10. Ml. 12, Clean up the obstruction at drillhote position and along access Set out drillhole locations and agree locations with the Engineer. Carry out underground utilities survey at drillhole locations by competent person, Erect the scaffolding and access bridge for drilling works where necessary. Excavate inspection pits to expose the underground utilities, Mobilize drilling rigs and drilling equipment to site. Set up drilling rig at drillhole position. Drilling operations: (a) Sink P/FUN size casing vertically by rotary drilling method with foam as flushing medium, () For soil Take soil samples and carry out in-situ tests at specified depth in drillhole until rockhead or specified depth is achieved. (© For Boulder/Cobbles/Dedrock: Use T2-101/TNW double tube core barrel to drill through boulder/ bedrock layers and obtain rockcores. When meet the termination criteria or upon receiving Engineer’s instruction to terminate drilling, install instrumentation (if any), extract all casings and backfill with cement grout and reinstate finished surface to its original condition. Move drilling rig and equipment to next drillhole position, Repeat step “5S” to “10” until all drillhole are completed. Demobilize drilling rigs and equipment off site. - End -

You might also like