You are on page 1of 16

The Typical Mega Foundation

Bored Pile

17

DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Diaphragm Wall
Table of Contents
04 Introduction

06 Construction Sequence

08 Main Projects (Overseas)

10 Main Projects (Korea)

11 Equipments in hand

14 Track Record
The Typical Mega Foundation

Bored Pile
Introduction

This method is able to excavate hard ground and under ground obstacles, deeper and faster
while casing tube is rotated and injected with the main body of excavator, underground earth is
removed by Hammer Grab.

This method can be used in similar soil conditions which could not be carried out by traditional
equipment and methods such as the earth auger, double auger and casing auger method, etc.

Indeed, this is a more effective method in removing underground steel-concrete structures


during redevelopment works.

4
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Since1991, In KOREA

Since 2006, at overseas


(Singapore, Vietnam, etc)

www.dage.co.kr
Maintain stable shaft

Immediate division of soil


condition

The Specialties Less any disturbance and


subsidence to the surrounding
areas

Less noise & vibration

Efficiency in QA/QC control

5
Deep Foundation;

DONGAH GEOLOGICAL ENGINEERING CO.,LTD


Bored pile application in construction

Bridge abutment, pier


Tank foundation

Removal of underground
structure
Bored Pile (Concrete block, etc)
Warehouse, building
foundation

Foundation with embedding


hard rock

Bored Pile
Construction Sequence

Survey

Re-bar
Casing install
fabrication
work

Boring works

Rock
socketing

Earth
N Cleaning slime material/
slime

6
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Inspection Disposal Re-bar cage

Y
Reinforcing work

Cleaning slime(2nd) Treatment

Concreting Remove
tremmie Pipe

Earth work
Toe grouting
/Capping Casing
removal

End

www.dage.co.kr
Board Pile Construction Sequence (Alll Casing + Earth Drilling)

1.Equipment moving and setting 2.Inserting of casing to the 3.Setting up earth drilling 4.Drilling by earth drill
weathered rock and equipment
excavation (G.L -0~40.0m)

( (
) )



Casing
40M
Casing
40M

Water level

Setting up oscillator in planed position Inserting of casing with hammer grab


to GL(-)40.0m
Setting up earth drilling equipment Drilling below GL(-)40.0m
7

DONGAH GEOLOGICAL ENGINEERING CO.,LTD


5.Move to next position 6.Insertion of steel cage 7.Placing concrete and pulling 8.Backlling after placing
out of casing concrete

() (
)



CON'C

Move to next position Insertion of steel cage Placing concrete with tremie pipe and Backfilling with soil or gravel after
pulling out of casing placing concrete

Casing
Machine Set Up Installing Boring Works Reinforcing Concreting

Bored Pile
Main Projects (Overseas)

Location: Palau Island, USA

PJ name: Palau Compact Road Const.


Application
Construction period : 1999.09~2002.11
Bored pile : 1,500mm
Depth : 43~63m

8
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Location: Kimseng Rd, Singapore

PJ name: Kimseng Condo


Application
Construction period : 2006.07~2007.11
Bored pile : 1,500mm
Depth : 43~63m

www.dage.co.kr
Location: Hanoi, Vietnam

PJ name: Hanoi City Complex


Application
Construction period : 2007.10~2008.07
Bored Pile : 1,500mm, 2,000mm
Depth : 43~63m

DONGAH GEOLOGICAL ENGINEERING CO.,LTD


Location: Collyer Quay Rd, Singapore

PJ name: Redevelopment of overseas Union House & Change Alley Plaza Collyer Quay
Application
Construction period : 2007.12~2008.07
Bored pile : 1,100mm, 1,500mm
Depth : 40m

Bored Pile
Main Projects (Korea)

Location: Incheon, Korea

PJ name: Incheon Bridge (Pier Foundation)


Application
Construction period : 2006.05~2008.05
Bored pile : 1,000~2,000mm
Depth : 35~40m
Highlights : Offshore foundation

10
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Location: Busan, Korea

PJ name: Doosan Wev Condo


Application
Construction period : 2007.12~2008.08
Bored pile : 2,500mm
Depth : 60m
Highlights : Building foundation

www.dage.co.kr
Equipments in hand

DRILLING RIG

BG28 BG36 BG40 DMB 18S SD515

11

DONGAH GEOLOGICAL ENGINEERING CO.,LTD


Crane Main Aux Kelly
Daimeter Depth Rotary
Item Crowd system weight winch winch bar Remark
(mm) (m) speed
(ton) (tf) (tf) torque

2008.
BG-28 2500MM 71 Winch type 96 35U/MIN(RPM) 25.51 8.16 276kNm 01

23/48U/ 2008.
BG-36 2500MM 71 Winch type 120 30.61 10.2 300kNm
MIN(RPM) 01

21/43U/ 1994.
BG-40 2500MM 53 Cylinder type 142.5 30.61 13.27 300kNm
MIN(RPM) 12

LOW9/ 2008.
DMB-18S 2000MM 57 Cylinder or winch 91 25.0 25.0
HIGH18 RPM 08

8.5/14.7/31.6/ 2007.
SD515 1500MM 45.5 Winch type 70 18.3 6.0 140kNm
52.9(RPM) 12

Bored Pile
Equipments in hand

Osillator

Model BM-C150 MGN2000HD BM-C200 BM-C200S BM-C300


Item
Casing Out Diameter Max. 1,500mm Max. 2,000mm Max. 2,000mm Max. 2,000mm Max. 3,000mm

Lifting Stroke 600 mm 700 mm 600 mm 600 mm 650 mm

Lifting Force 243 ton at 320bar 3940kN (402 ton) 314 ton at 320bar 581 ton at 320bar 726 ton

Clamping Force 197 ton at 320bar 2895kN (295 ton) 257 ton at 275bar 402 ton at 320bar 509 ton

Torque 286 ton-m at 320bar 6345kNm (647 ton-m) 481 ton-m at 320bar 721 ton-m at 320bar 1014 ton

Rotation Angle 25 26 25 25 21

Retaining Force 98 ton 129 ton 145 ton 163 ton

12
Travel of casing 327 mm 436 mm 436 mm 550 mm

Operating Pressure 320 bar 320 bar 320 bar 320 bar 320 bar
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

6,815(L) 2,780(W) 8,225(L) 3,540(W) 7,775(L) 3,310(W) 8,995(L) 3,780(W) 10,455(L) 4,700(W)
Size
2,210(H) 2,280(H) 2,230(H) 2,525(H) 2,655(H)

Whole weight 26 ton 32 ton 31 ton 42 ton 57 ton

www.dage.co.kr
RCD Machine
ItemModel Model BM-R1820/NW300
BM-C150 MGN2000HD BM-C200
Base frame Max.drill bit out diameter : 2,000mm
Power swivel (model) PS22 / 113.88 /18
(2 Hyd. motors) Rexross A6VM 250HD2 Max.350bar
(2 Planetary gearing) 2 Planetary gearing (G22)
(Lower speed) 0~5.9 rpm / 0~18.4 Ton.m
(High speed) 0~28.69 rpm / 0~3.8 Ton.m
Mast tilt 26 deg.
Thrust cylinders Max. 3.5m stroke
(Thrust) 88tons at 320bar
(Pull-up) 129tons at 320bar
Working platform tilt Max. 20deg.(option)
Retaining device NW 300 drill pipe
Drill pipe rack tilt Max. 41.5deg.
Jib crane Max. 1ton swivel boom 13
wire rope diameter 6mmlength 25m

DONGAH GEOLOGICAL ENGINEERING CO.,LTD


Water inlet 10K - NW200*2lines
Weight Approx. 25 tons(incl. casing clamp)

ItemModel Model BM-R3030/NW300


BM-C150 MGN2000HD BM-C200
Base frame Max.drill bit out diameter :3,000mm
Power swivel (model) 2 Planetary Gearing (G25)
(2 Hyd. motors) Rexross A6VM 250HD2 Max.350bar
(2 Planetary gearing) 2 Planetary Gearing (G25)
(Lower speed) 0~10.0 rpm / 0~30.0 Ton.m
(High speed) 0~27.2 rpm / 0~11.0 Ton.m
Mast tilt 32deg.
Thrust cylinders Max. 3.5m stroke
(Thrust) 122tons at 320bar
(Pull-up) 201tons at 320bar
Working platform tilt Max. 12.5deg.(option)
Retaining device NW 300 drill pipe
Drill pipe rack tilt Max. 37.6deg.
Jib crane Max. 1ton swivel boom
wire rope diameter 6mmlength 25m
Water inlet 10K - NW200*2lines
Weight Approx. 38 tons

Bored Pile
Track Record

Overseas

No project name Country Client Contract Description of work Remark


period

New Consturction of Hanoi City 2007.10


1 Vietnam Coralis Vietam Co Piling works Completed
Complex of 65 Stories Tower 2008.08

Redevelopment of overseas
union and change alley aerial
Clifford 2007.12
2 Singapore Developments P/L Piling works Completed
plaza at collyer quay 2008.07

Palau compact road USA 1999.09


3 USA coe Bored pile Completed
14 / Pilling work (Palau) 2002.11
DONGAH GEOLOGICAL ENGINEERING CO.,LTD

www.dage.co.kr
15

DONGAH GEOLOGICAL ENGINEERING CO.,LTD

Bored Pile
HEAD OFFICE
1033-2 Guseo 2-dong, Geumjeong-gu, Busan, Korea
TEL. 82-51-580-5500 FAX. 82-51-580-5678
SEOUL LIAISON OFFICE
16th Floor, Seongwon Bldg, 141 Samseong-dong, Gangnam-gu, Seoul
TEL. 82-2-553-3527 FAX. 82-2-555-1763
SINGAPORE BRANCH OFFICE
192 Waterloo Street #04-07 Skyline Building Singapore 18766
TEL. 65-6745-6530 FAX. 65-6745-3059

You might also like