You are on page 1of 2
‘Apeil24, 2017 ESOMEYE Fauquier County Public Schools ‘Ata: Ms Janice Bourne wampron noap: 320 Hospital Drive, Suite 4 MOETONI2. — Warenon, VA 20186 800 STUDENT MIDDLE ScHHOOL STUDY - PROTOTYPE FOR TAYLOR AND WARRENTON RENOVATION ADDITION Dear Ms, Bourne: Hsiavenur’"*"" tn accordance with your request we herein provide a proposal to complele additonal studies a outine below. omore: vata! Option 1 ‘+ Cost model update for 800 student prototype (core and classrooms) on onsnens vincinia Taylor ste Option 2 ‘+ Renovate Warrenton for 00 students instead of 650. Ths will involve @ ‘more in-depth review and potentially reffeshed thinking of the previous Pam ‘Warrenton renovation/addition, consideration of core space adequacy and ‘building access. ‘+ Color code and define areas of light, medium and heavy renovation. Give examples of each level, ‘© Describe what the renovation will include and compare itt new construction. ‘= Add a second entrance tothe site through the transportation lot andlor off ‘Waterloo, Include the costs for the second entrance. ‘= Describe what can be expected with a completed renovation and why a 21" Century learning environment is beneficial to learning, as wel athe impact ‘onthe renovations, ‘+ Develop graphics to convey modified floor and site plans. Provide a ‘presentation, be it PowerPoint or a handout, to illustrate the revised concepts ‘Include one visit for site review and on-site meeting and one visit for School Bosrd andor Joint SB/Bd of Supervisors presentation. ‘+ Provide updated cost model for Option 2. Ms. Janice Bourne ‘Apiil 24,2017 Page2 ‘These services can be provided hourly with s Not-to-Exceed of $15,00¢ without prior authorization. We trust that this is inline with your expectations for both scope and fee, Feel fre to call with questions Sincerely, Duane M. Harver, CEO ArchitetPrinsipa Director of K12 Sudio Ce: Mark Probst

You might also like