SOP FOR POWER ON THE UPS (2X130KVA) HIREL

MAKEUP

GVK-C&I-O&M

CONDITION: - WHEN UPS IS IN OFF CONDITION.

ENSURE THAT FOLLOWING BREAKERS SHOULD BE OFF

A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER
E. CBO BREAKER

PROCEDURE TO POWER UP THE UPS BY FOLLOWING ABOVE


CONDITIONS:-

1. SWITCH ON THE CBI BREAKER.

2. PRESS METERING FROM OPERATOR PANEL & CHECK THE BATTERY VOLTAGE.IT
SHOULD BE 385V APPROXIMATE.

3. SWITCH ON THE CBB BREAKER WHICH WILL PUT THE BATTERY BANK IN LINE
i.e CHARGING OF THE BATTERY BANK.

4. SWITCH ON THE CBA BREAKER WHICH WILL PUT THE BYPASS IN LINE.

5. SWITCH ON THE MIS BREAKER TO SWITCH ON THE OUTPUT.

6. PRESS THE INVERTER ON BUTTON FOR 2 TO 3 SECONDS WHICH WILL TAKE


THE INVERTER IN SERVICE.

AFTER THIS PROCEDURE THE UPS IS IN LINE AND IS IN POWER UP CONDITION.


ALSO CBO BREAKER REMAINS IN OFF CONDITION.

MANUALLY SELECT THESE SETTINGS FROM OPERATOR PANEL AFTER


POWER UP:-
1. BMS CONFIG (ENABLE).
2. BATTERY TYPE:-LATB (SELECTION).
3. BOOSTER CONFIG (DISABLE).

NOMENCLATURE
1. CBI-INPUT MCCB
2. CBB- BATTERY MCCB
3. CBA- BYPASS MCCB
4. CBO- MANUAL BYPASS MCCB
5. MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY

VAIBHAV ANAND G.M.(C&I)


V.P.(O&M)

SOP FOR POWER OFF THE UPS (2X130KVA) HIREL


MAKEUP
GVK-C&I-O&M

CONDITION: - WHEN UPS IS POWER UP.

ENSURE THAT THE FOLLOWING BREAKERS SHOULD BE ON

A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER

ENSURE THAT CBO BREAKER IS IN OFF CONDITION.

PROCEDURE TO POWER UP THE UPS BY FOLLOWING ABOVE


CONDITIONS:-

6. PRESS THE INVERTER OFF BUTTON FOR 4 TO 5 SECONDS.CHECK THE


DISPLAY PANEL SHOULD BE OFF.
7. SWITCH OFF THE MIS BREAKER.
8. SWITCH OFF THE CBA BREAKER.
9. SWITCH OFF THE CBB BREAKER.
10.SWITCH OFF THE CBI BREAKER.

AFTER THIS PROCEDURE THE UPS IS IN POWER OFF CONDITION. ALSO CBO
BREAKER REMAINS IN OFF CONDITION.

NOMENCLATURE
11.CBI-INPUT MCCB
12.CBB- BATTERY MCCB
13.CBA- BYPASS MCCB
14.CBO- MANUAL BYPASS MCCB
15.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY

VAIBHAV ANAND G.M.(C&I)


V.P.(O&M)

SOP FOR MAINTENANCE MODE OF THE UPS (2X130KVA)


HIREL MAKEUP
GVK-C&I-O&M

CONDITION: - WHEN UPS IS IN ON CONDITION.

ENSURE THAT FOLLOWING BREAKERS SHOULD BE ON

A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER

ENSURE THAT THE CBO BREAKER IS IN OFF CONDITION.

PROCEDURE FOR MAINTENANCE MODE OF BOTH THE UPS:-

1. PRESS OFF BUTTON OF BOTH THE INVERTER SIMULTANEOUSLY OR ONE BY


ONE.THIS WILL DISAPPEAR THE DISPLAY PANEL OF UPS #1 & UPS #2.
2. SWITCH ON THE CBO BREAKER OF BOTH INVERTERS AT FULL LOAD.THIS
PROCESS WILL PUT THE AUXILIARY SUPPLY IN SERVICE.
3. SWITCH OFF CBA BREAKER OF BOTH THE INVERTERS.
4. SWITCH OFF MIS BREAKER OF BOTH THE INVERTERS.
5. SWITCH OFF CBI BREAKER OF BOTH THE INVERTERS.
6. SWITCH OFF CBB BREAKER OF BOTH THE INVERTERS.

AFTER THIS PROCEDURE UPS IS IN MAINTENANCE MODE AND SUPPLY IS IN


THROUGH BYPASS LINE.

NOMENCLATURE
7. CBI-INPUT MCCB
8. CBB- BATTERY MCCB
9. CBA- BYPASS MCCB
10.CBO- MANUAL BYPASS MCCB
11.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY

VAIBHAV ANAND G.M.(C&I)


V.P.(O&M)

SOP FOR RESTORE MODE OF THE UPS (2X130KVA) HIREL


MAKEUP
GVK-C&I-O&M

CONDITION: - WHEN UPS IS IN MAINTENANCE CONDITION.

ENSURE THAT THE FOLLOWING BREAKERS SHOIUL BE OFF

A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER

ENSURE THAT THE CBO BREAKER IS IN ON CONDITION.

PROCEDURE TO RESTORE POWER FROM MAINTENANCE TO


RESTORE MODE OF BOTH THE UPS:-

1. SWITCH ON CBI BREAKER OF BOTH THE INVERTERS.


2. SWITCH ON CBB BREAKER OF BOTH THE INVERTERS. AFTER 2 OR 3
MINUTES DELAY. (COZ OF CAPACITOR CHARGE OR SAY DC BUS SHOULD BE
CHARGED).
3. SWITCH ON MIS BREAKER OF BOTH THE INVERTERS.
4. SWITCH OFF CBO BREAKER (MANUAL BYPASS) AFTER 2 MINUTES OF BOTH
THE INVERTERS.
5. PRESS ON BUTTON OF BOTH THE INVERTERS FROM OPERATER PANEL.

NOTE: - EITHER INVRTER #1 OR INVERTER #2 WHICH WILL STARTS FIRST


BECOMES THE MASTER INVERTER.

NOMENCLATURE
6. CBI-INPUT MCCB
7. CBB- BATTERY MCCB
8. CBA- BYPASS MCCB
9. CBO- MANUAL BYPASS MCCB
10.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY

VAIBHAV ANAND G.M.(C&I)


V.P.(O&M)

ANNEXURE 1

NOMENCLATURE
1. CBI-INPUT MCCB
2. CBB- BATTERY MCCB
3. CBA- BYPASS MCCB
4. CBO- MANUAL BYPASS MCCB
5. MIS- OUTPUT MCCB

NOTE: - IF THE CBI BREAKER OFF THEN INVERTER SHOWS DISCHARGING BUT IT
DOESNOT DISCHARGE BECOZ IT GETS CHARGING FROM OTHER INVERTER.
(BOTH THE INVERTER CONNECTED IN PARALLEL SUPPLY)

ALARM:-
1. UPS IS STAND ALONE MEANS ONLY THIS UPS IS CHARGING.
2. CHG CAN FAIL MEANS OTHER UPS IS NOT CHARGING.
3. CHG PMI FAIL means UPS #1 and UPS #2 ARE NOT COUPLED.
PREPARED BY REVIEWED BY
APPROVED BY

VAIBHAV ANAND G.M.(C&I)


V.P.(O&M)