1.0 Introduction 2

2.0 Executive Summary 3

3.0 Objective 4

3.1 Planning of Traffic Management Scheme 4

3.2 Planning for Three Months Ahead 4

3.3 Method Statement of Traffic Management 5

3.3.1 Stage 1

3.3.2 Stage 2

4.0 Project Brief 7

About Flood Mitigation Planning of Sungai Bunus 7

Project Location Plan 8

Project Information 9

5.0 Traffic Team Responsibility 10

5.1 Traffic Manager 10

5.2 Traffic Management Officer 10

5.3 Traffic Supervisor 11


TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
5.4 Traffic Controller 11

5.5 Organizational Chart ( ERT & TMT ) ( NOV- JAN 2015) 12

6.0 Work Progress &Traffic Management Scheme ( NOV- JAN 2015) 13

7.0 Traffic Devices Inventory and List of Equipment( NOV- JAN 2015) 19

8.0 Accident Report(( NOV- JAN 2015) 28

8.1 Accident Details

8.2 Vehicle Breakdown

9.0 Summary 31

10.0 Appendix

10.1 Appendix-1: Traffic Management Plan Drawing such as: 32

PPL/JPS/PAOR/GA/SGB/01

PPL/JPS/PAOR/GA/SGB/02

PPL/JPS/PAOR/GA/SGB/03

PPL/JPS/PAOR/GA/SGB/04

10.2 Appendix -2: Site Activity photo of Traffic Management( NOV- JAN 2015) 35

10.3 Appendix -3: Operation Schedule for Emergency Response Team 79

1
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
10.4 Appendix -4: Emergency Contact Number 80

10.5 Appendix- 5: temporary signboard for construction activity 81

1. INTRODUCTION

Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur, is initiated by the
Government of Malaysia. The project owner for this project is Jabatan Pengairan Dan Saliran
Malaysia. Furthermore, Perunding Azman,Ooi & Rao Sdn Bhd leads to be Consultant. To ensure
successful implementation of the works, Gaya Analisa Sdn Bhd has been appointed as a main
contractor.

To implement this project in an orderly manner and in accordance with the contractors schedule where it
involves the current traffic, the main contractor has appointed T&D Consult Sdn Bhd as the Traffic
Management Consultant and implement Traffic Management of Wilayah Persekutuan Kuala Lumpur,
Flood Mitigation Planning of Sungai Bunus.

Our call is specifically to come out with a Traffic Management concept during construction tenure prior to
commencement of work and some measure to divert traffic flow as well as providing safety
measurement between public road users and the construction personnel in construction vicinity. For this
2
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
arrangement, specified materials and equipment will include such as signage, barrier and other devices
which is to be complied by authority requirement. T&D Consult Sdn Bhd will develop and plan the traffic
diversion and providing traffic safety measurement during construction.

2. EXECUTIVE SUMMARY

The main objective of this technical proposal is to Plan, Design and Implement comprehensive Traffic
Management Scheme which consists of several sections and zones. We will ensure that the TMS
designed for Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur is
tailored to Gaya Analisa Sdn Bhd contractor construction program and method as well as compliance
to the relevant authority requirements.

The scope of Traffic Management Plan (TMP) consists of:

1 Planning, designing, and submit Traffic Management Plan to the Local Authorities / agencies
involved (City Hall) for approval and authorization before work has done.
2 Supply and install the standard traffic safety devices.
3 Implement and oversee the approved Traffic Management Plan

3
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
A major factor emphasis in Traffic Management Plan is the safety for all road users especially
motorcyclists, in general, traffic operators and construction workers who will directly involve the
construction work as well as to the public.

3. OBJECTIVE

The main objective of Traffic Management Scheme is as follows;

1 Ability to pre-warn the road users of hazard ahead.


2 To ensure effectiveness and surround protection with consideration of public road safety.
3 To ensure smoothness of existing road during the implementation of traffic management.
4 Ensure Emergency Response Team is always ready to carry out the duty in dealing in with
accidental and natural disasters in construction zone.

1. PLANNING OF TRAFFIC MANAGEMENT SCHEME

1 Carry out maintenance devices, installation temporary signage, lighting sources such
as 'blinkers', 'string delineator', reflective sticker to ensure safety for road users.
4
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
2 Monitoring the work carrying out efficient and effective traffic management schemes
such 'Road Diversion', 'Lane Closure and Traffic Control' in line with essential for
construction work.
3 Announcement and Information to road users, local residents, authorities regarding
work plan, traffic congestion, road closures, accident, natural disasters and
emergency that can occur on site through notification signage, media and electronic
media.
4 Provide effective management system, such as (permit to work) for ongoing work
activity.

2. PLANNING FOR 3 MONTHS AHEAD


1 Bore pile and Concrete Casting
2 Earthworks

3. METHOD STATEMENT FOR TRAFFIC MANAGEMENT PLAN

Due to high capacity of traffic flow on the working area especially in Kuala Lumpur and
prior to the commencement of the construction works, a proper traffic management will be
carried out to divert the traffic in order to provide a sufficient safety around work area. The
Traffic Management Plan will be implemented accordingly to the construction schedule
and subjected to authority requirement.
To implement Traffic Management Plan of Flood Mitigation Planning of Sungai Bunus,
Wilayah Persekutuan Kuala Lumpur. Wilayah Persekutuan Kuala Lumpur, Construction
and Completion Of Flood Diversion and Associated Works it will be divided into two (2)
main stages as follows:

The overall stages are covering the entire construction activities that will be undertaken
during construction. Aspects of safety for road users and construction workers have been
5
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
taken into account in the preparation of the proposed Traffic Management Scheme.
During construction period, work will be performed for each closure installation of warning
signboards, barrier, blinker and string delineator.

1 STAGE 1

The construction work in first stage, the work focused on Jalan Tun Razak, Jalan
Raja Muda Abdul Aziz, Jalan Raja Uda and road Haji Salleh. The work will be
carried out in this area will use the Open Cut method. At this stage, Jalan Raja
Uda and Jalan Haji Salleh will be closed to the user to make way for the work to
be carried out. Work-job using the pipe jacking method will be carried out in areas
dealing Perkeso Towers and Menara TH Selborn across Jalan Raja Muda Avdul
Aziz. At this stage, the construction work while railing to The Orion Condominium
will also be undertaken to facilitate work in the next stage.

To ensure that the work can be carried out successfully with optimum safety in the
vicinity of the work, all safety equipment and traffic warning signboard will be
placed at the site to warn road users to be more careful when approaching the
work area.

(Please Refer Drawing: PPL/JPS/PAOR/GA/SGB/03)

2 STAGE 2

The situation in second stage, the construction work is still ongoing. It is more
focused on the construction of a new bridge in front of Menara TH Selborn, Jax
Box Tunneling works across AKLEH with Pipe Jacking works across Jalan Raja
Muda Abdul Aziz. The road was closed on previous stages have been opened to
the user. However, routes of Jalan Haji Sirat and Menara TH Selborn routes to
6
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
The Orion Condominium where access to Jalan Tun Razak road to be closed.
Hence, users are advised to use other alternatives to Jalan Tun Razak and refer
the signboard that had been installed.

All equipment and traffic safety warning signboard, "plastic barrier with hoarding"
will be placed on site to warn road users to be more careful when approaching the
work area.

(Please Refer Drawing: PPL/JPS/PAOR/GA/SGB/03)

4. PROJECT BRIEF

About Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur

Sungai Bunus is one of the catchment areas of 17 km. The construction and completion bonus flood
diversion in the river is one of the flood mitigation project designs, in regions kuala lumpur. It is
concentrated in the area where Jalan Tun Razak area is always faced with the problem of flash floods.
This project aims to increase the level of flood protection for a period of 20-30 years.

There are proposed works for flood mitigation plan as follows:

1 Work to demolish both the surface and substructure


2 Cutting and cover tunnels including temporary works
7
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
3 Construction works and excavation Stilling Basin to bore contiguous pile wall
4 Construction work on pipe systems in road tunnels covered and the Raja Muda Abdul Aziz
including steel support structure using universal beams and universal columns and reinforced
concrete tunnel
5 Work to demolish the existing bridge.
6 Construction work on the new bridge using the M section in the Stilling Basin
7 Construction work on the structure of the RC Gate Pump
8 Home construction work control.
9 Tunnel construction work Jacked Box flyovers across the Ampang- Kuala Lumpur (AKLEH)
including installation works and garlic RC pile wall for ground stabilization works.
10 The refurbishment works existing roads, sidewalks, street furniture, signage, street lighting and
drainage systems.
11 Conduct follow-up investigations to the existing building in addition to the construction site as
workers' compensation and TH Selborn tower.
12 Work on the transfer of existing utility such as water pipes, sewage pipes, TNB and Gas
MALAYSIA.

1. PROJECT LOCATION PLAN


(PPL/JPS/PAOR/GA/SGB/01)

8
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

2. PROJECT INFORMATION

Project Title Flood Mitigation Planning of Sungai Bunus, Wilayah


Persekutuan Kuala Lumpur, Construction and Completion Of
Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur

Project Owner Jabatan Pengaliran Dan Saliran Malaysia

9
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
(Kementerian Sumber Asli Dan Alam Sekitar)

Lead Consultant Perunding Azman, Ooi & Rao Sdn Bhd

Contract Sum RM 62,800,000.00

Contract Period 20 Month (499 Days)

Letter of Award 31 Mac 2014

Notice to Proceed 15 April 2014

Countdown to CPC 13 December 2016

Defect Liability Period 14 December 2017 (12 Month)

10
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

LAD RM 11,366.80 per day

5. TRAFFIC TEAM RESPONSIBILITY

1. TRAFFIC MANAGER (TM)

The main responsibilities for Traffic Manager:


a) To ensure implementation of Traffic Management Plan as per approved
plan
b) To ensure traffic safety, safety for workers and site in order and at
acceptable performance
c) To review safety condition of site and to safeguard the site
d) To attend meeting with client
e) To prepare progress report
f) To receive the entire traffic safety device which deliver to project work

2. TRAFFIC MANAGEMENT OFFICER (TMO)

The main responsibilities of Traffic Management Officer:


a) To assist Traffic Manager preparing progress report
b) To schedule workers activity
c) To check the safety and cleanliness at site
11
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
d) To ensure all TMS in planned

3. TRAFFIC SUPERVISOR (TS)

The main responsibilities Traffic Supervisor:


a) To prepare the monthly working shift schedule for drivers and traffic
controllers.
b) To schedule daily site activity for drivers and traffic controllers, including
site patrol.
c) To conduct daily briefing to all site staff on emergency handling procedures
and daily tasks.
d) To patrol site and monitor areas as well as safety and cleanliness of site.
e) To prepare daily report for the requirement by the management and client.

4. TRAFFIC CONTROLLER (TC)

The main responsibilities of Traffic Controller:


a) To patrol site as per daily schedule
b) To attend to emergency situations when instructed
c) To install all temporary traffic sign as instructed by the management
d) To realign and set up traffic safety device complying local authority
requirement.
e) To maintain and upkeep traffic safety devices in good condition.
12
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
f) To standby and control traffic while at any road closure.
g) To act as temporary flagman before the actual flagman is ready.

5. ORGANIZATION CHART (TMT and ERT)

13
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

6.
WORK PROGRESS &TRAFFIC MANAGEMENT SCHEME (MONTH: FEBRUARY 2015)

Work Location Construction Activities Traffic Management Scheme

zone 1 Ongoing works of bore pile 1 Sand Bag and geotextile installed
work. at proper placed.
(In Front Th
Selborn) 2 Provide suitable taper (plastic
barrier, hoarding and con) base
on TMP plan for road closure in
front TH Selborn building.

3 Signboards installed at proper


spaces.

1 Attachment 2x Flagman standby


at site while work in progress.

2 Provide the new access for orion


condominium and sky setia
resident due existing access had

14
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
been closed.

3 Manage the traffic control when


machine such bore pile reach at
site.

4 Provide suitable taper for


temporary wash truck.

5 Barrier and hoarding stored at


zone 1.

Zone 2 Ongoing works of 4 Barricade with plastic barrier for


mechanical and electrical. zone 2 area.
(In Front TH
Selborn) 5 Maintenance on plastic barrier.

6 Advance warning and information


signboards installed at proper
spaces

Zone 3 Ongoing work Excavation, 7 Advance warning and information


sheet pile installation, signboards installed at proper
formwork work and concrete spaces.
work.
1 Flagman controls the traffic and
access for Lorry in and out.

15
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
2 Provide suitable taper for heavy
machine whenever enter work
area zone.

Zone 4 Ongoing works of Excavation 1 Barricade the micro pile area with
and micro pile. the warning tape.

2 Car and van had been removed


from excavation area.

WORK PROGRESS &TRAFFIC MANAGEMENT SCHEME (MONTH: MARCH 2015)

Work Location Construction Activities Traffic Management Scheme

zone 1 Ongoing works of bore pile 8 Provide suitable taper (plastic


work. barrier, hoarding and con) base
(In Front
on TMP plan for road closure in
TH SELBORN) front TH Selborn building.

16
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
9 Signboards installed at proper
spaces.

6 Attachment 2x Flagman standby


at site while work in progress.

7 Manage and control the traffic


when heavy machine/ trailer reach
at site for lifting purpose.

8 Provide suitable taper for


temporary wash trough- truck.

9 Provide suitable taper in order to


prevent public make a vehicle
parking in alternative road area
due to reduce hazard purpose.

Zone 2 Ongoing works of10 Maintenance on plastic barrier.

17
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
(In Front mechanical and electrical. 11 Advance warning and information
signboards installed at proper
TH SELBORN)
spaces.

12 Realignment the plastic barrier


base on Traffic Management Plan.

Zone 3 Ongoing work Excavation, 13 Advance warning and information


sheet pile installation, signboards installed at proper
(In Front
formwork work and concrete spaces especially PERKESO
PERKESO)
work. signboards.

3 Flagman controls the traffic and


access for Lorry in and out.

4 Provide suitable taper for heavy


machine whenever enter to work
area zone.

5 Barricade with plastic barrier in


front PERKESO.

6 Hoarding and geotextile had been


installed in front PERKESO.

Zone 4 Ongoing works of Excavation 3 Barricade the micro pile area with
and micro pile. the warning tape.

14 Advance warning and information


signboards installed at proper
spaces and locations.

18
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

WORK PROGRESS &TRAFFIC MANAGEMENT SCHEME (MONTH: APRIL 2015)

Work Location Construction Activities Traffic Management Scheme

zone 1 Ongoing works of bore pile 15 Provide suitable taper (plastic


work. barrier, hoarding and con) base
(In Front
on TMP plan for road closure in
TH SELBORN) front TH Selborn building.

16 Signboards installed at proper


spaces.

10 Attachment 2x Flagman standby


at site while work in progress.

11 Manage and control the traffic


when heavy machine/ trailer reach
at site for lifting purpose.

12 Provide suitable taper for


temporary wash trough- truck.

13 Provide suitable taper in order to


prevent public make a vehicle
parking in alternative road area
due to reduce hazard purpose.

19
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

Zone 2 Ongoing works of 17 Plastic hoarding & barrier had


mechanical and electrical. been stored at zone 2.
(In Front
18 Provide suitable taper for prevent
TH SELBORN)
public parking main access.

19 Realignment the plastic barrier


base on Traffic Management Plan.

Zone 3 Ongoing work Excavation, 20 Advance warning and information


sheet pile installation, signboards installed at proper
(In Front
formwork work and concrete spaces especially PERKESO
PERKESO)
work. signboards.

7 Flagman controls the traffic and


access for Lorry in and out.

8 Provide suitable taper for heavy


machine whenever enter to work
area zone.

20
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
9 Barricade with plastic barrier in
front PERKESO.

10 Hoarding, blinkers and geotextile


had been installed in front
PERKESO.

Zone 4 Ongoing works of Excavation 4 Barricade the micro pile area with
and micro pile. the warning tape.

21 Advance warning and information


signboards installed at proper
spaces and locations.

7. INVENTORY OF TRAFFIC DEVICES AND LIST OF EQUIPMENT (MONTH: FEB 2015)

Quantity
No Description Unit
BQ Supply Used Service Damage Lost

A Traffic safety equipment

1 1 Ton lorry for ERT set 1 - - - - -

2 1 Ton lorry for TMT set 1 1 1 - - -

3 Engine and water pump assembly set 1 1 - - -

4 1000 gallon water tank nos 1 1 - - -

5 Water jet nos 1 1 - - -

6 Portable compactor set - - - - -

7 Towing lorry set - - - - -

21
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
B Traffic devices

1 Concrete barrier pcs - - - - - -

2 Plastic barrier pcs 1080 600 400 - - -

3 Plastic hoarding pcs 1080 283 200 - - -

4 Super cone pcs - - - - - -

5 Standard cone pcs 100 50 50 - - -

6 Delineation sticker pcs - - - - -

7 String delineator (30m/roll) roll 20 20 - - - -

8 Blinker set set 40 20 12 - - -

9 Blinker battery pcs 40 20 20 - - -

10 Baton light set 1 1 - - -

11 Baton light battery pcs - - - - -

12 Flashing arrow set 2 2 - - - -

13 Beacon light set - - - - -

14 Robotic flagman set - - - - -

C Pole type signboards

Pembinaan dihadapan A nos 2 2 - - - -

2 Work area ahead 200m B nos - - - - -

3 Work area K nos 6 2 - - -

4 Speed limit 60km/h C nos 4 2 2

5 Speed limit 50km/h J nos - - -

6 Speed limit 40km/h E nos 4 2 2 - - -

7 Speed limit 30km/h nos - - -

8 Road narrow left D nos 6 4 - - -

9 Road narrow right G nos - - - - -

22
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
10 Arrow left F nos 11 9 - - -

11 Arrow right H nos - - - - -

12 Ratable Arrow nos - - - - -

13 Pembinaan tamat L nos 4 2 - - -

14 S-curve double left M nos

15 S-curve double right N nos

16 Chevron right O nos

17 Chevron left P nos

18 Flagman sign R nos

19 Lorry in-out caution S nos - - - - -

20 Double way out arrow T nos - - - - -

21 Trans passing left ahead U nos

22 Transpassing right ahead V nos

23 No entry W nos - - - - -

24 T-junction X nos - - - - -

25 Others nos 16 16 4 - - -

D Warning signboard on highway

1 AWAS caution a nos

2 Work area ahead 300m b nos

3 S-curve left 3 lanes ahead 200m c nos

4 S-curve left 3 lanes ahead 100m e nos

5 S-curve right 3 lanes ahead 200m h nos

6 S-curve right 3 lanes ahead 100m i nos

7 Arrow left g nos

8 Arrow right k nos

23
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
9 Speed limit 80km/h d nos

10 Speed limit 60km/h f nos

11 Speed limit 40km/h q nos

12 No entry l nos

13 Left lane narrow ahead 200m m nos

14 Left lane narrow ahead 100m n nos

15 Right lane narrow ahead 200m o nos

16 Right lane narrow ahead 100m p nos

17 Double way out arrow r nos

18 Lorry in-out caution t nos

19 Termination sign u nos

E A-shape signboards

1 PembinaanMula nos

2 Work Area nos

3 Speed limit 60km/j nos

Speed limit 50km/j nos

Speed limit 40km/j nos

Road narrow left nos

Road narrow right nos

Arrow sign left nos

Arrow sign right nos

Pembinaantamat nos

24
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
Note:
1 Signboard legends such A, B, C, etc. are referred from specified TMP drawings.

INVENTORY OF TRAFFIC DEVICES AND LIST OF EQUIPMENT (MONTH: MARCH 2015)

Quantity
No Description Unit
BQ Supply Used Service Damage Lost

A Traffic safety equipment

1 1 Ton lorry for ERT set 1 - - - - -

2 1 Ton lorry for TMT set 1 1 1 - - -

3 Engine and water pump assembly set 1 1 - - -

4 1000 gallon water tank nos 1 1 - - -

5 Water jet nos 1 1 - - -

6 Portable compactor set - - - - -

7 Towing lorry set - - - - -

B Traffic devices

1 Concrete barrier pcs - - - - - -

2 Plastic barrier pcs 1080 600 400 - - -

3 Plastic hoarding pcs 1080 283 200 - - -

4 Super cone pcs - - - - - -

5 Standard cone pcs 100 50 50 - - -

6 Delineation sticker pcs - - - - -

7 String delineator (30m/roll) roll 20 20 - - - -

8 Blinker set set 40 20 12 - - -


25
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

9 Blinker battery pcs 40 20 20 - - -

10 Baton light set 1 1 - - -

11 Baton light battery pcs - - - - -

12 Flashing arrow set 2 2 - - - -

13 Beacon light set - - - - -

14 Robotic flagman set - - - - -

C Pole type signboards

Pembinaan dihadapan A nos 2 2 2 - - -

2 Work area ahead 200m B nos 2 2 2 - - -

3 Work area K nos 6 2 - - -

4 Speed limit 60km/h C nos 4 2 2

5 Speed limit 50km/h J nos - - -

6 Speed limit 40km/h E nos 4 2 2 - - -

7 Speed limit 30km/h nos - - -

8 Road narrow left D nos 6 4 - - -

9 Road narrow right G nos - - - - -

10 Arrow left F nos 11 9 - - -

11 Arrow right H nos - - - - -

12 Ratable Arrow nos - - - - -

13 Pembinaan tamat L nos 4 2 - - -

14 S-curve double left M nos

15 S-curve double right N nos

16 Chevron right O nos

26
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
17 Chevron left P nos

18 Flagman sign R nos

19 Lorry in-out caution S nos - - - - -

20 Double way out arrow T nos - - - - -

21 Trans passing left ahead U nos

22 Transpassing right ahead V nos

23 No entry W nos - - - - -

24 T-junction X nos - - - - -

25 Others nos 16 16 14 - - -

D Warning signboard on highway

1 AWAS caution a nos

2 Work area ahead 300m b nos

3 S-curve left 3 lanes ahead 200m c nos

4 S-curve left 3 lanes ahead 100m e nos

5 S-curve right 3 lanes ahead 200m h nos

6 S-curve right 3 lanes ahead 100m i nos

7 Arrow left g nos

8 Arrow right k nos

9 Speed limit 80km/h d nos

10 Speed limit 60km/h f nos

11 Speed limit 40km/h q nos

12 No entry l nos

13 Left lane narrow ahead 200m m nos

14 Left lane narrow ahead 100m n nos

15 Right lane narrow ahead 200m o nos

27
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
16 Right lane narrow ahead 100m p nos

17 Double way out arrow r nos

18 Lorry in-out caution t nos

19 Termination sign u nos

E A-shape signboards

1 PembinaanMula nos

2 Work Area nos

3 Speed limit 60km/j nos

Speed limit 50km/j nos

Speed limit 40km/j nos

Road narrow left nos

Road narrow right nos

Arrow sign left nos

Arrow sign right nos

Pembinaantamat nos

Note:
1 Signboard legends such A, B, C, etc. are referred from specified TMP drawings.

INVENTORY OF TRAFFIC DEVICES AND LIST OF EQUIPMENT (MONTH: APRIL 2015)

28
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

Quantity
No Description Unit
BQ Supply Used Service Damage Lost

A Traffic safety equipment

1 1 Ton lorry for ERT set 1 - - - - -

2 1 Ton lorry for TMT set 1 1 1 - - -

3 Engine and water pump assembly set 1 1 - - -

4 1000 gallon water tank nos 1 1 - - -

5 Water jet nos 1 1 - - -

6 Portable compactor set - - - - -

7 Towing lorry set - - - - -

B Traffic devices

1 Concrete barrier pcs - - - - - -

2 Plastic barrier pcs 1080 600 400 - - -

3 Plastic hoarding pcs 1080 283 200 - - -

4 Super cone pcs - - - - - -

5 Standard cone pcs 100 50 50 - - -

6 Delineation sticker pcs - - - - -

7 String delineator (30m/roll) roll 20 20 - - - -

8 Blinker set set 40 20 12 - - -

9 Blinker battery pcs 40 20 20 - - -

10 Baton light set 1 1 - - -

11 Baton light battery pcs - - - - -

12 Flashing arrow set 2 2 - - - -

13 Beacon light set - - - - -

29
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
14 Robotic flagman set - - - - -

C Pole type signboards

Pembinaan dihadapan A nos 2 2 2 - - -

2 Work area ahead 200m B nos 2 2 2 - - -

3 Work area K nos 6 2 - - -

4 Speed limit 60km/h C nos 4 2 2

5 Speed limit 50km/h J nos - - -

6 Speed limit 40km/h E nos 4 2 2 - - -

7 Speed limit 30km/h nos - - -

8 Road narrow left D nos 6 4 - - -

9 Road narrow right G nos - - - - -

10 Arrow left F nos 11 9 - - -

11 Arrow right H nos - - - - -

12 Ratable Arrow nos - - - - -

13 Pembinaan tamat L nos 4 2 - - -

14 S-curve double left M nos

15 S-curve double right N nos

16 Chevron right O nos

17 Chevron left P nos

18 Flagman sign R nos

19 Lorry in-out caution S nos - - - - -

20 Double way out arrow T nos - - - - -

21 Trans passing left ahead U nos

22 Transpassing right ahead V nos

23 No entry W nos - - - - -

30
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
24 T-junction X nos - - - - -

25 Others nos 16 16 14 - - -

D Warning signboard on highway

1 AWAS caution a nos

2 Work area ahead 300m b nos

3 S-curve left 3 lanes ahead 200m c nos

4 S-curve left 3 lanes ahead 100m e nos

5 S-curve right 3 lanes ahead 200m h nos

6 S-curve right 3 lanes ahead 100m i nos

7 Arrow left g nos

8 Arrow right k nos

9 Speed limit 80km/h d nos

10 Speed limit 60km/h f nos

11 Speed limit 40km/h q nos

12 No entry l nos

13 Left lane narrow ahead 200m m nos

14 Left lane narrow ahead 100m n nos

15 Right lane narrow ahead 200m o nos

16 Right lane narrow ahead 100m p nos

17 Double way out arrow r nos

18 Lorry in-out caution t nos

19 Termination sign u nos

E A-shape signboards

31
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
1 PembinaanMula nos

2 Work Area nos

3 Speed limit 60km/j nos

Speed limit 50km/j nos

Speed limit 40km/j nos

Road narrow left nos

Road narrow right nos

Arrow sign left nos

Arrow sign right nos

Pembinaantamat nos

Note:
1 Signboard legends such A, B, C, etc. are referred from specified TMP drawings.

8. ACCIDENT REPORT (MONTH: FEBRUARY 2015)

No Date / Time Accident Vehicle Breakdown Remark

1 Nill Nil Nill Nill

Remark: Nothing of recordable accident happened around site.

1. ACCIDENT DETAILS
Damages of Traffic
Date / Time Weather Accident Details Location
Equipment etc

32
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

Nil Nil Nil Nil


Nil

Remark:Nothing of recordable accident happened around site.

2. VEHICLE BREAKDOWN
Damage of
Vehicle Breakdown
Date / Time Weather Location Traffic
Details
Equipment etc.

Nill Nill Nil


Nill Nill

Remark: Nothing of recordable vehicle breakdown happened around site.

ACCIDENT REPORT (MONTH: MARCH 2015)

No Date / Time Accident Vehicle Breakdown Remark

1 Nill Nil Nill Nill

Remark: Nothing of recordable accident happened around site.

33
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

3. ACCIDENT DETAILS
Damages of Traffic
Date / Time Weather Accident Details Location
Equipment etc

Nil Nil Nil Nil


Nil

Remark:Nothing of recordable accident happened around site.

4. VEHICLE BREAKDOWN
Damage of
Vehicle Breakdown
Date / Time Weather Location Traffic
Details
Equipment etc.

Nill Nill Nil


Nill Nill

Remark: Nothing of recordable vehicle breakdown happened around site.

ACCIDENT REPORT (MONTH: APRIL 2015)

34
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
No Date / Time Accident Vehicle Breakdown Remark

1 Nill Nil Nill Nill

Remark: Nothing of recordable accident happened around site.

5. ACCIDENT DETAILS
Damages of Traffic
Date / Time Weather Accident Details Location
Equipment etc

Nil Nil Nil Nil

Nil

Remark:Nothing of recordable accident happened around site.

6. VEHICLE BREAKDOWN
Damage of
Vehicle Breakdown
Date / Time Weather Location Traffic
Details
Equipment etc.

Nill Nill Nil


Nill Nill

Remark: Nothing of recordable vehicle breakdown happened around site.

Prepared by;

Oon Bin Mohd Nor


Traffic Management Officer
T&D Consult Sdn Bhd
35
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

9. SUMMARY

Three Months Back


In general, most of the excavation work carried out on the road shoulder but to remove soil from the
construction site, then it had to cross the street / use of existing roads.

To minimize disruption to road users, the traffic controller are placed at ingress / egress of parking area.
In addition, not only maintenance but also additional devices are conducted from time to time according
to the activities on site. Necessary warning to motorist was made regarding site condition.

Three Months Ahead


Based on the work program, most of the works are loading-unloading construction material and
substances, machinery movements, piling and earthwork. For the traffic management it will involve
temporary diversion, temporary road marking, installation additional traffic devices and maintenance.

Issues / Public Complaints / Media Announcement


Most of the complaints received in respect of road damage due to road congestion and failure controlling
traffic while vehicles in / out. Others, hoarding had been scattering due to empty barrier and lack of
blinker and string delineator
Suggestion

1 Increase the traffic controller quantity and other traffic devices such as blinker, string delineator,
etc.
2 Increase patrolling frequent in the area and careful maintenance to ensure all traffic safety
materials to be clean and proper position.
3 Water filled up into barriers and keep in nice alignment, installation at proper spaces to reduce
risk of accident and traffic congestion.

10. APPENDIX
36
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
1. APPENDIX -1: TRAFFIC MANAGEMENT PLAN
1 PPL/JPS/PAOR/GA/SGB/02

37
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
2 PPL/JPS/PAOR/GA/SGB/03

38
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================
3 PPL/JPS/PAOR/GA/SGB/04

39
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

2. APPENDIX -2:
SITE ACTIVITY PHOTO OF TRAFFIC MANAGEMENT
(MONTH: FEBRUARY 2015)

40
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

41
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

42
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

43
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

44
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

45
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

46
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

47
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

48
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

49
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

50
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

51
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

52
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

53
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

54
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

SITE ACTIVITY PHOTO OF TRAFFIC MANAGEMENT


(MONTH: MARCH 2015)

55
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

56
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

57
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

58
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

59
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

60
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

61
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

62
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

63
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

64
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

65
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

66
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

67
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

68
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

69
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

70
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

71
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

SITE ACTIVITY PHOTO OF TRAFFIC MANAGEMENT


(MONTH: APRIL 2015)

72
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

73
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

74
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

75
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

76
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

77
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

78
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

79
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

80
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

81
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

82
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

83
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

10.3 APPENDIX-3:
OPERATION SCHEDULE FOREMERGENCY RESPONSE TEAM

84
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

1 APPENDIX-4:
EMERGENCY CONTACT NUMBERS

Balai Polis, Kuala Lumpur 03-21460522

Balai BombadanPenyelamat, Kuala Lumpur 03-21484444

Hospital Kuala Lumpur 03-2615 5555

Ambulance, Pantai Indah Hospital 03-4280 2055

TenagaNasionalBerhad, Kuala Lumpur 03 -2296 5566

Suruhanjaya Pengangkutan Awam Darat 03- 2278 1222

Gaya Analisa Sdn Bhd (GASB) 03-41052550

Safety & Health Officer, GASB, En.Engku Nasir 019 -9150948

Site Safety Supervisor, GASB, En.Kamarul 012 -2634737

85

Traffic Management Officer, T&D Sdn Bhd, Oon Bin Mohd Nor 014-800 4991
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

2 APPENDIX-4:
TEMPORARY SIGNBOARD FOR CONSTRUCTION ACTIVITY

86
TRAFFIC MANAGEMENT MONTHLY REPORT FEBRUARY - APRIL 2015
Flood Mitigation Planning of Sungai Bunus, Wilayah Persekutuan Kuala Lumpur
Construction and Completion Of Flood Diversion and Associated Works, Wilayah Persekutuan
Kuala Lumpur
==================================================
===========================

87

You might also like