You are on page 1of 3

CABLE AND STRESSING PREPRATION SHEET

NAME OF WORK:- C/O 135 MTR SPAN PRESTRESSED BOX GIRDER


BRIDGE OVER SIRSA NADI ON BADDI SITAL PUR ROAD AT R.D.
1/338.

SPAN NO. ......................


DATE................................................

CABLE NO .................... LENGTH OF


CABLE...........................

TYPE OF CABLE 19 T 13

CABLE BELONGS TO COIL NO.......................... LOT NO


...................................

OF SUPPLIER M/S ...................................................VIDE TEST REPORT NO


...................................

THEORETICAL ELONGATION =

MODIFIED ELONGATION = (98.7mm2 X 195 X103MPa) X ( THEORETICAL EXTENSION)


(NEW AREA x NEW MODULUS)

THEORETICAL JACKING FORCE =

JACK EFFICIENCY = 98.78 %

JACK RAM AREA = 631cm2

MIN. ELONGATION (-5 %) =

MAX ELONGATION (+5 %) =

MODIFIED JACKING FORCE = THEORETICAL JACKING FORCE


JACKING EFFICIENCY

FULL LOAD PRESSURE GAUGE READING = MODIFIED JACKING FORCE


JACKING AREA

GAUGE READING AT MIN. JACKING FORCE =

GAUGE READING AT MAX. JACKING FORCE =


..................... ........................
CLIENT LRC BUILDERS PVT
LTD

STRESSING SHEET
NAME OF WORK:- C/O 135 MTR SPAN PRESTRESSED BOX GIRDER
BRIDGE OVER SIRSA NADI ON BADDI SITAL PUR ROAD AT R.D.
1/338.

DATE ..................... MODIFIED GAUGE


PRESSURE.................................

SPAN NO. ...................... MODIFIED


ELONGATION..........................................
CABLE NO .................... MIN. ELONGATION (-5
%)........................................
TYPE OF CABLE 19 T 13 MAX ELONGATION (+5
%)........................................

DATE OF CASTING ...............

BADDI END SHITALPUR END


S.N PRESS. JACK DIFFER ZERO TOTAL PRESS. JACK DIFFER ZERO TOTAL
O KG/CM2 READING ENCE CORRE EXT KG/CM2 READING ENCE CORRE EXT
(MM) (MM) CTION OF (MM) (MM) CTION OF
( MM) STRAND ( MM) STRAND
(MM) (MM)

1 50 50

2 100 100

3 150 150

4 200 200

5 250 250

6 300 300

7 350 350

8 400 400

9 437 437
JACK READING AFTER THE SLIP JACK READING AFTER THE
SLIP
JACK PRESSURE RELEASED JACK PRESSURE RELEASED
TO 50 KG/CM2 TO 50 KG/CM2

AVERAGE ELONGATION =

SLIP AFTER 24 Hrs =

..................... ........................

CLIENT LRC BUILDERS PVT