Owner's Profile /
Owner's Name /
Father's / Husband's Name /
CNIC Number with validity / Profession / Occupation /
Address of Correspondence /
Load Extension /
Temporary Connection /
Reinforcement /
Existing Gas Meter Number /
Change of Meter Position /
Type of Connection /
Single Phase / Three Phase / CTO / Underground / Overhead /
Details of Premises /
Type of Unit Area of the Premises Number of Connections / Meters Load Required (KW) Total Load Required
References Required /
Reference # 1 / Reference # 2 /
Name / Name /
Address / Address /
Designation / Designation /
Signature / Signature /
S. No. Document Required Residential Commercial Industrial Agricultural
Copy of employee card along with valid copy of CNIC of employee if applicable
2
Copy of approved Building Plan along with Covering Letter (NC / Extension of
5 Load / Reinforcement cases)
Indemnity for Industrial Connection on Rs.100/- Stamp Paper attested by Notary Public
10
NOC of DHA in case of DHA Phase-VII Ext & DHA Phase-VIII / NOC of Society /
NOC of CBC.
11
NOC from other owners with valid copy of CNIC required if applicable on Rs.100/-
Stamp Paper attested by Notary Public
12
13 NTN Certicate
Undertaking for deviation from approved building plan (in case of deviation)
14
Copy of last paid bill for Extension of Load / Reinforcement / CMP/ Maintenance cases
15
List of units / ats / houses / shops with load details on letterhead or on Rs.100/-
Stamp Paper attested by Notary Public (NC and Extension of Load ) in multistorey
and scheme cases
17
Note:
All original documents shall be presented at the time of submission of application
Each undertaking shall be on Rs. 100/- Stamp Paper (Attested by Notary Public)
All the correspondence will be done only on given contact numbers and email address
K-Electric may, as its option, use the Security Deposit for the purpose of self-utilisation by K-Electric from time to time and shall, upon discontinuation of electric supply
to the consumer, adjust / return the security deposit as the case may be as per applicable NEPRA notication
Customers Declaration /
I/We fully agree to pay the charges as per tariff (which shall be enforced from time to time) and all services related charges including Security Deposit, System Development
charges and other payments (if any) as per approved terms and conditions.
I/We hereby agree to abide by all the rules & regulations of K-Electric and verify that all details and documents are authentic. In case of any deliberate misinformation,
K-Electric reserves the right to reject the application.
Dear Customer,
You are welcome to KE.
Kindly read and follow all the instructions carefully in order to acquire
a connection at your premises without any hassle.
No. / Check /
Instructions for Scheme Cases /
You will be required to submit an application form containing all
1
the required documents mentioned in the form.
Please make sure that all the contact details you provide are
2
genuine and in use. In case of providing fake email IDs or contact
numbers, you will not be able to receive any intimation which will
result in delaying your case.
You will be given an ID against your application form, through
3
which you can check the status of your new connection application.
You will be contacted for a survey of your premises once your
documents have been reviewed and verified. Please remember,
your presence at the time of the survey to identify the point of
4
supply and PMT location is mandatory.
Please Note: Failure to comply will result in the cancellation of
your application.
You will be intimated about your approved load via SMS or email
5
once it is approved in accordance with the assessed load.
Requirements
Self Finance Undertaking / Agreement
Bank Guarantee (BG) or Pay Order (PO)
Estimate Amount (estimate is issued after submission and verification of BG or PO)
6 Security Deposit
*
* As per prescribed format provided by K-Electric
Submission Deadline
15 Days (from the date of issuance of BG Slip)
Requirements
Estimate Amount
Security Deposit
Submission Deadline
7 Days (from the date of estimate received)
You will be provided with the following documents along with the
intimation for execution:
Bill of materials
Approved drawings
List of approved manufacturers / suppliers for supply of materials
10 List of contact details of manufacturers / suppliers
List of approved pre-qualified contractors for scheme execution
Letter of agreement for conformance to current KE specifications
Letter of conformance to current KE specifications (for transformers)
Letter of conformance to current KE specifications (for other
materials)
You shall then nominate a contractor for the execution of your
scheme from the attached list of pre-qualified contractors who
shall further submit a letter confirming the award of work along
11
with the work schedule (preferably in a Gantt Chart format) before
you procure any material. You shall also submit the letter of
agreement for conformance to current KE specifications.
All intimations, including the hiring of a contractor and inspection of each
material, shall be sent to us in writing within 15 days of receiving the
intimation for execution. Delivery challans or order confirmation of the
12 materials and the letters of conformance to current KE specifications by
the manufacturer shall also be submitted along with the intimations.
Kindly note that the completion date of your scheme shall not
exceed the deadline. You shall also ensure that electrification of
13
your scheme is fully executed by a pre-qualified contractor
before the said deadline.
As per the Electricity Act, all your internal wiring and electrical
installations should be installed by a competent and qualified
electrical contractor. In this respect, you will have to submit the
following documents at the KE front office:
14 Test form
Work commencement report duly enclosed by EIK
Fitness certificate duly issued by EIK (in case of industry)
Copies of paid estimate and SD(s) receipts
Last paid bill (if applicable)
Undertaking for dues clearance
In order to maintain the load power factor at or above 0.9 at all
times, you will have to install an automatic power factor
improvement plant of an appropriate kVA rating (rating will be
confirmed by the NC department) before your scheme is
energised. The working of the automatic PFIP will be tested at
15 the time of installation of meters, for which a minimum of 25% of
your approved load must be installed. You will also have to
submit the following documents along with the test form:
The delivery challan for automated PFIP
Test reports for automated power factor improvement plant
PFIP undertaking
(This point is valid for industrial / commercial consumers)
Your scheme will be energised after the complete execution as
16 per KEs proposal and subject to dues clearance from the
concerned KE billing zone.
Your approved load will be final. Any change in construction /
usage / machinery at any stage will result in changing the approved
17 load due to which your case will be held in abeyance. KE will not be
liable for any loss, delay or damage caused by the deviation in
load. Necessary changes in the scheme will be conducted
accordingly as per the revised load after due approval, if possible.
Kindly make a copy of the checklist and submit the original along
18
with the application form.
Dear Customer,
You are welcome to KE.
Kindly read and follow all the instructions carefully in order to acquire
a connection at your premises without any hassle.
No. / Check /
Instructions for Non-Scheme Cases /
Please make sure that all the contact details you provide are
genuine and in use. In case of providing fake email IDs or contact
2
numbers, you will not be able to receive any intimation which will
result in delaying your case.
Kindly make a copy of the checklist and submit the original along
12 with the application form.