard N12A-S1B 1 No
K Panelboard N12A-6A 1 No
L Panelboard N12A-6B 1 No
M Panelboard N12A-6C 1 No
N Panelboard N12A-6D 1 No
O Panelboard N12A-6E 1 No
P Panelboard N12A-RF 1 No
Q Panelboard E12B-S1 1 No
R Panelboard E12B-1A 1 No
S Panelboard E12B-1B 1 No
T Panelboard E12B-1C 1 No
Project No. JE-1257
4/26/612
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 26
ELECTRICAL
U Panelboard E12B-2 1 No
To Collection SR..
A Panelboard E12B-3B 1 No
B Panelboard E12B-4C 1 No
C Panelboard E12B-5C 1 No
D Panelboard E12B-6C 1 No
E Panelboard DP-E12B-RF 1 No
F Panelboard DP-N12A-5 1 No
G Panelboard N12A-5A 1 No
H Panelboard N12A-5B 1 No
J Panelboard N12A-5C 1 No
K Panelboard N12A-5D 1 No
L Panelboard N12A-5E 1 No
M Panelboard DP-C12B 1 No
N Panelboard DP-N12B-3 1 No
O Panelboard DP-N12B-5 1 No
P Panelboard N12B-3A 1 No
Q Panelboard N12B-4A 1 No
R Panelboard N12B-3B 1 No
S Panelboard N12B-4B 1 No
T Panelboard DP-C12B-5 1 No
U Panelboard C12B-4A 1 No
To Collection SR..
A Panelboard C12B-4B 1 No
B Panelboard C12B-4C 1 No
C Panelboard DP-N12A-4 1 No
D Panelboard N12A-4A 1 No
E Panelboard N12A-4B 1 No
F Panelboard N12A-4C 1 No
G Panelboard N12A-4D 1 No
H Panelboard N12A-4E 1 No
J Panelboard DP-HVAC-12A-2 1 No
K Panelboard DP-HVAC-12A-S1 1 No
L Panelboard DP-HAVC-12B-2 1 No
M Panelboard DP-E12B-2B 1 No
N Panelboard DP-E12B-2A 1 No
O Panelboard DP-N12A-3 1 No
P Panelboard N12A-3A 1 No
Q Panelboard N12A-3B 1 No
R Panelboard N12A-3C 1 No
S Panelboard N12A-3D 1 No
T Panelboard N12A-3E 1 No
U Panelboard N12A-3F 1 No
To Collection SR..
A Panelboard DP-CU12A 1 No
B Panelboard CU12A-1A 1 No
C Panelboard CU12A-6 1 No
D Panelboard CU12A-1B 1 No
E Panelboard CU12A-1C 1 No
F Panelboard CU12A-2 1 No
G Panelboard CU12A-2 1 No
H Panelboard CU12A-3 1 No
J Panelboard CU12A-4 1 No
K Panelboard CU12A-5 1 No
L Panelboard C12B-3A 1 No
M Panelboard C12B-3B 1 No
N Panelboard C12B-3C 1 No
O Panelboard DP-C12B-3 1 No
P Panelboard LS12A-1 1 No
Q Panelboard LS12A-5 1 No
R Panelboard LS12A-3 1 No
S Panelboard LS12A-2 1 No
T Panelboard LS12A-6 1 No
U Panelboard LS12A-4 1 No
To Collection SR..
A Panelboard N12B-5A 1 No
B Panelboard N12B-6A 1 No
C Panelboard N12B-5B 1 No
D Panelboard N12B-6B 1 No
E Panelboard DP-LS12A 1 No
F Panelboard DP-N12B-1 1 No
G Panelboard DP-EL12B-7B 1 No
H Panelboard DP-EL12B-7A 1 No
J Panelboard N12B-1A 1 No
K Panelboard N12B-1C 1 No
L Panelboard N12B-1B 1 No
M Panelboard N12B-1D 1 No
N Panelboard N12B-1E 1 No
O Panelboard N12B-1F 1 No
P Panelboard N12B-1G 1 No
Q Panelboard E12B-4A 1 No
R Panelboard E12B-3A 1 No
S Panelboard E12B-4B 1 No
T Panelboard E12B-5A 1 No
U Panelboard E12B-5B 1 No
To Collection SR..
A Panelboard E12B-6A 1 No
B Panelboard E12B-6B 1 No
C Panelboard DP-N12A-1 1 No
D Panelboard N12A-1A 1 No
E Panelboard N12A-1N 1 No
F Panelboard N12A-1M 1 No
G Panelboard N12A-1L 1 No
H Panelboard N12A-1K 1 No
J Panelboard N12A-1B 1 No
K Panelboard N12A-1C 1 No
L Panelboard N12A-1D 1 No
M Panelboard N12A-1E 1 No
N Panelboard N12A-1F 1 No
O Panelboard N12A-1G 1 No
P Panelboard N12A-1H 1 No
Q Panelboard N12A-1I 1 No
R Panelboard N12A-1J 1 No
S Panelboard C12B-S1 1 No
T Panelboard DP-C12B-1 1 No
U Panelboard C12B-1A 1 No
To Collection SR..
A Panelboard C12B-1F 1 No
B Panelboard C12B-1E 1 No
C Panelboard C12B-1B 1 No
D Panelboard C12B-1C 1 No
E Panelboard C12B-1D 1 No
F Panelboard C12B-5A 1 No
G Panelboard C12B-5B 1 No
H Panelboard C12B-5C 1 No
J Panelboard C12B-6A 1 No
K Panelboard C12B-6B 1 No
L Panelboard C12B-6C 1 No
To Collection SR..
A Panelboard O-LCP-3 1 No
B Panelboard O-LCP-4 1 No
C Panelboard O-LCP-5 1 No
D Panelboard O-LCP-6 1 No
E Panelboard O-LCP-11 1 No
F Panelboard O-LCP-12 1 No
G Panelboard O-LCP-13 1 No
H Panelboard O-LCP-14 1 No
To Collection SR..
CONTROL PANEL
To Collection SR..
To Collection SR..
TRANSFORMERS
Dry Type, Forced air ventilation: 2000/2700 KVA; PRI 13.8 KV;
SEC 400/230V, 3PH, 4W, 60Hz.
G Ref. TR-12A 1 No
H Ref. TR-12B 1 No
Dry Type: 2500 KVA; PRI 13.8 KV; SEC 400/230V, 3PH, 4W,
60Hz.
To Collection SR..
MV CIRCUIT BREAKERS
Ring Main Unit (RMU), 17.5 KV, metal enclousre indoor type,
Motorized, complete as required and as shown on drawings,
specifications and workmanship.
B Ref. RMU-12A 1 No
C Ref. RMU-12B 1 No
To Collection SR..
POWER PROVISION
To Collection SR..
POWER PROVISION
To Collection SR..
DISCONNECT SWITCHES:
A
Disconnect switch 16A, 1PST, 220V, NEMA-1, UNFUSED.
No
C
Disconnect switch 16A, 3PST, 220V, NEMA-1, UNFUSED.
No
E
Disconnect switch 20A, 1PST, 220V, NEMA-1, FUSED.
No
F
Disconnect switch 20A, 3PST, 220V, NEMA-1, UNFUSED.
No
G
Disconnect switch 30A, 1PST, 220V, NEMA-1, UNFUSED.
No
J
Disconnect switch 80A, 3PST, 400V, NEMA-1, UNFUSED.
No
K
Disconnect switch 80A, 4PST, 400V, NEMA-1, FUSED.
No
L
Disconnect switch 100A, 3PST, 400V, NEMA-1, UNFUSED.
No
To Collection SR..
A
Disconnect switch 100A, 3PST, 400V, NEMA-1, FUSED.
No
B
Disconnect switch 125A, 3PST, 400V, NEMA-1, FUSED.
No
C
Disconnect switch 200A, 3PST, 400V, NEMA-1, FUSED.
No
D
Disconnect switch 20A, 3PST, 380V, NEMA-1, UNFUSED.
No
E
Disconnect switch 20A, 3PST, 400V, NEMA-1, UNFUSED.
No
To Collection SR..
To Collection SR..
RECEPTACLES
To Collection SR..
RECEPTACLES (Cont)
C Duplex receptacle, 20A, 220V, 2P grd. But listed with Hospital grade
(For TV, above false ceiling) No
F Duplex receptacle, 20A, 220V, 2P grd. But listed with Tamper Resistance
(For T.V) No
To Collection SR..
RECEPTACLES (Cont)
146 No
To Collection SR..
RECEPTACLES (Cont)
A
Duplex receptacle, 230V, 20A, 2P+E, mounted above counter, wired to
critical branch power circuit and with different color from the normal to
be identifiable, (For REF),(weatherproof),IP66.
21 No
To Collection SR..
RECEPTACLES (Cont)
To Collection SR..
LIGHTINGS
H Type - F1 No
J Type - F2 No
K Type- F3 No
L Type- F4 No
M Type- F12 No
N Type- F16 No
O Type- F17 No
P Type- F21 No
To Collection SR..
LIGHTINGS (Cont)
A Type- F23 No
B TYPE-F24 No
C Type -F31 No
E Type -J No
F Type- SL1 No
G Type -SL2 No
H Type -PL-1 24 No
J Type- PL8 No
K Type PL23 No
L TYPE-RF-4 56 No
M TYPE-RF5 No
N TYPE-RF-8 4 No
N.1 TYPE-RF8 66 m
R Type -DC8 No
S Type -DC9 No
Project No. JE-1257
4/26/657
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 26
ELECTRICAL
T Type- DC10 No
U Type- DC11 No
To Collection SR..
LIGHTINGS (Cont)
A Type- DC12 No
B Type- DC13 No
C Type- DC-14 77 No
D Type- DC14A No
E Type -DC15 No
F Type- DC21 No
G Type- DC22 No
H TYPE-XR1C No
J TYPE-BL24A No
J.1 TYPE-PL24A No
K Type -WS2 No
L Type -WS3 No
M Type- WS4 17 No
N Type -EX1 No
O Type- EX2 No
P Type -EX3 No
Q Type- EX4 No
R Type- EX5 No
To Collection SR..
LIGHTINGS (Cont)
A Type -XST-1 No
B Type -XFM-3 No
C Type -XFM-4A No
D Type- XFM-4B No
E Type -XFM-4C No
F Type -XFM-5 No
G Type-R1 No
H Type-EB No
J TYPE-UL3 No
J.1 TYPE-UL2 No
K TYPE-F32 No
L TYPE-XLE-2 No
M TYPE-XBC-1 No
N TYPE-XNE-1 52 No
P
Led drivers for building Faade Lighting Control 150W
17 No
Q
Led drivers for building Faade Lighting Control 120W
7 No
R
Led drivers for building Faade Lighting Control 100W
124 No
Project No. JE-1257
4/26/661
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 26
ELECTRICAL
To Collection SR..
LIGHTINGS (Cont)
A Type- A1 178 No
C Type- A24 81 No
F Type- LF--2 83 No
G Type- LF-3 4 No
H Type- LF-4 83 No
J Type- PL-10A 6 No
K Type- PL-24 12 No
L Type- PL-27 1 No
O Type- RF-11 25 No
P Type- RF-14D 8 No
Q Type- RF-14A 11 No
S Type- RF-16 30 No
To Collection SR..
LIGHTINGS (Cont)
B Type- RF-20 90 No
E Type- RF-28 32 No
G Type- W-24 2 No
H Type- OB-1 2 No
J Type- XAM-1 6 No
K Type- XAM-2 12 No
L Type- XBM-1 6 No
M Type- XBO-1 18 No
N Type- XBO-2 27 No
O Type- XBO-3 27 No
P Type- XBO-4 4 No
S Type- XPO-1 21 No
T Type- XUE-3 7 No
U Type- XUE-4A 1 No
W Type- XWM-1 10 No
X Type- XWE-1A 22 No
Project No. JE-1257
4/26/665
KFSH & RC
B01 - Oncology Bldg.
BILL No. 4
DIVISION 26
ELECTRICAL
Y Type- XWE-1B 7 No
Z Type- XWE-1C 18 No
To Collection SR..
SWITCHES:
A
Single pole toggel switch (Switch,one way, one gang, 20A, 230V)
1128 No
C
Two pole toggle switch (Switch,one way, two gang, 20A, 230V)
292 No
E
Two way toggle switch (Switch, three way, one gang, 20A, 230V)
128 No
K Dimming Station 18 No
To Collection SR..
B GPS antenna 1 No
C Photo-electric controller 1 No
D junction box 1 No
To Collection SR..
L
25mm x 3mm copper tape installed on the top of parapet, walls,
roof, etc., including intersection (for lightning).
2,425 m
To Collection SR..
To Collection SR..
To Collection SR..
COLLECTION
To Collection
COLLECTION
Page No. 4/26/25
Page No. 4/26/26
Page No. 4/26/27
Page No. 4/26/28
Page No. 4/26/29
Page No. 4/26/30
Page No. 4/26/31
Page No. 4/26/32
Page No. 4/26/33
Page No. 4/26/34
Page No. 4/26/35
Page No. 4/26/36
Page No. 4/26/37
Page No. 4/26/38
Page No. 4/26/39
Page No. 4/26/40
Total Sum of Page No. 4/26/41
BILL No. 4
DIVISION 26 - ELECTRICAL
Carried to Summary
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Included in SWBD-
12A-A
Included in SWBD-
12B-A
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
0.00
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
SR..
General Requirements:
Price rates have to include but not limited all Builder works,
reinforced concrete pads, openings, sleeves, frames, bases, sealant,
fire barrier materials, supports, formwork, vibration isolators,
marking, labels, operational and maintenance manuals, guarantee
and spare parts for all electrical equipments as stated in the contract
documents, Cable trunks & Ladders C/W all their accessories,
Grounding and bounding of all technology system, coordination
with other trades and connecting to all systems and also connecting
the technology cabling infrastructure installations to site OSP&
connection to STC & all related external work including all
accessories as per the standard, specifications and drawings.
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 27 - COMMUNICATIONS
Amount
SR..
Amount
SR..
Amount
SR..
0.00
General Requirements:
Price rates have to include but not limited all Builder works,
reinforced concrete pads, openings, sleeves, frames, bases, sealant,
fire barrier materials, supports, formwork, vibration isolators,
marking, labels, operational and maintenance manuals, guarantee
and spare parts for all electrical equipments as stated in the contract
documents, Cable trunks & Ladders C/W all their accessories,
Grounding and bounding of all technology system, coordination
with other trades and connecting to all systems and also connecting
the technology cabling infrastructure installations to site OSP&
connection to STC & all related external work including all
accessories as per the standard, specifications and drawings.
A Sub fire alarm control panel SFACP6 (12 loops + 1 loop Spare)
class A intelligent type, auto dialer, interfaces to BAS with Backnet
protocol, HVAC, elevator, public address and BMS system with
built in SLA battery and battery charger.
0 No
1 No
C Events printer 1 No
C.3 Fire alarm control panel Addressable type with built in SLA
battery and battery charger . 1 No
To Collection SR..
K
Fixed temperature heat detector (Addressable heat detector) 2 No
To Collection SR..
O battery 0 No
To Collection SR..
To Collection SR..
COLLECTION
BILL No. 4
DIVISION 28 - ELECTRONIC SAFETY & SECURITY
Carried to Summary
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Included
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
Unit Amount
Rate SR..
To Collection SR..
Unit Amount
Rate SR..
SR.. -
EXCAVATION WORK
Excavation
SOIL TREATMENT
OPTION -1
SHORING SYSTEM
OPTION -2
SHORING SYSTEM
COLLECTION
From
Page
SR..
44,350,931.05
1,496,830.00
2,091,853.60
5,404,560.93
4,005,974.52
0.00
21,675,219.00
1,452,251.00