You are on page 1of 38

Republic of the Philippines

Region IV-A CALABARZON


Division of Laguna
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOOL

Brigada Eskwela 2014


PALATUTUNAN
Unang Bahagi

Brigada eskwela 2014


Parada . . . . . . .. ......... ........
Ikalawang Bahagi
I. Pambansang Awit ..................................... Kendrick P. Maristela
Guro, Baitang V at VI
II. Panalangin ................................................ Ma. Angelita N. Maloles
Prepared;
Guro Baitang I at II

III. Pambungad na Pagbati............................. ROMELDA


Romelda O. DeO.Jose
DE JOSE
Head Teacher
Pang-ulong Guro
IV. Pambungad na Pananalita......................... Esmeralda E. De Castro
OIC Tagamasid Pampurok

V. Noted;
Mensahe ................................................. Kgg. Rufino A. Maloles
Kapitan, Brgy. Bagong Silang
ESMERALDA E. DE CASTRO Ed.D.
Ana Coscuella
OIC
HRDistrict
Sun PowerSupervisor
Corporation

Alvin Quiatchon
Barangay Kagawad
Komite ng Edukasyon

VI. Pasasalamat ..................................................... Rosana Delos Reyes


Pang.Pangulo Samahan ng mga Magulang

Ikatlong Bahagi
Paglilinis, pagpipintura at paakumpuni ng mga sirang kagamitan sa
paaralan

Ma. Angelita N. Maloles


PROGRAM
AND
ATTENDANCE
HIGHLIGHTS OF
ACCOMPLISHMENTS

COMPLIMENTS WERE GIVEN To the following


stakeholders and donors under
adopt-a school program
1. Sun Power multi purpose Corporation
2. Galva Steel Corporation
3.Hon. Board member Rolly Bagnes
4. Municipal Councilor Jay G. Rolusta
5. Municipal Councilor Norvin Tamisin
6.. Municipal Councilor John Emmanual T. Oliva
7.Municipal Councilor Julius Molinawe
8.Municipal Councilor Ricardo Bagnes
9. Mr. Randy Banzuela
10. Dr. Marius Moran
11. 4 Ps Members Bagong Silang Los Banos Lag.
12.P.T.A. of Bagong Silang Elem. school
13. UP Society of Agronomy
14. KFC UP Colloge Branch Mary Ann Milagrosa
15.Greenwich Olivarez Branch Los Banos-Majo Sotomojo

Republic of the Philippines


DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
SY 2014-2015

NARRATIVE REPORT on brigada eskwela

I. INTRODUCTION

In connection with Addendum to DepEd No. 32 s. 2014 Brigada Eskwela is geared in making our school a safer place in ensuring the protection of our learners, teachers and
properties. This is a one week activity in preparation for the opening of classes this coming school year 2014.
It can be considered the guiding spirit of the teachers to be resourceful, creative, , and responsible in terms of school beautification, and for the other stakeholders to be active
participants in the development of the school as a conducive learning community.
The specific objectives and strategies were designed to provide guidance to school personnel and education partners as they engaged in coordination of processes school planning for
the coming school year.

II. ACCOMPLISHMENT

A day prior to the first day of Brigada Eskwela, the principal and teachers led the campaign of having a one week activities using announcement and posting tarpaulin near the
school gate to ensure awareness of the whole barangay. The school also complied with the brigada interest form for the ,maintenance week

The opening program was presided by Mrs. Ange;lita N. Maloles and followed by National Anthem led by Mr. Kendrick P. Maristela. A short welcome remarks was given by Mrs.
Romelda O. de Jose , Head teacher of Bagong Silang Elem. School. A short messages were also delivered by the honorable barangay Captain Rufino A. Maloles, education committee Alvin
Quiatchon and HR Manager and Administrative officer of SUN Power Philippines Miss Ana Coscuella.
This school years BRIGADA ESKWELA 2014 the The Sun Power Philippines and Multi Purpose Corporation has extended its support to the school .The group which is
spearheaded by Ms.Regina Martinez the Administrative Officer I, They painted the outside and inside the walls of the school and classrooms that cost P 10, 000.00. The representatives of the Sun
Power Corporation continued cleaning the school surroundings, trimmed some grasses , helped in the renovation of the room, together with the parents and other barangay officials. Right after
the whole day affair, distribution of school supplies to 100 pupils of Bagong Silang were done. It also includes rain coat, umbrellas and tumblers with a total of P25,000.00. The hauling of
construction materials for the school fence and labor fee amounting to P 20, 000.00 took two weeks . It was on the same day that they gave the children of Bagong Silang school supplies , bags,
umbrellas and teachers instructional materials and cleaning materials.

LGUs and parents helped in hauling the construction materials from May 19 to 24, 2014. Parents and pupils pulled out the tall grasses around the vicinity while other volunteered to
repair cabinets, paint the new rehabilitated classroom and walls of other classrooms. Mothers from Purok 3 volunteered members of 4 Ps or Pantawid Pampamilyang Pilipino Program helped in
cleaning the school surroundings.

Other groups donated school supplies and paints from the GALVASTEEL Corporation headed by Mr. Joy Chamoro amounting to P 6 000.00. A 3 days seminar Workshop on Basic
Computer Literacy were also given to Grade 4 pupils last May 10 and 24, 2014. This enhanced pupils knowledge on computer literacy.

Other group from UP Society of Agronomy Major Students supported the school by donating complete set of school supplies to grades I to III pupils amounting to P 15,000.00.

Honorable municipal councilors also extended their support through cash donations, school supplies and paints.

Name of donor Details of Donation Amount


Honorable Jay G. Roulsta School supplies P 750.00
Honorable John Emmanuel T. Oliva School supplies P 750.00
Honorable Julius Molinawe Paint P 750.00
Honorable Norvin Tamisin Cash and school supplies P 500.00
Honorable Bagnes Cash P 500.00
Mr. Randy Banzuela Cash P 500.00

On the other hand Greenwich and KFC los Banos also extended helped by providing snacks for the teachers amounting to P 1 500.00 spearhead by the store manager Ms Mary Ann
Milagrosa and Ms Majo Sotomojo.

The much awaited closing program happened last May 24, 2014. A short program and accomplishment of reports were done. All went home with a smile on their face. Thanks to our
valuable sponsors for making our school a safe and conducive to learning this school year 2014-2015. Mabuhay!

Prepared:

ROMELDA O. DE JOSE
Head Teacher

Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y. 2014-2015

Action Plan School Safety and Preparedness


To facilitate the Brigada Eskwela 2014 the school and the planning committee developed the safety and preparedness chart to provide guidance to education partners in the different

activities which are most applicable to the school.

a. School site and building

Repair minor classroom damages like broken windows, doors and roofs. Secure cabinets and drawers necessary for heavy or sharp objects. Make sure that corridors and pathways are safe

from harm to students. Prune trees to avoid accident. Pull grasses around the school surroundings to prevent snakes entering the school ground.

Prepared:

ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y. 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 19 , 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column
that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not yet Not done Remarks/Recommendations
completed
Opening Program x Finished
Cleaning of the surroundings x Accomplished

Removing of weeds and grasses x Accomplished

Cleaning of dirty windows x Accomplished


Prepared:

KENDRICK P. MARISTELA May 19, 2014


Program Implementation Committee Date Prepared

Noted:
ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y. 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 20, 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column
that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not yet Not done Remarks/Recommendations
completed
Hauling of construction materials x Bayanihan system was exercised.
Putting out the unnecessary materials from the room x
Preparing the room for rehabilitation x
Cleaning of the surroundings x Everyday cleaning is needed due to
uncontrollable falling of leaves
Removing of weeds and grasses x
Classroom rehabilitation/Construction of the x Classroom rehabilitation requires more days to
dilapidated room finish
Prepared:

KENDRICK P. MARISTELA May 20, 2014


Program Implementation Committee
Date Prepared

Noted:
ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y. 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 21, 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column
that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not Not done Remarks/Recommendations
yet completed
Classroom rehabilitation/Construction of the x Classroom rehabilitation requires more days to
dilapidated room finish
Cleaning the surrounding x Everyday cleaning is needed due to
uncontrollable falling of leaves
Cleaning the rooms x
Hauling of construction materials x

Prepared:

KENDRICK P. MARISTELA May 21, 2014


Program Implementation Committee Date Prepared

Noted:
ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y. 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 22, 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column
that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not Not done Remarks/Recommendations
yet completed
Classroom rehabilitation/Construction of the dilapidated X Classroom rehabilitation requires more days to finish
room
Cleaning the surrounding X More dried leaves are falling everyday.
Cleaning the rooms x
Classroom rehabilitation Principals Office) X Jalousies are to be built in CR and ceiling is still under repair.

Prepared:

KENDRICK P. MARISTELA May 22, 2014


Program Implementation Committee Date

Noted:
ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y.: 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 23, 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column that corresponds to the status
of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not yet Not done Remarks/Recommendations
completed
Classroom rehabilitation/Construction of the x Wall finishing will be done the day that follows.
dilapidated room
Construction and painting of x
bookshelves.
Prepared:

KENDRICK P. MARISTELA May 23, 2014


Program Implementation Committee Date Prepared

Noted:
ROMELDA O. DE JOSE
Head Teacher
BE FORM 06
Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y.: 2014-2015

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
( To be accomplished by the Program Implementation Committee )
DAY 1 2 3 4 5 6 May 24, 2014

Instruction: List all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, Please mark the appropriate column
that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
ACTIVITIES Completed Started but not Not done Remarks/Recommendations
yet completed
Closing Program x
Distribution of School Supplies, bags and x
umbrellas
Wall finishing x
Painting the walls and ceilings of the rooms x
Prepared:

KENDRICK P. MARISTELA May 24, 2014


Program Implementation Committee Date Prepared

Noted:

ROMELDA O. DE JOSE
Head Teacher
BE Division Form 1.1

FORM 2
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
SY 2014-2015

ACTION PLAN

KRA Activities Timeline Person/s Materials Needed Budget


Responsible
1.Advocac Announcement of the forthcoming Brigada School Head Tarpaulin None
y and Eskwela during Graduation ceremony, April 1-May
Marketing recognition day and other school and 24, 2014 Teachers Letter of solicitation
barangay gatherings. for Brigada Eskwela
Information and Letter dissemination to Parents 2014
NGOs, Brgy. Officials and Stakeholders.
Display of tarpaulin.
House-to-house dissemination of information Brgy. Officials
during home visitation of the teachers.
Pupils
2.Resource Through Bayanihan April-May 25, School Head Letter of None
Mobilizati Solicitation of Donation to stakeholders 2014 Teachers Brigada Eskwela
on Personal endowment of school personnel. Parents
Brgy. Officials
3.Impleme Create and follow schedule for conduct of April- End of School Head Letter of Brigada None
ntation various activities Brigada Teachers Eskwela
Schedule meeting to direct and monitor Eskwela Pupils
activities
Issuance of letter
4.Moni Verification of the checklist in BE form 1 May 19-24, School Head Checklist
toring 2014 Teachers
and Daily supervision
Evalua
tion

5.Repo Inform parents, NGOs, etc. through closing May 24, 2014 School Head Pictures Php 100.00
rting program Teachers Narrative report on
Thank you letter to the donors. Parents the concluded BE
Documentation Brgy. Officials
Round table meeting with teachers

Date Prepared
March 26, 2014

Prepared:
ROMELDA O. DE JOSE
Head Teacher

Noted:

ESMERALDA E. DE CASTRO E.d.D.


OIC District Supervisor
BE FORM 3
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV A - CALABARZON
DIVISION OF LAGUNA
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOL
S. Y.: 2014-2015

BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM

Labor/ Quantity Key Strategies/Plan of Action Persons Status Remarks


Skills/ Volunteers Persons/Organizations Responsible
Needed To be tapped
Laborer/Mason 6/2 Sun Power Corp./Galva Class room Rehabilitation Rosana Delos Action complete Well done
Steel Corp. Reyes
Helpers 6 P.T.A./ Parents Construction of 3 seaters Engr. R. S. Action complete Well Accomplished
C.R Ostrera
Haulers 10 Brgy. Officials Hauling of cons. Capt. R. Action complete Bayanihan Spirit
Materials/ school fence Maloles
Sweepers/trimmer 20 P.T.A./ Teachers Cleaning the school Mr. A. Action complete Bayanihan Spirit
s surrounding Quiatchon

Prepared:

KENDRICK P. MARISTELA
Resource Mobilization Committee Chairperson

Noted:

ROMELDA O. DE JOSE
Head Teacher

Republic of the Philippines


DEPARTMENT OF EDUCATION
Region IV CALABARZON
DIVISION OF LAGUNA
Santa Cruz
BAGONG SILANG ELEMENTARY SCHOOL
SY 2014-2015

Project Proposal
I. Project Title : CONSTRUCTING SCHOOL FENCE

II. Proponent : BAGONG SILANG ELEMENTARY SCHOOL

III. Project/Training Duration : 1 WEEK ( May 19-24, 2014 during Brigada Eskwela)

IV. Project / Venue : BAGONG SILANG ELEMENTARY SCHOOL

V. Project Description :

a. Rationale
It is natural for every school to give its best to its learners. Stake holders initiative in promoting school development is an integral part of partnership in the filed of

education at present. The reason why Bagong Silang Elementary School Teachers and Parents Association ( BESPTA) decided to have a project of completing the

school fence in front and side of the gate. Construction of school fence near the gate will diminished number of stray animals entering the school premises during class
hours. This will also ensure pupils and teachers safety especially when they are inside the school. At the same time, it will give the school a pleasant view and will

meet one of the schools need when it comes to physical aspect.

It is the same as hitting two birds with one stone, additional knowledge and unforgettable experiences on the part of the learners and an improvement towards

the schools physical aspect.

The accomplishment of the project will be included in quarterly and annual report to be submitted to the division office. We will be joining the Search for Brigada

Eskwela Implementers and Big Time Stake Holders (first timer) this coming May 20-24, 2014.

b. Objectives

1. to provide safety measures among students and pupils inside the school premises

2. To give the school adequate facilities

3. To improve the physical aspect of the school

c. Methodology

Strategies:
A. Conference with P.T.A on the activities of Incoming Brigada Eskwela 2014

B. Plan of Activities and Work Plan

C. Preparation of materials and other forms needed

c1. Participants

A. Teachers

B. Parents
C. Pupils

D. stake holders / donors

c2. Plan of activities


A. Preparation of letter on Project Proposal
B. Planning of Activities

C. Sending e-mail to stake holders

d. Program of Work

1. Budgetary requirements
1. Personal Services
2.
BAYANIHAN (Manpower from Sun Power Corp. n P.T.A officers)

3. Operating Expenses
Materials

Item No. Quantity Description Unit Price Total Cost


1 5 cu. White sand Php 600 Php 3000.00
2 25 bags Cement Php 200 Php 5000.00
3 5 cu Gravel Php 300 Php 1500.00
4 10 pcs. Steel bar # 12 Php 200 Php 2000.00
5 1000 pcs Hollow blocks #4 Php 7 Php 7000.00
6 1 gal Paint Php 1500 Php 1500.00
TOTAL Php 20 000.00

E. Plan of Action

Objectives Persons Involved Target Date Funding Source


1. . to provide safety measures School Head
among students and pupils Teachers Donations from the Stake
inside the school premises Parents holders (SUNPOWER
Pupils May 20-24, CPRPORATION)
2. To give the school adequate Stake Holders 2014
facilities Barangay Officials BAYANIHAN
3. To improve the physical Manpower (Sun
aspect of the school Power Corporation GALVA Steel Corp.
Inc)
GALVA STEEL
Corp.

4. Inclusion of the activity in School Head


the quarterly report Teachers May- March MOOE Fund
Parents 2014
Pupils

Prepared by:
_______________________
ROMELDA O. DE JOSE (09192827237)
Head Teacher

________________________
KENDRICK P. MARISTELA
President- Teachers Association

______________________
SUSANA DELOS REYES
P.T.A. Vice President

______________________
RUFINO MALOLES
Barangay Captain

Recommending approval:

_________________________
ESMERALDA E. DE CASTRO Ed.D
OIC District Supervisor
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV CALABARZON
DIVISION OF LAGUNA
Santa Cruz
BAGONG SILANG ELEMENTARY SCHOOL
SY 2014-2015

March 18, 2014

The Management
SUNPOWER Corporation
Batangas City
Dear Sir / Madam:

Warm greetings in the sweet and mighty name of our Lord Jesus Christ!
In the continuance of our journey to build a better future through well- rounded individuals, we are currently forming a group of pupils, teachers, and parents in our school (Bagong Silang Elementary School ) for the Incoming
BRIGADA ESKWELA. It is a yearly activity in preparation of the next school year this coming May 20-24, 2014.
Cognizant of the need to improve the Physical Plant and Facilities of Bagong Silang Elementary School, the officers and members of the P.T.A., during the very recently concluded general assembly meeting, have unanimously
agreed to solicit your generosity and benevolence for a donation of cash or in kind for an urgent construction of school fence along and besides the gate of our school.
To this writing, we are extremely worried on the safety of our learners and teachers from stray animals roaming inside the school premises during class hours. Along with this is the project proposal and program of work, activities
and needed materials for your perusal.

We fervently hope for your very kind consideration and favorable action. ! Lest we forget that blessed are the hearts who finds joy in giving.

Prepared by:

ROMELDA O. DE JOSE
Head Teacher

KENDRICK P. MARISTELA
President- Teachers Association

ROSANA DELOS REYES


P.T.A. Vice President
RUFINO MALOLES
Barangay Captain

Recommending approval:
ESMERALDA E. DE CASTRO Ed.D
OIC District Supervisor

Republic of the Philippines

Region IV-A CALABARZON


Division of Laguna
District of Los Baos
BAGONG SILANG ELEMENTARY SCHOOOL

Brigada Eskwela 2014

Mayo 19-24 , 2014


Ika- 7:00 ng Umaga
G./Gng,/Bb. __________________________
Itoy silbing paanyaya
PASASALAMAT

Kaming mga mag-aaral, guro at magulang nang Paaralang


Elementarya ng Bagong Silang sa taong kasalukuyan ay buong
pusong kumikilala na malaking utang na loob sa lahat ng mga taong
tumulong upang ang palatuntunang ito ay maging isang ganap na
tagumpay.
Sa inyong lahat na palaging naghahandog ng tulong at suporta.
Maraming salamat po.
III. PICTURES

The Grade 4 pupils during the 3 days seminar Workshop on Basic Computer Literacy held at
Galvasteel Corporation, Parian Calamba Laguna together with Miss Tenorio
as resource speaker
The Greenwich Staff together with Miss Majo Sotomajo , the store
Manager and Mrs Romelda O. De Jose and Mrs. Cristina Martinez
during thE receiving of snacks from the management.
Municipal councilors Jay Rolusta and John Emmanual T. Oliva sparaehaded the 3rd day

of Brigada Eskwela by donating paints and school supplies to Bagong Silang Elem.School.
Barangay officials during the
construction of school fence
Trimming of
trees
was done by
barangay
captain
Rufino A.
Maloles.
While some
4Ps
member
volunteers
to brush and
clean the
stone s
around
plants and
pulling
grasses
Some barangay officials
and parents practiced
Bayanihan spirit in
putting up the school
fence near the gate.
Trimming
and
weeding of
grasses of
some
parents
P.T.A Officers headed by Mrs Condino joined
other parents in painting the newly built-in
fence .
The new Comfort room

The newly painted Comfort Room


Teachers and parents while mixing
paint for the stones, walls and fence
of the school.
Barangay councilor Mrs
Jane Callao helped in
cutting the bamboo .

Barangay captain Rufino maloles together with


baranagy councilor Mrs Jane Callao and Ronnie
Javier helped in cutting the bamboo .
Parents participated in making the garden clean and safe from any harm
.

The Galva Steel with the pupils of BES

Sun power Corporation donated school supplies bags, umbrellas, raincoat etc.

The stake holders of Bagong Silang Elem School.MABUHAY!

UP student with the pupls of BES

You might also like