You are on page 1of 2

DAILY ACTIVITY REPORT

CONSTRUCTION
BLOCK A GAS DEVELOPMENT PROJECT - EPC 2

Location : Daily Report No. :


Client : MEDCO E&P MALAKA
Date :
Working Hour : 08:00 - 18:00

PERSONNEL SHE EQUIPMENT


Manpower Manhours Remarks SHE Statistic
No. Description No Equipment & Tools Unit Qty
Unit Today Unit Prev. Today Cumulative No Description Total
1 PT KELSRI
Indirect 1 Incident/Accident 1 5 Kg Hammer Unit
1 Deputy Site Manager Person M/H - - 2 Near Miss Report 2 Handset Saw Unit
2 Superintendent Person M/H - - 3 Total Stop Card 3 Shovel Unit
3 Project Control Person M/H - - 4 Hazard Hunting Report 4 Fire Extinguisher Unit
4 SHE Superintendent Person M/H - - 5 Positive Reinforcement 5 Wheelbarrow Unit
5 Security Coordinator Person M/H - - 6 Total PTW Issued 6 Genset Unit
6 Public Relation Coordinator Person M/H - - 7 Water Pump Unit
7 Security Lead Person M/H - - 8 Molen Engine Unit
8 Security Person M/H - - 9 Electronic Generator Unit
9 Paramedic Person M/H - - 10 Steel Cutting Tool Unit
10 General Affair Person M/H - - 11 Well Drilling Engine Unit
11 Public Affair Person M/H - - 12 Small Hand Tools Unit
12 Driver Person M/H - - 13 Compacting Vibrator Unit
13 Safety Officer Person M/H - - 14 Chainsaw Unit
14 Chief Surveyor Person M/H - - 15 Crane 35 Ton Unit
Total Indirect - - - 16 Total Station Unit
Direct
1 Sr. Supervisor Person M/H - -
2 Supervisor Person M/H - -
3 Site Coordinator Person M/H - -
4 Civil Inspector Person M/H - -
5 Civil Engineer Person M/H - -
6 Carpenter Person M/H - -
7 Rebar man Person M/H - -
8 Digger Person M/H - -
9 Surveyor Person M/H - -
10 Helper Person M/H - -
11 Material Man Person M/H - -
12 Operator Person M/H - -
13 Rigger Person M/H - -
14 Foreman Person M/H - -
15 Helper Surveyor Person M/H - -
Total Direct - - - -
Total Manpower - - - -
No. HIGHLIGHTS REMARKS

No. DOCUMENT REFERENCES REMARKS


1
2
3
4
5
6
7
8
9
10
11

ACTIVITIES AREA OF CONCERN


No. Today Activities No. Description

No. Plan Activities WEATHER


1 Time
2 08:00 - 12:00
3 13:00 - 18:00
4
5
6
7
PREPARED BY ACKNOWLEDGED BY APPROVED BY

Jacky Rinanza Zulsyafar Ilyas Filbert Iskandar


Site Manager Superintendent Sr. Project Engineer
PT GEARINDO TIGA UTAMA PT KELSRI PT KELSRI
DAILY ACTIVITY REPORT
CONSTRUCTION

BLOCK A GAS DEVELOPMENT PROJECT - EPC 2

PREPARED BY ACKNOWLEDGED BY APPROVED BY

Jacky Rinanza Zulsyafar Ilyas Filbert Iskandar


Site Manager Superintendent Sr. Project Engineer
PT GEARINDO TIGA UTAMA PT KELSRI PT KELSRI