Professional Documents
Culture Documents
Process
Identify Bid Weight the Evaluate The Review Bidder Notify & Award
Process Flow Competitors Scores
Criteria Criteria Contract/ Bid
Estimated Completion
Date
Page 1 of 8
Jenks Public Schools
Bidder Comparison Worksheet and Process
Page 2 of 8
Bid Explanation or #:
Jenks Public Schools --- Bidder Comparison Worksheet
Ratings from Jenks' Committee Perspective Average
Bid item Bid % of Bid Competitor
Primary Bid Criterion Bid Criteria Description Bidder 1 Bidder 2 Bidder 3 Bidder 4 Bidder 5 Bidder 6 Bidder 7 Bidder 8 Bidder 9 Score
# Weight Criterion
1 #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0!
3 #DIV/0! #DIV/0!
4 #DIV/0! #DIV/0!
5 #DIV/0! #DIV/0!
6 #DIV/0! #DIV/0!
7 #DIV/0! #DIV/0!
8 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
10 #DIV/0! #DIV/0!
11 #DIV/0! #DIV/0!
12 #DIV/0! #DIV/0!
13 #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
* Orange & Yellow fields calculate automatically. 0 0 0 0 0 0 0 0 0 0 0.0
RANK 1 1 1 1 1 1 1 1 1
Bid Evaluation completed by: Date completed
Instructions Description
Step 1 Note which bid (by description or bid # )being evaluated in cell G1 Evaluation Grading System Value
Select criteria from the Master Bid Criteria List to evaluate the bid prior to solicting or opening of bids. The
Outstanding 9,10
Step 2 criteria (not specifically the weights) should be shared with bidders in the package given to bid.
Step 3 Paste criteria and criteria description to columns B & C Good 7,8
As a committee, enter relative values (weights) for each criteria in column D. These do not have to equal Adequate 5,6
Step 4 100 but do need to reflect the importance of each item in comparison to all other criteria.
After bids are opened, replace the "Bidder 1-9" with the name of bidder company name & 'clear contents of
Step 5 Marginally Acceptable 3,4
evaluation data from form.
Step 6 Send file to committee to enter evaluations of each biddercomplete each column 1-10 for each criteria. Poor 1,2
Each evaluator will complete columns G-O with their evaluation of how well that company compares to the Unacceptable or No
Step 7 need of the project. Use "Evaluation Grading System" found in the light blue cells starting in cell J27. A 0
response
Drop Down list of the grading system is available if desried.
Step 8 Each evaluator fill in C25 with their name and cell H25 with the date the evaluation is finished.
Step 9 Each committee member will send their evaluations to the person tabulating the evaluations.
Tabulation is done either by a combined or average score. The average score must be utilized when one
Step 10 evaluator does not evaluate a particular bidder.
Step 11 If at any point of the evaluation a bidder is determined not to be a "responsible bidder" the Statement of
Bidder Exclusion (JPS- PUR 139) is completed and filed in the bid documentation
Step 12 Results of the evaluation are published to the committee and the bidders.
Step 13 Proceeded with the contract or purchase as per district policy and procedures.
file:///var/www/apps/conversion/tmp/scratch_5/353359842.xls
Bid Evaluation/ Compilations
Bid description or No.
Member Avg
Bidder 1 Bidder 2 Bidder 3 Bidder 4 Bidder 5 Bidder 6 Bidder 7 Bidder 8 Bidder 9 Score
Member 1 0.0 0.0
Member 2 0.0 0.0
Member 3 0.0 0.0
Member 4 0.0 0.0
Member 5 0.0 0.0
Member 6 0.0 0.0
Member 7 0.0 0.0
Member 8 0.0 0.0
Member 9 0.0 0.0
Bidder Total Avg 0.0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0 0.0
Overall Rank #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Step Description
1 Modify Row 2 company names to match the columns on the Compare Sheet. (Paste)
2 Modify Column each with a name of each committee member
3 Paste special- Value to bring over each corresponding Committee member evaluation score
4 The Orange cells will calculate automatically.
5 The Highest ranked Bidder will be ranked #1
6 Complete JPS-PUR 139 if the highest rank bidder is not a responsible bidder. Use #2 Bidder.
7 Row 27 completed by the person doing the compilation of evaluations
* Enter ZERO in at least one cell for all bidder columns for calculations to work properly.
Jenks Public Schools
Bidder Comparison Worksheet - (High, Medium, Low)
1 Price 10 H H
2 Experience 8 H M
3 Technical 7 M M
4 Staffing 7 M H
5 Reputation 4 H M
6 Financial 4 H M
7
8
9
10
11
12
13
14
15
Total Average Weighted Score 18 16
Dark gray cells will be calculated for you. You do not need to enter anything into them.
* See "Bidder Compare 1-10 Weighted" worksheet instruction to use this document.
Instructions Description
Step 1 Note which bid (by description or bid # )being evaluated i
Select criteria from the Master Bid Criteria List to evaluat
prior to opening of bids. The criteria (not specifically th
Step 2 should be shared with bidders in the package given t
Step 3 Paste criteria and criteria description to columns B & C
Page 5 of 8
Jenks Public Schools
Bidder Comparison Worksheet - (High, Medium, Low)
Step 5 After bids are opened, replace the "Bidder 1-9" with the n
bidder company name & 'clear contents of evaluation dat
Page 6 of 8
Jenks Public Schools
Bidder Comparison Worksheet - (High, Medium, Low)
H M 27 No hidden costs
M H 19 Client references
L M 12 Server integration
L M 14 Strong project managers
L L 5 Need employee buy-in
L M 7 Dunn & Bradstreet check
11 14 14
Description
n or bid # )being evaluated in cell G1
r Bid Criteria List to evaluate the bid
criteria (not specifically the weights)
ers in the package given to bid.
cription to columns B & C
Page 7 of 8
Jenks Public Schools
Bidder Comparison Worksheet - (High, Medium, Low)
Page 8 of 8