GVK-C&I-O&M
A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER
E. CBO BREAKER
2. PRESS METERING FROM OPERATOR PANEL & CHECK THE BATTERY VOLTAGE.IT
SHOULD BE 385V APPROXIMATE.
3. SWITCH ON THE CBB BREAKER WHICH WILL PUT THE BATTERY BANK IN LINE
i.e CHARGING OF THE BATTERY BANK.
4. SWITCH ON THE CBA BREAKER WHICH WILL PUT THE BYPASS IN LINE.
NOMENCLATURE
1. CBI-INPUT MCCB
2. CBB- BATTERY MCCB
3. CBA- BYPASS MCCB
4. CBO- MANUAL BYPASS MCCB
5. MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY
A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER
AFTER THIS PROCEDURE THE UPS IS IN POWER OFF CONDITION. ALSO CBO
BREAKER REMAINS IN OFF CONDITION.
NOMENCLATURE
11.CBI-INPUT MCCB
12.CBB- BATTERY MCCB
13.CBA- BYPASS MCCB
14.CBO- MANUAL BYPASS MCCB
15.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY
A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER
NOMENCLATURE
7. CBI-INPUT MCCB
8. CBB- BATTERY MCCB
9. CBA- BYPASS MCCB
10.CBO- MANUAL BYPASS MCCB
11.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY
A. CBI BREAKER
B. CBB BREAKER
C. CBA BREAKER
D. MIS BREAKER
NOMENCLATURE
6. CBI-INPUT MCCB
7. CBB- BATTERY MCCB
8. CBA- BYPASS MCCB
9. CBO- MANUAL BYPASS MCCB
10.MIS- OUTPUT MCCB
PREPARED BY REVIEWED BY
APPROVED BY
ANNEXURE 1
NOMENCLATURE
1. CBI-INPUT MCCB
2. CBB- BATTERY MCCB
3. CBA- BYPASS MCCB
4. CBO- MANUAL BYPASS MCCB
5. MIS- OUTPUT MCCB
NOTE: - IF THE CBI BREAKER OFF THEN INVERTER SHOWS DISCHARGING BUT IT
DOESNOT DISCHARGE BECOZ IT GETS CHARGING FROM OTHER INVERTER.
(BOTH THE INVERTER CONNECTED IN PARALLEL SUPPLY)
ALARM:-
1. UPS IS STAND ALONE MEANS ONLY THIS UPS IS CHARGING.
2. CHG CAN FAIL MEANS OTHER UPS IS NOT CHARGING.
3. CHG PMI FAIL means UPS #1 and UPS #2 ARE NOT COUPLED.
PREPARED BY REVIEWED BY
APPROVED BY