DATA SHEET

3
Oil Storage Tank 200m
FOAIE DE DATE
3
Rezervor Stocare iei 200 m

PETROM PROJECT NO. : ROA02164227803

LOCATION: Park 2 Fureti

EQUIPMENT NUMBER: TK-007840

EQUIPMENT SERVICE: Oil Storage Tank

SERIAL NUMBER:

REQ / SPEC NO. :

PURCH ORDER NO. :

CP-92 PROJECT NO. : 1889

Issued for review /


01 5.04.2017 M.D.V. A.N.G. M.N.
Emis pentru verificare
Rev. Date Description Prepared Checked Approved
No. Data Descriere Intocmit Verificat Aprobat
Client Doc.: Phase
PU-P-ROA02164227803- DE-ME-DTA-001-01-B
Nr. Doc. Client Faza

Doc.No.:
DE
Nr. Doc.
Project Title : Page no.:
Titlul proiectului Pagina nr.
OIL STORAGE TANK 200 MC
PARK 2 FURETI /
REZERVOR STOCARE 200 MC 1 of 8
PARC 2 FURETI
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 2 of 8
no. :

Details of revisions made to this document after approval shall be recorded on this sheet.
Modificarile aduse acestui document dupa aprobarea se inregistreaza pe aceasta foaie.

Section/ Description/ Page/


Rev.
Sectiune Descriere Pagina
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 3 of 8
no. :

1 Item No. TK-007840 Number required 1


2 Equipment name Oil Storage Tank Design code SR EN 14015
3 Manufacturer Place of manufacture workshop on site
4 Site-Location outdoor indoor
5 Special service no CO2 H2S chloride
6 Requisition No. o sour gas service naphtenic acid
7 P&ID-Diagram No. C-Pl-DR-2MA-22F Compulsory calibration yes no
8 OPERATING DATA
9 Product stored Oil & Water Holding temperature [C] 20
10 Product toxic yes no Density at 15 C / holding t [kg/m3] 825.1 / -
11 Class of product NFPA Other n/a Kin. viscosity at min./ max. temp. [cSt] 4.81 / 3.10
12 Emission control 97/11/CE n/a Specific heat Cp [kJ/kgC] TBD
13 Erosion / Corrosion n/a / n/a Flash point / pour point [C] < 21 / 6
14 H2S / Chloride content [ppm] / 0.001% - 0.102kg/vag Vapor pressure [bar abs] TBD
15 Tendency to foam 24gr yes 30cm no Max. pumping rate in / out [m/h] 25 / 12
16 Operat. temp. min. / max. [C] 25 / 40 Nominal capacity (brutto) (2) [m] 210
17 Operat. press. min. / max. [bar abs] ATM / ATM Net work. capacity (1) [m] 200
18 Relief valve set press. (30) [bar ga] -0.005 / 0.027 Liquid level low / high (33) (3) [m] 0.45 / 5.7
19 MECHANICAL DATA
20 Design metal temp. min. / max. [C] -29 / +60 Joint efficiency [%] 100
21 Design pressure : [bar ga] 0.025 / -0.004 Corrosion allowance:
22 Test press. : hydrostatic [bar ga] full of water - tank shell / fixed roof / bottom [mm] 3 / 1 / 3
23 pneumatic [bar ga] - retention shell / double shell [mm] n/a / n/a
24 Specific design gravity [kg/m3] 825.1 - int.floating roof/ext.floating roof [mm] n/a / n/a
25 - structurals (roof girders etc.) [mm] 1.5 (on each side)
26 Tank size : Roof to shell detail acc. code (by vendor)
27 - inside diameter [mm] 6690 Wind girder : acc. code (by vendor)
28 - height [mm] 6000 - top (used as walkway) yes no
29 - intermediate yes no
30 Tank with retention / double shell : NO Roof type fixed roof selfsupported supported
31 - inside diameter [mm] n/a / n/a (6) cone (1 : 5) dome
32 - height from bottom (minimum) [mm] n/a Floating roof type external floating internal floating
33 pontoon type by vendor
34 No. of shell courses : Type of seal design n/a
35 - tank shell 3
36 - retention shell n/a Roof plate joint seams lap butt
37 Plate width and thickness incl. corr. allowance: (4) - thickness (4) [mm] 6 (*)
38 Plate width Plate thickness Undertank leak detection (8) yes no
39 No. [mm] [mm] - type pipe on elastic bed outward
40 Tank Shell Retent. Shell Tank Shell Retent. Shell Cathodic protection yes no by others
41 1 2000 n/a 7 (*) n/a Type-Internal sacrificial anodes
42 2 2000 n/a 6 (*) n/a PWHT / Stress relieving yes no
43 3 2000 n/a 6 (*) n/a - process requirement yes no
44 4 complete tank yes no
45 5 - partial stress relieving yes no n/a
46 6 required by Code
47 7 Gas blanketing yes no
48 8+ - pressure [bar ga]
49 - type of gas
50 Tank bottom : (4)
51 - bott. plate thickness [mm] 9 (*) Type of foundation concrete ring wall concrete base plate
52 - bottom plate seams lap butt earth foundation
53 - slope 10 [mm/m] to centre from centre no Foundation loads :
54 [mm/m] to one side (see also sheet 7) - max. moment at base [kg m] by vendor
55 Annular plate : (4) yes no - max. shear force at base [kg] by vendor
56 - width [mm] n/a
57 - thickness [mm] n/a Foundation anchors : (7) by vendor
58 Draw-off sump : (4) (5) yes no - no. of anchors / size 12 / M30
59 - diameter / height [mm] 600 / 100 - anchor circle diameter [mm] 6930
60 - plate thickness [mm] 9 (*) - anchor
North =circle
0diameter first anchor at XX (CW)
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 4 of 8
no. :

1 Item No. TK-007840


2 MATERIAL SPECIFICATION TANK INSULATION & HEATING
3 Shell, Retent. shell / bottom S235J2 / S235J2 Insulation required yes no by others
4 Fixed roof / Floating roof S235J2 / n/a Insulation type HC CC PP
5 Nozzle pipe / flanges P275NL1 / P285NH - thickness shell / roof [mm] 70 (TBD) / 70 (TBD)
6 Ext. attachments / Structurals S235J2 / S235J2 Insulation supports yes no
7 Floating roof seal n/a - Clip design yes (*)
8 Heating coil / internals P235GH / P235GH - support ring design yes (*)
9 Bolts internal / external 42CrMo4QT (*) / 42CrMo4QT (*) Tank heating required yes no by others
10 Nuts internal / external 42CrMo4QT (*) / 42CrMo4QT(*) Design code SR EN 13480
11 Gaskets internal / external SR EN 1514-1,flat,IBC,graphite(35)(56) Legal code PED 97/23/EC
12 Foundation anchors Gr. 4.6 Fluidgroup 1 2 (steam) n/a
13 Earth. lug / name plate / supp. CS / SS / CS Category I II III IV n/a
14 Liquid jet mixer n/a Module G H H3 n/a
15 Water spray / foam piping TBD / P275NL1 Type of tank heating electr. heat transfer fluid
16 Construction type bottom coil
17 ACCESSORIES suction heater tank heater
18 Mixer: if required, see sheet 3 n/a vendor design
19 - circulation rate [No./h] n/a / n/a Electric supply : n/a
20 - side-entry mixer (sheet 3) yes no by others - voltage / frequency [V] / [Hz] n/a /
21 - top entry mixer yes no by others - power [kW] n/a
22 - liquid jet mixing nozzle yes no No. requ'd. : Heat transfer fluid steam
23 - manufacturer / type n/a / n/a - operat. temp. min. / max. [C] TBD / 120
24 - jet stream capacity [m/h] total: n/a - operat. press. min. / max. [bar abs] 0.5 / 1
25 - effective pressure [bar ga] est. n/a (refers at nozzle inlet) Heater / coil design (15) (18) By manufacturer
26 - total surface required (16) [m] By manufacturer
27 Access steelwork (9) (25) yes no by others - design temperature [C] By manufacturer
28 Stairs yes no - design pressure [bar ga] By manufacturer
29 - typ / angle to horizontal [] spiral stairway / 45 - corr. allowance (each side) [mm] By manufacturer
30 Roof platform (34) yes (TBD) platform axis no - hydrostatic test pressure [bar ga] acc. Design code
31 Ladder / walkway (12) yes, see sheet ---- no DESIGN
32 Railing yes no Design code API 620 API 650 API 12F EN 14015
33 - around roof yes no Constr. code API 620 API 650 API 12F EN 14015
34 - to centre of tank yes no Fire fighting NFPA EN 13656 P118-2/2013
35 Piping class SR EN 13480 ASME B31.3
36 Fire fighting system yes no see sheet Shell design Basic standard API SR EN 14015
37 Water spray lines : yes no API 650 Appendix A API 650 Appendix F
38 - tankroof yes no Roof design Basic standard API SR EN 14015
39 - tankshell yes no API 650 Appendix C (external floating)
40 - retention shell yes no API 650 Appendix H (internal floating)
41 Foam connections : yes no Roof design information :
42 - tank yes no - uniform life load [kN/m] 2.5
43 - retention shell yes no - special loads [kN/m] by manufacturer
44 - insulation load [kN/m] n/a
45 Internal piping of : yes no - snow load [kN/m] 2.0
46 - swing line yes no n/a Frangible roof joint yes no
47 - suction line (N- ) yes no n/a Emergency vent. acc. SR EN 14015 yes no (13)
48 - jet mixing nozzles yes no n/a Nozzle load calculation acc. to W.R.C. SR EN 13445
49 - nozzle N- n/a - allowable nozzle loads by manufacturer
50 Instruments / safety devices yes no by others - min. nozzle loads acc. to spec. yes
51 Tank gauge (level indicator) yes no by others Earthquake design yes no
52 Safety valve yes no SR EN 1998-1 SR EN 1998-1/NA:2008 P100-1/2013
53 Sampling device yes no by others Technical specification (additional) yes
54 Setting marks yes 4 pcs. no - design peak ground acc.horizontal ag= 0.20 g
55 Earthing lugs yes 4 pcs. no - design peak ground acc.vertical avg= 0.14 g
56 Corrosion gauge yes no - response spectra (horizontal) Tc= 1.0 s
57 Name plate : yes by others - response spectra (vertical) Tcv= 0.45 s
58 - according to API SR EN 14015 Wind Load - according to :
59 - engraved by Vendor by others SR EN 1991-1-4 SR EN 1991-1-4/NB:2007 CR 1-1-4/2012
60 Spares : - basic wind velocity vb.0 = 30 m/s
61 - gaskets [sets] 2 - dynamic wind pressure qb= 0.5 kPa
62 - bolts / nuts [%] 10 (min. 1 of each) Snow Load - according to :
63 - rupture disc [sets] yes no 3 (Disc sticla) SR EN 1991-1-3 SR EN 1991-1-3/NA:2006 CR 1-1-3/2012
64 Mechanical level device yes (with MIRA) no (61) - value of snow load on ground Sk(S0,k)= 2.0 kN/m
65 Electrodes for field erection yes no Min. / max. temperature -29 C / +42 C
66 Foundation anchors yes no by others Rainfall - acc.to : STAS 9470/1973 Diagram no.10
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 5 of 8
no. :

1 Item No. TK-007840


2 INSPECTION SURFACE TREATMENT
3 Design Examination by: yes no Scale to be shotblasted in shop yes
4 According to Romanian Law Shop painting yes no
5 (only primer)
6 Inspection acc. : (41) API SR EN 14015 Field painting : (23) yes no by others
7 - retention shell internal yes no n/a
8 Inspection by : external yes no n/a
9 - shop Client - tank shell internal yes no
10 - field Client external yes no
11 - foundation (17) Client / ISC - bottom internal yes no
12 Conformity Marking yes (19) (20) underside yes no
13 TESTING - roof external yes no
14 Leak testing API SR EN 14015 underside yes no
15 - bottom Vacuum box - floating roof upperside yes no n/a
16 - shell by hydrostatic test underside yes no
17 - fixed roof Structural steel, stairway, etc. (9) painted hot dip galvanised
18 - floating roof n/a Foam / spray piping on tank
19 Mill test reports required yes, EN 10024 no - foam piping painted hot dip galvanised
20 - plate / flange / nozzle pipe / / - spray piping painted hot dip galvanised
21 - structural shapes Applicable painting specification
22 - bolts, nuts / gaskets / Coating of tank (internal) : yes no n/a
23 - roof yes no
24 Weld examination : - tank bottom yes no
25 - radiography (shell) API EN 14015 Requ. Spec. - height of coating on shell [m] 6.00 (all shell height)
26 - radiography (heating coil) n/a - material Epoxy Lining
27 Supplementary tests: yes no - applicable specification Annex 1-Technical Spec.
28 - ultrasonic (US) yes no Coating of retention shell (internal.) : yes no n/a
29 - magnetic particle (MP) yes no (shell to bottom weld) - retention shell bottom yes no n/a
30 - liquid penetration (LP) yes no - height of coating on shell [m] n/a
31 - material n/a
32 Test / Certif. for heat coil EN 13480 others n/a - applicable specification n/a
33
34 Max. hardness of base material [HB] 140 Pickling and passivating yes no
35 CONSTRUCTION AND OPERATING DATA FOR MIXER n/a
36 Item no. / No. required n/a / n/a Guideline to be considered ATEX 94/9/EC
37 Location (Nozzle) n/a CE-Marking required yes no
38 Type / Design fixed-offset angle swivel-angle Mixer data by vendor: n/a
39 To be operated at continuously filling draw off Mixer model no.
40 Circulation rate [1/h] n/a Motor
41 Duration time [h] n/a - Manufacturer
42 - Speed [rad/s]
43 Liquid level control system yes no - Installed power [kW]
44 Liquiphant Pressure switch Gear box
45 Mixer drive Motor Gear box belt - Ratio
46 Techn. spec. for motor Spec.-number - Manufacturer
47 Shaft coupling / Shaft seal
48 Shaft seal mechanical packed stuffing box Shaft OD / Length from mount. flange [mm] /
49 - shaft shut-off device yes no Shaft design solid hollow
50 Vibration level ISO 10816 Propeller dia. / number of blades [mm] / [no.] /
51 Sound power level [dB(A)] Propeller blades removable from shaft yes no
52 Sound press. level [dB(A)] Mounting flange [DN / PN] /
53 Testing Dry perform. test Wet perform. test Details of swifel-angle arrangement
54 Pressure / leakage test Details of shaft shut-off device
55 BOLTING
56 Nozzle ISO metric bolts with reduced shank Manhole ISO metric bolts with reduced shank
57 flange bolting inch (UNC/UN) stud bolts with 2 nuts flange bolting inch (UNC/UN) stud bolts with 2 nuts
58 WEIGHTS & SHIPPING INFORMATION ERECTION
59 Erection weight [kg] appr. 16300 (*) Methode of erection :
60 Filled with medium (24) [kg] appr. 182000 (*) - in one part (shop fabricated) yes no
61 Filled with water (24) [kg] appr. 227500 (*) - jacking up method yes no
62 Total shipping weight [kg] appr. 16700 (*) - flotation method yes no
63 Clips (platforms / ladder / pipes) [kg] appr. - progressiv assembly and welding yes no
64 Platform / stairs etc. (25) [kg] appr. 950 / Erection by others yes no
65 Weight of side-entry mixer [kg] appr. n/a Erection procedure yes no n/a
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 6 of 8
no. :

1 Item No. TK-007840


2 FIXED ROOF - NOZZLE DATA LIST
3 Code requirement for flange standard ANSI B16.5 SR EN 1092-1 SR EN 1759-1 SR EN 14015
4 MARK NOZZLE NOZZLE FLANGE FLANGE GASKET ORIEN- DISTANCE
SIZE RATING FACING TYPE TYPE TATION FROM
5 REMARKS
DESCRIPTION north=0 CENTER
6 [NPS/DN] PN (**)
7 [] [mm]
8 N14 hold PN16 B1 11 IBC BREATHING VALVE 310 2000 with flame arrestor
9 N15 hold PN16 B1 11 IBC PSV 310 2800
10 N16 DN 150 PN16 B1 11 IBC SPARE 340 2000 with blind flange
11 N17 DN 500 acc. to SR EN 14015 ROOF MANHOLE 336 2800
12 N18 DN 150 PN16 B1 11 IBC SAMPLE NOZZLE 336 2800 On roof manhole
13
14
15
16
17
18
19
20 TANK SHELL - NOZZLE DATA LIST
21 Code requirement for flange standard ANSI B16.5 SR EN 1092-1 SR EN 1759-1 SR EN 14015
22 MARK NOZZLE NOZZLE FLANGE FLANGE GASKET ORIEN- HEIGHT
SIZE RATING FACING TYPE TYPE TATION FROM
23 REMARKS
DESCRIPTION north=0 BOTTOM
24 [NPS/DN] [PN] (26)
25 [] [mm]
26 N1 DN 100 PN16 B1 11 IBC INLET 7 300 from pumps
27 N2 DN 100 PN16 B1 11 IBC DRAIN 0 300 (55) with elbow to pit
28 N3 DN 150 PN16 B1 11 IBC OUTLET 351 300
29 N4 DN 100 PN16 B1 11 IBC INLET 223 300 from prod. wells
30 N5 DN 80 PN16 B1 11 IBC FOAM 310 5850 with baffle plate
31 N6 DN 80 PN16 B1 11 IBC FOAM 130 5850 with baffle plate
32 N7 DN 50 PN16 B1 11 IBC STEAM INLET 25 350
33 N8 DN 50 PN16 B1 11 IBC STEAM OUTLET 38 350
34 N9 DN 50 PN16 B1 11 IBC TERMOMETER 317 450
35 N10 DN 150 PN16 B1 11 IBC SPARE 341 300 with blind flange
36 N11 DN 100 PN16 B1 11 IBC SPARE 326 300 with blind flange
37 N12 DN 100 PN16 B1 11 IBC OVERFLOW 15 5800
38 N13 DN 600 acc. to SR EN 14015 SHELL MANHOLE 151 750 with davit
39
40
41
42
43
44
45
46
47
48
49 NOTE: Height are related to upper part of bottom plate (0.00).
50
51
52
53
54
55
56
57
58
59
60
60
61
62
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 7 of 8
no. :

1 Item No. TK-007840


2 REMARKS
3 Applicable.
4 Vendor shall design / provide / supply accordingly. (33) Min. 100mm above the pipe inlet in the steam coil
5 Data / information must be compl. by the bidder with the bid
6 Abbreviations :
7 EN = European Norme (34) Nozzles and manhole to be arranged (located) as close as possible
8 B.S. = British Standard Code to each other to be operated from one platform
9 U.B.C. = Uniform Building Code
10 HC = Heat Conservation (35) Gasket type: Spiral wound
11 CC = Cold Conservation Gasket with inner and centerring ring, thickness 4,5 mm
12 PP = Personnel Protection Material: Spiral => SS type, Inner Ring => SS type,
Centerring Ring => CS, galvanised, Filler => Graphit
13 W.R.C. = Welding Research Council
14 LWN = Long Welding Neck Flange
15 WN = Welding Neck Flange (41) Inspections during site fabrication and site erection by purchaser
16 SO = Slip On Flange
17 PWHT = Post Weld Heat Treatment
18 NFPA = National Fire Protection Association. (55) To be located near shell manway for drainage
19 CS = Carbon Steel
20 KCS = Killed Carbon Steel (56) Gaskets to be specified by vendor considering product stored and
21 SS = Stainless Steel design data
22
23 (61) MIRA to be located near roof manhole for maintenance
24
25 n/a = not applicable
26 PED = Pressure Equipment Directive (62) It is not allowed to use for tanks joints (welded or screwed) on main
27 GENERAL NOTES steel structures when their length is less than 12m
28 (1) Volume betw. liquid level low (LLL) and liquid level high (LLH)
29 (2) Volume between tank bottom and the top incl. top angle.
30 (3) Liquid level high (LLH) = distance from top angle
31
32 (4) Minimum thickness according to code and/or specifcation
33 (5) To be located near shell manway to facilitate cleaning of sump.
34
35 (6) Vendor to advise with the bid the type of roof, roof support
36 (rafters, girders, rafters on trusses, with or without columns)
37 (7) Only if necessary according to calculation
38
39 (8) Vendor to supply with the bid the certification / permit for leak
40 dectection system.
41 (9) According to specification for steelwork
42
43 (13) If code does not allow for frangible roof joint or in addition
44 emergency venting devices are required.
45
46 (15) Sloped towards condensate outlet nozzles
47 PED 97/23 EC only for heating coil
48 (16) Except for bottom coil, data to be checked and confirmed or
49 supplied by vendor to guarantee thermal design
50
51 (17) Witnessed by purchasers representative incl. preparing and
52 dimensional protocol.
53 (18) Internal flanged connections are not permitted
54 (19) Vendor to submit with the bid the authorization for stamping the
55 tank.
56 (20) The heating coil shall be marked by CE-Marking.
57 (23) Field application according to painting specification
58 (24) Including all internal and external attachments
59 (25) If platforms, stairs, walkways etc. are in scope of supply of tank
60 vendor, the approx. weight for these structural parts to be advised
61 in the quotation
62 (26) For the lower nozzles, position of anchors to be considered
63
64 (*)-By vendor
65
OIL STORAGE TANK 200 MC Client PU-P-ROA02164227803-
PARK 2 FURETI / Doc.: DE-ME-DTA-001-01-B
REZERVOR STOCARE 200 MC Doc.
PARC 2 FURETI no. :
DATA SHEET Rev.
01
Oil Storage Tank 200m3 no. :
FOAIE DE DATE Page
Rezervor Stocare iei 200 m3 8 of 8
no. :

Item No. TK-007840