Professional Documents
Culture Documents
S1
SPECIFIC SPECIFICATIONS
a. Special individual outlets shall be installed and be located on the same level 760mm within the equipment.
2.00 2.00
b. All metal frames shall be properly and adequately grounded. ground wire shall be provided on all
equipment feeder.
S2
c. All convenience outlets shall be installed 300mm from the finished floor line.
LIGHTING LAYOUT POW ER LAYOUT d. All switches shall be installed 1200mm from the finished floor line.
e. The use of wiring for service entrance shall be TW (other applicable or required type of wire)
SECOND FLOOR
SCALE 1:100
2.15
6.45
2.15 2.15
6.45
2.15 RISER DIAGRAM LEGEND
NOT DRAWN TO SCALE
PANEL BOARD
1.75 1.75
SERVICE ENTRANCE
ACU CIRCUIT BREAKER
STREET MAIN
3.25
S1
3.50 ELECTRICAL SUPPLY
SINGLE POLE SWITCH
S1
S2
15 A 20 A
S2
TWO GANG SWITCH
1 2
THREE-WAY SWITCH
S1 30 A S3W
DOWN DOWN 15 A
CONCRETE 3 4 REF/RANGE OUTLET
POST 20 A REF/ RANGE
30 A
S1 7.00 7.00
5 6 AIR CONDITION OUTLET
3.60
SPARE
ACU
KILOWATT 7
3.25 3.25 HOUR M
CONVENIENCE OUTLET
METER
S1
S1
(By CFL OUTLET
MERALCO)
1.50 SWITCH RUN
2.50 2.50
POWER LINE
S1
GROUND LEVEL
1.00
2.15 2.15