3.0 The key parameters for various capacities of SPV system shall be as under:
SPV Capacity Battery Capacity Minimum No. of Incentive to be
units generation given for Ist yr for
guaranteed the generation
exceeding no. of
units.
3.75 KWp 2X 200AH 5900KWH 6200KWH
5 KWp 2X600AH 7900 KWH 8300KWH
7.5 KWp 2X800 AH 11900KWH 12500 KWH
10KWp 2X1250AH 15800 KWH 16600 KWH
4.0 The Specifications attached are for 5 KWp Solar PV System and the above
parameters may be accordingly substituted .
1
SPECIFICATIO
(OR)
Authorized suppliers / vendor approved by the above original
manufacturers. The authorization letter specific to the concerned tender
on printed letter head of the manufacturer in this regard will have to be
produced by the supplier/ vendor.
Note: The tender will not be opened at all, if the firm fails to submit the
documentary proof for eligibility as said above.
2
Schedule of Quantity
SITC of 5KWp Solar Photo Voltaic (SPV) power supply [Hybrid: Solar-Grid-DG] for various BTS in BS
L
Unit cost / job
Sl
Description of Item
Qty
per set
agency
( If any)
unit price
Total
et Cost
Basic price
( 9 - 10- 11)
to BS
L (3 x 12)
Forwarding
Packing and
[4+5 +6+7+8]
/ Custom duty
exclusive of all
Any other levies
imp.
ote 3 below)
01 Job
suitable cabling for interconnections, earthing, etc
complete as required as per the attached
specifications.
5 KWp SPV
2 Supply of 2 x 600 AH, 48V( 24 cells) VRLA
battery suitable for SPV application with standard
mounting structure, interconnection with suitable
cable/busbar, standard protective devices, weather
01 job
proof ventilated M.S canopy suitable for IP-55
Protection etc., as per specification attached.
et Cost to BS
L (as per Column 13)for one number of site in words Rupees
Total
umber of sites ..
os
et cost to BS
L for ..
os of site
3
Unit cost / job
CE
VAT
et cost
Sl. Service -able
Description of Item Qty ITC (Rs) Total to BS
L
o Tax duties
exclusive of Rs. per set
Applicable (Service
Service tax (4+5) Rs
Total
et Cost
to BS
L (3 x 8)
Rs Tax as per
(6-7)
column 5)
1 2 3 4 5 6 7 8 9
PART B : Installation Testing and commissioning of Solar-
1 Hybrid Power Generation System
01 Job
monitoring, protections, suitable cabling for interconnections,
earthing, etc complete as required as per the attached
specifications.
5 KWp SPV
et Cost to BS
L (as per Column 09)for one number of site in words Rupees
Total
umber of sites ..
os
et cost to BS
L for ..
os of site
4
Important Note : for Supply and ITC & portion
1. The prices shall be quoted after taking into account the entire credit on inputs available under the MODVAT
SCHEME introduced w.e.f. 1st March 1986 and further extended on more items till date.
2. The firm shall be responsible to see that E.D/ Customs Tariff Head shown in the above columns are correct and
CENVAT Credit for the amount shown above is admissible as per CENVAT Credit Rules 2004."
3. Only Form C will be issued by BSNL on specific request for Part A (supply)
4. Invoice favouring BSNL shall be issued by the supplier indicating ED, service Tax., with documentary proof to avail
CENVAT credit.
5. The evaluation and comparison of responsive bids shall be done on the basis of Net cost to BSNL (for Part-A +
Part-B) i.e, supply, and ITC and on the prices offered inclusive of duties and taxes (but excluding CENVAT - able
duties and taxes ), sales Tax, packing, forwarding, freight and insurance charges etc., as indicated in the price
schedule. Octroi / Entry Taxes are not to be included in the composite price and hence the same will not be
considered for the purpose of evaluation and comparison of responsive bids. However, Octroi / entry taxes will be
paid extra, as per actual wherever applicable on production of proof of payment / relevant invoices / documents.
6. The complete system shall be guaranteed for Three years, the manufacture shall guarantee all the equipments
supplied by him for any kind of defect . The firm shall also undertake the comprehensive maintenance of the entire
solar PV installations for the period of three years including the batteries supplied by the vendor.
7. The vendor has to perform the weekly check at site including cleaning of the panel etc
8. LOI/ Award letter shall be issued separately for Supply and ITC & CMC items and separate agreements shall be
framed for these items.
9. In case supplier / contractor submits exemption certificate from the commercial tax department, the WCT shall not
be deducted at source (for ITC portion only). WCT and Service Tax are not applicable for supply portion and as
such WCT will not be deducted at source for supply portion.
10.If any levy/duty is not payable or documentary proof is not produced, the amount for the same shall be deducted.
11.No advance payments can be made. The payment is governed by the normal department practice and stipulations
like levy of interest if payment is not made in a specified time is also not acceptable.
5
TECHNICAL SPECIFICATIONS
Sl.No Sub Head Page No
1 Scope 7
2 SPV Module/Array 8
3 Charge Control Unit 11
4 Battery 15
5 Interconnecting Cable 15
6 General Requirement 15
7 DC termination 16
8 Cabling and Wiring 16
9 Meters 16
10 Earthing 17
11 Marking and Labeling 17
12 Circuit and cabling diagram 17
13 Finishing and Painting 17
14 Name plate 17
15 Guarantee and Defects Liability 18
16 Packing 18
17 Quality and Workmanship 18
18 Documentation 18
19 Test Certificates 19
20 Date of Completion 19
21 Testing at Site 19
22 Accessories 19
23 Other conditions 20
24 Completion Plan 20
25 Terms of Payment 21
26 Maintenance & Guidelines 21
27 Technical Particulars 23
(Actual To be filled by Vendor)
28 Approved Makes 24
29 Block Diagram of SPV Module 25
30 Typical Test Format for Battery set 26
31 Test Schedule for MF-VRLA Battery Set 27
6
TECHNICAL SPECIFICATIONS 5KWp SOLAR PHOTO VOLTAIC (SPV) POWER SUPPLY
[HYBRID: SOLAR-GRID-DG] FOR TELECOM EQUIPMENTS for 5KWp Capacity
1. Scope:
This document contains the generic requirements of 5KWp Solar Photo Voltaic
(SPV) power supply for various Telecom equipment, working on - 48V DC.
These power supplies shall be capable of generating minimum of 7900 KWH per
year. The mean Insolation on any panel kept at optimum tilt at places where the
solar panel is installed is assumed to be 4.5 KW hour/m/day. The minimum
units generated shall be calculated on prorate basis w.r.t actual insolation at the
particular location as per the published data of insolation for that location.
Test certificates for the above performance from ETDC/any other Govt
Test Centers have to be produced on sample basis.
The BSNL reserves the right to get any sample tested in the presence of
their officer to witness this test in ETDC/ any other NABL accredited
Govt Test Labs.
This type of power supply shall have provision, so that, when both the output of
SMPS and SPV power source are available, they shall take the load collectively.
SPV power source shall deliver the load as per its available power and rest of the
load shall be taken care of by SMPS. For proper load sharing of the two power
sources, it shall be ensured that voltage of the SPV power source, even in worst
working conditions (high SPV cell temperature) is higher than that of the SMPS.
1. The Solar supply should be available both for the battery charging and
for the BTS Load as a float.
2. Solar controller and charge controller should be assembled in one unit box
The SPV Hybrid Power Supply System shall be supplied as complete unit
including charge controller, maintenance free battery bank, Solar panel, module
mounting structure, interconnecting cable etc. required for its satisfactory
operation.
2. SPV MODULE/ARRAY
Solar Photo Voltaic Generating Source: SPV generating sources constituted
of the following building blocks:
SPV Module: SPV Module is the basic building block of the SPV power supply,
which consists of a number of Solar Cells (a Semi Conductor Device which when
exposed to sun light produces DC electricity) connected in series and
hermetically sealed with a toughened and highly transparent front glass cover.
These modules are connected in series and parallel to get the desired power and
voltage. The Rated DC current of One module shall be 200Wp or higher.
SPV Panel: SPV Modules of same rating are connected in series to form a SPV
panel to get the desired voltage.
SPV Array: A number of panels are connected in parallel to get the desired
power. This whole combination is called an array. The SPV array is so designed
that, it provides the necessary battery charging current and simultaneously
meets the load demand, when sufficient sunshine is available.
SPV Modules : The cells shall be fully encapsulated and mounted behind a
toughened low iron high transmission glass surface of thickness not less than
3mm to protect the cells from moisture, dust and external environment. The
contacts should be corrosion resistant. The leads must be weather protected.
SPV modules shall be constructed of materials and component, which are known
to be resistant to damage or deleterious change when exposed outdoors for a
period of 25 years in any of the climatic conditions prevailing in India and provide
mechanical and environmental protection to the encapsulated components. The
possibility of attack by birds and animals shall be taken into account when
selecting materials for the exterior of modules.
The modules shall have proven laminate construction. The laminates shall be
sealed in a frame of light weight anodized aluminum to provide shock resistance
and a further moisture barrier. The back surface shall be of white refractive
plastic material such as TEDLAR.
The sealing of edges of glass on the frames shall be hermetically tight so that
rain water and dew do not enter into the cell compartment.
The design of the solar module shall be multi-cell and modular in construction to
provide the required output.
8
The SPV module is for use in terrestrial application and is to comprise of mono-
crystalline/ poly-crystalline silicon solar cells to be connected in series parallel
arrangement. Each module shall be completely encapsulated and sealed to
provide reliable operation under adverse climatic conditions.
The SPV modules shall comply with the requirement of IEC 61215 and IEC
61730. The relevant certificates shall be submitted by the firm.
Electrical requirements: The module must deliver full current to the load
corresponding to the terminal voltage of 54V, plus the diode drop and cable drop
at a maximum expected cell temperature (55 deg C).
Voltage de-rating: shall not be more than -0.5% per degree C above 25
degree C cell temperature.
It shall be provided for mounting the SPV module on any of the following
locations:-
a) Roof top
b) On the ground at an angle of tilt with horizontal, in
accordance with the latitude of the place of installation.
The steel for the mounting structure shall be as per IS 2062: 1992 and
mounting structure galvanization shall be in compliance of IS 4759 (latest issue).
The mounting arrangement shall be suitable for column mounting or flat surface
as per site requirement.
The design/drawings of the mounting structure shall be supplied along with the
module.
The mounting structure shall be suitably designed to withstand the weight of the
panel/array.
The exact mounting mechanism shall be decided as per the actual requirement
at the site of installation.
a) First stage protection to DC path, from the SPV array shall be provided with
GD tube protection between +ve and earth and ve and earth. The GD tubes
shall be provided with a proper rated fuse to avoid short circuit due to failure
of the protection component. The failure of fuse or protective device shall
create an alarm (Visual as well as Audio) to draw the immediate attention of
the maintenance staff.
b) Second Stage protection for DC shall consist of MOV between +ve to earth
and ve to earth.
Proper de-coupling using suitably rated inductance shall be provided between the
two stages for proper co-ordination.
GD Tube: not less than 10KA, having the following current >= 100Amps. The
rating of fuse used for protection of GD Tube shall be as per GD tube
specification.
MOV: 5 KA at 8/20S wave shape. The voltage rating of the MOVs shall be at
least V higher than specified value of the SPV array.
10
Environmental requirements for SPV Module/Panels: SPV Modules
shall satisfy the IEC 61215 and IEC 61730 for the module and environmental test
conditions:
Test certificates for the above performance from ETDC/any other Govt
Test Centers
Each module should have a name plate/ label on its rear side detailing product
type, rated power, rated voltage, open circuit voltage, short circuit current, all as
measured under standard test condition( STC) , weight, maximum fuse rating
etc.
Each individual module should have a unique identification alpha numeric code
which is bar coded and the label to be permanently affixed on the interior of the
module before lamination indicating the date, month and year of manufacturing.
The charge controller shall provide for all the functions, as detailed below.
It shall provide for the necessary DC power supply to the load and battery and
also protect battery bank from over charge, deep discharge, reverse polarity and
short circuit, thereby ensuring that the electrical characteristics are met for
optimum performance and reliability. It monitors all the functions of SPV power
source and SMPS (some on charge controller along with SMPS and all other on
the SMPS). It provides for termination for output of the SPV array, output of the
SMPS (through a switch, if required), load and battery. It shall have facility for
positive ground. It shall house all the necessary alarms, monitoring and control
circuits. It shall also provide for the mounting of the lightning and surge
protection devices (SPV side on the charge controller itself). The charge
controller shall also select the most optimum power source available at any
particular instance for catering the load at that instance. The priorities for
selecting the various sources shall be site settable. The factory default setting
should have solar PV source as first priority followed by EB supply and the last
option shall be DG source.
The Charge controller shall have one MCB, Multi function meter to measure
KWH, Voltage and Current of SPV Output. The CCU shall also have the capability
for Data logging, with the help of RS 232/RS 485/USB Port along with necessary
connection cable of minimum length of 1 metre, for last 4 months as per the
defined periodicity (Site Settable) of not less than One Minute for the following
parameters.
a) Array Voltage
b) Array Current
c) Array Energy output (Cumulative)
d) Battery Current
e) Battery voltage
f) Battery power
The CCU should also have facility for remote monitoring with help of GSM
modem for connection to BSNL TOC.
CCU design will ensure optimal energy transfer from the SPV system
using MPPT (Maximum Power Point Tracking) technique which
maximizes the amount of current going into the battery/load from the
11
solar array. It should have micro-controller based controls to adapt to
the changing conditions of the sun light but not just a fixed SPV voltage
for maximum energy transfer.
The Supplier shall provide one standby charge controller module of CCU as spare.
CCU should be modular in construction with power modules and Distribution,
Switching, Control and Alarm module. Should be able to increase the capacity of
the total system just by adding the SPV modules and CCU modules without
replacing the whole CCU just like SMPS system. The module controls need to be
micro-controller based. Float and Charge modes need to be like the SMPS.
i) It is at least 20C below the permissible limit for the grade of insulation.
ii) The temperature rise shall be at least 30C below the curie temperature of
the magnetic material.
iii) This temperature shall neither affect other components nor lead to fire
hazard.
The Supplier has to get SPV charge controller approved by TSEC, CGM
(QA) Bangalore within 45 days from the date of award of work,
including integration for one pro-type unit as per actual site
requirement.
All the above components shall be of reputed make and easily replaceable
type.
All the protective elements shall be cartridge type.
12
Charge controller Unit: Electrical Requirements:
Voltage to Load and battery: The SPV voltage at the output of the charge
controller shall be limited to 55.2V for 48V power supplies.
Efficiency: Efficiency of the charge controller at full load and rated output
voltage of 54V for 48V power supply respectively shall be in excess of 90% while
working on SPV power source.
Protections : The charge controller shall provide for the control circuitry
using solid state switching techniques to incorporate suitable protections (with a
tolerance of +/- 1% for DC voltage and current) to safeguard circuit against the
following conditions:
a) DC over voltage :
Charge controller: The output voltage of the charge controller shall
be limited to 55.2 V for 48 V power supply. In case the charge controller
output voltage exceeds 56V for 48V power supply due to failure of the
voltage control device provided to control the SPV Power Source voltage,
the SPV power source shall be isolated automatically, creating alarm. SPV
power source shall get reconnected when the load voltage falls below the
specified level, which corresponds to output voltage of 55.2V for 48V
power supplies.
1. Negative DC output.
2. Against failure of control sensing circuit.
13
Note : 1. Use of mechanical switching devices such as relays etc. is not
permitted in the control circuit. MCBs are, however, permitted for
short circuit protection only. But these can be used in the power
circuit to limit the inrush current and isolation purposes.
2. Two fuses (minimum) of each type shall be provided with each unit.
These fuses shall be kept inside the unit in an enclosure. For logic
power, re-settable fuses must be used.
All the alarm circuits shall be provided with solid state technology. Use of
electromechanical relays is precluded.
All the alarms shall be DC only. All alarm circuits shall be provided with suitable
delay to ensure that they do not operate to transients.
Every Alarm condition shall be accompanied with an audio alarm with a non-
locking type audio cut-off facility.
Two Potential Free Contacts (one for alarm and one redundant) shall be provided
for extension of alarm to centralized display.
All indications shall be suitably designated and there shall be provision for their
easy identification from a distance of at least 3 meters.
A manual reset switch (non-locking/push button type) for disabling audio alarm
shall be provided. In such case, the visual indication shall continue for the
receive attention, till the fault is attended and rectified.
The unit shall only be based on menu driven Micro Processor Controlled
Techniques for Modules, for control, monitoring and alarms. Setting of all the
parameters shall be through menu-driven microprocessor control only. Use of
potentiometer for setting of parameters is not permitted. The power
supply shall be RS 485 compatible.
Dimensions: The dimensions of the charge controller unit shall be minimum but
sufficient to house all the components, including battery and lightning protection
section. It shall take care of the thermal engineering requirements of the unit.
Note 1: Only approved MCBs which do not produce spark, while manually,
isolating or connecting the battery.
14
Note 2: Battery shall be protected against the short circuit from any source
including control and sensing circuitry.
4. Battery Bank : The Battery shall be mounted in the stand and shall be
accommodated in the weather proof MS shelter/ MS box suitable for IP-55
Protection supplied along with the battery bank. The battery stand and box
/shelter shall be made M.S and shall have sufficient mechanical strength.
For 48V Power supply, a 24 cell battery formed by 2V cells is used. Mono-block
are not permissible for the purpose.
The vendor will supply VRLA batteries having TSEC approval by CGM
(QA), Bangalore.
The vendor should get his prototype battery tested for incremental test
for solar application as per the GR from BSNL QA, before supply.
The Length of the interconnecting cables shall be as per the requirement of the
site. The gauge of the cable shall be so chosen that the total voltage drop across
the whole length of cable shall be less than 340mV (2% of voltage at peak
power) for 48V SPV power generating source. It shall also be capable of taking
load without overheating. The termination of the cables shall be through lugs of
suitable gauge. The cables used shall be fire retardant and suitable for outdoor
application.
6. General Requirements
The structure of the unit/rack shall be made up of rigid frame work of MS steel
profiles with proper ventilating arrangements. The structural strength of the
framework shall be able to withstand the ultimate mechanical load of the
unit/rack without any deformity. Unit/rack shall be free of sharp edges or sharp
corners. The unit/rack shall have suitable ventilating arrangements (forced
cooling from the sides is not permitted). The front door (if provided) and rear
door may be of hinged or removable type. The gauge of metal sheet for panels
shall not be less than 2mm.
The battery is mounted inside the shelter; the battery mounting fixture shall be
such as to hold the battery firmly in position in any orientation. Proper sign
showing the orientation of the unit shall be marked.
15
Provision for mounting the charge controller unit on the wall as well as Floor to
be provided.
All the components mounted on the PCB shall be permanently fixed To PCB. Use
of mounting sockets for components is not allowed.
The unit or rack shall ensure uniform floor loading below 320 kg/Sq metre.
7. DC Terminations:
At the input and output, proper rated fuses and circuit breakers shall be
provided on the ve lead from the unit. All DC +ve and ve leads shall be
clearly marked.
The fuse or circuit breakers with current limiting devices used, shall be
accessible and properly rated.
The DC output to Battery and Load shall be through cable/bus-bars as per
requirement. However, for inter-rack connections, cables of proper rating
permitted.
The isolation of any of the battery from the load shall create an alarm.
All the AC, DC Control & alarm cabling shall be supplied with the rack.
8.Cabling and Wiring : All insulated conductors except those within confines of
a printed circuit board assembly shall be of the rating enough to withstand the
maximum current and voltage during fault and overload. The wires and cables
used shall be fire retardant as per IS 1554 with amendment 1 (June 94). It shall
be neatly secured in position and adequately supported. Where wires pass
through any of metal panel or cover, the hole through which they pass shall be
suitably bushed.
9. Meters: There shall be provision to monitor the voltage and current and
KWH generated by solar PV system as given below:
Current : +/- 1.0 % of the range or better, shall be able to read up to full digit
for meter range 100A and 1 place decimal for lower meter range.
16
Voltage : +/- 1.0% of the range or better with a resolution of one decimal point
in case of DC voltmeter.
Fuse holder identification shall include details of fuse rating & type.
14. Name Plate: A name plate, anodized shall be suitably fixed to the modules
of the glass), iron structure and charge controller with the following:
The vendor has to perform the weekly check at site including cleaning of the
panel etc.
All wiring shall be neatly secured in position and adequately supported Metal
panel or cover holes through which the wires or cables pass shall be bushed.
18
Installation, Operation and Maintenance manual part shall include:
Hard copy of the documentation shall be prepared using good quality paper with
clear and crisp printing. All the drawings in clear printing shall be attached to
the hand book binding. The binding of the manual shall be long lasting and
presentable. One set of flow chart drawings necessary for trouble shooting shall
be provided with lamination, with each manual.
(b) The firm without any extra cost will supply variable resistive load for testing of battery.
In case of failure of the SPV module, Battery & system during testing, all equipments
necessary for testing shall be provided again free of cost. In case of failure of the SPV
module, battery & system during testing, the department reserves the right to reject
the complete set. Decision of Engineer-in-Charge in this regard shall be final
22. ACCESSORIES
All standard accessories required for SPV power generation, battery bank, shall
be got from the manufactures as a part of equipment.
19
23. OTHER CONDITIONS
(i) The firm should note that offers with condition and/ or conditional rebates other
than technical offer will be summarily rejected.
(ii) The rates for all items of work, shall, unless clearly specified otherwise, include
cost of all labour, materials and other inputs involved in the execution of the
item.
(iii) The layout of the work will be given by the Engineer-in charge or his duly
authorized representative at site of works.
(iv) The work will be done as per current CPWD/ BSNL /TEC Specification.
(v) The contractor has to test the panel and bus bar for the insulation for which
nothing extra is payable.
(vi) Inter connection between bus bar and switch of capacity 100 Amps. & above will
be done with solid copper conductor with PVC Insulation.
(vii) The route for the cable laying should be got approved by the Engineer-in Charge.
(viii) Under ground cables should be subjected to pressure Insulation test before and
after laying the same in the ducts. In case of unsatisfactory result the cost of all
repairs and replacement and all extra work of removal and relaying will have to
be borne by the contractor.
(ix) The contractor has to arrange the following test
a) Earthing test. b) Insulation test. c) Continuity test.
xi) Any damage done to the building during the execution will have to be made good
to the entire satisfaction of Engineer-in-charge.
xii) Only ISI marked material shall be used. In case ISI marked is not available in
particular item, material conforming to BS, shall be provided.
25.Terms of Payment :
Payment to the contractors, during progress of work, will be regulated as below:-
Supply agreement:
a) 70% of prorata of the approved price breakup of contract value on
receipt of equipment at site and after satisfactory physical installation and
seven days testing at site
b) 10% of the approved value of supply portion at the end of I year (to be paid
on quarterly basis @2.5% at the end of each quarter for the comprehensive
maintenance including weekly checks, the firm is required to submit the
satisfactory working certificate for each weekly visit) .
c) 10% of the approved value of supply portion at the end of II year (to be paid
on quarterly basis @2.5% at the end of each quarter for the comprehensive
maintenance including weekly checks, the firm is required to submit the
satisfactory working certificate for each weekly visit).
d) 10% of the approved value of supply portion at the end of III year (to be
paid on quarterly basis @2.5% at the end of each quarter for the
comprehensive maintenance including weekly checks, the firm is required to
submit the satisfactory working certificate for each weekly visit)
ITC agreement:
a) 100% of pro-rata of the approved price breakup of ITC part (i.e part
B) after installation and commissioning and seven days of testing at site.
NOTE:
1) These SPV power supplies shall be capable of generating minimum of 7900
KWH per year. Final Reading of the same shall be taken at the end of 12
months from date of commissioning.
2) If the SPV Energy Generated falls short of expected 7900 KWH in first year,
a recovery on prorate basis of awarded amount shall be made from the
performance Guarantee/balance amount due to the firm.
3) If the SPV Energy Generated is in excess of 8400 KWH in first year, a bonus
on excess units exceeding 8400 KWH @ Rs 5/KWH (for the first year only)
shall be paid to the firm along with the release of Security Deposit.
4) The Supplier has to get SPV charge controller approved by TSEC,
CGM (QA) Bangalore within 45 days from the date of award, failing
which the Performance Guarantee of 5% will be forfeited and the
agreement will be terminated.
WEEKLY CHECK:
1 The vendor has to perform the weekly check at site including cleaning of the panel
etc
MONTHLY CHECK:
2 Check the charge controller for proper alarms indications & proper functioning by
operating Alarm Check Key.
3 For VRLA batteries check the voltages :
Between 13.00 and 14 hours on a bright sunny day for any mark deviation in cell
voltages (the indication of cell deterioration).
21
4 After 2 hours of discharge to know the charge condition of the battery or any sign of
deterioration.
5 Follow the battery maintenance guidelines issued by the manufacturer.
5. Inspect the modules/panels of the array for any damage.
6. Check the wiring for physical damage & also for any sign of excessive heating.
7. Check all the junction Boxes for covers and sealing.
8. Check the nut-bolts of the mounting structure and array for proper torque &
tightening.
9. Inspect the modules/panels of the array for any damage.
10. Check the battery terminals for corrosion & proper torque clean and apply
anti-oxydent jelly if necessary.
11.The Battery shall be boost charged once in a month for 18hrs to 24 hrs @ 2.3V
QUARTERLY:
22
27. Technical Particulars [To be filled by Vendor]
23
28.APPROVED MAKES
Battery :Valve Regulated Lead Acid The vendor will supply VRLA batteries
A (VRLA) Batteries 2V - 600 AH having TSEC approval by CGM (QA), BSNL
Bangalore.
Note: Any other items which do not have specific approvals, shall be provided after obtaining
approval of Engineer in charge.
24
LIGHTNING &
SURGE
SPV
PROTECTIVE
POWER
DEVICES ON THE
CONTROL
OUTSIDE OF THE
PROTECTI
CHARGE
ON
CONTROLLER
ALARM
UNIT
Existing
FR FC
UNIT
(SMPS
POWER
PLANT)
AMF/Change
Over Panel
D
G
25
30. TYPICAL TEST FORMAT FOR BATTERY BANK (600Ah):
CELL N.L F.L 1ST HR 2ND HR 3RD HR 4TH HR 5TH HR 6TH HR 7TH HR 8TH HR
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
BTRY
VOLT
Note: 1) Discharge Test to be conducted for 10 Hours for a fully charged Battery Bank, discharge
rate @ 10% of Total Capacity.
2) Individual Cell Voltage should not fall below 1.74V at any time.
3) Battery Bank Voltage should not fall below 44V at any time.
4) Two Battery Banks to be tested at separate intervals.
5) Interconnecting wires, Control Switch gear, Resistive Load, Suitable Shunt for measuring
discharge current ( 60A) etc to be provided by
Firm for the Test.
26
(31) TEST SCHEDULE FOR MF-VRLA BATTERY SET
2. CAPACITY TEST :-
27