Date Plot No Description of work Contractor's Name
7/1/2074 57 External plaster work Mahendra Shrestha
Brick masonry work 2nd Fl slab Mahendra Shrestha
61 External plaster work Mahendra Shrestha
53 Internal plaster work Mahendra Shrestha
42 Form work for terrace floor Laxmi Sudhi
60 Electric work Ramesh
IPS work Mahendra Shrestha
58 Electric work Ramesh
59 Toilet water proofing Sujan
49 First floor column casting Laxmi Sudhi
1 1 Shaurav Shrestha
2 1
2
1 1
2 2
2 5
3 2
1 1
3 3
3
2
1 1
1 1
2 3 Ganesh Shing
1 2
1 2
2 1
3 2
2 2
2 3 Rabindra Parajuli
2 6
2
1 1
2 2
1 1
Padma Colony
Sitapaila
Third Phase
Nos of workers
Date Plot No Description of work Contractor's Name
Masons
8/1/2074 57 External plaster work Mahendra Shrestha 2
Brick masonry work 2nd Fl slab Mahendra Shrestha 3
61 External plaster work Mahendra Shrestha 3
53 Internal plaster work Mahendra Shrestha 3
42 Form work for terrace floor Laxmi Sudhi 2
60 Electric work Ramesh
IPS work Mahendra Shrestha 1
45 Brick masonry work Laxmi Sudhi 2
58 Electric work Ramesh
4
1
2
2
2
1
1
3
1
3
1
3
1
2
2
2
15
1
4 Ganesh Shing
4
2
1
10
3
3 Rabindra Parajuli
4
3
1
Column Design Summary
Desigh parameters:
Concrete grade:-M20 Clear cover:-40mm
Steel grade:-Fe 415 Lateral ties:-Fe 415
NOTE:- The area of steel is calculated according to STAAD
Diameter
Column Column size Column Area Ast. Req. as per
Column Floor
Type BXD mm2 STAAD Design mm2
a b
Nos Nos
8 1256 1.35 8
8 1256 1.35 8
8 1256 1.35 8
8 1608 1.73 8
8 1608 1.73 8
8 1608 1.73 8