S CURVE

S CURVE EPCI-2 CONTRACT OF FLOWLINE, TRUNKLINE AND PIPELINE BLOCK A ACEH PROJECT
BLOCK A ACEH PROJECT

Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17


No Item Works Bobot Remark W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21 W-22 W-23 W-24 W-25 W-26 W-27 W-28
Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress Progress
1 PREPARATION
1.1 Site Preparation 0.26% 0.0008631 0.0008631 0.00086306
1.2 Temporary Facilities 2.59% 0.0009958 0.0009958 0.00099584 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958 0.0009958
1.3 MOB/DEMOB Manpower & Equipment
1.3.1 Mob/Demob Staff and Project Team 0.34% 0.0001295 0.0001295 0.00012946 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295 0.0001295
1.3.2 Mobilization Man Power and Equipment 0.44% 0.0001761 0.0001761 0.00017606 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761 0.0001761
1.4 Medical Check 0.26% 0.0006473 0.00064729 0.0006473 0.0006473
1.5 Safety Induction
1.5.1 Safety Induction Project Team and Staff By - PT Kelsri
1.5.2 Safety Induction Man Power By - PT Kelsri
1.6 Equipment Inspection By - PT GTU - PT Kelsri
1.7 Permits By - PT GTU - PT Kelsri
1.8 Construction Survey 1.17% 0.0004481 0.0004481 0.00044813 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481 0.0004481
1.9 Welder Performance Test 1.04% 0.0051783 0.0051783
1.10 Temporary Retaining Wall Fabrication 0.08% 0.0007768
1.11 Shop Drawing 0.02% 3.107E-05 3.107E-05 3.107E-05 3.107E-05 3.107E-05
2 CONSTRUCTION
2.1 Trunkline A from JR-Cluster I Manifold to AS CPP -
2.1.1 Pipeline
2.1.1.1 Hauling and Stringing 1.49% 0.0149353
2.1.1.2 Line Up & Welding 3.34% 0.003336 0.003336 0.003336 0.003336 0.003336 0.003336 0.003336 0.003336 0.003336 0.003336
2.1.1.3 NDE By - PT Kelsri
2.1.1.4 Field Joint Coating 1.78% Mat- BY PT Kelsri 0.0019818 0.0019818 0.0019818 0.0019818 0.0019818 0.0019818 0.0019818 0.0019818 0.0019818
(1)
2.1.1.5 Trenching, Lowering & Backfilling 4.65% Lowering Equipment & Crew by PT Kelsri 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533 0.0046533
2.1.1.6 Reinstatement 1.28% 0.001427 0.001427 0.001427 0.001427 0.001427 0.001427 0.001427 0.001427 0.001427
2.1.1.7 Cleaning, Gauging, Hydrotest, Swabbing 1.03% 0.0051665 0.0051665
2.1.2 Flowline
2.1.2.1 Site Preparation 0.02% 0.0001832
2.1.2.2 Hauling and Stringing 0.01% 0.000138
2.1.2.3 Line Up & Welding 0.05% 0.000501
2.1.2.4 NDE By - PT Kelsri
2.1.2.5 Field Joint Coating 0.03% Mat- BY PT Kelsri 0.0003297
2.1.2.6 Trenching 0.09% 0.0008602
2.1.2.8 Reinstatement 0.02% 0.0002374
2.1.2.9 Aboveground
2.1.2.10 Line Up & Welding 0.08% 0.0008279
2.1.2.11 NDE By PT Kelsri
2.1.2.12 Field Joint Coating 0.05% Mat By PT Kelsri 0.0005448
2.1.2.13 Cleaning, Gauging, Hydrotest, Swabbing, Dewaring 0.03% 0.0002667
2.1.3 Mechanical
2.1.3.1 20-KAQ-702A (at AS CPP) 0.47% 0.00467
2.1.3.2 20-KAH-702A (at JR-71) 0.47% 0.00467
2.1.3.3 Valve & Accessories Installation 0.22% 0.002162
2.1.4 Piping
2.1.4.1 Welding 0.89% 0.0022177 0.0022177 0.0022177 0.0022177
2.1.4.2 Piping Painting 0.56% 0.0014053 0.0014053 0.0014053 0.0014053
2.2 Trunkline B from JR-Cluster II Manifold to AS CPP
2.2.1 Pipeline
2.2.1.1 Hauling and Stringing 1.58% 0.0079202 0.0079202
2.2.1.2 Line Up & Welding 3.54% 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382 0.0035382
2.2.1.3 NDE By - PT Kelsri
2.2.1.4 Field Joint Coating 1.89% Mat- BY PT Kelsri 0.002102 0.002102 0.002102 0.002102 0.002102 0.002102 0.002102 0.002102 0.002102
(1)
2.2.1.5 Trenching, Lowering & Backfilling 4.94% Lowering Equipment & Crew by PT Kelsri 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353 0.0049353
2.2.1.6 Reinstatement 1.36% 0.0034053 0.0034053 0.0034053 0.0034053
Cleaning, Gauging, Hydrotest, Swabbing, Dewatering
1.10% 0.0036531 0.0036531 0.0036531
2.2.1.7
2.2.2 Flowline
2.2.2.1 Hauling and Stringing 0.02% 0.000181
2.2.2.2 Line Up & Welding 0.04% 0.0004044
2.2.2.3 NDE By - PT Kelsri
2.2.2.4 Field Joint Coating 0.02% Mat-By PT Kelsri 0.0002162
2.2.2.5 Trenching 0.06% 0.000564
2.2.2.7 Reinstatement 0.02% 0.0001557
2.2.2.8 Aboveground
2.2.2.9 Line Up & Welding 0.04% 0.0003882
2.2.2.10 NDE By - PT Kelsri
2.2.2.11 Field Joint Coating 0.02% 0.0002076
2.2.2.12 Cleaning, Gauging, Hydrotest, Swabbing 0.01% 0.0001252
2.2.3 Mechanical
2.2.3.1 20-KAQ-702B (at AS CPP) 0.47% 0.00467
2.2.3.2 20-KAH-702B (at JR-74) 0.47% 0.00467
2.2.3.3 Valve & Accessories Installation 0.22% 0.002162
2.2.4 Piping
2.2.4.1 Welding 0.89% 0.0014785 0.0014785 0.0014785 0.0014785 0.0014785 0.0014785
2.2.4.2 Piping Painting 0.56% 0.0009369 0.0009369 0.0009369 0.0009369 0.0009369 0.0009369
2.3 AS CPP to Jambo Balee MX
2.3.1 Pipeline
2.3.1.1 Hauling and Stringing 4.52% 0.0090309 0.0090309 0.0090309 0.0090309 0.0090309
2.3.1.2 Line Up & Welding 15.13% 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643 0.0075643
2.3.1.3 NDE By - PT Kelsri
2.3.1.4 Field Joint Coating 5.39% Mat- BY PT Kelsri 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382 0.0028382
(1)
2.3.1.5 Trenching, Lowering & Backfilling 14.07% Lowering Equipment & Crew by PT Kelsri 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341 0.0070341
2.3.1.6 Reinstatement 3.88% 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865 0.0029865
2.3.1.7 Cleaning, Gauging, Hydrotest, Swabbing 3.12% 0.0156199 0.0156199
2.3.1.8 Fiber Optic Cable (FOC) 1.00% 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476 0.000476
2.3.1.9 Electrical Power Cable (EPC) 0.40% 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904 0.0001904
2.3.2 Mechanical
2.3.2.1 50-KAH-702 0.49% 0.0049044
2.3.2.2 50-KAQ-702 0.49% 0.0049044
2.3.2.3 Valve & Accessories Installation 0.23% 0.0022706
2.3.3 Piping
2.3.3.1 Welding 0.26% 0.0026223
2.3.3.2 Piping Painting 0.56% 0.0056212
2.3.3.3 Piping Erection 0.01% 0.0001274
2.4 MX to PTG Tie-In
2.4.1 Pipeline
2.4.1.1 Hauling and Stringing 0.10% 0.0009506
2.4.1.2 Line Up & Welding 0.27% 0.0013271 0.0013271
2.4.1.3 NDE By PT Kelsri
2.4.1.4 Field Joint Coating 0.11% Mat- BY PT Kelsri 0.0011353
(1)
2.4.1.5 Trenching, Lowering & Backfilling 0.30% Lowering Equipment & Crew by PT Kelsri 0.0029617
2.4.1.6 Reinstatement 0.08% 0.0008174
2.4.1.7 Cleaning, Gauging, Hydrotest, Swabbing 0.07% 0.0003288 0.0003288
2.4.2 Mechanical
2.4.2.1 50-KAH-703 0.49% 0.0049044
2.4.2.2 50-KAQ-703 0.49% 0.0049044
2.4.2.3 Valve & Accessories Installation 0.23% 0.0022706
2.5 Water Injection Line JR-38A
2.5.1 Pipeline
2.5.1.1 Hauling and Stringing 0.13% 0.0013035
2.5.1.2 Line Up & Welding 0.30% 0.0030327
2.5.1.3 NDE By PT Kelsri
2.5.1.4 Field Joint Coating 0.17% Mat - By PT Kelsri 0.0016864
(1)
2.5.1.5 Trenching, Lowering & Backfilling 1.69% Lowering Equipment & Crew by PT Kelsri 0.0042303 0.0042303 0.0042303 0.0042303
2.5.1.6 Reinstatement 0.56% 0.0056038
2.5.1.7 Cleaning, Gauging, Hydrotest, Swabbing,Dewatring 0.08% 0.0007515
2.5.2 Piping
2.5.2.1 Welding 0.05% 0.0005366
2.5.2.2 Piping Painting 0.56% 0.0056212
2.6 Water Injection Line JR-40A
2.6.1 Pipeline
2.6.1.1 Hauling and Stringing 0.18% 0.0018466
2.6.1.2 Line Up & Tie In Welding 0.43% 0.0042964
2.6.1.3 NDE By PT Kelsri
2.6.1.4 Field Joint Coating 0.24% Mat - By PT Kelsri 0.0005973 0.0005973 0.0005973 0.0005973
(1)
2.6.1.5 Trenching, Lowering & Backfilling 2.40% Lowering Equipment & Crew by PT Kelsri 0.0039953 0.0039953 0.0039953 0.0039953 0.0039953 0.0039953
2.6.1.6 Reinstatement 0.79%
2.6.1.7 Cleaning, Gauging, Hydrotest, Swabbing, Dewatering 0.08% 0.0007515
2.6.2 Piping
2.6.2.1 Welding 0.06%
2.6.2.2 Piping Painting 0.56%
3 PREPARATION
3.1 Report and Documentation 0.03% 1.0788E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05 1.079E-05
3.2 As - Built Drawing 0.02% 3.448E-05 3.448E-05 3.448E-05 3.448E-05 3.448E-05 3.448E-05 3.448E-05
JUMLAH 100.00%
WEEKLY PLAN 0.00% 0.00% 0.26% 0.33% 0.33% 0.76% 2.91% 4.41% 3.13% 3.13% 4.96% 4.39% 6.21% 4.55% 4.84% 4.84% 4.48% 4.48% 4.82% 5.47% 6.33% 4.69% 4.02% 4.85% 4.01% 3.89% 3.96% 3.94%
CUMM PLAN 0.00% 0.00% 0.26% 0.59% 0.92% 1.68% 4.59% 9.00% 12.14% 15.27% 20.22% 24.61% 30.82% 35.37% 40.21% 45.06% 49.54% 54.02% 58.85% 64.31% 70.65% 75.33% 79.35% 84.20% 88.21% 92.10% 96.06% 100.00%