ABSTRACT: A bench slope of moraine is selected as the study object. A new method of reliability
analysis, that is simplified rosenblueth method, is presented and adopted to analyze the reliability of
the bench slope of original design scheme and recommended scheme. The results indicate that the
inherent variability of strength, anti-weathering ability and hydro-physical properties of moraine soil
primarily affect the high failure probability of benches. Geometrical factors of slope bring little effects
on it. The bench slope with ternary platform widths of 3m, 3m and 15m are recommended and some
effective measures such as drainage and revetment are suggested to enhance the stability of the slope.
KEYWORDS: Bench slope, Simplified rosenblueth method, Reliability, Failure probability
Where:
3 RELIABILITY ANALYSIS OF BENCH SLOPE
2
E ( ln FS ) = ln ( E [ FS ])
ln FS
, 3.1 Characteristics of slope soil
2
A slope in Sichuan province that composed of moraine
FS 2 has following characteristics:
= ln 1 +
E ( FS )
ln FS .
(1) Solid-phase of moraine could be simplified as soft
clayey soil and hard gravel. Soft clayey soil acts as
2.3 Determination of failure surface with the minimal substrate and hard gravel, which has a wide grading with
reliability index (min) the grain size from 2.1mm to 1.6m, act as filler.
(2) Gravel with different grain size is random distributed
The calculation of (min) is under the condition that the at the soft clayey soil unevenly. The content of gravel or
denominator of formula (3) reaches its maximum value, that is, soft clayey soil may be concentrated in a local part, and
the potential failure surface with the most sensitive safety result in changeable characteristics.
factor must be given. A slope with two layer medias and two (3) Water content is determined by the cementation
parameters (cohesion c and internal frictional angle ) is degree of the gravel and the soft clayey soil. Moraine
selected as an example to describe the calculating method of exposed under the sunshine and eroded by rainfall lost
the failure surface with the minimal reliability index [4-5]. much caking capability. Many parts of the slope with
(1) Strength parameters are designated as a specific moraine collapsed or eroded.
combination. Each parameter will be decreased to a lesser
value, that is, E [Xi]-m [Xi], where m is the time of decrease, 3.2 Calculation scheme
and then, the following combinations are given:
Collapse and erosion can be seen in this selected slope.
(
FS1 = f c , E [1 ] , E [ c2 ] , E [2 ]
1 ), Because the bench slope with single and double steps are
the main forms in engineering, and bench slope with three
steps destroyed occasionally, these three kinds of slope are
(
FS2 = f E [ c1 ] , 1 , E [ c2 ] , E [2 ] ), designed as calculation model.
Meanwhile, an optimization scheme with the same slope
(
FS3 = f E [ c1 ] , E [1 ] , c2 , E [2 ] ), angle and different step width of the original scheme is
presented for contrastive analysis. Tables 1 to 2 show the
(
FS4 = f E [ c1 ] , E [1 ] , E [ c2 ] , 2 ) geometric parameters of the bench slopes.
Physical and mechanical properties of moraine are
shown as Table 3. Shear strength parameters (c and ) are
Each combinations most danger failure surface (Si) will
discounted according to correlation study [5].
be searched and the minimal safety factor FSi could be
given [6].
(2) Using formula (3), each failure surface of step (1) is Table 1 Geometric parameters of original scheme
calculated and reliability index i then be given. Calculation Step Height Slope Step
(
1 )
FS1 = f c , E [1 ] , E [ c2 ] , E [2 ] S1 , 1 , scheme number /m angle/() width/m
1 12 42 6
( )
FS2 = f E [ c1 ] , 1 , E [ c2 ] , E [2 ] S 2 , 2
2 24 42 6, 6
( )
FS3 = f E [ c1 ] , E [1 ] , c2 , E [2 ] S3 , 3 , 3 36 42 6, 6, 10
( )
FS4 = f E [ c1 ] , E [1 ] , E [ c2 ] , 2 S 4 , 4 Table 2 Geometric parameters of optimization scheme
(3) Among these failure surfaces of step (1), the failure Calculation Step Height Slope Step
surface which has the minimal safety factor is the failure scheme number /m angle/() width/m
surface with the minimal reliability index [7-8].
1 12 42 6
FS min = Min( FS i ) 2 24 42 3, 10
F / X 3 36 42 3, 3, 15
Judging from formula (3), s i corresponding to
-
min is the maximum and FS is the minimum. Accordingly,
8
Physical and Numerical Simulation of Geotechnical Engineering
15th Issue, June. 2014
Table 3 Physical and mechanical properties of moraine Table 4 Calculation result of slope reliability for original
scheme
Parameter Mean Standard deviation
Calculation
scheme
Pf /% Fs
c/ kPa 100.0 87.8
0.75 22.66 3.53
/() 21.0 2.6
0.82 20.61 2.59
/ (kNm-3) 18.2 0.58 28.09 2.18
0
3.4 Discussion of calculation results
0 15 30
Horizontal distance/m
(1) Safety factor of bench slope that calculated by the
mean of state parameters is greater both in original and
(a) 1st step
optimization scheme. The value of the safety factor is
30 within 2.18 and 4.37, which proves steady. The failure
probability of the original and optimization scheme are
Realitive height/m
30
Failure surface with the and two steps decrease from 22.64% to 20.61% and
minimal reliability index 16.12% to 23.27%, which indicate that the influencing
15 factors of the reliability is not the geometric parameters, but
the strength parameters. The reliability of bench slope of
three steps is from 28.09% to 19.77%. Bench slope of three
0
0 15 30 45 60 75 steps with the width of 15m could decrease the failure
Horizontal distance/m probability efficiently and hold up the landslide upside.
(c) 3rd step
9
Reliability Analysis of Bench Slope Based on Rosenblueth Method
DOI:10.5503/J.PNSGE.2014.15.002
reliability index to calculate the minimal reliability index. [3]. SHENG Ju, XIE Shiqian, PAN Chengyi. Probability and
As far as accuracy is concerned, it is much more accurate Statistics. Higher Education Press. 1989: 53-57 (in Chinese)
[4]. James Michael Duncan. The Use of Back Analysis to
than the method that is based on the failure surface with the Reduce Slope Failure Risk. Civil Engineering Practice [J].
minimal safety index. Journal of the Boston Society of Civil Engineers, Spring-
(3) Affected by inherent properties of moraine soil and Summer. 1999, 14 (1): 75-91
the working environment of slope, bench slope has a high [5]. DUAN Wenfu. Stability Analysis of Cutting Slope Based on
probability of failure. It indicates that there will be some Reliability Theory [Master Degree Thesis]. Wuhan
Polytechnic University. 2007 (in Chinese)
unavoidable damage happening to bench slope. In order to [6]. Griffiths D V and Lane P A. Slope Stability Analysis by
improve the stability of the bench slope and keep it Finite Elements [J]. Geo-technique. 1999, 49 (3): 387-403
beautiful, bench slope of three steps with the width of 3m, [7]. QIAN Jiahua, YIN Zongze. Principle and Calculation of the
3m and 15m are recommended. Meanwhile, some effective Soil. China Water Power Press. 1996: 308-312 (in Chinese)
measures such as drainage and revetment are put forward to [8]. LUO Wenqiang, GONG Yu. Application of Rosenblueth
Moment Estimation Method into Probabilistic Analysis of
prevent moraine soil from weathering and the strength from Slope Stability [J]. Chinese Journal of Rock Mechanics and
discounting. Engineering. 2003, 2 (2): 232-235 (in Chinese)
[9]. LUO Wenqiang, WANG Liangqing, GONG Yu. Study on
Slope Stability by Dual Index System Based on Normal
REFERENCES Distribution [J]. Chinese Journal of Rock Mechanics and
Engineering. 2005, 24 (13): 2288-2292 (in Chinese)
[1]. ZHU Yuxue. Reliability Analysis for Slope. Metallurgical
Industry Press. 1993: 280-292 (in Chinese)
[2]. WANG Jiachen. Principle of the Stochastic Analysis on the
Slope Engineering. Coal Industry Press. 1996: 51-65 (in
Chinese)