What is the hook path?

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Building high Span

There must be a safety distance between the top edge of the crane Span is center to center between runway rails.
girder/bridge and the first obstacle edge in the building (example - Typically distance is approximate 500mm less than the width of
roof beam, light and pipes) the building. (span is in cross travel direction)

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Run way Hook path

Run way

Hook path is the distance between hook maximum lifting


with the ground(or to the lowest positions,example tunnel).
Run way is the rail along long travel direction which the girder
attached.
8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

1
Crane terminology Crane terminology
The name for material handling The name for material handling

Safe Working Load Girder


Basic hoist

End carriage

Crab Rubber
bumper

Bottom block
Pendan

Save working load (SWL) is the maximum permissible load including


attachment if any (example spreader) Girder is bridge between 2 run way rail which the crab and basic hoist
attached.

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Rope reeving Rope reeving


Method of rope reeving
Rope reeving is how to make spooling between rope drum,
bottom sheave (bottom block), return sheave and compensating sheave

There are many kind of rope reeving method. The purpose of rope
reeving is to increase capacity of Save Working Load (SWL)
with the same hoist type.
Rope drum Return sheave Bottom sheave

In another word, SWL will be increased due to more reeving, but the
lifting speed will be decreased.

Compensating
Rope anchorage
sheave
8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Rope reeving Crane Duty


Method of rope reeving To determine crane duty regarding FEM group it is need the
following factors:

1.Load spectrum > Indicate the frequency of maximum and smaller


loading during examined time period.

2.Class of utilization > This is determine according to number of hoisting


cycles during life time of crane

Note:
Return sheave are fully rotate,
Compensating sheave only
compensating(a bit movement)

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

2
Crane terminology Crane terminology
The name for material handling The name for material handling

Crane Duty Load spectrum


Crane duty group are set of classification for defining the use of crane There are four group of crane load spectrum
1. Light duty
A crane duty tells which kind of duty crane is for,the range is from light
duty to very heavy duty

It is vital to define the needs and estimated the use because of safety
reasons and for to ensure a long working life for the crane

Demag crane are follow standard FEM group (Federations Europeene Hoist unit which are usually subject to very small load and in exceptional
de la Manutention) cases only to maximum load.

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Load spectrum Load spectrum


There are four group of crane load spectrum There are four group of crane load spectrum
2. Medium duty 3. Heavy duty

Hoist unit which are usually subject to small load but rather often Hoist unit which are usually subject to medium loads but frequently
to maximum load. to maximum load

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Load spectrum Class of utilization


There are four group of crane load spectrum To know the utilization class, we must know the operating time.
The formula for calculate operating time in hour are :
4. Very heavy duty
2 x average hook path x no of cycle per hour x working time per day
H= ------------------------------------------------------------------------------------
60 x lifting speed

H=Operating time per day in hours

Hoist unit which are usually subject to maximum or almost to No of cycle per hour= The total number of lifting and lowering per hour
maximum loads
Lifting speed = Maximum speed of hoisting (see manual data)

Average hook path = Average of maximum lifting


8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

3
Crane terminology Crane terminology
The name for material handling The name for material handling

Class of utilization Class of utilization


Example to calculate operating hours per day Regarding the table, operating time 2.66 hour per day is 2 to 4 hours
range in class of utilization for light duty load spectrum.
Load spectrum = light So,the FEM group is 1Am
Lifting speed = 8 m/minute
Rope reeving = 2/1
Load spectrum operating hour per day .
Average hook path = 4 meter
1.Light up to 2 2-4 4-8 8-16 up to 16
No.of cycle per hour = 20
2.Medium up to 1 1-2 2-4 4-8 8-16
Working time per day = 8 hours
3.Heavy up to 0.5 0.5-1 1-2 2-4 4-8
4.Very heavy up to 0.025 0.025-0.5 0.5-1 1.2 2.4 .
2 x 4 x 20 x 8 Group of mechanism 1Bm 1Am 2M 3M 4M
Operating hour per day = ------------------ = 2.66 Hour to FEM
60 x 8

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

FEM group Duty type of motor


Most common duty type of motor are divide 4 group.
List of FEM group A.Continues duty
Full load FEM ISO
12.500 h 5m M8 For instance : The FEM group is
6.300 h 4m M7 2m, mean the crane must be
3.200 h 3m M6 carried out to general overhaul
1.600 h 2m M5 (GO) after 1600 full load operating hour
800 h 1Am M4
400 h 1Bm M3 The FEM group mostly related to
200 h 1Cm M2 mechanical side.
100 h 1Dm M1
The motor can be operated full time under load
Note : 1Am of FEM group are equal to M4 of ISO group
8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Duty type of motor Duty type of motor

B.Short time duty C.Periodic intermittent duty


The motor can be operated
under load with several idle time
(cooling time). Referring to 10
minutes period

The motor can be operated under load only at short time

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

4
Crane terminology Crane terminology
The name for material handling The name for material handling

Duty type of motor Duty type of motor


Example 1
D.Periodic intermittent duty with influence of starting time
The motor can be operated
under load with several idle time
(cooling time). Referring to 10
minutes period.
DH 200 with hoisting motor type KMH 100B2/8 have CDF 40% for
full speed(step2),and CDF 20% for slow speed(step1).
Meaning that at full speed the maximum motor run time is 4 minutes at
full load, and permissible to run another 4 minutes after cooling down
for 6 minutes. And for slow speed maximum run is 2 minutes and
need to cooling down 8 minutes before continue running another
2 minute.
8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

Crane terminology Crane terminology


The name for material handling The name for material handling

Duty type of motor


Example 2

Motor KDF 63A2 has 100%CDF.


Meaning, the motor can be operated/run at any time without cooling time

8/24/2016 10:34:32 PM Sug MDI March 07 8/24/2016 10:34:32 PM Sug MDI March 07

You might also like