AFIA Jeddah Factory Project DATE: 27/01/2016

Location AFIA Jeddah Factory Project Task/Activity Pipefitting


Completed by: Date:
Completed by: Date:

Severity

Probability

Severity

Page 1 of 8
Health, Safety, and Environmental
2 4 6 8 10
10 20 40 60 80 100 REF:
REVISION:
8 16 32 48 64 80
AFIA Jeddah Factory Project DATE: 27/01/2016
6 12 24 36 48 60
4 8 16 24 32 40
2
2 4 8 12 16 20
First aid

Unlikely

Probability

Page 2 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Minor injury or damage

Possible

Moderate injury or damage

Likely

Page 3 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Major injury or damage

Very Likely

10

Fatality or extensive damage

10

Imminent

Page 4 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

RISK ACCEPTABILITY MATRIX

Risk Rating Acceptability level Action required &


priority

Unacceptable risk Shutdown the


installation immediate
R>80
correct action

(40:64) High risk Immediate corrective


action

(20:36) Important & possible Corrective action ASAP


risk

Page 5 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

R<16 Acceptable risk Consider the necessary


of a corrective action

Risk after
Potential P Risk Existing control control Additional Final
hazard S Rat measures measures Control Risk
e P S measures
R required
Hitting When handling Must be
someone or pipes may hit the Watch where
something other workers can you are going.
with the pipe. 4 4 16 cause injuries or Handle piping
accidents but no 2 2 4 carefully. And
precautions uses also using
there safety signs
and
4 6 24 barrication in
working area.
Electric shock When Using power Must be
tools such as Inspect cord
6 10 60 grinder, portable before use.
saw, pipe cutter, Keep power
and pipe threading cord away

Page 6 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

machine may cause from work


electric shock, Do area. Plug
not use electric 2 6 12 tools into GFCI
tools if work area protected
is wet or damage outlets.
tools.
Getting caught When working with must be guide
in pipe 6 8 48 threading machine the workers do
threading may cause serious not wear loose
machine injuries but clothing,
workers having no 4 4 16 jewelry, or
awareness about keys. Stay
that severity. alert while
working with
pipe
threading.
Cuts, pinches, When Using fitters Keep tools in
and , tools, pipe good
punctures, 6 6 36 wrenches, and condition.
combination 4 6 24 Inspect tools
wrenches hand before use.
tools without wear safety
gloves may cause glasses, gloves
cuts and punctures etc. Work away
on body parts from yourself.
Use normal

Page 7 of 8
Health, Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

caution
required for all
hand tools.
Fire hazard When grinding or Must be
from flying 6 10 60 cutting the pipes Remove
sparks the flying sparks flammable
may cause fire materials from
incident, or skin work area.
burning. Wear welding
jacket. Also
managing the
fire watchers
on work place,
should used
fire extinguish.

Page 8 of 8