You are on page 1of 1

LAKEFRONT TRAIL SEPARATION PROJECT

LEGEND
Lakefront Trail
Closed for
Construction
LAKEFRONT TRAIL SOUTH DETOUR LAKEFRONT TRAIL OPEN
TRAIL ACCESS RESUMES NORTH OF DIVERSEY AVE Bicycle
Route
AT NORTH AVE UNDERPASS
SOUTHBOUND ONLY Pedestrian
DIVERSEY AVE Route

LAKEFRONT TRAIL CLOSED


NO PUBLIC ACCESS SOUTH
OF DIVERSEY AVE

PEDESTRIAN BEACH ACCESS


AT FULLERTON AVE
OPEN DURING CONSTRUCITON
FULLERTON AVE

PEDESTRIAN BEACH ACCESS AT BRIDGE


OPEN DURING CONSTRUCTION

BEACH ACCESS AT LASALLE ST


PEDESTRIAN BRIDGE OPEN DURING CONSTRUCTION
ALLE S
LAS T

PEDESTRIAN BEACH ACCESS


AT NORTH AVE UNDERPASS
OPEN DURING CONSTRUCTION
NORTH AVE
LAKEFRONT TRAIL CLOSED
LAKEFRONT TRAIL NORTH DETOUR
NO PUBLIC ACCESS NORTH
TRAIL ACCESS RESUMES AT
OF NORTH AVE
DIVERSEY AVE NORTHBOUND ONLY
NORTH LAKEFRONT TRAIL OPEN
SOUTH OF NORTH AVE

NORTH AVE BEACH OPEN DURING CONSTRUCTION


Visit www.chicagoparkdistrict.com/lakefront-trail/ or follow @ChicagoParks on Twitter for project updates.
The lakefront trail separation project is made possible, in part, by a generous gift from Kenneth Griffin.

You might also like